About this file
This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, interior renovations including demolition and new construction, data center renovations, physical security enhancements, fiber optic infrastructure assessment and upgrades between buildings, installation of a diversified wide area network path to the datacenter, and hazardous material abatement. The project involves construction and renovation activities in buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 50
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
2 2
2 2
2 2
2 2
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
DN
UP
DN
DN
29' - 4"
4' - 0"
55ET403a
55ET403a
B.4
C
D
F
H
B
E
G
J
8.2
D.3
D.4
8.48765432 7.9
H.8
J.1
H.4
6.46.11.9 5.8
A
TR
3A120
PROGRAM MANAGER
3A121
A R
E A
A
55ET403a
3 Group Room
3A 101
Work Area & Storage
3A 173
Group Room
3A 102
SP
3A 172
Corridor
C3-6
Corridor
C3-13
Group Room, Large
3A 100
P. Toilet
3A 106
Corridor
C3-13
Waiting
3A 108
Reception
3A 105
Group Room
3A 103
Counseling A
3A 143
Counseling A
3A 145
Counseling A
3A 147
Counseling B
3A 151
Counseling B
3A 153 Counseling A
3A 150
SP
3A 171
SP
3A 169
Counseling B
3A 167
Counseling B
3A 165Counseling B
3A 163
Counseling B
3A 161
Secretary GER
3A 116
Print Room
3A 166 Elec.
3A 168
Print Room
3A 136
Counseling, Student
3A 118
Counseling, Student
3A 115
Counseling B
3A 152 Counseling B
3A 154
Ger. Counseling
3A 127
Elec.
3A 129
Counseling A
3A 144
Counseling A
3A 142
Program Manager GER
3A 122
Counseling A
3A 138
Patient Toilet
3A 160
Ger. Counseling
3A 134
Ger. Counseling
3A 133
Ger. Counseling
3A 125
Ger. Counseling
3A 126 Ger. Counseling
3A 128
Ger. Counseling
3A 130
Ger. Counseling
3A 132
Counseling A
3A 149
Counseling A
3A 141
Counseling B
3A 155 Counseling B
3A 157 Counseling B
3A 158
Counseling B
3A 159
Counseling A
3A 135
Patient Toilet
3A 114
Staff Toilet
3A 162 Lounge
3A 170
Patient Toilet
3A 148
Staff Toilet
3A 137
Counseling A
3A 139
Mechanical
3M 1
P. Toilet
3A 107
Injection
3A 111 Intake
3A 110
Pharmacist Office
3A 113
Intake
3A 109
Counseling A
3A 140
Computer Kiosk
3A 104
DATA SYSTEM
3A 119
Stair #1-3
2C159
Corridor
C3-7
Corridor
C3-8
Corridor
C3-9
Corridor
C3-11
Corridor
C3-12
Secretary A & B
3A 117
Counseling B
3A 156
Counseling A
3A 146
PC Exam
3A 131
Counseling B
3A 164
Housekeeping
3A 112
Oxygen
3M 1A
Vac.
3M 1B
Elevator Machine Room
3B 100
3 4
DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE
SERVED FROM TELECOMMUNICATION ROOM 3A120.
ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;
CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS
AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS
DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.
TYP
EXISTING CABLE TRAY
THROUGHOUT CORRIDORS
NOT SHOWN FOR CLARITY.
USE EXISTING CABLE TRAY
TO ROUTE FIBER-OPTIC
BACKBONE CABLING AS
REQUIRED.
AREA A
AREA OF WORK
- 1" = 10'-0"
1 BLDG 55 - FLOOR 3 - AREA A - TELECOMMUNICATIONS PLAN
GENERAL NOTES
KEY PLAN
KEY NOTES
GENERAL NOTES
1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO
REPLACE EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT
SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET
DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET FOR
ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.
ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A
CABLING. CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.
FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO
INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIREPROOFING AND ALL
REQUIRED APPERTUNANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503
FOR ADDITIONAL INFORMATION.
CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY
WILL BE REQUIRED TO BE MODIFIED/REPLACED AT EACH TR.
UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED
PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END
LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR
PACS SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS
REQUIRED. COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL
VERIFY EXACT HEAD END LOCATION AS REQUIRED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 55ET103a
BLDG 55 - FLOOR 3 - AREA A
TELECOMMUNICATIONS PLAN 55
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
0' 5' 10' 20'
PROJECT
NORTH
PROJECT
NORTH
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO
BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE
UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED
OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED
BY EXISTING CABLING AS CONDUIT FILL ALLOWS. PROVIDE RACEWAYS TO EXTEND
TO ASSOCIATED TR AS REQUIRED.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO
REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR,
MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE
INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY
FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A
CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION
OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL
IN AND AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR
PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;
DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN
RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
UP
DN
2 22 2 2
2 2
2 2
2 2
2 2 2
2 2
DN
DN
DN
29' - 4"
55ET403b
55ET403b
B.4
C
D
F
H
B
E
G
J
K
L
1312111098.2 8.8
D.3
K.8
K.4
K.6
J.7
8.3 8.5 8.7 8.9
K.3
9.88.487.9
CORRIDOR
C3-21
TR
3C149
A R
E A
B
A R
E A
A
S E
E S
H E
E T
E
T a
55ET403b
Public Elev. #1
2C148
Public Elev. #2
2C149
Service Elev. #3
2C150
GRECC Lounge
3C 154
Waiting
3C 100
Clean- Instrument, SPD, Linen
3C 102
Office - Exam
3C 139
Office - Exam
3C 137
Office - Exam
3C 124
Office - Exam
3C 122
Patient Education / Shared Conference
3C 133
Reception
3C 129a
Pat. Toilet
3C 125
Staff Toilet
3C 144
Clean Supply
3C 138
Multipurpose Office - Pharmacy
3C 140
Office - Exam
3C 121
Housekeeping
3C 156
Group Room
3A 101
Work Area & Storage
3A 173
Office - Exam
3C 141
Pat. Toilet
3C 123
Group Room
3A 102
Resident Workspace
3C 147
Exam/Multi- Purpose Office
3C 142
Waiting 2
3C 130
Pat. Toilet
3C 131
Pat. Toilet
3C 132
Office- Exam
3C 120
Wheelchair Storage
3C 118
MAS Control (Nurse Station)
3C 135
Medication
3C 127
Immunization
3C 128
Nutrition Classroom
3C 126
Office - Exam
3C 136
X-Ray
3C 107
Operatory
3C 106 Hygienist
3C 108 Operatory
3C 110 Staff Lounge
3C 114
IP Holding
3C 105
Staff Toilet
3C 115
Soiled Holding
3C 101
Storage
3C 109
Housekeeping
3C 104
Staff Work (SEPS Office)
3C 112
Public Patient Toilet
3C 111
Reception
3C 103
Elec.
3C 117
Office - Admin
3C 155
Office - Admin
3C 151
Office - Admin
3C 148
Kiosk
3C 129b
Mechanical
3M 2
Waiting 1
3C 129
Staff Toilet
3C 157
SP
3A 172
Dental Lab
C3-15
Office - Exam
3C 119
Elec.
3C 152
Women's Toilet
3B 101
Men's Toilet
3B 102
Service Elev. #3
2C158
Stair #3-3
2C160
Elevator Lobby
C3-3
Corridor
C3-2
Corridor
C3-5
Corridor
C3-14
Corridor
C3-18
Corridor
C3-20
Group Room, Large
3A 100
DATA TECH
3C 150
Pump
3C 113 Pump
3C 116
Soiled Holding
3C 146 Chief Office
3C 153
Office - Provider
3C 143
Office - Provider
3C 145
Corridor
C3-24
Intake Room
3C 134
Corridor
C3-17
P. Toilet
3A 106
Corridor
C3-25
Corridor
C3-19
Corridor
C3-22
Closet
3C 133a
Stair #2-3
2C162
Storage
3C 158
Corridor
C3-16
Group Room Storage (Future Public Elev.) #4
3B 103
Print Alcove
C3-23
Cl.
3C-112A
Elevator Machine Room
3B 100
3 4
TYP
TYP
DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE
SERVED FROM TELECOMMUNICATION ROOM 3C149
ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;
CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS
AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS
DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.
EXISTING CABLE TRAY
THROUGHOUT CORRIDORS
NOT SHOWN FOR CLARITY.
USE EXISTING CABLE TRAY
TO ROUTE FIBER-OPTIC
BACKBONE CABLING AS
REQUIRED.
AREA B
AREA OF WORK
- 1" = 10'-0"
1 BLDG 55 - FLOOR 3 - AREA B - TELECOMMUNICATIONS PLAN
KEY NOTES
GENERAL NOTES
KEY PLAN
KEY NOTES
GENERAL NOTES
0' 5' 10' 20'
1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO
REPLACE EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT
SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET
DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET FOR
ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.
ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A
CABLING. CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.
FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO
INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIREPROOFING AND ALL
REQUIRED APPURTENANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503
FOR ADDITIONAL INFORMATION.
CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY
WILL BE REQUIRED TO BE MODIFIED/REPLACED AT EACH TR.
UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED
PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END
LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR
PACS SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS
REQUIRED. COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL
VERIFY EXACT HEAD END LOCATION AS REQUIRED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 55ET103b
BLDG 55 - FLOOR 3 - AREA B -
TELECOMMUNICATIONS PLAN 55
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO
BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE
UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS
NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY
VACATED BY EXISTING CABLING AS CONDUIT FILL ALLOWS. PROVIDE RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED
TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL
LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED
FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION
OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY
INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A
CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION
OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO
SEAL IN AND AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS
FOR PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;
DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS
OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
2 2
2 2
2 2
2 22
2 2
22 22
2 2
2 2
2 2 2
2 2 2
2 2
2 2
2 2
2 2
2 2 2 2
2 2 2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
AVID MACHINE
ROOM
BB 117
IT NON - SECURE
STR
BB 121
AMD / AV
PRODUCTION
COORD
BB 143
IT CDN, SHARED
BB 144
E-LEARN PROD
OFFICE
BB 145
E-LEARN PROD
OFFICE
BB 146
E-LEARN PROD
OFFICE
BB 147
GRAPHICS
OFFICE
BB 109
GRAPHICS
OFFICE
BB 108
GRAPHICS
OFFICE
BB 107
GRAPHICS
OFFICE
BB 105
OFFICE, STUDIO
MGR
BB 104
OFFICE, STUDIO
MGR
BB 100
OFFICE
PRODUCER
BA 125
OFFICE
PRODUCER
BA 123
TR
BA 105
DATA
BA 106
ELEC
BA 107
RECYCLING
ROOM
BA 104
PROD CTL VIDEO
BA 110
STAIR 1
STAIR
WOMEN
BA 100
OFFICE, SR
ENGINEER
BA 122
NAT'L MEDIA
SVCS COORD
BA 121
OFFICE
PRODUCER
BA 120
GREEN ROOM
BA 119
DRESSING RM
BA
118A
MAKE UP
BA 118
LAN / TEL / DATA
DMARK ROOM
BA 114ENG MAINT
BA 115
OFFICE
PRODUCER
BA 116
AV PRODUCTION
SUPPORT
BA 113CONTRACTOR
WKSTNS (2)
BA 112
SUPPORT TECH
BA
112A
STUDIO
BA 109
EQPT AV STR
BA
103A
STUDIO MECH
BA
108B
MEDIA STORAGE
BA 108
DOCK /
RECEIVING
BA 103
MAIL ROOM
BA 102
MEN
BA 101
ELEV
S - 1
ELEV
P - 1
IT SECURE
STORAGE
BB 120
STORAGE,
EQUIPMENT +
SUPPLIES /
PARTS
BB 119
COMBINED
COMPUTER /
SERVER ROOM
BB 102
AVID SUITE
BB 116
AVID SUITE
BB 114
AVID SUITE
BB 113
MSTR OFFICE
SUPPLIES
BB 124
STAIR 2
STAIR
KIT
BB 126
TLT
BB 127
TLT
BB 128
SOCIAL MEDIA
BB 132
IT SYSTEM ADMIN
BB 133
IT SPECIALIST
BB 134
IT SPECIALIST
BB 135
IT SYSTEM
ADMIN, SHARED
BB 136
IT OFFICE ISO
BB 137
IT SPECIALIST,
SHARED
BB 138
OFFICE
ENGINEER
SHARED
BB 139
Room
BB 140
ELEARN PROD
BB 141
LRG COORD
BB 148
LRG PROGRAM
SUPPORT
BB 130
NORMAL
ELECTRICAL
ENTRY
BB
129A
EMERGENCY
ELECTRICAL
ENTRY
BB 129
EES ELEC
BB 125
MUSIC LIBRARY
BB 118
OFFICE EDIT
BB 115
OFFLINE EDIT
BB 112
GRAPHICS
STORAGE
BB 111
DUBBING / CDN
BB 106
AUDIO BOOTH
BB 110
COPY ROOM
BB 103
WK ROOM
BB 101 MASTER
CONTROL
BA 117
MECH
BB 123
HSKG
BB 122
LRG
CB-20
LRG
CB-19
LRG
CB-18
COLLABORATION
CB -50
56ET400
56ET400
56ET400
5.5
E
5.2
EXISTING SIDE-A FIBER-OPTIC BACKBONE BUILDING ENTRY POINT
(APPROXIMATE LOCATION). ROUTE FIBER-OPTIC CABLES. TO TRs AS
INDICATED ON COMMUNICATIONS DRAWINGS. REFERENCE
COMMUNICATIONS DRAWINGS FOR ALL FIBER-OPTIC CABLING, RACEWAY
TYPES, SPECIFICATIONS, AND RATINGS. REFERENCE KEY NOTES ON THIS
SHEET REGARDING CABLE TRAY AND VERTICAL/HORIZONTAL ROUTING
FOR ADDITIONAL FIBER BACKBONE CABLING REQUIREMENTS.
SIDE-B FIBER-OPTIC BACKBONE: REFERENCE
COMMUNICATION SHEETS FOR ADDITIONAL INFORMATION
REGARDING HANDHOLE, CONDUIT, BUILDING PENETRATIONS,
FIBER-OPTIC CABLING, AND RACEWAY INFORMATION
3 5
TYP
PROVIDE NEW FIBER DISTRIBUTION CABINETS
WITH CASSETTES IN EXISTING CABINETS 7, 8, 9
TO TERMINATE ALL CAMPUS SIDE-B FIBERS WITHIN.
LABEL ACCORDING TO DRAWINGS AND VA STANDARDS.
DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE
SERVED FROM TELECOMMUNICATIONS ROOM BA 105.
ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;
CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS
DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS DRAWINGS
FOR ALL REQUIRED FIBER-OPTIC CABLING.
2 3 4 5 6 7 86.4 6.64.84.4
B
C
D
F
4.6 sC
D.5
HANDHOLEHANDHOLE
SERVICE DEMARK
CONDUITS
MCR TO TR
DATA CONDUITS
CONNECT SIDE-A FIBER TO EXISTING
RACK WHERE CURRENT SIDE A
CONNECTION EXISTS; PROVIDE AND/OR
REPLACE EXISTING RACK HARDWARE
TO MAKE PROPER CONNECTIONS FOR A
COMPLETE AND FULLY FUNCTIONAL
SYSTEM. CONTRACTOR SHALL FIELD
VERIFY EXACT LOCATION.
EXISTING CABLE TRAY
THROUGHOUT CORRIDORS
NOT SHOWN FOR CLARITY.
USE EXISTING CABLE TRAY
TO ROUTE FIBER-OPTIC
BACKBONE CABLING AS
REQUIRED.
BLDG 56
AREA OF WORK
- 1/8" = 1'-0"
1 BLDG 56 - FLOOR 0 - TELECOMMUNICATIONS PLAN 0' 4' 8' 16'
KEY PLAN
GENERAL NOTES
KEY NOTES
1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE EXISTING
TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET FOR
ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.
ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A CABLING. CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.
FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL REQUIRED APPURTENANCES AS REQUIRED.
REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.
FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP CEILING WHEREVER POSSIBLE. UTILIZE CABLE TRAY AS APPLICABLE. PROVIDE CONDUIT SLEEVE WITH FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS ARE REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR
ADDITIONAL INFORMATION.
CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY WILL BE REQUIRED TO
BE MODIFIED/REPLACED AT EACH TR.
TERMINATE ALL SIDE-A AND SIDE-B FIBER-OPTIC CABLING TO MODIFIED DATA CABINETS AS INDICATED.
UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY EXACT HEAD
END LOCATION AS REQUIRED.
TYP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 56ET100
BLDG 56 - FLOOR 0 -
TELECOMMUNICATIONS PLAN 56
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL
POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL RACEWAYS AND
CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR
SOURCE, UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT THE EXPENSE OF THE
CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW FIRE
RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH CAT6A PORTS
AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY EXISTING CABLING.
PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING FROM EACH WAO
(WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT RUNS, OR
CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER
TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT VARIANCES
ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING TRANSPORTATION, FOR
ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE DIAGRAMMATICAL.
COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS, ARCHITECTURAL FEATURES, MECHANICAL
DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2 2 22
2 2 2
2 2 2
2 2 2
2 2 2
2 2 2
2 2
2 2 2
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
TR
1A 109
DATA
1A 108
ELEC
1A 107
MM PHOTO
STUDIO
1A 101
CONF STOR
1B
104A
CONF COATS
1B 104
HSKG
1B 103
FOOD PREP
1B 105
CONF A/V
1B 106
NCA COPY
1B 107
TLT
1B 108
ELEV
P - 1
ELEV
S - 1
WOMEN
1A 106
MEN
1A 105CONFERENCE
STOR
1A 104
CONFERENCE
STOR
1B 101
MECHANICAL
1B 102
STAIR 2
STAIR
SCURE STOR
1B 113
BREAK RM /
KITCHEN
1B 112
TLT
1B 111
CT / S
1B 110
ELEC
1B 109
REFERENCE
LIBRARY
1B 121
STOR
1B 129
COATS
1B 128
STOR
1B 127
NCA OFF
1B 122
NCA OFF
1B 123
NCA OFF
1B 124
NCA OFF
1B 125
NCA OFF
1B 126
TLT / CHG
1B
101A
VESTIBULE
C1 - 1
RECEPTION
WAITING
C1 - 4
STAFF LOUNGE
1B 100
STAFF LOUNGE
1B
100A VESTIBULE
C1 - 11
VIDEO EDIT
1A
102F
MM STORAGE
1A
102E WEB DESIGNER
1A
102D
GRAPHIC
DESIGNER / PUB
1A
102C
GRAPHIC
DESIGNER / PUB
1A
102B
CHIEF OFF
1A 102A
CLO
1A
100A
MM VIDEO CONF
1A 100
MM STORAGE
1A 103
MM WORKROOM,
ILLUSTRATOR
1A 102
BREAK OUT
1B 117
BREAK OUT
1B 116
BREAK OUT
1B 114
BREAK OUT
1B 115
LARGE
CLASSROOM
1B 118
COMPUTER LAB
1B 119
MEDIUM
CLASSROOM
1B 120
CONFERENCE
1B 130
RECEPTION
C1 - 14
STUDENT WKRM
C1 - 16
DISPLAY
C1 - 20
WAITING
C1 - 13
EWC
C1 - 7
ELEV LOBBY
C1 - 8
WORK ALCOVE
C1 - 3
56ET401
56ET401
56ET401
5.5
E
5.2
B-SIDE:
TO TR 2A122 FROM
MCR BB102, FROM
FLR 01 TO 02
3 5
TYP
STAIR 1
STAIR
PREFUNCTION
C1-12
LOBBY
C1-5
CORR
C1-6
Room
C1-7
CORRIDOR
C1-10
CORR
C1-9
CORRIDOR
C1-17
LOCKERS
C1-18
LOCKERS
C1-21
CORRIDOR
C1-19
CORRIDOR
C1-22
CORR
C1-15
DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE
SERVED FROM TELECOMMUNICATIONS ROOM 1A 109.
ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;
CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS
DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS DRAWINGS
FOR ALL REQUIRED FIBER-OPTIC CABLING.
2 3 4 5 6 7 86.4 6.64.84.4
B
C
D
F
4.6s1 sC
D.5
EXISTING CABLE TRAY
THROUGHOUT CORRIDORS NOT
SHOWN FOR CLARITY. USE
EXISTING CABLE TRAY TO ROUTE
FIBER-OPTIC BACKBONE CABLING
AS REQUIRED.
BLDG 56
AREA OF WORK
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD
VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL
RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE
DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED
MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT
THE EXPENSE OF THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR
NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS
REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH
CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY
EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO
REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR,
MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE
INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY
FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING FROM
EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT
RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF
HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND
AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES
AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT
VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA
AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT
NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED
THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS
ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED
WITH LIKE SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS
AS REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER
OBSTRUCTIONS PRIOR TO INSTALLATION.
- 1/8" = 1'-0"
1 BLDG 56 - FLOOR 1 - TELECOMMUNICATIONS PLAN 0' 4' 8' 16'
GENERAL NOTES
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 56ET101
BLDG 56 - FLOOR 1 -
TELECOMMUNICATIONS PLAN 56
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
KEY NOTES
TYP
PROJECT
NORTH
PROJECT
NORTH
PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE EXISTING
TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES
ON THIS SHEET FOR ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET
PLACEMENT.
ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A CABLING.
CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.
FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO
INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL REQUIRED
APPURTENANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL
INFORMATION.
FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP CEILING
WHEREVER POSSIBLE. UTILIZE CABLE TRAY AS APPLICABLE. PROVIDE CONDUIT SLEEVE WITH
FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS ARE REQUIRED. REFERENCE DETAIL
2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.
CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY WILL BE
REQUIRED TO BE MODIFIED/REPLACED AT EACH TR.
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 22 2
2 2 2
2 2 2 2
2 2
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
TR
2A 122
DATA
2A 121
ELEC
2A 120
MKTG STOR
2B 126
FISCAL STOR
RECORDS
2B 124
HR STORAGE
2B 132
HR OFF
2B 130
HR DIRECTOR
2B 123
FISCAL OFF
2B 129
FISCAL OFF
2B 128
FISCAL OFF -
SHARED
2B 127
EES CONF
2B 115
ELEC
2B 121
STAIR 1
STAIR
WOMEN
2A 124
MEN
2A 125
MKTG STOR
2A 126
HSKG
2B 131
COPY
C2 - 24
ELEV
P - 1
ELEV
S - 1
MECH
2B 106
STAIR 2
STAIR
ACQ STOR
2B 114
EES CONF CLO
2B
115A
OAA CONF ROOM
2A 109
OAA WKRM
2A 104
OAA STOR
2A 111
MKTG STOR
2A 113
FISCAL OFF -
SHARED
2A 125
FISCAL OFF -
SHARED
2B 123
FISCAL OFF -
SHARED
2B 122
FISCAL WORK
AREA
2B 120
FISCAL OFFICE
2B 119
FISCAL BUDGET
ANALYST
2B 118
FISCAL BUDGET
ANALYST
2B 117
FISCAL BUDGET
ANALYST
2B 116
FISCAL ASS'T
CHIEF
2B 113
FISCAL CHIEF
2B 112
ACQ OFFICE
2B 111
ACQ COORD
2B 110
OFF PROG
SUPPORT
2B 109
ACQ DEPUTY
2B 107
ACQ OFF -
SHARED
2B 105
ACQ OFF -
SHARED
2B 104
ACQ OFF -
SHARED
2B 103
ACQ OFF -
SHARED
2B 101
ACQ OFF -
SHARED
2B 100
COLLABORATION
ROOM
2A 101
ACQ OFF
2A 102
OAA OFF WEB
DEVELOPER
2A 103
OAA OFF ADMIN
2A 105
OAA OFF
DIRECTOR
2A 106
OAA OFF PHYS /
DIRECTOR
2A 107
OAA OFF WRITER
/ EDITOR
2A 108
OAA OFF HEALTH
SYS SPEC
2A 110
OAA OFF
PROGRAM
ANALYST
2A 112
MKTG OFF PA
2A 114
MKTG DIR
2A 115
MKTG OFF
SHARED
2A 116
MKTG OPEN
OFFICE
2A 117
FISCAL OFF
MANAGEMENT
ANALYST
2A 118
FISCAL ASS'T
A&MM
2A 119
COPY ALCOVE
C2 - 15
KIT ALCOVE
C2 - 14
MKTG STOR
2B 102
ELEV LOBBY
C2 - 1
EWC
C2 - 3
CORR
C2 - 16CUBE
C2 - 20
CUBE
C2 - 19
CUBE
C2 - 18
KIT ALCOVE
C2 - 10
COPY
C2 - 22
56ET402
56ET402
56ET402
5.5
E
5.2
B-SIDE:
TO TR 2A122 FROM
MCR BB102, FROM
FLR 01 TO 02
TYP
DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE
SERVED FROM TELECOMMUNICATIONS ROOM 2A 122.
ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;
CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS
DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS DRAWINGS
FOR ALL REQUIRED FIBER-OPTIC CABLING.
2 3 4 5 6 7 86.4 6.64.84.4
D
F
4.6
D.5
WAP 1 2
WAP 1
WAP 1
WAP 1 2
WAP 1 2 WAP 1 2
WAP 1
WAP 1 2
WAP 1
WAP 1 2WAP 1 2
WAP 1 2
BLDG 56
AREA OF WORK
- 1/8" = 1'-0"
1 BLDG 56 - FLOOR 2 - TELECOMMUNICATIONS PLAN 0' 4' 8' 16'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 56ET102
BLDG 56 - FLOOR 2 -
TELECOMMUNICATIONS PLAN 56
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
TYP
PROJECT
NORTH
PROJECT
NORTH
KEY PLAN
GENERAL NOTES
KEY NOTES
1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE EXISTING
TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET FOR
ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.
ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A CABLING. CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.
FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL REQUIRED APPURTENANCES AS REQUIRED.
REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.
FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP CEILING WHEREVER POSSIBLE. UTILZE CABLE TRAY AS APPLICABLE. PROVIDE CONDUIT SLEEVE WITH FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS ARE REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR
ADDITIONAL INFORMATION.
CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY WILL BE REQUIRED TO
BE MODIFIED/REPLACED AT EACH TR.
UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY EXACT HEAD
END LOCATION AS REQUIRED.
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL
POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL RACEWAYS AND
CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR
SOURCE, UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT THE EXPENSE OF THE
CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW FIRE
RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH CAT6A PORTS
AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY EXISTING CABLING.
PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING FROM EACH WAO
(WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT RUNS, OR
CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER
TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT VARIANCES
ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING TRANSPORTATION, FOR
ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE DIAGRAMMATICAL.
COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS, ARCHITECTURAL FEATURES, MECHANICAL
DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
EXISTING CABLE TRAY
THROUGHOUT CORRIDORS
NOT SHOWN FOR CLARITY.
USE EXISTING CABLE TRAY
TO ROUTE FIBER-OPTIC
BACKBONE CABLING AS
REQUIRED.
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2 2 2 2
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
TR
3A 122
PSA
C3 - 24
PSA
C3 - 23
PSA
C3 - 22
PSA
C3 - 21
PSA
C3 - 20
EWC
C3 - 3
DATA
3A 121
ELEC
3A 119
STAIR 1
STAIR
WOMEN
3A 125
MEN
3A 126
ELEV
P - 1
ELEV
S - 1
MECH
3A 129
SHARED
INSTRUCT OFF
3A 100
LEARNING
CONSULT OFF
3B 101
LEARNING
CONSULT OFF
3B 102
LEARNING
CONSULT OFF
3B 103
LEARNING
CONSULT OFF
3B 104
LEARNING
CONSULT OFF
3B 106
LEARNING
CONSULT OFF
3B 107
ADMIN
MANAGING DIR
3B 109
ADMIN
MANAGING DIR
3B 110
ADMIN - DEPUTY
DIR
3B 111
ADMIN - DEPUTY
DIR
3B 112
PROG OFF
3B 113
PROG OFF
3B 115
PROG OFF
3B 117
ADMIN SUP
C3 - 18
CAMPUS MGR
C3 - 17
COLLAB ROOM
3B 114
ELEC
3B 116
STOR, PROGRAM
FILES
3B 122
COPY
C3 - 19
PROG OFF
3B 118
AMD FOR
PROGRAMS
OFFICE
3B 119
PROG MANAGER
OFFICE
3B 120
PROG MANAGER
OFFICE
3B 121
PROG MANAGER
OFFICE
3B 123
PROG MANAGER
OFFICE
3B 124
PROG MANAGER
OFFICE
3B 125
PROG MANAGER
OFFICE
3B 126
PROG MANAGER
OFFICE
3B 128
PROG MANAGER
OFFICE
3A 124
PROG MANAGER
OFFICE
3A 123
PROG MANAGER
OFFICE
3A 120
PROG MANAGER
OFFICE
3A 118
EDUCATION TECH
3A 116
WORKSTATIONS,
V15 / V23 PGM
SUPPORT (2)
3A 115
OFFICE,
EDUCATION TECH
(3)
3A 114
PROG OFF
3A 113
PROG OFF
3A 111
V15 EDUCATION
SPEC
3A 109a
V23 ESR PGM
MGR OFF
3A 109
V15 ESR PGM
MGR
3A 107
WORKSTATIONS,
PSA (3)
3A 106
WKSTN,
CONTRACTOR
3A 105
PROG OFF
3A 104
PROG SUPPORT
ASSISTANT OFF
3A 103
PROG OFF
3A 102
PRINTER
C3 - 9
KIT ALCOVE
C3 - 8
STOR
3B 100
PSA WORK ROOM
3A 127
WORKSTATIONS,
PSA (4)
3A 108
WORKSTATIONS,
PSA (4)
3A 110
WORKSTATIONS,
PSA (4)
3A 112
COPY STORAGE
3A 117
EES STOR
3B 127
HSKG
3B 129
56ET403
56ET403
56ET403
5.5
E
5.2
3 4
2 3 4 5 6 7 86.4 6.64.84.4
B
C
D
F
4.6 sC
D.5
DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE
SERVED FROM TELECOMMUNICATIONS ROOM 3A 122.
ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;
CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS
DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS DRAWINGS
FOR ALL REQUIRED FIBER-OPTIC CABLING.
WAP 1 2 WAP 1 2
WAP 1
WAP 1
WAP 1 2
WAP 1 2 WAP 1 2
WAP 1
WAP 1
WAP 1 2
BLDG 56
AREA OF WORK
- 1/8" = 1'-0"
1 BLDG 56 - FLOOR 3 - TELECOMMUNICATIONS PLAN 0' 4' 8' 16'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 56ET103
BLDG 56 - FLOOR 3 -
TELECOMMUNICATIONS PLAN 56
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
PROJECT
NORTH
TYP
PROJECT
NORTH
KEY PLAN
GENERAL NOTES
KEY NOTES
1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE EXISTING
TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET FOR
ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.
ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A CABLING. CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.
FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL REQUIRED APPURTENANCES AS REQUIRED.
REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.
CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY WILL BE REQUIRED TO
BE MODIFIED/REPLACED AT EACH TR.
UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY EXACT HEAD
END LOCATION AS REQUIRED.
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL
POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL RACEWAYS AND
CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR
SOURCE, UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT THE EXPENSE OF THE
CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW FIRE
RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH CAT6A PORTS
AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY EXISTING CABLING.
PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING FROM EACH WAO
(WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT RUNS, OR
CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER
TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT VARIANCES
ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING TRANSPORTATION, FOR
ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE DIAGRAMMATICAL.
COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS, ARCHITECTURAL FEATURES, MECHANICAL
DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
EXISTING CABLE TRAY
THROUGHOUT CORRIDORS NOT
SHOWN FOR CLARITY. USE
EXISTING CABLE TRAY TO ROUTE
FIBER-OPTIC BACKBONE CABLING
AS REQUIRED.
2 22
2 2 2 2
22 2
2 2 2 2
2 2
2 2
2 2
2 2
2 2
2 2
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
ELEC ENTR
1C 105e
DATA ENTR
1C 105f
STORAGE GENERAL + MEDICAL
1C 105
SOILED HOLDING
1B 138f
GROUNDS - MAINT
1A 109
ELEC SHOP-FLR
1A 107
PLUMBING SHOP-FLR
1A 105
RECYCLING
1B 136
CART STOR.
1A 108
STORAGE, FORMS
1C 105d
LOBBY
C1-2
STORAGE SECURED
1C 104c
REPAIR
1B 135
EXCESS ITEMS STOR
1C 103
CLEAN HOLDING
1C 102
STORAGE MED GAS, STOR
FLAMMABLE
1C 105c
ELEC
1C 105a
ELEC
1C 105g
ELEC
1B 141
DATA
1B 140
ELEC
1B 137
ELEC
1A 106
OFFICE
1B 119
ELEC
1B 117
MECH ENTR
1A 101
LOUNGE
1A 105e
CONF RM
1B 100
PLANNING & ACTIVATION SHARED
OFFICE
1B 125a
DOCK+ RECEIVING + ISSUE
1C 104
STORAGE-EQUIPMENT
1C 101
VISN WORK ROOM
1B 128
SHARED OFFICE, PM
1B 101
OFFICE, PE
1B 109
OFFICE, PE
1B 111
SHARED OFFICE, PM
1B 115
SHARED OFFICE, PM
1B 114
OFFICE, PE
1B 110
OFFICE, CHIEF
1B 112
MEETING ROOM
1B 113
OFFICE, SAFETY
1B 116
OFFICE, PE
1B 105
OFFICE, PE
1B 102
OFFICE, PE
1B 103
OFFICE, PE
1B 104
OFFICE, PE
1B 107
OFFICE, PE
1B 108
OFFICE AMMS ASSIST
1B 131
OFFICE AMMS CHIEF
1B 132
OFFICE VISN CONTRACT
1B 130
OFFICE VISN CONTRACT
1B 129
OFFICE, STOREKEEPER
1C 104b
ELEC
1A 104d
HOUSEKEEPING AIDS CL-CLEAN
1A 110b
HOUSEKEEPING AIDS CL
1A 110a
M TOILET
1B 124
W TOILET
1B 123
GROUNDS-STOR
1A 109e
PAINT SHOP -FLAMMABLE STOR
1A 103c
PAINT AREA
1A 103b
OFFICE
1A 104e
OFFICE
1A 105c
OFFICE
1A 100c
OFFICE
1A 107c
GROUNDS - MAINT / WET RM / WASH
BAY
1A 109d
SERVER
1B 135d
RECEIVING CLERKS
1C 104a
TOILET
1C 105b
OFFICE
1A 109b
HOSP. PLANS & DRAFTING
1B 125
RECEIVING
1B 138e
N CORR
C1-18
E CORR
C1-16
S CORR
C1-8
ENG DOCK
C1-11
W CORR
C1-9
CORR
C1-12
AMMS ADMIN CUBICLES (6).
1B 133
W LOCKER / TLT
1B 138a
CLERK
1A 109c
MECH
1A 110
CORR
C1-7
PLUMBING SHOP-STOR
1A 105a
CARPENTRY SHOP-FLR.
1A 104a
MASON SHOP
1A 104c
LOCKSMITH - STOR
1A 102b
PAINT SHOP-FLR
1A 103a
GROUNDS-BENCH
1A 109a
CORR
C1-13
TR
1B 139
LOUNGE
1B 122
PEDESTRIAN CORRIDOR
C1-10
STOR MED RECORDS
1C 100
SOILED
1C 102a
CARPENTRY TOOL LOCK-UP
1A 104f
PLUMBING TOOL LOCK-UP
1A 105d
ELECTRICAL TOOL LOCK-UP
1A 107d
OFFICE
1B 118
TR
1B 120
VESTIBULE
C1-1
BID OPG/CONF
1B 134
FORKLIFT BATTERY CHARGE
1C 105h
WAITING RM
C1-3
CORR
C1-4
CORR
C1-6
CORR
C1-5
STORAGE
1B 117a
HOUSEKEEPING AIDS CLOSET
1B 142
HOUSEKEEPING AIDS
CLOSET-CLEAN
1B 143
MACH+A/C TOOL LOCK-UP
1A 100d
LOUNGE
1A 100e
LOUNGE
1A 104g
CARPENTRY STOR.
1A 104h
LOUNGE
1A 107e
ALCOVE
C1-25
ALCOVE
C1-24
ALCOVE
C1-26
ALCOVE
C1-22
ALCOVE
C1-21
ALCOVE
C1-20
ALCOVE
C1-23
ALCOVE
C1-27
ALCOVE
C1-28
ALCOVE
C1-30
LOUNGE
1A 109f
CORR
C1-31
MACH + A/C SHOP-FLR
1A 100
W TOILET
1B 127
M TOILET
1B 126
57ET401a
57ET401b
57ET401a
57ET401b
8.1
8.1
5.5
5.5
0.5 0.6 0.7 0.8
6.1
6.1 8.4
8.4
8.7
8.7
8.10
8.10
K
J
H
G
E.9
C
E
A
B
D
F
C.6
D.4
E.7
G.2
A.3
E.8
TYP
57ET401a
57ET401b
DATA
1B 121
LOUNGE-STAFF
1B 138c
OFFICE, MANAGER
1B 138d
DISTRIBUTION & CLEAN HOLDING
1B 138
M LOCKER / TLT
1B 138b
HANDHOLE
SIDE-B FIBER-OPTIC BACKBONE:
REFERENCE COMMUNICATION SHEETS
FOR ADDITIONAL INFORMATION
REGARDING HANDHOLE, CONDUIT,
BUILDING PENETRATIONS, FIBER-
OPTIC CABLING, AND RACEWAY
INFORMATION
TYP
EXISTING SIDE-A FIBER-OPTIC BACKBONE BUILDING
ENTRY POINT (APPROXIMATE LOCATION). ROUTE FIBER-
OPTIC CABLES TO TRs AS INDICATED ON
COMMUNICATIONS DRAWINGS; REFERENCE
COMMUNICATIONS DRAWINGS FOR ALL FIBER-OPTIC
CABLING, RACEWAY TYPES, SPECIFICATIONS, AND
RATINGS. REFERENCE KEY NOTES ON THIS SHEET
REGARDING CABLE TRAY AND VERTICAL/HORIZONTAL
ROUTING FOR ADDITIONAL FIBER BACKBONE CABLING
REQUIREMENTS.
DATA OUTLETS AND
DEVICES IN THIS AREA
SHALL BE SERVED FROM
TELECOMMUNICATION
ROOM 1B139
DATA OUTLETS AND
DEVICES IN THIS AREA
SHALL BE SERVED FROM
TELECOMMUNICATION
ROOM 1B120
ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;
CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS
DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS
DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.
WAP 1
WAP 1
WAP 1
WAP 1WAP 1
WAP 1
WAP 1
3 3
EXISTING CABLE TRAY THROUGHOUT
CORRIDORS NOT SHOWN FOR
CLARITY. USE EXISTING CABLE TRAY
TO ROUTE FIBER-OPTIC BACKBONE
CABLING AS REQUIRED.
- AREA OF WORK
BLDG 57
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD
VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL
RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL
BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED
MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR
REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING
OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS
REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH
CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY
EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO
REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR,
MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE
INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY
FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING
FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT
RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF
HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND
AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR PARTITION
TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;
DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE
WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING,
BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED
THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING
IS ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE
BUNDLED WITH LIKE SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH
TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRA…