Attachment 11 - Drawings Part-10.pdf
PDF 15 MB Posted
- Attached to
- Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
- Solicitation number
- 36C77623R0009
About this file
This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, interior renovations including demolition and new construction, data center renovations, physical security enhancements, fiber optic infrastructure assessment and upgrades between buildings, installation of a diversified wide area network path to the datacenter, and hazardous material abatement. The project involves construction and renovation activities in buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75 on the campus. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 50
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
UP
DN
Tectonic Copyright 2007
Tectonic Copyright 2007
C
F
H
B
E
G
J
K
L
111098 8.2 8.8
D.4
L.9
A
55EP403b
55EP403b
TR
3C149
DATA TECH
3C150
A R
E A
A
A R
E A
B
S E
E S
H E
E T
E P b
Public Elev. #1
P-2
Service Elev. #3
S-1
Public Elev. #1
2C148
Service Elev. #3
2C150
Group Room 3A
Work Area & Storage
3A
Group Room 3A
SP
3A
P. Toilet 3A
Elevator Machine Room
3B
Women's Toilet 3B
Public Elev. #1
2C156
Service Elev. #3
2C158
Elevator Lobby
C3-1
Corridor
C3-4
Group Room, Large
3A
P. Toilet 3A
Stair #2-3
2C162
Group Room Storage (Future Public Elev.) #4
3B
Stair #2-3
2C162
CORRIDOR
C3-21
Public Elev. #2
P-3
Public Elev. #2
2C149
GRECC Lounge 3C
Waiting 3C
Clean- Instrument, SPD, Linen
3C
Office - Exam 3C
Office - Exam 3C
Office - Exam 3C
Office - Exam 3C
Patient Education / Shared
Conference 3C
Reception 3C
129a
Pat. Toilet 3C
Staff Toilet 3C
Clean Supply 3C
Multipurpose Office - Pharmacy
3C
Office - Exam 3C
Housekeeping 3C
Office - Exam 3C
Pat. Toilet 3C
Resident Workspace
3C
Exam/Multi- Purpose Office
3C
Waiting 2 3C
Pat. Toilet 3C
Pat. Toilet 3C
Office- Exam 3C
Wheelchair Storage
3C
MAS Control (Nurse Station)
3C
Medication 3C
Immunization 3C
Nutrition Classroom
3C
Office - Exam 3C
X-Ray 3C
Operatory 3C
Hygienist 3C
Operatory 3C
Staff Lounge 3C
IP Holding 3C
Staff Toilet 3C
Soiled Holding 3C
Storage 3C
Housekeeping 3C
Staff Work (SEPS Office)
3C
Public Patient Toilet
3C
Reception 3C
Elec.
3C
Office - Admin 3C
Office - Admin 3C
Office - Admin 3C
Kiosk 3C
129b
Mechanical 3M
Waiting 1 3C
Staff Toilet 3C
Dental Lab
C3-15
Office - Exam 3C
Elec.
3C
Men's Toilet 3B
Public Elev. #2
2C157
Stair #3-3
2C160
Elevator Lobby
C3-3
Corridor
C3-2
Corridor
C3-5
Corridor
C3-14
Corridor
C3-18
Corridor
2C161
Corridor
C3-20
Pump 3C
Pump 3C
Soiled Holding 3C 146Chief Office
3C
Office - Provider 3C
Office - Provider 3C
Corridor
C3-24
Intake Room 3C
Corridor
C3-17
Corridor
C3-25
Corridor
C3-19
Corridor
C3-22
Closet 3C
133a
Storage 3C
Corridor
C3-16
Print Alcove
C3-23
Cl.
3C-112A
55EP403b
55EP403b
AREA B
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER,SIGNAL, LIGHTING DEVICES AND ASSOCIATED CIRCUITRY
AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED
BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
- AREA OF WORK
- 1" = 10'-0"
1 BLDG 55 - FLOOR 3 - AREA B - ELECTRICAL PLAN
KEY PLAN
KEY NOTES
GENERAL NOTES
KEY PLAN
KEY NOTES
GENERAL NOTES
0' 5' 10' 20'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
55EP103b
BLDG 55 - FLOOR 3 - AREA B
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
LRL/WNM LLT/JPS
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
AVID MACHINE
ROOM
BB 117
IT NON - SECURE
STR
BB 121
AMD / AV
PRODUCTION
COORD
BB 143
IT CDN, SHARED
BB 144
E-LEARN PROD
OFFICE
BB 145
E-LEARN PROD
OFFICE
BB 146
E-LEARN PROD
OFFICE
BB 147
GRAPHICS
OFFICE
BB 109
GRAPHICS
OFFICE
BB 108
GRAPHICS
OFFICE
BB 107
GRAPHICS
OFFICE
BB 105
OFFICE, STUDIO
MGR
BB 104
OFFICE, STUDIO
MGR
BB 100
OFFICE
PRODUCER
BA 125
OFFICE
PRODUCER
BA 123
TR
BA 105
DATA
BA 106
ELEC
BA 107
RECYCLING
ROOM
BA 104
PROD CTL VIDEO
BA 110
STAIR 1
STAIR
WOMEN
BA 100
OFFICE, SR
ENGINEER
BA 122
NAT'L MEDIA
SVCS COORD
BA 121
OFFICE
PRODUCER
BA 120
GREEN ROOM
BA 119
DRESSING RM
BA
118A
MAKE UP
BA 118
LAN / TEL / DATA
DMARK ROOM
BA 114ENG MAINT
BA 115
OFFICE
PRODUCER
BA 116
AV PRODUCTION
SUPPORT
BA 113
CONTRACTOR
WKSTNS (2)
BA 112
SUPPORT TECH
BA
112A
STUDIO
BA 109
EQPT AV STR
BA
103A
STUDIO MECH
BA
108B
MEDIA STORAGE
BA 108
DOCK /
RECEIVING
BA 103
MAIL ROOM
BA 102
MEN
BA 101
ELEV
S - 1
ELEV
P - 1
IT SECURE
STORAGE
BB 120
STORAGE,
EQUIPMENT +
SUPPLIES /
PARTS
BB 119
COMBINED
COMPUTER /
SERVER ROOM
BB 102
AVID SUITE
BB 116
AVID SUITE
BB 114
AVID SUITE
BB 113
MSTR OFFICE
SUPPLIES
BB 124
STAIR 2
STAIR
KIT
BB 126
TLT
BB 127
TLT
BB 128
SOCIAL MEDIA
BB 132
IT SYSTEM ADMIN
BB 133
IT SPECIALIST
BB 134
IT SPECIALIST
BB 135
IT SYSTEM
ADMIN, SHARED
BB 136
IT OFFICE ISO
BB 137
IT SPECIALIST,
SHARED
BB 138
OFFICE
ENGINEER
SHARED
BB 139
Room
BB 140
ELEARN PROD
BB 141
LRG COORD
BB 148
LRG PROGRAM
SUPPORT
BB 130
NORMAL
ELECTRICAL
ENTRY
BB
129A
EMERGENCY
ELECTRICAL
ENTRY
BB 129
EES ELEC
BB 125
MUSIC LIBRARY
BB 118
OFFICE EDIT
BB 115
OFFLINE EDIT
BB 112
GRAPHICS
STORAGE
BB 111
DUBBING / CDN
BB 106
AUDIO BOOTH
BB 110
COPY ROOM
BB 103
WK ROOM
BB 101
MASTER
CONTROL
BA 117
MECH
BB 123
HSKG
BB 122
LRG
CB-20
LRG
CB-19
LRG
CB-18
COLLABORATION
CB -50
56EP400
56EP400
1 2 3 4 5 6 7 86.4 6.65.54.84.41.3
B
C
D
E
F
G
H
4.6 5.2s1 s5 sC sA
D.5
56EP400
56EP400
TR-56-DP-TRB
56-DP-TRB
56-DP-TRA
DP 56EQ
DP 56LS
MSB 56-1
TR 56-C
ATS C
DP 56-L
DP 56-M
DP 56-R
GSB 56
ATS EQ
ATS LS
DP 56-C
BLDG 56
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
9. REFERENCE ONE-LINE DIAGRAM ON SHEET 56EP601 FOR CONDUIT AND WIRE
SIZING.
AREA OF WORK
- 1/8" = 1'-0"
1 BLDG 56 - FLOOR 0 - ELECTRICAL PLAN 0' 4' 8' 16'
GENERAL NOTES
KEY PLAN
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
56EP100
BLDG 56 - FLOOR 0 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM - INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 56EP601
FOR ADDITIONAL INFORMATION.
EXISTING EQUIPEMENT TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON
SHEET 56EP601 FOR ADDITIONAL INFORMATION.
PROJECT
NORTH
PROJECT
NORTH
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
TR
1A 109
DATA
1A 108
ELEC
1A 107
MM PHOTO
STUDIO
1A 101
CONF STOR
1B
104A
CONF COATS
1B 104
HSKG
1B 103
FOOD PREP
1B 105
CONF A/V
1B 106
NCA COPY
1B 107
TLT
1B 108
ELEV
P - 1
ELEV
S - 1
WOMEN
1A 106
MEN
1A 105CONFERENCE
STOR
1A 104
CONFERENCE
STOR
1B 101
MECHANICAL
1B 102
STAIR 2
STAIR
SCURE STOR
1B 113
BREAK RM /
KITCHEN
1B 112
TLT
1B 111
CT / S
1B 110
ELEC
1B 109
REFERENCE
LIBRARY
1B 121
STOR
1B 129
COATS
1B 128
STOR
1B 127
NCA OFF
1B 122
NCA OFF
1B 123
NCA OFF
1B 124
NCA OFF
1B 125
NCA OFF
1B 126
TLT / CHG
1B
101A
VESTIBULE
C1 - 1
RECEPTION
WAITING
C1 - 4
STAFF LOUNGE
1B 100 STAFF LOUNGE
1B
100A
VESTIBULE
C1 - 11
VIDEO EDIT
1A
102F
MM STORAGE
1A
102E WEB DESIGNER
1A
102D
GRAPHIC
DESIGNER / PUB
1A
102C
GRAPHIC
DESIGNER / PUB
1A
102B
CHIEF OFF
1A
102A
CLO
1A
100A
MM VIDEO CONF
1A 100
MM STORAGE
1A 103
MM WORKROOM,
ILLUSTRATOR
1A 102
BREAK OUT
1B 117
BREAK OUT
1B 116
BREAK OUT
1B 114
BREAK OUT
1B 115
LARGE
CLASSROOM
1B 118
COMPUTER LAB
1B 119
MEDIUM
CLASSROOM
1B 120
CONFERENCE
1B 130
RECEPTION
C1 - 14
STUDENT WKRM
C1 - 16
DISPLAY
C1 - 20
WAITING
C1 - 13
EWC
C1 - 7
ELEV LOBBY
C1 - 8
WORK ALCOVE
C1 - 3
56EP401
56EP401
1 2 3 4 5 6 7 86.4 6.65.54.84.41.3
B
C
D
E
F
G
4.6 5.2s1 s5 sC sA
D.5
56EP401
56EP401
BLDG 56
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
56EP101
BLDG 56 - FLOOR 1 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM - INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1/8" = 1'-0"
1 BLDG. 56 - FLOOR 1 - ELECTRICAL PLAN 0' 4' 8' 16'
GENERAL NOTES
KEY PLAN
KEY NOTES
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
TR
2A 122
DATA
2A 121
ELEC
2A 120
MKTG STOR
2B 126
FISCAL STOR
RECORDS
2B 124
HR STORAGE
2B 132
HR OFF
2B 130
HR DIRECTOR
2B 123
FISCAL OFF
2B 129
FISCAL OFF
2B 128
FISCAL OFF -
SHARED
2B 127
EES CONF
2B 115
ELEC
2B 121
STAIR 1
STAIR
WOMEN
2A 124
MEN
2A 125
MKTG STOR
2A 126
HSKG
2B 131
COPY
C2 - 24
ELEV
P - 1
ELEV
S - 1
MECH
2B 106
STAIR 2
STAIR
ACQ STOR
2B 114
EES CONF CLO
2B
115A
OAA CONF ROOM
2A 109
OAA WKRM
2A 104
OAA STOR
2A 111
MKTG STOR
2A 113
FISCAL OFF -
SHARED
2A 125
FISCAL OFF -
SHARED
2B 123
FISCAL OFF -
SHARED
2B 122
FISCAL WORK
AREA
2B 120
FISCAL OFFICE
2B 119
FISCAL BUDGET
ANALYST
2B 118
FISCAL BUDGET
ANALYST
2B 117
FISCAL BUDGET
ANALYST
2B 116
FISCAL ASS'T
CHIEF
2B 113
FISCAL CHIEF
2B 112
ACQ OFFICE
2B 111
ACQ COORD
2B 110
OFF PROG
SUPPORT
2B 109
ACQ DEPUTY
2B 107
ACQ OFF -
SHARED
2B 105
ACQ OFF -
SHARED
2B 104
ACQ OFF -
SHARED
2B 103
ACQ OFF -
SHARED
2B 101
ACQ OFF -
SHARED
2B 100
COLLABORATION
ROOM
2A 101
ACQ OFF
2A 102
OAA OFF WEB
DEVELOPER
2A 103
OAA OFF ADMIN
2A 105
OAA OFF
DIRECTOR
2A 106
OAA OFF PHYS /
DIRECTOR
2A 107
OAA OFF WRITER
/ EDITOR
2A 108
OAA OFF HEALTH
SYS SPEC
2A 110
OAA OFF
PROGRAM
ANALYST
2A 112
MKTG OFF PA
2A 114
MKTG DIR
2A 115
MKTG OFF
SHARED
2A 116
MKTG OPEN
OFFICE
2A 117
FISCAL OFF
MANAGEMENT
ANALYST
2A 118
FISCAL ASS'T
A&MM
2A 119
COPY ALCOVE
C2 - 15
KIT ALCOVE
C2 - 14
MKTG STOR
2B 102
ELEV LOBBY
C2 - 1
EWC
C2 - 3
CORR
C2 - 16CUBE
C2 - 20
CUBE
C2 - 19
CUBE
C2 - 18
KIT ALCOVE
C2 - 10
COPY
C2 - 22
56EP402
56EP402
2 3 4 5 6 7 86.4 6.65.54.84.4
D
E
F
G
4.6 5.2s1 s5 sC sA
D.5
56EP402
56EP402
BLDG 56
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
56EP102
BLDG 56 - FLOOR 2 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM - INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1/8" = 1'-0"
1 BLDG 56 - FLOOR 2 - ELECTRICAL PLAN 0' 4' 8' 16'
GENERAL NOTES
KEY PLAN
KEY NOTES
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
TR
3A 122
PSA
C3 - 24
PSA
C3 - 23
PSA
C3 - 22
PSA
C3 - 21
PSA
C3 - 20
EWC
C3 - 3 DATA
3A 121
ELEC
3A 119
STAIR 1
STAIR
WOMEN
3A 125
MEN
3A 126
ELEV
P - 1
ELEV
S - 1
MECH
3A 129
SHARED
INSTRUCT OFF
3A 100LEARNING
CONSULT OFF
3B 101
LEARNING
CONSULT OFF
3B 102LEARNING
CONSULT OFF
3B 103
LEARNING
CONSULT OFF
3B 104LEARNING
CONSULT OFF
3B 106
LEARNING
CONSULT OFF
3B 107ADMIN
MANAGING DIR
3B 109
ADMIN
MANAGING DIR
3B 110
ADMIN - DEPUTY
DIR
3B 111
ADMIN - DEPUTY
DIR
3B 112
PROG OFF
3B 113
PROG OFF
3B 115
PROG OFF
3B 117
ADMIN SUP
C3 - 18
CAMPUS MGR
C3 - 17
COLLAB ROOM
3B 114
ELEC
3B 116
STOR, PROGRAM
FILES
3B 122
COPY
C3 - 19
PROG OFF
3B 118
AMD FOR
PROGRAMS
OFFICE
3B 119
PROG MANAGER
OFFICE
3B 120
PROG MANAGER
OFFICE
3B 121
PROG MANAGER
OFFICE
3B 123
PROG MANAGER
OFFICE
3B 124
PROG MANAGER
OFFICE
3B 125
PROG MANAGER
OFFICE
3B 126
PROG MANAGER
OFFICE
3B 128
PROG MANAGER
OFFICE
3A 124
PROG MANAGER
OFFICE
3A 123
PROG MANAGER
OFFICE
3A 120
PROG MANAGER
OFFICE
3A 118
EDUCATION TECH
3A 116
WORKSTATIONS,
V15 / V23 PGM
SUPPORT (2)
3A 115
OFFICE,
EDUCATION TECH
(3)
3A 114
PROG OFF
3A 113
PROG OFF
3A 111
V15 EDUCATION
SPEC
3A
109a
V23 ESR PGM
MGR OFF
3A 109
V15 ESR PGM
MGR
3A 107
WORKSTATIONS,
PSA (3)
3A 106
WKSTN,
CONTRACTOR
3A 105
PROG OFF
3A 104
PROG SUPPORT
ASSISTANT OFF
3A 103
PROG OFF
3A 102
PRINTER
C3 - 9
KIT ALCOVE
C3 - 8
STOR
3B 100
PSA WORK ROOM
3A 127
WORKSTATIONS,
PSA (4)
3A 108
WORKSTATIONS,
PSA (4)
3A 110
WORKSTATIONS,
PSA (4)
3A 112
COPY STORAGE
3A 117
EES STOR
3B 127
HSKG
3B 129
56EP403
56EP403
2 3 4 5 6 7 86.4 6.65.54.84.4
B
C
D
E
F
4.6 5.2s1 s5 sC sA
D.5
56EP403
56EP403
BLDG 56
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
56EP103
BLDG 56 - FLOOR 3 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM - INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1/8" = 1'-0"
1 BLDG 56 - FLOOR 3 - ELECTRICAL PLAN 0' 4' 8' 16'
GENERAL NOTES
KEY PLAN
KEY NOTES
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
ELEC ENTR
1C
105e
DATA ENTR
1C 105f
STORAGE
GENERAL +
MEDICAL
1C 105
SOILED HOLDING
1B
138f
LOUNGE-STAFF
1B
138c
GROUNDS -
MAINT
1A 109
ELEC SHOP-FLR
1A 107
PLUMBING
SHOP-FLR
1A 105
RECYCLING
1B 136
CART STOR.
1A 108
STORAGE,
FORMS
1C 105d
LOBBY
C1-2
STORAGE
SECURED
1C 104c
REPAIR
1B 135
EXCESS ITEMS
STOR
1C 103
CLEAN HOLDING
1C 102
STORAGE MED
GAS, STOR
FLAMMABLE
1C
105c
ELEC
1C
105a
ELEC
1C
105g
ELEC
1B 141
DATA
1B 140
ELEC
1B 137
ELEC
1A 106
OFFICE
1B 119
ELEC
1B 117
MECH ENTR
1A 101
LOUNGE
1A
105e
CONF RM
1B 100
PLANNING &
ACTIVATION
SHARED OFFICE
1B
125a
DOCK+
RECEIVING +
ISSUE
1C 104
STORAGE-EQUIPMENT
1C 101
VISN WORK
ROOM
1B 128
SHARED OFFICE,
PM
1B 101
OFFICE, PE
1B 109
OFFICE, PE
1B 111
SHARED OFFICE,
PM
1B 115
SHARED OFFICE,
PM
1B 114
OFFICE, PE
1B 110
OFFICE, CHIEF
1B 112
MEETING ROOM
1B 113
OFFICE, SAFETY
1B 116
OFFICE, PE
1B 105
OFFICE, PE
1B 102
OFFICE, PE
1B 103
OFFICE, PE
1B 104
OFFICE, PE
1B 107
OFFICE, PE
1B 108
OFFICE AMMS
ASSIST
1B 131
OFFICE AMMS
CHIEF
1B 132
OFFICE VISN
CONTRACT
1B 130
OFFICE VISN
CONTRACT
1B 129
OFFICE,
STOREKEEPER
1C 104b
ELEC
1A
104d
OFFICE,
MANAGER
1B 138dHOUSEKEEPING
AIDS CL-CLEAN
1A
110b
HOUSEKEEPING
AIDS CL
1A 110a
M TOILET
1B 124
W TOILET
1B 123
GROUNDS-STOR
1A
109e
PAINT SHOP
-FLAMMABLE
STOR
1A
103c
PAINT AREA
1A
103b
OFFICE
1A
104e
OFFICE
1A
105c
OFFICE
1A
100c
OFFICE
1A
107c
GROUNDS -
MAINT / WET RM /
WASH BAY
1A
109d
SERVER
1B
135d
RECEIVING
CLERKS
1C 104a
TOILET
1C
105b
OFFICE
1A
109b
HOSP. PLANS &
DRAFTING
1B 125
RECEIVING
1B
138e
N CORR
C1-18
E CORR
C1-16
S CORR
C1-8
ENG DOCK
C1-11
W CORR
C1-9
CORR
C1-12
AMMS ADMIN
CUBICLES (6).
1B 133
M LOCKER / TLT
1B
138b
W LOCKER / TLT
1B
138a
CLERK
1A
109c
MECH
1A
CORR
C1-7
PLUMBING
SHOP-STOR
1A 105a
CARPENTRY
SHOP-FLR.
1A 104a
MASON SHOP
1A
104c
LOCKSMITH -
STOR
1A 102b
PAINT SHOP-FLR
1A
103a
GROUNDS-BENCH
1A
109a
CORR
C1-13
CORR
C1-14
TR
1B 139
LOUNGE
1B 122
PEDESTRIAN
CORRIDOR
C1-10
STOR MED
RECORDS
1C 100
SOILED
1C
102a
CARPENTRY
TOOL LOCK-UP
1A 104f
PLUMBING TOOL
LOCK-UP
1A 105d
ELECTRICAL
TOOL LOCK-UP
1A 107d
DISTRIBUTION &
CLEAN HOLDING
1B 138
OFFICE
1B 118
DATA
1B 121
VESTIBULE
C1-1
BID OPG/CONF
1B 134
FORKLIFT
BATTERY
CHARGE
1C 105h
WAITING RM
C1-3
CORR
C1-4
CORR
C1-6
CORR
C1-5
STORAGE
1B
117a
HOUSEKEEPING
AIDS CLOSET
1B 142
HOUSEKEEPING
AIDS
CLOSET-CLEAN
1B 143
MACH+A/C TOOL
LOCK-UP
1A 100d
LOUNGE
1A
100e
LOUNGE
1A
104g
CARPENTRY
STOR.
1A 104h
LOUNGE
1A
107e
ALCOVE
C1-25
ALCOVE
C1-24
ALCOVE
C1-26
ALCOVE
C1-22
ALCOVE
C1-21
ALCOVE
C1-20
ALCOVE
C1-27
ALCOVE
C1-29
ALCOVE
C1-30
LOUNGE
1A
109f
CORR
C1-31
MACH + A/C
SHOP-FLR
1A 100
W TOILET
1B 127
M TOILET
1B 126
57EP401a
57EP401b
57EP401a
57EP401b
1210953 62 4 7 8.17.9 115.5 8.4 8.6 8.10
K K
J J
H H
G G
C C
E E
A A
B B
D D
F F
C.6 C.6
D.4 D.4
G.4 G.4
A.3 A.3
E.8 E.8
TR 57-1N6
57-1N6
TR 57-1N4
57-1N4
I
TR
1B 120
57EP401a
57EP401a
57EP401b
57EP401b
LL
MSB 57
57-1L1
DP 57M
DP 57R
DP 57L
BLDG 57
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
57EP101
BLDG 57 - FLOOR 1 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1/16" = 1'-0"
1 BLDG 57 - FLOOR 1 - ELECTRICAL PLAN
KEY PLAN
GENERAL NOTES
0' 8' 16' 32'
KEY NOTES
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
1 EQUIPMENT TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET 57EP601
FOR ADDITIONAL INFORMATION.
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
58L1
DP1
58P1
MDP - 58
58P4 58P3
58L2
58P2
C1
58EP401
58EP401
58EP401
58EP401
A
B C D E E1 F G I J
MECH. RM.
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
RM.
OFFICE
OFFICE
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
TR
OFFICE
OFFICE
OFFICE
TOILET, MALE
EQUIPMENT RM.
GROUP RM.
GROUP RM.
LOUNGE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
PRINTER RM.
OFFICE
120B
TOILET, FEMALE
TOILET, MALE
GROUP RM.
GROUP RM.
TOILET, FEMALE
TOILET, MALE
TOILET, FEMALE
HAC
ELEC RM.
LOBBY
C108
CORRIDOR
C112
CORRIDOR
C107
STORAGE
CLOSET
C106.1
CORRIDOR
C106
CORRIDOR
C111
CLOSET
C110.1
CORRIDOR
C110
CORRIDOR
C113
CORRIDOR
C114
WAITING
C108
CHASE
CH-1
CHASE
CH-2
CHASE
CH-3
CHASE
CH-4
VESTIBULE
C103
VESTIBULE
C101
CORRIDOR
C106.3
OFFICE
120A
CORRIDOR
C105
LOBBY / WAITING
C102
LOBBY
C104
MECH. RM.
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
RM.
OFFICE
OFFICE
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
TR
OFFICE
OFFICE
OFFICE
TOILET, MALE
OI&T
EQUIPMENT RM.
GROUP RM.
GROUP RM.
LOUNGE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
PRINTER RM.
OFFICE
120B
TOILET, FEMALE
TOILET, MALE
GROUP RM.
GROUP RM.
TOILET, FEMALE
TOILET, MALE
TOILET, FEMALE
HAC
ELEC RM.
CORRIDOR
C107
STORAGE
CLOSET
C106.1
CORRIDOR
C106
CORRIDOR
C111
CLOSET
C110.1
CORRIDOR
C110
CORRIDOR
C113
CORRIDOR
C114
WAITING
C108
CHASE
CH-1
CHASE
CH-2
CHASE
CH-3
CHASE
CH-4
VESTIBULE
C103
VESTIBULE
C101
CORRIDOR
C106.3
OFFICE
120A
CORRIDOR
C105
BLDG 58
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
- AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
58EP101
BLDG 58 - FLOOR 1 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1/8" = 1'-0"
1 BLDG 58 - FLOOR 1 - ELECTRICAL PLAN
KEY PLAN
GENERAL NOTES
0' 4' 8' 16'
KEY NOTES
Revisions: Date:
EXISTING PANEL TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET
58EP601 FOR ADDITIONAL INFORMATION.
PROJECT
NORTH
PROJECT
NORTH
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
LOADING DOCK
1 2 3 4 5 6 7 7.5 8 91.5 6.52.5
A
B
C
D
E
E.5
F
G
H
A B
60-B2 60-B2
60-BA
60-2
P4A
P4 DP-60EM
MDP-60
60EP401
60EP401
REFRIGERATOR
REFRIGERATOR
LOCKER RM.
60EP401
60EP401
STORAGE
CART WASH
RECEIVING
REFRIGERATOR
STORAGE
113A
FREEZER
112A
WALK IN FREEZER
FOOD PREP. RM.
OFFICE
120A
INGREDIENT RM.
F.E. CLOSET
120C
STORAGE
NOURISHMENT
HAC
MECH. RM.
OFFICE
WALK-IN FREEZER
REFRIGERATOR
OFFICE
OFFICE
STORAGE
135A
REFRIGERATOR
DISHWASHER
FOYER
120B
CORRIDOR
H101
CORRIDOR
CORRIDOR
H102
OI&T
101A
STORAGE
133A
TRANSFORMER RM.
MECH. RM.
CHASE
CH-A-02
TR
SHARED WORK AREA
WALK IN FREEZER
FREEZER
133N
WALK-IN FREEZER
REFRIGERATOR
BUTCHER SHOP
KITCHEN
TOILET
TOILET
BLDG 60
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED EQUIPMENT TO
BE DEMOLISHED SHALL BE BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
60EP101
BLDG 60 - FLOOR 1 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1/8" = 1'-0"
1 BLDG 60 - FLOOR 1 - ELECTRICAL PLAN 0' 4' 8' 16'
GENERAL NOTES
KEY PLAN
KEY NOTES
Revisions: Date:
EXISTING PANEL TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET
60EP601 FOR ADDITIONAL INFORMATION.
PROJECT
NORTH
PROJECT
NORTH
DN
UP
UP
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
A B C D E F G H
60TEP401
60TEP401
OFFICE
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
RM.
ENTRY
H101
OFFICE
OFFICE
OFFICE
HAC
TOILET, MALE
TOILET, FEMALE
KITCHEN
TR
WORK RM.
CLASS RM.
OFFICE
OFFICE
OFFICE
CORRIDOR
H102
CORRIDOR
H104
CORRIDOR
H103
BLDG 60T
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR
ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
60TEP101
BLDG 60T - FLOOR 1 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
60T
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1/4" = 1'-0"
1 BLDG 60T - FLOOR 1 - ELECTRICAL PLAN
KEY PLAN
0' 2' 4' 8'
GENERAL NOTES
KEY NOTES
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
UP
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
F F
DD
E E
C.5C.5
4.5
4.5
75EP401
A A
G G
CC
BB
H H
J J
D.1 D.1
Control Room
1B 108
Entry Room
1B 109
TERMINAL ROOM
A
1B 107
Corridor
C1-3
Office
1B 106
Men's Toilet 1B
103a
Recyclable Storage
1B 102
Break Room
1B 100 Women's Toilet
1B 101a
Men's Lockers 1B
103b
Women's Lockers 1B
101b
Housekeeping
1B 104
Shower 1B
103c Shower 1B
101c
KK
(MCC / 75-1)
(MCC / 75-3)
PANEL '75N'
(MCC / 75-2)
PANEL 'DP / 75-1'
TR - 75 - 112.5
PANEL '75L'
BAY-12
BAY-11
BAY-10
BAY-9
BAY-8
BAY-7
BAY-6
BAY-5
BAY-4
FUTURE
FUTURE
FUTURE
BAY-1
BAY-2
BAY-3
BAY-4
BAY-5
PARALL. CONTROLS
BAY-1
BAY-2
BAY-3
BAY-4
BAY-5
BAY-6
BAY-7
BAY-8
BAY-9
BAY-10
BAY-11
BAY-12
BACK FRONT
BACKFRONT
BACKFRONT
(PG / 75-1)
(UNS / 75-1)
(TR-UNS -
75-1)
MAIN (NORMAL)
MAIN (EM)
CAMPUS
MEDIUM
VOLTAGE
SWITCHGEAR
(PS / 75-1)
(MDP / 75-1)
MAIN1
UTIL. METERING
GENCHP
MAIN2
75EP401
Air Lock
C1-5
Entry
1B 103
Entry
1B 101 Switchgear
1C 100
Switchgear
1C 101
Switchgear
1C 102
Generator Bay
1C 103
Areaway
1C 104 Areaway
1C 105
Vest.
C1-1
Corridor
C1-2
CORRIDOR
C1-6
Boiler Bay
1A 101
Chiller Bay
1A 100 Substation
SITE
Sound Lock
C1-4
75-DP-TRAB
75EP401
75EP401
TR
1B 105
BLDG 75
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
9. REFERENCE ONE-LINE DIAGRAM ON SHEET 75EP601 FOR CONDUIT AND WIRE
SIZING.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
75EP101
BLDG 75 - FLOOR 1 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1" = 10'-0"
1 BLDG 75 - FLOOR 1 - ELECTRICAL PLAN
PROJECT
NORTH
KEY PLAN
KEY NOTES
GENERAL NOTES
Revisions: Date:
PROJECT
NORTH
0' 5' 10' 20'
1 EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 75EP601 FOR
ADDITIONAL INFORMATION.
EXISTING TRANSFORMER TO BE MODIFIED; REFERENCE ONE-LINE DIAGRAM ON SHEET
75EP601 FOR ADDITIONAL INFORMATION.
J
J
JJ
J
DN
UP
DN
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
M N OK.2 N.1
AA BB
DATA RACK, TYP
DATA RACK, TYP
PANEL
CDP-B
PANEL EMGC11PANEL
CDP
OI&T
GC11B
113 SF
OI&T
GC11A
191 SF
OI&T
GC12A
152 SF
M N
O
K.2 N.1
AA BB
PANEL
CDP-B
PANEL EMGC11PANEL
CDP
DATA RACK, TYP
DATA RACK, TYP
OI&T
GC11B
113 SF
OI&T
GC12A
152 SF
OI&T
GC11A
191 SF
1 11
GC11A
GC11B
GC12
GC12A
GC12A
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
01EP400a
BLDG 01 - FLOOR 0 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON
BARRACKS MO
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
GENERAL NOTES
KEY PLAN
PROJECT
NORTH
KEY NOTES
1/4" = 1'-0"01EP100
1 RM GC11A, GC11B, GC12, GC12A - DEMOLITION ELECTRICAL PLAN
1/4" = 1'-0"01EP100
2 RM GC11A, GC11B, GC12, GC12A - ELECTRICAL PLAN
0' 2' 4' 8'
PROJECT
NORTH
0' 2' 4' 8'
PROJECT
NORTH
Revisions: Date:
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
File details come from the government source that posted it. Updated .