Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, interior renovations including demolition and new construction, data center renovations, physical security enhancements, fiber optic infrastructure assessment and upgrades between buildings, installation of a diversified wide area network path to the datacenter, and hazardous material abatement. The project involves construction and renovation activities in buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
36C77623R0009 0005.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
36C77623R0009 0003.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
36C77623R0009 0001.pdf PDF
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
Attachment 1 - Specifications.pdf PDF
Attachment 5 - Drawings Part-4.pdf PDF
Attachment 6 - Drawings Part-5.pdf PDF
Attachment 9 - Drawings Part-8.pdf PDF
Attachment 16 - Drawings Part-15.pdf PDF
Attachment 22 - Drawings Part-21.pdf PDF
Attachment 24 - Drawings Part-23.pdf PDF
Attachment 36 - Envr. Report - Appendix B.pdf PDF
Attachment 41 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 44 - Contractor Safety - Environmental Form.docx DOCX document
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 38 - Envr. Report - Drawings.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

2 2

2 2

2 2

2 2

2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

DN

UP

DN

DN

29' - 4"

4' - 0"

55ET403a

55ET403a

B.4

C

D

F

H

B

E

G

J

8.2

D.3

D.4

8.48765432 7.9

H.8

J.1

H.4

6.46.11.9 5.8

A

TR

3A120

PROGRAM MANAGER

3A121

A R

E A

A

55ET403a

3 Group Room

3A 101

Work Area & Storage

3A 173

Group Room

3A 102

SP

3A 172

Corridor

C3-6

Corridor

C3-13

Group Room, Large

3A 100

P. Toilet

3A 106

Corridor

C3-13

Waiting

3A 108

Reception

3A 105

Group Room

3A 103

Counseling A

3A 143

Counseling A

3A 145

Counseling A

3A 147

Counseling B

3A 151

Counseling B

3A 153 Counseling A

3A 150

SP

3A 171

SP

3A 169

Counseling B

3A 167

Counseling B

3A 165Counseling B

3A 163

Counseling B

3A 161

Secretary GER

3A 116

Print Room

3A 166 Elec.

3A 168

Print Room

3A 136

Counseling, Student

3A 118

Counseling, Student

3A 115

Counseling B

3A 152 Counseling B

3A 154

Ger. Counseling

3A 127

Elec.

3A 129

Counseling A

3A 144

Counseling A

3A 142

Program Manager GER

3A 122

Counseling A

3A 138

Patient Toilet

3A 160

Ger. Counseling

3A 134

Ger. Counseling

3A 133

Ger. Counseling

3A 125

Ger. Counseling

3A 126 Ger. Counseling

3A 128

Ger. Counseling

3A 130

Ger. Counseling

3A 132

Counseling A

3A 149

Counseling A

3A 141

Counseling B

3A 155 Counseling B

3A 157 Counseling B

3A 158

Counseling B

3A 159

Counseling A

3A 135

Patient Toilet

3A 114

Staff Toilet

3A 162 Lounge

3A 170

Patient Toilet

3A 148

Staff Toilet

3A 137

Counseling A

3A 139

Mechanical

3M 1

P. Toilet

3A 107

Injection

3A 111 Intake

3A 110

Pharmacist Office

3A 113

Intake

3A 109

Counseling A

3A 140

Computer Kiosk

3A 104

DATA SYSTEM

3A 119

Stair #1-3

2C159

Corridor

C3-7

Corridor

C3-8

Corridor

C3-9

Corridor

C3-11

Corridor

C3-12

Secretary A & B

3A 117

Counseling B

3A 156

Counseling A

3A 146

PC Exam

3A 131

Counseling B

3A 164

Housekeeping

3A 112

Oxygen

3M 1A

Vac.

3M 1B

Elevator Machine Room

3B 100

3 4

DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE

SERVED FROM TELECOMMUNICATION ROOM 3A120.

ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;

CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS

AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS

DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.

TYP

EXISTING CABLE TRAY

THROUGHOUT CORRIDORS

NOT SHOWN FOR CLARITY.

USE EXISTING CABLE TRAY

TO ROUTE FIBER-OPTIC

BACKBONE CABLING AS

REQUIRED.

AREA A

AREA OF WORK

- 1" = 10'-0"

1 BLDG 55 - FLOOR 3 - AREA A - TELECOMMUNICATIONS PLAN

GENERAL NOTES

KEY PLAN

KEY NOTES

GENERAL NOTES

1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO

REPLACE EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT

SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET

DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET FOR

ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.

ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A

CABLING. CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.

FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO

INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIREPROOFING AND ALL

REQUIRED APPERTUNANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503

FOR ADDITIONAL INFORMATION.

CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY

WILL BE REQUIRED TO BE MODIFIED/REPLACED AT EACH TR.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED

PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END

LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR

PACS SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS

REQUIRED. COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL

VERIFY EXACT HEAD END LOCATION AS REQUIRED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 55ET103a

BLDG 55 - FLOOR 3 - AREA A

TELECOMMUNICATIONS PLAN 55

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

0' 5' 10' 20'

PROJECT

NORTH

PROJECT

NORTH

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO

BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE

UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED

OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED

BY EXISTING CABLING AS CONDUIT FILL ALLOWS. PROVIDE RACEWAYS TO EXTEND

TO ASSOCIATED TR AS REQUIRED.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO

REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR,

MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE

INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY

FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A

CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION

OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL

IN AND AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR

PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;

DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN

RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL

SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND

ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

UP

DN

2 22 2 2

2 2

2 2

2 2

2 2 2

2 2

DN

DN

DN

29' - 4"

55ET403b

55ET403b

B.4

C

D

F

H

B

E

G

J

K

L

1312111098.2 8.8

D.3

K.8

K.4

K.6

J.7

8.3 8.5 8.7 8.9

K.3

9.88.487.9

CORRIDOR

C3-21

TR

3C149

A R

E A

B

A R

E A

A

S E

E S

H E

E T

E

T a

55ET403b

Public Elev. #1

2C148

Public Elev. #2

2C149

Service Elev. #3

2C150

GRECC Lounge

3C 154

Waiting

3C 100

Clean- Instrument, SPD, Linen

3C 102

Office - Exam

3C 139

Office - Exam

3C 137

Office - Exam

3C 124

Office - Exam

3C 122

Patient Education / Shared Conference

3C 133

Reception

3C 129a

Pat. Toilet

3C 125

Staff Toilet

3C 144

Clean Supply

3C 138

Multipurpose Office - Pharmacy

3C 140

Office - Exam

3C 121

Housekeeping

3C 156

Group Room

3A 101

Work Area & Storage

3A 173

Office - Exam

3C 141

Pat. Toilet

3C 123

Group Room

3A 102

Resident Workspace

3C 147

Exam/Multi- Purpose Office

3C 142

Waiting 2

3C 130

Pat. Toilet

3C 131

Pat. Toilet

3C 132

Office- Exam

3C 120

Wheelchair Storage

3C 118

MAS Control (Nurse Station)

3C 135

Medication

3C 127

Immunization

3C 128

Nutrition Classroom

3C 126

Office - Exam

3C 136

X-Ray

3C 107

Operatory

3C 106 Hygienist

3C 108 Operatory

3C 110 Staff Lounge

3C 114

IP Holding

3C 105

Staff Toilet

3C 115

Soiled Holding

3C 101

Storage

3C 109

Housekeeping

3C 104

Staff Work (SEPS Office)

3C 112

Public Patient Toilet

3C 111

Reception

3C 103

Elec.

3C 117

Office - Admin

3C 155

Office - Admin

3C 151

Office - Admin

3C 148

Kiosk

3C 129b

Mechanical

3M 2

Waiting 1

3C 129

Staff Toilet

3C 157

SP

3A 172

Dental Lab

C3-15

Office - Exam

3C 119

Elec.

3C 152

Women's Toilet

3B 101

Men's Toilet

3B 102

Service Elev. #3

2C158

Stair #3-3

2C160

Elevator Lobby

C3-3

Corridor

C3-2

Corridor

C3-5

Corridor

C3-14

Corridor

C3-18

Corridor

C3-20

Group Room, Large

3A 100

DATA TECH

3C 150

Pump

3C 113 Pump

3C 116

Soiled Holding

3C 146 Chief Office

3C 153

Office - Provider

3C 143

Office - Provider

3C 145

Corridor

C3-24

Intake Room

3C 134

Corridor

C3-17

P. Toilet

3A 106

Corridor

C3-25

Corridor

C3-19

Corridor

C3-22

Closet

3C 133a

Stair #2-3

2C162

Storage

3C 158

Corridor

C3-16

Group Room Storage (Future Public Elev.) #4

3B 103

Print Alcove

C3-23

Cl.

3C-112A

Elevator Machine Room

3B 100

3 4

TYP

TYP

DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE

SERVED FROM TELECOMMUNICATION ROOM 3C149

ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;

CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS

AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS

DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.

EXISTING CABLE TRAY

THROUGHOUT CORRIDORS

NOT SHOWN FOR CLARITY.

USE EXISTING CABLE TRAY

TO ROUTE FIBER-OPTIC

BACKBONE CABLING AS

REQUIRED.

AREA B

AREA OF WORK

- 1" = 10'-0"

1 BLDG 55 - FLOOR 3 - AREA B - TELECOMMUNICATIONS PLAN

KEY NOTES

GENERAL NOTES

KEY PLAN

KEY NOTES

GENERAL NOTES

0' 5' 10' 20'

1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO

REPLACE EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT

SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET

DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET FOR

ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.

ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A

CABLING. CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.

FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO

INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIREPROOFING AND ALL

REQUIRED APPURTENANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503

FOR ADDITIONAL INFORMATION.

CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY

WILL BE REQUIRED TO BE MODIFIED/REPLACED AT EACH TR.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED

PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END

LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR

PACS SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS

REQUIRED. COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL

VERIFY EXACT HEAD END LOCATION AS REQUIRED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 55ET103b

BLDG 55 - FLOOR 3 - AREA B -

TELECOMMUNICATIONS PLAN 55

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO

BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE

UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS

NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY

VACATED BY EXISTING CABLING AS CONDUIT FILL ALLOWS. PROVIDE RACEWAYS

TO EXTEND TO ASSOCIATED TR AS REQUIRED.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED

TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL

LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED

FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION

OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY

INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A

CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION

OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO

SEAL IN AND AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS

FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;

DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS

OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL

SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;

ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND

ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

2 2

2 2

2 2

2 22

2 2

22 22

2 2

2 2

2 2 2

2 2 2

2 2

2 2

2 2

2 2

2 2 2 2

2 2 2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

AVID MACHINE

ROOM

BB 117

IT NON - SECURE

STR

BB 121

AMD / AV

PRODUCTION

COORD

BB 143

IT CDN, SHARED

BB 144

E-LEARN PROD

OFFICE

BB 145

E-LEARN PROD

OFFICE

BB 146

E-LEARN PROD

OFFICE

BB 147

GRAPHICS

OFFICE

BB 109

GRAPHICS

OFFICE

BB 108

GRAPHICS

OFFICE

BB 107

GRAPHICS

OFFICE

BB 105

OFFICE, STUDIO

MGR

BB 104

OFFICE, STUDIO

MGR

BB 100

OFFICE

PRODUCER

BA 125

OFFICE

PRODUCER

BA 123

TR

BA 105

DATA

BA 106

ELEC

BA 107

RECYCLING

ROOM

BA 104

PROD CTL VIDEO

BA 110

STAIR 1

STAIR

WOMEN

BA 100

OFFICE, SR

ENGINEER

BA 122

NAT'L MEDIA

SVCS COORD

BA 121

OFFICE

PRODUCER

BA 120

GREEN ROOM

BA 119

DRESSING RM

BA

118A

MAKE UP

BA 118

LAN / TEL / DATA

DMARK ROOM

BA 114ENG MAINT

BA 115

OFFICE

PRODUCER

BA 116

AV PRODUCTION

SUPPORT

BA 113CONTRACTOR

WKSTNS (2)

BA 112

SUPPORT TECH

BA

112A

STUDIO

BA 109

EQPT AV STR

BA

103A

STUDIO MECH

BA

108B

MEDIA STORAGE

BA 108

DOCK /

RECEIVING

BA 103

MAIL ROOM

BA 102

MEN

BA 101

ELEV

S - 1

ELEV

P - 1

IT SECURE

STORAGE

BB 120

STORAGE,

EQUIPMENT +

SUPPLIES /

PARTS

BB 119

COMBINED

COMPUTER /

SERVER ROOM

BB 102

AVID SUITE

BB 116

AVID SUITE

BB 114

AVID SUITE

BB 113

MSTR OFFICE

SUPPLIES

BB 124

STAIR 2

STAIR

KIT

BB 126

TLT

BB 127

TLT

BB 128

SOCIAL MEDIA

BB 132

IT SYSTEM ADMIN

BB 133

IT SPECIALIST

BB 134

IT SPECIALIST

BB 135

IT SYSTEM

ADMIN, SHARED

BB 136

IT OFFICE ISO

BB 137

IT SPECIALIST,

SHARED

BB 138

OFFICE

ENGINEER

SHARED

BB 139

Room

BB 140

ELEARN PROD

BB 141

LRG COORD

BB 148

LRG PROGRAM

SUPPORT

BB 130

NORMAL

ELECTRICAL

ENTRY

BB

129A

EMERGENCY

ELECTRICAL

ENTRY

BB 129

EES ELEC

BB 125

MUSIC LIBRARY

BB 118

OFFICE EDIT

BB 115

OFFLINE EDIT

BB 112

GRAPHICS

STORAGE

BB 111

DUBBING / CDN

BB 106

AUDIO BOOTH

BB 110

COPY ROOM

BB 103

WK ROOM

BB 101 MASTER

CONTROL

BA 117

MECH

BB 123

HSKG

BB 122

LRG

CB-20

LRG

CB-19

LRG

CB-18

COLLABORATION

CB -50

56ET400

56ET400

56ET400

5.5

E

5.2

EXISTING SIDE-A FIBER-OPTIC BACKBONE BUILDING ENTRY POINT

(APPROXIMATE LOCATION). ROUTE FIBER-OPTIC CABLES. TO TRs AS

INDICATED ON COMMUNICATIONS DRAWINGS. REFERENCE

COMMUNICATIONS DRAWINGS FOR ALL FIBER-OPTIC CABLING, RACEWAY

TYPES, SPECIFICATIONS, AND RATINGS. REFERENCE KEY NOTES ON THIS

SHEET REGARDING CABLE TRAY AND VERTICAL/HORIZONTAL ROUTING

FOR ADDITIONAL FIBER BACKBONE CABLING REQUIREMENTS.

SIDE-B FIBER-OPTIC BACKBONE: REFERENCE

COMMUNICATION SHEETS FOR ADDITIONAL INFORMATION

REGARDING HANDHOLE, CONDUIT, BUILDING PENETRATIONS,

FIBER-OPTIC CABLING, AND RACEWAY INFORMATION

3 5

TYP

PROVIDE NEW FIBER DISTRIBUTION CABINETS

WITH CASSETTES IN EXISTING CABINETS 7, 8, 9

TO TERMINATE ALL CAMPUS SIDE-B FIBERS WITHIN.

LABEL ACCORDING TO DRAWINGS AND VA STANDARDS.

DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE

SERVED FROM TELECOMMUNICATIONS ROOM BA 105.

ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;

CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS

DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS DRAWINGS

FOR ALL REQUIRED FIBER-OPTIC CABLING.

2 3 4 5 6 7 86.4 6.64.84.4

B

C

D

F

4.6 sC

D.5

HANDHOLEHANDHOLE

SERVICE DEMARK

CONDUITS

MCR TO TR

DATA CONDUITS

CONNECT SIDE-A FIBER TO EXISTING

RACK WHERE CURRENT SIDE A

CONNECTION EXISTS; PROVIDE AND/OR

REPLACE EXISTING RACK HARDWARE

TO MAKE PROPER CONNECTIONS FOR A

COMPLETE AND FULLY FUNCTIONAL

SYSTEM. CONTRACTOR SHALL FIELD

VERIFY EXACT LOCATION.

EXISTING CABLE TRAY

THROUGHOUT CORRIDORS

NOT SHOWN FOR CLARITY.

USE EXISTING CABLE TRAY

TO ROUTE FIBER-OPTIC

BACKBONE CABLING AS

REQUIRED.

BLDG 56

AREA OF WORK

- 1/8" = 1'-0"

1 BLDG 56 - FLOOR 0 - TELECOMMUNICATIONS PLAN 0' 4' 8' 16'

KEY PLAN

GENERAL NOTES

KEY NOTES

1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE EXISTING

TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET FOR

ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.

ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A CABLING. CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.

FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL REQUIRED APPURTENANCES AS REQUIRED.

REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.

FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP CEILING WHEREVER POSSIBLE. UTILIZE CABLE TRAY AS APPLICABLE. PROVIDE CONDUIT SLEEVE WITH FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS ARE REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR

ADDITIONAL INFORMATION.

CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY WILL BE REQUIRED TO

BE MODIFIED/REPLACED AT EACH TR.

TERMINATE ALL SIDE-A AND SIDE-B FIBER-OPTIC CABLING TO MODIFIED DATA CABINETS AS INDICATED.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY EXACT HEAD

END LOCATION AS REQUIRED.

TYP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 56ET100

BLDG 56 - FLOOR 0 -

TELECOMMUNICATIONS PLAN 56

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL

POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL RACEWAYS AND

CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR

SOURCE, UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT THE EXPENSE OF THE

CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW FIRE

RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH CAT6A PORTS

AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY EXISTING CABLING.

PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING FROM EACH WAO

(WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT RUNS, OR

CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER

TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT VARIANCES

ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING TRANSPORTATION, FOR

ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE DIAGRAMMATICAL.

COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS, ARCHITECTURAL FEATURES, MECHANICAL

DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2 2 22

2 2 2

2 2 2

2 2 2

2 2 2

2 2 2

2 2

2 2 2

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

TR

1A 109

DATA

1A 108

ELEC

1A 107

MM PHOTO

STUDIO

1A 101

CONF STOR

1B

104A

CONF COATS

1B 104

HSKG

1B 103

FOOD PREP

1B 105

CONF A/V

1B 106

NCA COPY

1B 107

TLT

1B 108

ELEV

P - 1

ELEV

S - 1

WOMEN

1A 106

MEN

1A 105CONFERENCE

STOR

1A 104

CONFERENCE

STOR

1B 101

MECHANICAL

1B 102

STAIR 2

STAIR

SCURE STOR

1B 113

BREAK RM /

KITCHEN

1B 112

TLT

1B 111

CT / S

1B 110

ELEC

1B 109

REFERENCE

LIBRARY

1B 121

STOR

1B 129

COATS

1B 128

STOR

1B 127

NCA OFF

1B 122

NCA OFF

1B 123

NCA OFF

1B 124

NCA OFF

1B 125

NCA OFF

1B 126

TLT / CHG

1B

101A

VESTIBULE

C1 - 1

RECEPTION

WAITING

C1 - 4

STAFF LOUNGE

1B 100

STAFF LOUNGE

1B

100A VESTIBULE

C1 - 11

VIDEO EDIT

1A

102F

MM STORAGE

1A

102E WEB DESIGNER

1A

102D

GRAPHIC

DESIGNER / PUB

1A

102C

GRAPHIC

DESIGNER / PUB

1A

102B

CHIEF OFF

1A 102A

CLO

1A

100A

MM VIDEO CONF

1A 100

MM STORAGE

1A 103

MM WORKROOM,

ILLUSTRATOR

1A 102

BREAK OUT

1B 117

BREAK OUT

1B 116

BREAK OUT

1B 114

BREAK OUT

1B 115

LARGE

CLASSROOM

1B 118

COMPUTER LAB

1B 119

MEDIUM

CLASSROOM

1B 120

CONFERENCE

1B 130

RECEPTION

C1 - 14

STUDENT WKRM

C1 - 16

DISPLAY

C1 - 20

WAITING

C1 - 13

EWC

C1 - 7

ELEV LOBBY

C1 - 8

WORK ALCOVE

C1 - 3

56ET401

56ET401

56ET401

5.5

E

5.2

B-SIDE:

TO TR 2A122 FROM

MCR BB102, FROM

FLR 01 TO 02

3 5

TYP

STAIR 1

STAIR

PREFUNCTION

C1-12

LOBBY

C1-5

CORR

C1-6

Room

C1-7

CORRIDOR

C1-10

CORR

C1-9

CORRIDOR

C1-17

LOCKERS

C1-18

LOCKERS

C1-21

CORRIDOR

C1-19

CORRIDOR

C1-22

CORR

C1-15

DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE

SERVED FROM TELECOMMUNICATIONS ROOM 1A 109.

ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;

CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS

DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS DRAWINGS

FOR ALL REQUIRED FIBER-OPTIC CABLING.

2 3 4 5 6 7 86.4 6.64.84.4

B

C

D

F

4.6s1 sC

D.5

EXISTING CABLE TRAY

THROUGHOUT CORRIDORS NOT

SHOWN FOR CLARITY. USE

EXISTING CABLE TRAY TO ROUTE

FIBER-OPTIC BACKBONE CABLING

AS REQUIRED.

BLDG 56

AREA OF WORK

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD

VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL

RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE

DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED

MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT

THE EXPENSE OF THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR

NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS

REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH

CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY

EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO

REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR,

MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE

INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY

FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING FROM

EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT

RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF

HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND

AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES

AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT

VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA

AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT

NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED

THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS

ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED

WITH LIKE SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS

AS REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER

OBSTRUCTIONS PRIOR TO INSTALLATION.

- 1/8" = 1'-0"

1 BLDG 56 - FLOOR 1 - TELECOMMUNICATIONS PLAN 0' 4' 8' 16'

GENERAL NOTES

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 56ET101

BLDG 56 - FLOOR 1 -

TELECOMMUNICATIONS PLAN 56

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

TYP

PROJECT

NORTH

PROJECT

NORTH

PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE EXISTING

TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES

ON THIS SHEET FOR ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET

PLACEMENT.

ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A CABLING.

CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.

FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO

INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL REQUIRED

APPURTENANCES AS REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL

INFORMATION.

FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP CEILING

WHEREVER POSSIBLE. UTILIZE CABLE TRAY AS APPLICABLE. PROVIDE CONDUIT SLEEVE WITH

FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS ARE REQUIRED. REFERENCE DETAIL

2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.

CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY WILL BE

REQUIRED TO BE MODIFIED/REPLACED AT EACH TR.

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 22 2

2 2 2

2 2 2 2

2 2

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

TR

2A 122

DATA

2A 121

ELEC

2A 120

MKTG STOR

2B 126

FISCAL STOR

RECORDS

2B 124

HR STORAGE

2B 132

HR OFF

2B 130

HR DIRECTOR

2B 123

FISCAL OFF

2B 129

FISCAL OFF

2B 128

FISCAL OFF -

SHARED

2B 127

EES CONF

2B 115

ELEC

2B 121

STAIR 1

STAIR

WOMEN

2A 124

MEN

2A 125

MKTG STOR

2A 126

HSKG

2B 131

COPY

C2 - 24

ELEV

P - 1

ELEV

S - 1

MECH

2B 106

STAIR 2

STAIR

ACQ STOR

2B 114

EES CONF CLO

2B

115A

OAA CONF ROOM

2A 109

OAA WKRM

2A 104

OAA STOR

2A 111

MKTG STOR

2A 113

FISCAL OFF -

SHARED

2A 125

FISCAL OFF -

SHARED

2B 123

FISCAL OFF -

SHARED

2B 122

FISCAL WORK

AREA

2B 120

FISCAL OFFICE

2B 119

FISCAL BUDGET

ANALYST

2B 118

FISCAL BUDGET

ANALYST

2B 117

FISCAL BUDGET

ANALYST

2B 116

FISCAL ASS'T

CHIEF

2B 113

FISCAL CHIEF

2B 112

ACQ OFFICE

2B 111

ACQ COORD

2B 110

OFF PROG

SUPPORT

2B 109

ACQ DEPUTY

2B 107

ACQ OFF -

SHARED

2B 105

ACQ OFF -

SHARED

2B 104

ACQ OFF -

SHARED

2B 103

ACQ OFF -

SHARED

2B 101

ACQ OFF -

SHARED

2B 100

COLLABORATION

ROOM

2A 101

ACQ OFF

2A 102

OAA OFF WEB

DEVELOPER

2A 103

OAA OFF ADMIN

2A 105

OAA OFF

DIRECTOR

2A 106

OAA OFF PHYS /

DIRECTOR

2A 107

OAA OFF WRITER

/ EDITOR

2A 108

OAA OFF HEALTH

SYS SPEC

2A 110

OAA OFF

PROGRAM

ANALYST

2A 112

MKTG OFF PA

2A 114

MKTG DIR

2A 115

MKTG OFF

SHARED

2A 116

MKTG OPEN

OFFICE

2A 117

FISCAL OFF

MANAGEMENT

ANALYST

2A 118

FISCAL ASS'T

A&MM

2A 119

COPY ALCOVE

C2 - 15

KIT ALCOVE

C2 - 14

MKTG STOR

2B 102

ELEV LOBBY

C2 - 1

EWC

C2 - 3

CORR

C2 - 16CUBE

C2 - 20

CUBE

C2 - 19

CUBE

C2 - 18

KIT ALCOVE

C2 - 10

COPY

C2 - 22

56ET402

56ET402

56ET402

5.5

E

5.2

B-SIDE:

TO TR 2A122 FROM

MCR BB102, FROM

FLR 01 TO 02

TYP

DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE

SERVED FROM TELECOMMUNICATIONS ROOM 2A 122.

ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;

CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS

DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS DRAWINGS

FOR ALL REQUIRED FIBER-OPTIC CABLING.

2 3 4 5 6 7 86.4 6.64.84.4

D

F

4.6

D.5

WAP 1 2

WAP 1

WAP 1

WAP 1 2

WAP 1 2 WAP 1 2

WAP 1

WAP 1 2

WAP 1

WAP 1 2WAP 1 2

WAP 1 2

BLDG 56

AREA OF WORK

- 1/8" = 1'-0"

1 BLDG 56 - FLOOR 2 - TELECOMMUNICATIONS PLAN 0' 4' 8' 16'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 56ET102

BLDG 56 - FLOOR 2 -

TELECOMMUNICATIONS PLAN 56

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

TYP

PROJECT

NORTH

PROJECT

NORTH

KEY PLAN

GENERAL NOTES

KEY NOTES

1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE EXISTING

TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET FOR

ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.

ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A CABLING. CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.

FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL REQUIRED APPURTENANCES AS REQUIRED.

REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.

FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP CEILING WHEREVER POSSIBLE. UTILZE CABLE TRAY AS APPLICABLE. PROVIDE CONDUIT SLEEVE WITH FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS ARE REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR

ADDITIONAL INFORMATION.

CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY WILL BE REQUIRED TO

BE MODIFIED/REPLACED AT EACH TR.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY EXACT HEAD

END LOCATION AS REQUIRED.

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL

POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL RACEWAYS AND

CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR

SOURCE, UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT THE EXPENSE OF THE

CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW FIRE

RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH CAT6A PORTS

AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY EXISTING CABLING.

PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING FROM EACH WAO

(WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT RUNS, OR

CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER

TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT VARIANCES

ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING TRANSPORTATION, FOR

ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE DIAGRAMMATICAL.

COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS, ARCHITECTURAL FEATURES, MECHANICAL

DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

EXISTING CABLE TRAY

THROUGHOUT CORRIDORS

NOT SHOWN FOR CLARITY.

USE EXISTING CABLE TRAY

TO ROUTE FIBER-OPTIC

BACKBONE CABLING AS

REQUIRED.

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2 2 2 2

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

TR

3A 122

PSA

C3 - 24

PSA

C3 - 23

PSA

C3 - 22

PSA

C3 - 21

PSA

C3 - 20

EWC

C3 - 3

DATA

3A 121

ELEC

3A 119

STAIR 1

STAIR

WOMEN

3A 125

MEN

3A 126

ELEV

P - 1

ELEV

S - 1

MECH

3A 129

SHARED

INSTRUCT OFF

3A 100

LEARNING

CONSULT OFF

3B 101

LEARNING

CONSULT OFF

3B 102

LEARNING

CONSULT OFF

3B 103

LEARNING

CONSULT OFF

3B 104

LEARNING

CONSULT OFF

3B 106

LEARNING

CONSULT OFF

3B 107

ADMIN

MANAGING DIR

3B 109

ADMIN

MANAGING DIR

3B 110

ADMIN - DEPUTY

DIR

3B 111

ADMIN - DEPUTY

DIR

3B 112

PROG OFF

3B 113

PROG OFF

3B 115

PROG OFF

3B 117

ADMIN SUP

C3 - 18

CAMPUS MGR

C3 - 17

COLLAB ROOM

3B 114

ELEC

3B 116

STOR, PROGRAM

FILES

3B 122

COPY

C3 - 19

PROG OFF

3B 118

AMD FOR

PROGRAMS

OFFICE

3B 119

PROG MANAGER

OFFICE

3B 120

PROG MANAGER

OFFICE

3B 121

PROG MANAGER

OFFICE

3B 123

PROG MANAGER

OFFICE

3B 124

PROG MANAGER

OFFICE

3B 125

PROG MANAGER

OFFICE

3B 126

PROG MANAGER

OFFICE

3B 128

PROG MANAGER

OFFICE

3A 124

PROG MANAGER

OFFICE

3A 123

PROG MANAGER

OFFICE

3A 120

PROG MANAGER

OFFICE

3A 118

EDUCATION TECH

3A 116

WORKSTATIONS,

V15 / V23 PGM

SUPPORT (2)

3A 115

OFFICE,

EDUCATION TECH

(3)

3A 114

PROG OFF

3A 113

PROG OFF

3A 111

V15 EDUCATION

SPEC

3A 109a

V23 ESR PGM

MGR OFF

3A 109

V15 ESR PGM

MGR

3A 107

WORKSTATIONS,

PSA (3)

3A 106

WKSTN,

CONTRACTOR

3A 105

PROG OFF

3A 104

PROG SUPPORT

ASSISTANT OFF

3A 103

PROG OFF

3A 102

PRINTER

C3 - 9

KIT ALCOVE

C3 - 8

STOR

3B 100

PSA WORK ROOM

3A 127

WORKSTATIONS,

PSA (4)

3A 108

WORKSTATIONS,

PSA (4)

3A 110

WORKSTATIONS,

PSA (4)

3A 112

COPY STORAGE

3A 117

EES STOR

3B 127

HSKG

3B 129

56ET403

56ET403

56ET403

5.5

E

5.2

3 4

2 3 4 5 6 7 86.4 6.64.84.4

B

C

D

F

4.6 sC

D.5

DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE

SERVED FROM TELECOMMUNICATIONS ROOM 3A 122.

ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;

CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS

DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS DRAWINGS

FOR ALL REQUIRED FIBER-OPTIC CABLING.

WAP 1 2 WAP 1 2

WAP 1

WAP 1

WAP 1 2

WAP 1 2 WAP 1 2

WAP 1

WAP 1

WAP 1 2

BLDG 56

AREA OF WORK

- 1/8" = 1'-0"

1 BLDG 56 - FLOOR 3 - TELECOMMUNICATIONS PLAN 0' 4' 8' 16'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 56ET103

BLDG 56 - FLOOR 3 -

TELECOMMUNICATIONS PLAN 56

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

PROJECT

NORTH

TYP

PROJECT

NORTH

KEY PLAN

GENERAL NOTES

KEY NOTES

1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE EXISTING

TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET FOR

ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.

ALL EXISTING WIRELESS ACCESS POINTS (WAP) SHALL BE RE-FED WITH CAT 6A CABLING. CONTRACTOR SHALL FIELD VERIFY QUANTITY AND LOCATIONS OF WAPs.

FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL REQUIRED APPURTENANCES AS REQUIRED.

REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.

CONTRACTOR SHALL ASSUME AT LEAST 10 LINEAR-FEET OF EXISTING CABLE TRAY WILL BE REQUIRED TO

BE MODIFIED/REPLACED AT EACH TR.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY EXACT HEAD

END LOCATION AS REQUIRED.

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL

POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL RACEWAYS AND

CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR

SOURCE, UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT THE EXPENSE OF THE

CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW FIRE

RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH CAT6A PORTS

AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY EXISTING CABLING.

PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING FROM EACH WAO

(WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT RUNS, OR

CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER

TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT VARIANCES

ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING TRANSPORTATION, FOR

ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE DIAGRAMMATICAL.

COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS, ARCHITECTURAL FEATURES, MECHANICAL

DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

EXISTING CABLE TRAY

THROUGHOUT CORRIDORS NOT

SHOWN FOR CLARITY. USE

EXISTING CABLE TRAY TO ROUTE

FIBER-OPTIC BACKBONE CABLING

AS REQUIRED.

2 22

2 2 2 2

22 2

2 2 2 2

2 2

2 2

2 2

2 2

2 2

2 2

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

ELEC ENTR

1C 105e

DATA ENTR

1C 105f

STORAGE GENERAL + MEDICAL

1C 105

SOILED HOLDING

1B 138f

GROUNDS - MAINT

1A 109

ELEC SHOP-FLR

1A 107

PLUMBING SHOP-FLR

1A 105

RECYCLING

1B 136

CART STOR.

1A 108

STORAGE, FORMS

1C 105d

LOBBY

C1-2

STORAGE SECURED

1C 104c

REPAIR

1B 135

EXCESS ITEMS STOR

1C 103

CLEAN HOLDING

1C 102

STORAGE MED GAS, STOR

FLAMMABLE

1C 105c

ELEC

1C 105a

ELEC

1C 105g

ELEC

1B 141

DATA

1B 140

ELEC

1B 137

ELEC

1A 106

OFFICE

1B 119

ELEC

1B 117

MECH ENTR

1A 101

LOUNGE

1A 105e

CONF RM

1B 100

PLANNING & ACTIVATION SHARED

OFFICE

1B 125a

DOCK+ RECEIVING + ISSUE

1C 104

STORAGE-EQUIPMENT

1C 101

VISN WORK ROOM

1B 128

SHARED OFFICE, PM

1B 101

OFFICE, PE

1B 109

OFFICE, PE

1B 111

SHARED OFFICE, PM

1B 115

SHARED OFFICE, PM

1B 114

OFFICE, PE

1B 110

OFFICE, CHIEF

1B 112

MEETING ROOM

1B 113

OFFICE, SAFETY

1B 116

OFFICE, PE

1B 105

OFFICE, PE

1B 102

OFFICE, PE

1B 103

OFFICE, PE

1B 104

OFFICE, PE

1B 107

OFFICE, PE

1B 108

OFFICE AMMS ASSIST

1B 131

OFFICE AMMS CHIEF

1B 132

OFFICE VISN CONTRACT

1B 130

OFFICE VISN CONTRACT

1B 129

OFFICE, STOREKEEPER

1C 104b

ELEC

1A 104d

HOUSEKEEPING AIDS CL-CLEAN

1A 110b

HOUSEKEEPING AIDS CL

1A 110a

M TOILET

1B 124

W TOILET

1B 123

GROUNDS-STOR

1A 109e

PAINT SHOP -FLAMMABLE STOR

1A 103c

PAINT AREA

1A 103b

OFFICE

1A 104e

OFFICE

1A 105c

OFFICE

1A 100c

OFFICE

1A 107c

GROUNDS - MAINT / WET RM / WASH

BAY

1A 109d

SERVER

1B 135d

RECEIVING CLERKS

1C 104a

TOILET

1C 105b

OFFICE

1A 109b

HOSP. PLANS & DRAFTING

1B 125

RECEIVING

1B 138e

N CORR

C1-18

E CORR

C1-16

S CORR

C1-8

ENG DOCK

C1-11

W CORR

C1-9

CORR

C1-12

AMMS ADMIN CUBICLES (6).

1B 133

W LOCKER / TLT

1B 138a

CLERK

1A 109c

MECH

1A 110

CORR

C1-7

PLUMBING SHOP-STOR

1A 105a

CARPENTRY SHOP-FLR.

1A 104a

MASON SHOP

1A 104c

LOCKSMITH - STOR

1A 102b

PAINT SHOP-FLR

1A 103a

GROUNDS-BENCH

1A 109a

CORR

C1-13

TR

1B 139

LOUNGE

1B 122

PEDESTRIAN CORRIDOR

C1-10

STOR MED RECORDS

1C 100

SOILED

1C 102a

CARPENTRY TOOL LOCK-UP

1A 104f

PLUMBING TOOL LOCK-UP

1A 105d

ELECTRICAL TOOL LOCK-UP

1A 107d

OFFICE

1B 118

TR

1B 120

VESTIBULE

C1-1

BID OPG/CONF

1B 134

FORKLIFT BATTERY CHARGE

1C 105h

WAITING RM

C1-3

CORR

C1-4

CORR

C1-6

CORR

C1-5

STORAGE

1B 117a

HOUSEKEEPING AIDS CLOSET

1B 142

HOUSEKEEPING AIDS

CLOSET-CLEAN

1B 143

MACH+A/C TOOL LOCK-UP

1A 100d

LOUNGE

1A 100e

LOUNGE

1A 104g

CARPENTRY STOR.

1A 104h

LOUNGE

1A 107e

ALCOVE

C1-25

ALCOVE

C1-24

ALCOVE

C1-26

ALCOVE

C1-22

ALCOVE

C1-21

ALCOVE

C1-20

ALCOVE

C1-23

ALCOVE

C1-27

ALCOVE

C1-28

ALCOVE

C1-30

LOUNGE

1A 109f

CORR

C1-31

MACH + A/C SHOP-FLR

1A 100

W TOILET

1B 127

M TOILET

1B 126

57ET401a

57ET401b

57ET401a

57ET401b

8.1

8.1

5.5

5.5

0.5 0.6 0.7 0.8

6.1

6.1 8.4

8.4

8.7

8.7

8.10

8.10

K

J

H

G

E.9

C

E

A

B

D

F

C.6

D.4

E.7

G.2

A.3

E.8

TYP

57ET401a

57ET401b

DATA

1B 121

LOUNGE-STAFF

1B 138c

OFFICE, MANAGER

1B 138d

DISTRIBUTION & CLEAN HOLDING

1B 138

M LOCKER / TLT

1B 138b

HANDHOLE

SIDE-B FIBER-OPTIC BACKBONE:

REFERENCE COMMUNICATION SHEETS

FOR ADDITIONAL INFORMATION

REGARDING HANDHOLE, CONDUIT,

BUILDING PENETRATIONS, FIBER-

OPTIC CABLING, AND RACEWAY

INFORMATION

TYP

EXISTING SIDE-A FIBER-OPTIC BACKBONE BUILDING

ENTRY POINT (APPROXIMATE LOCATION). ROUTE FIBER-

OPTIC CABLES TO TRs AS INDICATED ON

COMMUNICATIONS DRAWINGS; REFERENCE

COMMUNICATIONS DRAWINGS FOR ALL FIBER-OPTIC

CABLING, RACEWAY TYPES, SPECIFICATIONS, AND

RATINGS. REFERENCE KEY NOTES ON THIS SHEET

REGARDING CABLE TRAY AND VERTICAL/HORIZONTAL

ROUTING FOR ADDITIONAL FIBER BACKBONE CABLING

REQUIREMENTS.

DATA OUTLETS AND

DEVICES IN THIS AREA

SHALL BE SERVED FROM

TELECOMMUNICATION

ROOM 1B139

DATA OUTLETS AND

DEVICES IN THIS AREA

SHALL BE SERVED FROM

TELECOMMUNICATION

ROOM 1B120

ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;

CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS AS

DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS

DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.

WAP 1

WAP 1

WAP 1

WAP 1WAP 1

WAP 1

WAP 1

3 3

EXISTING CABLE TRAY THROUGHOUT

CORRIDORS NOT SHOWN FOR

CLARITY. USE EXISTING CABLE TRAY

TO ROUTE FIBER-OPTIC BACKBONE

CABLING AS REQUIRED.

- AREA OF WORK

BLDG 57

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD

VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL

RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL

BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED

MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR

REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING

OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS

REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH

CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY

EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO

REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR,

MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE

INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY

FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING

FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT

RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF

HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND

AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR PARTITION

TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;

DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE

WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING,

BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED

THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING

IS ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE

BUNDLED WITH LIKE SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH

TRAY DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .