32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf

PDF 208 KB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document contains a government contractor's response to a federal solicitation for construction services. Firewatch Contracting of FL, LLC submitted shop drawings, samples, certifications, and other documentation for a mechanically stabilized earth wall system project at the Department of Veterans Affairs St. Louis Jefferson Barracks medical center. The response included manufacturer certifications, physical samples of wall materials, qualifications of installers, and civil engineering certification as required. It also contained revised shop drawings addressing comments provided by the architectural and engineering firm regarding wall construction details, drainage, stair interfaces, and exposed block finishes. The solicitation seeks a general contractor to provide infrastructure upgrades at multiple buildings at the St. Louis Jefferson Barracks VAMC campus, including electrical, HVAC, communications, security, and hazardous material abatement work.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
36C77623R0009 0005.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
36C77623R0009 0003.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
36C77623R0009 0001.pdf PDF
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
Attachment 1 - Specifications.pdf PDF
Attachment 5 - Drawings Part-4.pdf PDF
Attachment 6 - Drawings Part-5.pdf PDF
Attachment 9 - Drawings Part-8.pdf PDF
Attachment 16 - Drawings Part-15.pdf PDF
Attachment 22 - Drawings Part-21.pdf PDF
Attachment 24 - Drawings Part-23.pdf PDF
Attachment 36 - Envr. Report - Appendix B.pdf PDF
Attachment 41 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 44 - Contractor Safety - Environmental Form.docx DOCX document
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 38 - Envr. Report - Drawings.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Veterans Affairs

RETURN OF SUBMITTAL

Title or Description

ECDR - 32 32 23-01 - Mechanically Stabilized Earth Wall System Date

01/09/2020

Contractor's Name and Address

Firewatch Contracting of FL, LLC

Contract No.

36C10F19C0003

Project No.

657-313-St. Louis, MO - JB Project

Submittal Items Acted Upon

Submittal Item Review Status

5146 32 32 23-01R1 - Manufacturer's Certification Approved

Manufacturers Literature

9/27/2019 Resubmittal- attached is the manufacturer's certifications per AE previous comments

10/07/2019

Notes/Comments

COMMENTS FOR 323223-01 (REVISE AND RESUBMIT):

1) Paragraph 1.5.A requires submittal of manufacturer's certification that the retaining wall units and geosynthetic reinforcement meet the requirements of the specification. This certification was not included in the submittal package.

5147 32 32 23-01 - Sample Sets of Each Color, Texture and Pattern

Approved As Noted

Physical Sample Physical samples in FW job trailer 08/19/2019 Notes/Comments

COMMENTS FOR 323223-01 (APPROVED AS NOTED):

1) No exceptions taken to color, finish and pattern of submitted sample. See comments for shop drawings. This item may need to be resubmitted if product is changed to comply with design intent.

5148 32 32 23-01 - Capabilities and Experience of Installers Approved

Qualification Data 08/19/2019 Notes/Comments

5149 32 32 23-01 - Professional Civil Engr. Certification Approved

Certificate 08/19/2019 Notes/Comments

5150 32 32 23-01R2 - Wall System Drawings and Analysis Approved As Noted

Shop Drawings 12/20/2019 Resubmittal - Attached corrected shop drawings per AE's "approved as noted resubmit" comments dated 10/7/19

01/09/2020

Notes/Comments

COMMENTS FOR 322323-01R2(APPROVED AS NOTED):

1) Wall constructions on either side of a stair are to step uniformly with the adjacent stair.

COMMENTS FOR 323223-01R1 (APPROVED AS NOTED, RESUBMIT):

1) See A/E review comments on submittal, attached in 'Notes & Documents' tab under this submittal task item.

2) The wall drain tile detail shows daylighting thru the wall. The pipes should be connected to the structures noted on the drawings.

3) The block walls located on either side of the concrete stair(s) are to step uniformly with each other and with the adjacent concrete steps per detail F5 on sheet LS502. The revised profiles do not appear to meet these criteria. Revise the shop drawings accordingly.

4) See details E3 and F3 on sheet LS502 for wall finishing requirements when the back of wall blocks are exposed above grade. The design intent is to have split face finishes on both sides of the exposed blocks.

COMMENTS FOR 323223-01 (REVISE AND RESUBMIT):

1) Retaining Wall Shop Drawings show 1" setback for each 6" unit. The elevations on Drawing C-111 include a note for "retaining wall to have vertical face", while the proposed construction indicates a batter. The batter created by the 1" setback would be more than 14" based on the highest point of the wall.

2) Submit product that matches design intent for vertical retaining wall, or submit shop drawings correctly showing impact of batter on design in plan. If alternate product is submitted to match design intent, also resubmit sample per Paragraph 1.5.B.

File details come from the government source that posted it. Updated .