Attachment 11 - Drawings Part-10.pdf

PDF 15 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, interior renovations including demolition and new construction, data center renovations, physical security enhancements, fiber optic infrastructure assessment and upgrades between buildings, installation of a diversified wide area network path to the datacenter, and hazardous material abatement. The project involves construction and renovation activities in buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75 on the campus. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
36C77623R0009 0005.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf PDF
36C77623R0009 0003.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
36C77623R0009 0001.pdf PDF
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 38 - Envr. Report - Drawings.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 5 - Drawings Part-4.pdf PDF
Attachment 6 - Drawings Part-5.pdf PDF
Attachment 9 - Drawings Part-8.pdf PDF
Attachment 16 - Drawings Part-15.pdf PDF
Attachment 22 - Drawings Part-21.pdf PDF
Attachment 24 - Drawings Part-23.pdf PDF
Attachment 36 - Envr. Report - Appendix B.pdf PDF
Attachment 41 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 44 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

UP

DN

Tectonic Copyright 2007

Tectonic Copyright 2007

C

F

H

B

E

G

J

K

L

111098 8.2 8.8

D.4

L.9

A

55EP403b

55EP403b

TR

3C149

DATA TECH

3C150

A R

E A

A

A R

E A

B

S E

E S

H E

E T

E P b

Public Elev. #1

P-2

Service Elev. #3

S-1

Public Elev. #1

2C148

Service Elev. #3

2C150

Group Room 3A

Work Area & Storage

3A

Group Room 3A

SP

3A

P. Toilet 3A

Elevator Machine Room

3B

Women's Toilet 3B

Public Elev. #1

2C156

Service Elev. #3

2C158

Elevator Lobby

C3-1

Corridor

C3-4

Group Room, Large

3A

P. Toilet 3A

Stair #2-3

2C162

Group Room Storage (Future Public Elev.) #4

3B

Stair #2-3

2C162

CORRIDOR

C3-21

Public Elev. #2

P-3

Public Elev. #2

2C149

GRECC Lounge 3C

Waiting 3C

Clean- Instrument, SPD, Linen

3C

Office - Exam 3C

Office - Exam 3C

Office - Exam 3C

Office - Exam 3C

Patient Education / Shared

Conference 3C

Reception 3C

129a

Pat. Toilet 3C

Staff Toilet 3C

Clean Supply 3C

Multipurpose Office - Pharmacy

3C

Office - Exam 3C

Housekeeping 3C

Office - Exam 3C

Pat. Toilet 3C

Resident Workspace

3C

Exam/Multi- Purpose Office

3C

Waiting 2 3C

Pat. Toilet 3C

Pat. Toilet 3C

Office- Exam 3C

Wheelchair Storage

3C

MAS Control (Nurse Station)

3C

Medication 3C

Immunization 3C

Nutrition Classroom

3C

Office - Exam 3C

X-Ray 3C

Operatory 3C

Hygienist 3C

Operatory 3C

Staff Lounge 3C

IP Holding 3C

Staff Toilet 3C

Soiled Holding 3C

Storage 3C

Housekeeping 3C

Staff Work (SEPS Office)

3C

Public Patient Toilet

3C

Reception 3C

Elec.

3C

Office - Admin 3C

Office - Admin 3C

Office - Admin 3C

Kiosk 3C

129b

Mechanical 3M

Waiting 1 3C

Staff Toilet 3C

Dental Lab

C3-15

Office - Exam 3C

Elec.

3C

Men's Toilet 3B

Public Elev. #2

2C157

Stair #3-3

2C160

Elevator Lobby

C3-3

Corridor

C3-2

Corridor

C3-5

Corridor

C3-14

Corridor

C3-18

Corridor

2C161

Corridor

C3-20

Pump 3C

Pump 3C

Soiled Holding 3C 146Chief Office

3C

Office - Provider 3C

Office - Provider 3C

Corridor

C3-24

Intake Room 3C

Corridor

C3-17

Corridor

C3-25

Corridor

C3-19

Corridor

C3-22

Closet 3C

133a

Storage 3C

Corridor

C3-16

Print Alcove

C3-23

Cl.

3C-112A

55EP403b

55EP403b

AREA B

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER,SIGNAL, LIGHTING DEVICES AND ASSOCIATED CIRCUITRY

AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED

BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

- AREA OF WORK

- 1" = 10'-0"

1 BLDG 55 - FLOOR 3 - AREA B - ELECTRICAL PLAN

KEY PLAN

KEY NOTES

GENERAL NOTES

KEY PLAN

KEY NOTES

GENERAL NOTES

0' 5' 10' 20'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

55EP103b

BLDG 55 - FLOOR 3 - AREA B

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

LRL/WNM LLT/JPS

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

AVID MACHINE

ROOM

BB 117

IT NON - SECURE

STR

BB 121

AMD / AV

PRODUCTION

COORD

BB 143

IT CDN, SHARED

BB 144

E-LEARN PROD

OFFICE

BB 145

E-LEARN PROD

OFFICE

BB 146

E-LEARN PROD

OFFICE

BB 147

GRAPHICS

OFFICE

BB 109

GRAPHICS

OFFICE

BB 108

GRAPHICS

OFFICE

BB 107

GRAPHICS

OFFICE

BB 105

OFFICE, STUDIO

MGR

BB 104

OFFICE, STUDIO

MGR

BB 100

OFFICE

PRODUCER

BA 125

OFFICE

PRODUCER

BA 123

TR

BA 105

DATA

BA 106

ELEC

BA 107

RECYCLING

ROOM

BA 104

PROD CTL VIDEO

BA 110

STAIR 1

STAIR

WOMEN

BA 100

OFFICE, SR

ENGINEER

BA 122

NAT'L MEDIA

SVCS COORD

BA 121

OFFICE

PRODUCER

BA 120

GREEN ROOM

BA 119

DRESSING RM

BA

118A

MAKE UP

BA 118

LAN / TEL / DATA

DMARK ROOM

BA 114ENG MAINT

BA 115

OFFICE

PRODUCER

BA 116

AV PRODUCTION

SUPPORT

BA 113

CONTRACTOR

WKSTNS (2)

BA 112

SUPPORT TECH

BA

112A

STUDIO

BA 109

EQPT AV STR

BA

103A

STUDIO MECH

BA

108B

MEDIA STORAGE

BA 108

DOCK /

RECEIVING

BA 103

MAIL ROOM

BA 102

MEN

BA 101

ELEV

S - 1

ELEV

P - 1

IT SECURE

STORAGE

BB 120

STORAGE,

EQUIPMENT +

SUPPLIES /

PARTS

BB 119

COMBINED

COMPUTER /

SERVER ROOM

BB 102

AVID SUITE

BB 116

AVID SUITE

BB 114

AVID SUITE

BB 113

MSTR OFFICE

SUPPLIES

BB 124

STAIR 2

STAIR

KIT

BB 126

TLT

BB 127

TLT

BB 128

SOCIAL MEDIA

BB 132

IT SYSTEM ADMIN

BB 133

IT SPECIALIST

BB 134

IT SPECIALIST

BB 135

IT SYSTEM

ADMIN, SHARED

BB 136

IT OFFICE ISO

BB 137

IT SPECIALIST,

SHARED

BB 138

OFFICE

ENGINEER

SHARED

BB 139

Room

BB 140

ELEARN PROD

BB 141

LRG COORD

BB 148

LRG PROGRAM

SUPPORT

BB 130

NORMAL

ELECTRICAL

ENTRY

BB

129A

EMERGENCY

ELECTRICAL

ENTRY

BB 129

EES ELEC

BB 125

MUSIC LIBRARY

BB 118

OFFICE EDIT

BB 115

OFFLINE EDIT

BB 112

GRAPHICS

STORAGE

BB 111

DUBBING / CDN

BB 106

AUDIO BOOTH

BB 110

COPY ROOM

BB 103

WK ROOM

BB 101

MASTER

CONTROL

BA 117

MECH

BB 123

HSKG

BB 122

LRG

CB-20

LRG

CB-19

LRG

CB-18

COLLABORATION

CB -50

56EP400

56EP400

1 2 3 4 5 6 7 86.4 6.65.54.84.41.3

B

C

D

E

F

G

H

4.6 5.2s1 s5 sC sA

D.5

56EP400

56EP400

TR-56-DP-TRB

56-DP-TRB

56-DP-TRA

DP 56EQ

DP 56LS

MSB 56-1

TR 56-C

ATS C

DP 56-L

DP 56-M

DP 56-R

GSB 56

ATS EQ

ATS LS

DP 56-C

BLDG 56

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

9. REFERENCE ONE-LINE DIAGRAM ON SHEET 56EP601 FOR CONDUIT AND WIRE

SIZING.

AREA OF WORK

- 1/8" = 1'-0"

1 BLDG 56 - FLOOR 0 - ELECTRICAL PLAN 0' 4' 8' 16'

GENERAL NOTES

KEY PLAN

KEY NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

56EP100

BLDG 56 - FLOOR 0 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM - INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 56EP601

FOR ADDITIONAL INFORMATION.

EXISTING EQUIPEMENT TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON

SHEET 56EP601 FOR ADDITIONAL INFORMATION.

PROJECT

NORTH

PROJECT

NORTH

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

TR

1A 109

DATA

1A 108

ELEC

1A 107

MM PHOTO

STUDIO

1A 101

CONF STOR

1B

104A

CONF COATS

1B 104

HSKG

1B 103

FOOD PREP

1B 105

CONF A/V

1B 106

NCA COPY

1B 107

TLT

1B 108

ELEV

P - 1

ELEV

S - 1

WOMEN

1A 106

MEN

1A 105CONFERENCE

STOR

1A 104

CONFERENCE

STOR

1B 101

MECHANICAL

1B 102

STAIR 2

STAIR

SCURE STOR

1B 113

BREAK RM /

KITCHEN

1B 112

TLT

1B 111

CT / S

1B 110

ELEC

1B 109

REFERENCE

LIBRARY

1B 121

STOR

1B 129

COATS

1B 128

STOR

1B 127

NCA OFF

1B 122

NCA OFF

1B 123

NCA OFF

1B 124

NCA OFF

1B 125

NCA OFF

1B 126

TLT / CHG

1B

101A

VESTIBULE

C1 - 1

RECEPTION

WAITING

C1 - 4

STAFF LOUNGE

1B 100 STAFF LOUNGE

1B

100A

VESTIBULE

C1 - 11

VIDEO EDIT

1A

102F

MM STORAGE

1A

102E WEB DESIGNER

1A

102D

GRAPHIC

DESIGNER / PUB

1A

102C

GRAPHIC

DESIGNER / PUB

1A

102B

CHIEF OFF

1A

102A

CLO

1A

100A

MM VIDEO CONF

1A 100

MM STORAGE

1A 103

MM WORKROOM,

ILLUSTRATOR

1A 102

BREAK OUT

1B 117

BREAK OUT

1B 116

BREAK OUT

1B 114

BREAK OUT

1B 115

LARGE

CLASSROOM

1B 118

COMPUTER LAB

1B 119

MEDIUM

CLASSROOM

1B 120

CONFERENCE

1B 130

RECEPTION

C1 - 14

STUDENT WKRM

C1 - 16

DISPLAY

C1 - 20

WAITING

C1 - 13

EWC

C1 - 7

ELEV LOBBY

C1 - 8

WORK ALCOVE

C1 - 3

56EP401

56EP401

1 2 3 4 5 6 7 86.4 6.65.54.84.41.3

B

C

D

E

F

G

4.6 5.2s1 s5 sC sA

D.5

56EP401

56EP401

BLDG 56

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

56EP101

BLDG 56 - FLOOR 1 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM - INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

- 1/8" = 1'-0"

1 BLDG. 56 - FLOOR 1 - ELECTRICAL PLAN 0' 4' 8' 16'

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

TR

2A 122

DATA

2A 121

ELEC

2A 120

MKTG STOR

2B 126

FISCAL STOR

RECORDS

2B 124

HR STORAGE

2B 132

HR OFF

2B 130

HR DIRECTOR

2B 123

FISCAL OFF

2B 129

FISCAL OFF

2B 128

FISCAL OFF -

SHARED

2B 127

EES CONF

2B 115

ELEC

2B 121

STAIR 1

STAIR

WOMEN

2A 124

MEN

2A 125

MKTG STOR

2A 126

HSKG

2B 131

COPY

C2 - 24

ELEV

P - 1

ELEV

S - 1

MECH

2B 106

STAIR 2

STAIR

ACQ STOR

2B 114

EES CONF CLO

2B

115A

OAA CONF ROOM

2A 109

OAA WKRM

2A 104

OAA STOR

2A 111

MKTG STOR

2A 113

FISCAL OFF -

SHARED

2A 125

FISCAL OFF -

SHARED

2B 123

FISCAL OFF -

SHARED

2B 122

FISCAL WORK

AREA

2B 120

FISCAL OFFICE

2B 119

FISCAL BUDGET

ANALYST

2B 118

FISCAL BUDGET

ANALYST

2B 117

FISCAL BUDGET

ANALYST

2B 116

FISCAL ASS'T

CHIEF

2B 113

FISCAL CHIEF

2B 112

ACQ OFFICE

2B 111

ACQ COORD

2B 110

OFF PROG

SUPPORT

2B 109

ACQ DEPUTY

2B 107

ACQ OFF -

SHARED

2B 105

ACQ OFF -

SHARED

2B 104

ACQ OFF -

SHARED

2B 103

ACQ OFF -

SHARED

2B 101

ACQ OFF -

SHARED

2B 100

COLLABORATION

ROOM

2A 101

ACQ OFF

2A 102

OAA OFF WEB

DEVELOPER

2A 103

OAA OFF ADMIN

2A 105

OAA OFF

DIRECTOR

2A 106

OAA OFF PHYS /

DIRECTOR

2A 107

OAA OFF WRITER

/ EDITOR

2A 108

OAA OFF HEALTH

SYS SPEC

2A 110

OAA OFF

PROGRAM

ANALYST

2A 112

MKTG OFF PA

2A 114

MKTG DIR

2A 115

MKTG OFF

SHARED

2A 116

MKTG OPEN

OFFICE

2A 117

FISCAL OFF

MANAGEMENT

ANALYST

2A 118

FISCAL ASS'T

A&MM

2A 119

COPY ALCOVE

C2 - 15

KIT ALCOVE

C2 - 14

MKTG STOR

2B 102

ELEV LOBBY

C2 - 1

EWC

C2 - 3

CORR

C2 - 16CUBE

C2 - 20

CUBE

C2 - 19

CUBE

C2 - 18

KIT ALCOVE

C2 - 10

COPY

C2 - 22

56EP402

56EP402

2 3 4 5 6 7 86.4 6.65.54.84.4

D

E

F

G

4.6 5.2s1 s5 sC sA

D.5

56EP402

56EP402

BLDG 56

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

56EP102

BLDG 56 - FLOOR 2 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM - INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

- 1/8" = 1'-0"

1 BLDG 56 - FLOOR 2 - ELECTRICAL PLAN 0' 4' 8' 16'

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

TR

3A 122

PSA

C3 - 24

PSA

C3 - 23

PSA

C3 - 22

PSA

C3 - 21

PSA

C3 - 20

EWC

C3 - 3 DATA

3A 121

ELEC

3A 119

STAIR 1

STAIR

WOMEN

3A 125

MEN

3A 126

ELEV

P - 1

ELEV

S - 1

MECH

3A 129

SHARED

INSTRUCT OFF

3A 100LEARNING

CONSULT OFF

3B 101

LEARNING

CONSULT OFF

3B 102LEARNING

CONSULT OFF

3B 103

LEARNING

CONSULT OFF

3B 104LEARNING

CONSULT OFF

3B 106

LEARNING

CONSULT OFF

3B 107ADMIN

MANAGING DIR

3B 109

ADMIN

MANAGING DIR

3B 110

ADMIN - DEPUTY

DIR

3B 111

ADMIN - DEPUTY

DIR

3B 112

PROG OFF

3B 113

PROG OFF

3B 115

PROG OFF

3B 117

ADMIN SUP

C3 - 18

CAMPUS MGR

C3 - 17

COLLAB ROOM

3B 114

ELEC

3B 116

STOR, PROGRAM

FILES

3B 122

COPY

C3 - 19

PROG OFF

3B 118

AMD FOR

PROGRAMS

OFFICE

3B 119

PROG MANAGER

OFFICE

3B 120

PROG MANAGER

OFFICE

3B 121

PROG MANAGER

OFFICE

3B 123

PROG MANAGER

OFFICE

3B 124

PROG MANAGER

OFFICE

3B 125

PROG MANAGER

OFFICE

3B 126

PROG MANAGER

OFFICE

3B 128

PROG MANAGER

OFFICE

3A 124

PROG MANAGER

OFFICE

3A 123

PROG MANAGER

OFFICE

3A 120

PROG MANAGER

OFFICE

3A 118

EDUCATION TECH

3A 116

WORKSTATIONS,

V15 / V23 PGM

SUPPORT (2)

3A 115

OFFICE,

EDUCATION TECH

(3)

3A 114

PROG OFF

3A 113

PROG OFF

3A 111

V15 EDUCATION

SPEC

3A

109a

V23 ESR PGM

MGR OFF

3A 109

V15 ESR PGM

MGR

3A 107

WORKSTATIONS,

PSA (3)

3A 106

WKSTN,

CONTRACTOR

3A 105

PROG OFF

3A 104

PROG SUPPORT

ASSISTANT OFF

3A 103

PROG OFF

3A 102

PRINTER

C3 - 9

KIT ALCOVE

C3 - 8

STOR

3B 100

PSA WORK ROOM

3A 127

WORKSTATIONS,

PSA (4)

3A 108

WORKSTATIONS,

PSA (4)

3A 110

WORKSTATIONS,

PSA (4)

3A 112

COPY STORAGE

3A 117

EES STOR

3B 127

HSKG

3B 129

56EP403

56EP403

2 3 4 5 6 7 86.4 6.65.54.84.4

B

C

D

E

F

4.6 5.2s1 s5 sC sA

D.5

56EP403

56EP403

BLDG 56

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

56EP103

BLDG 56 - FLOOR 3 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM - INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

- 1/8" = 1'-0"

1 BLDG 56 - FLOOR 3 - ELECTRICAL PLAN 0' 4' 8' 16'

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

ELEC ENTR

1C

105e

DATA ENTR

1C 105f

STORAGE

GENERAL +

MEDICAL

1C 105

SOILED HOLDING

1B

138f

LOUNGE-STAFF

1B

138c

GROUNDS -

MAINT

1A 109

ELEC SHOP-FLR

1A 107

PLUMBING

SHOP-FLR

1A 105

RECYCLING

1B 136

CART STOR.

1A 108

STORAGE,

FORMS

1C 105d

LOBBY

C1-2

STORAGE

SECURED

1C 104c

REPAIR

1B 135

EXCESS ITEMS

STOR

1C 103

CLEAN HOLDING

1C 102

STORAGE MED

GAS, STOR

FLAMMABLE

1C

105c

ELEC

1C

105a

ELEC

1C

105g

ELEC

1B 141

DATA

1B 140

ELEC

1B 137

ELEC

1A 106

OFFICE

1B 119

ELEC

1B 117

MECH ENTR

1A 101

LOUNGE

1A

105e

CONF RM

1B 100

PLANNING &

ACTIVATION

SHARED OFFICE

1B

125a

DOCK+

RECEIVING +

ISSUE

1C 104

STORAGE-EQUIPMENT

1C 101

VISN WORK

ROOM

1B 128

SHARED OFFICE,

PM

1B 101

OFFICE, PE

1B 109

OFFICE, PE

1B 111

SHARED OFFICE,

PM

1B 115

SHARED OFFICE,

PM

1B 114

OFFICE, PE

1B 110

OFFICE, CHIEF

1B 112

MEETING ROOM

1B 113

OFFICE, SAFETY

1B 116

OFFICE, PE

1B 105

OFFICE, PE

1B 102

OFFICE, PE

1B 103

OFFICE, PE

1B 104

OFFICE, PE

1B 107

OFFICE, PE

1B 108

OFFICE AMMS

ASSIST

1B 131

OFFICE AMMS

CHIEF

1B 132

OFFICE VISN

CONTRACT

1B 130

OFFICE VISN

CONTRACT

1B 129

OFFICE,

STOREKEEPER

1C 104b

ELEC

1A

104d

OFFICE,

MANAGER

1B 138dHOUSEKEEPING

AIDS CL-CLEAN

1A

110b

HOUSEKEEPING

AIDS CL

1A 110a

M TOILET

1B 124

W TOILET

1B 123

GROUNDS-STOR

1A

109e

PAINT SHOP

-FLAMMABLE

STOR

1A

103c

PAINT AREA

1A

103b

OFFICE

1A

104e

OFFICE

1A

105c

OFFICE

1A

100c

OFFICE

1A

107c

GROUNDS -

MAINT / WET RM /

WASH BAY

1A

109d

SERVER

1B

135d

RECEIVING

CLERKS

1C 104a

TOILET

1C

105b

OFFICE

1A

109b

HOSP. PLANS &

DRAFTING

1B 125

RECEIVING

1B

138e

N CORR

C1-18

E CORR

C1-16

S CORR

C1-8

ENG DOCK

C1-11

W CORR

C1-9

CORR

C1-12

AMMS ADMIN

CUBICLES (6).

1B 133

M LOCKER / TLT

1B

138b

W LOCKER / TLT

1B

138a

CLERK

1A

109c

MECH

1A

CORR

C1-7

PLUMBING

SHOP-STOR

1A 105a

CARPENTRY

SHOP-FLR.

1A 104a

MASON SHOP

1A

104c

LOCKSMITH -

STOR

1A 102b

PAINT SHOP-FLR

1A

103a

GROUNDS-BENCH

1A

109a

CORR

C1-13

CORR

C1-14

TR

1B 139

LOUNGE

1B 122

PEDESTRIAN

CORRIDOR

C1-10

STOR MED

RECORDS

1C 100

SOILED

1C

102a

CARPENTRY

TOOL LOCK-UP

1A 104f

PLUMBING TOOL

LOCK-UP

1A 105d

ELECTRICAL

TOOL LOCK-UP

1A 107d

DISTRIBUTION &

CLEAN HOLDING

1B 138

OFFICE

1B 118

DATA

1B 121

VESTIBULE

C1-1

BID OPG/CONF

1B 134

FORKLIFT

BATTERY

CHARGE

1C 105h

WAITING RM

C1-3

CORR

C1-4

CORR

C1-6

CORR

C1-5

STORAGE

1B

117a

HOUSEKEEPING

AIDS CLOSET

1B 142

HOUSEKEEPING

AIDS

CLOSET-CLEAN

1B 143

MACH+A/C TOOL

LOCK-UP

1A 100d

LOUNGE

1A

100e

LOUNGE

1A

104g

CARPENTRY

STOR.

1A 104h

LOUNGE

1A

107e

ALCOVE

C1-25

ALCOVE

C1-24

ALCOVE

C1-26

ALCOVE

C1-22

ALCOVE

C1-21

ALCOVE

C1-20

ALCOVE

C1-27

ALCOVE

C1-29

ALCOVE

C1-30

LOUNGE

1A

109f

CORR

C1-31

MACH + A/C

SHOP-FLR

1A 100

W TOILET

1B 127

M TOILET

1B 126

57EP401a

57EP401b

57EP401a

57EP401b

1210953 62 4 7 8.17.9 115.5 8.4 8.6 8.10

K K

J J

H H

G G

C C

E E

A A

B B

D D

F F

C.6 C.6

D.4 D.4

G.4 G.4

A.3 A.3

E.8 E.8

TR 57-1N6

57-1N6

TR 57-1N4

57-1N4

I

TR

1B 120

57EP401a

57EP401a

57EP401b

57EP401b

LL

MSB 57

57-1L1

DP 57M

DP 57R

DP 57L

BLDG 57

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

57EP101

BLDG 57 - FLOOR 1 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

- 1/16" = 1'-0"

1 BLDG 57 - FLOOR 1 - ELECTRICAL PLAN

KEY PLAN

GENERAL NOTES

0' 8' 16' 32'

KEY NOTES

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

1 EQUIPMENT TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET 57EP601

FOR ADDITIONAL INFORMATION.

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

58L1

DP1

58P1

MDP - 58

58P4 58P3

58L2

58P2

C1

58EP401

58EP401

58EP401

58EP401

A

B C D E E1 F G I J

MECH. RM.

OFFICE

OFFICE

OFFICE

OFFICE

CONFERENCE

RM.

OFFICE

OFFICE

STORAGE

OFFICE

OFFICE

OFFICE

OFFICE

TR

OFFICE

OFFICE

OFFICE

TOILET, MALE

EQUIPMENT RM.

GROUP RM.

GROUP RM.

LOUNGE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

STORAGE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

PRINTER RM.

OFFICE

120B

TOILET, FEMALE

TOILET, MALE

GROUP RM.

GROUP RM.

TOILET, FEMALE

TOILET, MALE

TOILET, FEMALE

HAC

ELEC RM.

LOBBY

C108

CORRIDOR

C112

CORRIDOR

C107

STORAGE

CLOSET

C106.1

CORRIDOR

C106

CORRIDOR

C111

CLOSET

C110.1

CORRIDOR

C110

CORRIDOR

C113

CORRIDOR

C114

WAITING

C108

CHASE

CH-1

CHASE

CH-2

CHASE

CH-3

CHASE

CH-4

VESTIBULE

C103

VESTIBULE

C101

CORRIDOR

C106.3

OFFICE

120A

CORRIDOR

C105

LOBBY / WAITING

C102

LOBBY

C104

MECH. RM.

OFFICE

OFFICE

OFFICE

OFFICE

CONFERENCE

RM.

OFFICE

OFFICE

STORAGE

OFFICE

OFFICE

OFFICE

OFFICE

TR

OFFICE

OFFICE

OFFICE

TOILET, MALE

OI&T

EQUIPMENT RM.

GROUP RM.

GROUP RM.

LOUNGE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

STORAGE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

PRINTER RM.

OFFICE

120B

TOILET, FEMALE

TOILET, MALE

GROUP RM.

GROUP RM.

TOILET, FEMALE

TOILET, MALE

TOILET, FEMALE

HAC

ELEC RM.

CORRIDOR

C107

STORAGE

CLOSET

C106.1

CORRIDOR

C106

CORRIDOR

C111

CLOSET

C110.1

CORRIDOR

C110

CORRIDOR

C113

CORRIDOR

C114

WAITING

C108

CHASE

CH-1

CHASE

CH-2

CHASE

CH-3

CHASE

CH-4

VESTIBULE

C103

VESTIBULE

C101

CORRIDOR

C106.3

OFFICE

120A

CORRIDOR

C105

BLDG 58

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

- AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

58EP101

BLDG 58 - FLOOR 1 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

- 1/8" = 1'-0"

1 BLDG 58 - FLOOR 1 - ELECTRICAL PLAN

KEY PLAN

GENERAL NOTES

0' 4' 8' 16'

KEY NOTES

Revisions: Date:

EXISTING PANEL TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET

58EP601 FOR ADDITIONAL INFORMATION.

PROJECT

NORTH

PROJECT

NORTH

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

LOADING DOCK

1 2 3 4 5 6 7 7.5 8 91.5 6.52.5

A

B

C

D

E

E.5

F

G

H

A B

60-B2 60-B2

60-BA

60-2

P4A

P4 DP-60EM

MDP-60

60EP401

60EP401

REFRIGERATOR

REFRIGERATOR

LOCKER RM.

60EP401

60EP401

STORAGE

CART WASH

RECEIVING

REFRIGERATOR

STORAGE

113A

FREEZER

112A

WALK IN FREEZER

FOOD PREP. RM.

OFFICE

120A

INGREDIENT RM.

F.E. CLOSET

120C

STORAGE

NOURISHMENT

HAC

MECH. RM.

OFFICE

WALK-IN FREEZER

REFRIGERATOR

OFFICE

OFFICE

STORAGE

135A

REFRIGERATOR

DISHWASHER

FOYER

120B

CORRIDOR

H101

CORRIDOR

CORRIDOR

H102

OI&T

101A

STORAGE

133A

TRANSFORMER RM.

MECH. RM.

CHASE

CH-A-02

TR

SHARED WORK AREA

WALK IN FREEZER

FREEZER

133N

WALK-IN FREEZER

REFRIGERATOR

BUTCHER SHOP

KITCHEN

TOILET

TOILET

BLDG 60

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED EQUIPMENT TO

BE DEMOLISHED SHALL BE BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

60EP101

BLDG 60 - FLOOR 1 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

- 1/8" = 1'-0"

1 BLDG 60 - FLOOR 1 - ELECTRICAL PLAN 0' 4' 8' 16'

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

EXISTING PANEL TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET

60EP601 FOR ADDITIONAL INFORMATION.

PROJECT

NORTH

PROJECT

NORTH

DN

UP

UP

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

A B C D E F G H

60TEP401

60TEP401

OFFICE

STORAGE

OFFICE

OFFICE

OFFICE

OFFICE

CONFERENCE

RM.

ENTRY

H101

OFFICE

OFFICE

OFFICE

HAC

TOILET, MALE

TOILET, FEMALE

KITCHEN

TR

WORK RM.

CLASS RM.

OFFICE

OFFICE

OFFICE

CORRIDOR

H102

CORRIDOR

H104

CORRIDOR

H103

BLDG 60T

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

60TEP101

BLDG 60T - FLOOR 1 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

60T

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

- 1/4" = 1'-0"

1 BLDG 60T - FLOOR 1 - ELECTRICAL PLAN

KEY PLAN

0' 2' 4' 8'

GENERAL NOTES

KEY NOTES

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

UP

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

F F

DD

E E

C.5C.5

4.5

4.5

75EP401

A A

G G

CC

BB

H H

J J

D.1 D.1

Control Room

1B 108

Entry Room

1B 109

TERMINAL ROOM

A

1B 107

Corridor

C1-3

Office

1B 106

Men's Toilet 1B

103a

Recyclable Storage

1B 102

Break Room

1B 100 Women's Toilet

1B 101a

Men's Lockers 1B

103b

Women's Lockers 1B

101b

Housekeeping

1B 104

Shower 1B

103c Shower 1B

101c

KK

(MCC / 75-1)

(MCC / 75-3)

PANEL '75N'

(MCC / 75-2)

PANEL 'DP / 75-1'

TR - 75 - 112.5

PANEL '75L'

BAY-12

BAY-11

BAY-10

BAY-9

BAY-8

BAY-7

BAY-6

BAY-5

BAY-4

FUTURE

FUTURE

FUTURE

BAY-1

BAY-2

BAY-3

BAY-4

BAY-5

PARALL. CONTROLS

BAY-1

BAY-2

BAY-3

BAY-4

BAY-5

BAY-6

BAY-7

BAY-8

BAY-9

BAY-10

BAY-11

BAY-12

BACK FRONT

BACKFRONT

BACKFRONT

(PG / 75-1)

(UNS / 75-1)

(TR-UNS -

75-1)

MAIN (NORMAL)

MAIN (EM)

CAMPUS

MEDIUM

VOLTAGE

SWITCHGEAR

(PS / 75-1)

(MDP / 75-1)

MAIN1

UTIL. METERING

GENCHP

MAIN2

75EP401

Air Lock

C1-5

Entry

1B 103

Entry

1B 101 Switchgear

1C 100

Switchgear

1C 101

Switchgear

1C 102

Generator Bay

1C 103

Areaway

1C 104 Areaway

1C 105

Vest.

C1-1

Corridor

C1-2

CORRIDOR

C1-6

Boiler Bay

1A 101

Chiller Bay

1A 100 Substation

SITE

Sound Lock

C1-4

75-DP-TRAB

75EP401

75EP401

TR

1B 105

BLDG 75

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

9. REFERENCE ONE-LINE DIAGRAM ON SHEET 75EP601 FOR CONDUIT AND WIRE

SIZING.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

75EP101

BLDG 75 - FLOOR 1 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

- 1" = 10'-0"

1 BLDG 75 - FLOOR 1 - ELECTRICAL PLAN

PROJECT

NORTH

KEY PLAN

KEY NOTES

GENERAL NOTES

Revisions: Date:

PROJECT

NORTH

0' 5' 10' 20'

1 EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 75EP601 FOR

ADDITIONAL INFORMATION.

EXISTING TRANSFORMER TO BE MODIFIED; REFERENCE ONE-LINE DIAGRAM ON SHEET

75EP601 FOR ADDITIONAL INFORMATION.

J

J

JJ

J

DN

UP

DN

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

M N OK.2 N.1

AA BB

DATA RACK, TYP

DATA RACK, TYP

PANEL

CDP-B

PANEL EMGC11PANEL

CDP

OI&T

GC11B

113 SF

OI&T

GC11A

191 SF

OI&T

GC12A

152 SF

M N

O

K.2 N.1

AA BB

PANEL

CDP-B

PANEL EMGC11PANEL

CDP

DATA RACK, TYP

DATA RACK, TYP

OI&T

GC11B

113 SF

OI&T

GC12A

152 SF

OI&T

GC11A

191 SF

1 11

GC11A

GC11B

GC12

GC12A

GC12A

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

01EP400a

BLDG 01 - FLOOR 0 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON

BARRACKS MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

GENERAL NOTES

KEY PLAN

PROJECT

NORTH

KEY NOTES

1/4" = 1'-0"01EP100

1 RM GC11A, GC11B, GC12, GC12A - DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"01EP100

2 RM GC11A, GC11B, GC12, GC12A - ELECTRICAL PLAN

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

Revisions: Date:

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

File details come from the government source that posted it. Updated .