32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf
PDF 208 KB Posted
- Attached to
- Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
- Solicitation number
- 36C77623R0009
About this file
This document contains a government contractor's response to a federal solicitation for construction services. Firewatch Contracting of FL, LLC submitted shop drawings, samples, certifications, and other documentation for a mechanically stabilized earth wall system project at the Department of Veterans Affairs St. Louis Jefferson Barracks medical center. The response included manufacturer certifications, physical samples of wall materials, qualifications of installers, and civil engineering certification as required. It also contained revised shop drawings addressing comments provided by the architectural and engineering firm regarding wall construction details, drainage, stair interfaces, and exposed block finishes. The solicitation seeks a general contractor to provide infrastructure upgrades at multiple buildings at the St. Louis Jefferson Barracks VAMC campus, including electrical, HVAC, communications, security, and hazardous material abatement work.
View the file
Other files for this federal contract opportunity
Show all 50
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs
RETURN OF SUBMITTAL
Title or Description
ECDR - 32 32 23-01 - Mechanically Stabilized Earth Wall System Date
01/09/2020
Contractor's Name and Address
Firewatch Contracting of FL, LLC
Contract No.
36C10F19C0003
Project No.
657-313-St. Louis, MO - JB Project
Submittal Items Acted Upon
Submittal Item Review Status
5146 32 32 23-01R1 - Manufacturer's Certification Approved
Manufacturers Literature
9/27/2019 Resubmittal- attached is the manufacturer's certifications per AE previous comments
10/07/2019
Notes/Comments
COMMENTS FOR 323223-01 (REVISE AND RESUBMIT):
1) Paragraph 1.5.A requires submittal of manufacturer's certification that the retaining wall units and geosynthetic reinforcement meet the requirements of the specification. This certification was not included in the submittal package.
5147 32 32 23-01 - Sample Sets of Each Color, Texture and Pattern
Approved As Noted
Physical Sample Physical samples in FW job trailer 08/19/2019 Notes/Comments
COMMENTS FOR 323223-01 (APPROVED AS NOTED):
1) No exceptions taken to color, finish and pattern of submitted sample. See comments for shop drawings. This item may need to be resubmitted if product is changed to comply with design intent.
5148 32 32 23-01 - Capabilities and Experience of Installers Approved
Qualification Data 08/19/2019 Notes/Comments
5149 32 32 23-01 - Professional Civil Engr. Certification Approved
Certificate 08/19/2019 Notes/Comments
5150 32 32 23-01R2 - Wall System Drawings and Analysis Approved As Noted
Shop Drawings 12/20/2019 Resubmittal - Attached corrected shop drawings per AE's "approved as noted resubmit" comments dated 10/7/19
01/09/2020
Notes/Comments
COMMENTS FOR 322323-01R2(APPROVED AS NOTED):
1) Wall constructions on either side of a stair are to step uniformly with the adjacent stair.
COMMENTS FOR 323223-01R1 (APPROVED AS NOTED, RESUBMIT):
1) See A/E review comments on submittal, attached in 'Notes & Documents' tab under this submittal task item.
2) The wall drain tile detail shows daylighting thru the wall. The pipes should be connected to the structures noted on the drawings.
3) The block walls located on either side of the concrete stair(s) are to step uniformly with each other and with the adjacent concrete steps per detail F5 on sheet LS502. The revised profiles do not appear to meet these criteria. Revise the shop drawings accordingly.
4) See details E3 and F3 on sheet LS502 for wall finishing requirements when the back of wall blocks are exposed above grade. The design intent is to have split face finishes on both sides of the exposed blocks.
COMMENTS FOR 323223-01 (REVISE AND RESUBMIT):
1) Retaining Wall Shop Drawings show 1" setback for each 6" unit. The elevations on Drawing C-111 include a note for "retaining wall to have vertical face", while the proposed construction indicates a batter. The batter created by the 1" setback would be more than 14" based on the highest point of the wall.
2) Submit product that matches design intent for vertical retaining wall, or submit shop drawings correctly showing impact of batter on design in plan. If alternate product is submitted to match design intent, also resubmit sample per Paragraph 1.5.B.