Attachment 12 - Drawings Part-11.pdf

PDF 14 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details for a federal contract solicitation to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The solicitation seeks a general contractor to upgrade electrical systems including panels, power, bonding and UPS; assess and potentially upgrade HVAC systems; renovate and expand existing space through demolition, new construction and finish work; renovate the existing data center; upgrade physical security and communication infrastructure including new data outlets, fiber backbone and a diversified WAN path to the datacenter; and conduct hazardous material abatement. The work will occur across 25 buildings on site. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
FOLLOW-UP Technical Questions - St. Louis 4-6-23.pdf PDF
36C77623R0009 0005.pdf PDF
Technical Questions - FINAL - St. Louis 3-28-23.pdf PDF
657-21-701JB - Addendum 1_03_24_23.pdf PDF
329000-5 - Sod Certificate.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-24-23.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0003.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
Attachment 45 - Site Visit Instructions Updated 2-16-23.pdf PDF
36C77623R0009 0001.pdf PDF
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Attachment 33 - Drawings Part-32.pdf PDF
Attachment 34 - Envr. Report - Narrative.pdf PDF
Attachment 37 - Envr. Report - Appendix C.pdf PDF
Attachment 40 - NARA RM Contract Language Clause.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 1-20-23.pdf PDF
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 38 - Envr. Report - Drawings.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

UP

DN

DN

M NK.2 N.1

ELECTRICAL

VAULT ROOM

GC16

PANEL GDP

ATS EDP25

225A

4160V XRAY

DISCONNECT

PANEL 1-MSB

70A ECB

SPACE HEATERS

ATS EAST & WEST

ELEVATORS

225A

EAST & WEST

ELEVATOR

CONTROLLERADVANCED DIGITAL

METER FOR PANEL 1-MSB

4160 - 120/240

XFMR FOR XRAY

225KVA STEP-

UP XFMR TO

PANEL X1

RM. H004

400A DISCONNECT

FOR XFMR

SECONDARY TO

PANEL X1

ADVANCED

METERING

INTERFACE BOX

600A

XRAY

400A DISCONNECT

FOR PANEL EP3

ATS CDP

600A

30A 400A ECB

MCC-EMSP

PANEL

EMDP

15KVA XFMR

FOR STREET

LIGHTING

ATS EMDP

800A

CDP

600A

100A ECB

FOR PANEL

LSA

ATS LSA

225A

400A ECB

PANEL EP3L

M NK.2 N.1

ELECTRICAL

VAULT ROOM

GC17

PANEL GDP

ATS EDP25

225A

4160V XRAY

DISCONNECT

PANEL 1-MSB

70A ECB

SPACE HEATERS

ATS EAST & WEST

ELEVATORS

225A

EAST & WEST

ELEVATOR

CONTROLLER

ADVANCED DIGITAL

METER FOR PANEL 1-MSB

4160 - 120/240

XFMR FOR XRAY

225KVA STEP-

UP XFMR TO

PANEL X1

RM. H004

400A DISCONNECT

FOR XFMR

SECONDARY TO

PANEL X1

ADVANCED

METERING

INTERFACE BOX

600A

XRAY

400A DISCONNECT

FOR PANEL EP3

ATS CDP

600A

30A

400A ECB

MCC-EMSP

PANEL

EMDP

15KVA XFMR

FOR STREET

LIGHTING

ATS EMDP

800A

CDP

600A

100A ECB

FOR PANEL

LSA

ATS LSA

225A

1-DP-TRB 1

1-DP-TRA 1

400A ECB

PANEL EP3L

GC16A

GC16

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. REFERENCE ONE-LINE DIAGRAMS ON SHEET 01EP601 AND 01EP602 FOR CONDUIT

AND WIRE SIZING.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

01EP400b

BLDG 01 - FLOOR 0 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON

BARRACKS MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

GENERAL NOTES

KEY PLAN

PROJECT

NORTH

KEY NOTES

1/4" = 1'-0"01EP100

1 RM GC16 & GC16A - DEMOLITION ELECTRICAL PLAN

1 EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 01EP601

FOR ADDITIONAL INFORMATION.

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON

SHEET 01EP601 AND LOAD SCHEDULES ON SHEET 01EP701.

EXISTING EQUIPMENT TO BE MODIFIED.

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'1/4" = 1'-0"01EP100

2 RM GC16 & GC16A - ELECTRICAL PLAN

Revisions: Date:

LRL/WNM LLT/JPS

J

S S

S S

Mo

H

TR

C102D

116 SF

TYP

H

TR

C102D

116 SF

TYP.

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

H

TR

C102D

116 SF

DATA RACK, TYP

1-C102DA-1,3,5

1-C102DA-2 1-C102DA-2

1-C102DA-2

1-C102DA-2

1-C102DB-2

1-C102DB-2

1-C102DB-2

1-C102DB-2

1-C102DB-1,3,56

01-AC-3-C102D

EP502

1-DP-TRA

1-DP-TRB

H

10 TR

C102D

116 SF

1-C102DA-4

L2

L2

L2

L2

1-C102DA

1-C102DB

DATA RACK, TYP

C102D

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

01EP401a

BLDG 01 - FLOOR 1 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON

BARRACKS MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

GENERAL NOTES

KEY PLAN

PROJECT

NORTH

KEY NOTES

1/2" = 1'-0"01EP101

1 RM C102D - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"01EP101

3 RM C102D - DEMOLITION LIGHTING PLAN

1/2" = 1'-0"01EP101

2 RM C102D - ELECTRICAL PLAN

1/2" = 1'-0"01EP101

4 RM C102D - LIGHTING PLAN

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

SOURCE A POWER PANELBOARD "1-C102DA".

SOURCE B POWER PANELBOARD "1-C102DB".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. CABLING SHALL BE DEMOLISHED BACK TO

SOURCE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR AS

REQUIRED.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

Revisions: Date:

S

S S

S

Mo

S

J J

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

1E15

TR

1E15

203 SF

DATA

RACK,

TYP

W

X

Y

TYP

EC1Y

EC1X

TR

1E15

203 SF

W

X

Y

DATA

RACK,TYP

1-1E15A-4

L1

L1

L1

L1

L1

L1

1-1E15A

EC1Y

EC1X

1-1E15B

EC1Y

EC1X

DATA

RACK,

TYP

W

X

Y

TR

1E15

203 SF

TYP

W

X

Y

DATA

RACK,

TYP

TR

1E15

203 SF

EC1Y

EC1X

1-1E15A-2 1-1E15A-2

1-1E15A-2

1-1E15A-2

1-1E15B-2

1-1E15B-21-1E15B-2

1-1E15B-2

1-1E15B-1,3,5

1-1E15A-1,3,5

01-CU-3-1E15

1-1E15A-6,8

201-AC-3-1E15

1-DP-TRA

1-DP-TRB

EP502

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

01EP401b

BLDG 01 - FLOOR 1 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON

BARRACKS MO

657-21-701JB

03/31/2022 Checker Author

CONSTRUCTION

DOCUMENTS

GENERAL NOTES

KEY PLAN

PROJECT

NORTH

KEY NOTES

1/2" = 1'-0"01EP101

3 RM 1E15 - DEMOLITION LIGHTING PLAN

1/2" = 1'-0"01EP101

4 RM 1E15 - LIGHTING PLAN

1/2" = 1'-0"01EP101

1 RM 1E15 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"01EP101

2 RM 1E15 - ELECTRICAL PLAN

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

SOURCE A POWER PANELBOARD "1-1E15A".

SOURCE B POWER PANELBOARD "1-1E15B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. CONDUCTORS SHALL BE DEMOLISHED

BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR AS

REQUIRED.

Revisions: Date:

2C10

2C10A

MK.2

OI&T

2C10A

SERVER RM.

2C10BDATA RACK, TYP.

TYP

AA BB

CHASE

CH-C-3

LAB.

2C10

287 SF

8 3

DATA

RACK,

TYP

AA

1-2C10AA-2

1-2C10AA-2

1-2C10AA-2

1-2C10AB-2

1-2C10AB-2

1-2C10AB-2

1-2C10AB-2

1-2C10AB-1,3,5

1-2C10AA-1,3,5

01-AC-3-2C10A

TR

2C10A

179 SF

EP502

1-2C10AB-7,9,11

1-2C10AA-7,9,11

1-2C10AA

1-2C10AB

MK.2

SERVER RM.

2C10B

AA BB

TYP

CHASE

CH-C-3

24 SF

LAB.

2C10

287 SF

25289 SF

OI&T

2C10A

EXPOSED

K.2

AA

1-2C10AA-4

Mo

L2 L2

L2 L2

S S

S S

TR

2C10A

179 SF

LAB.

2C10

287 SF

1-2C10AA

1-2C10AB

DATA

RACK,

TYP.

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

01EP402

BLDG 01 - FLOOR 2 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON

BARRACKS MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

GENERAL NOTES

KEY PLAN

PROJECT

NORTH

KEY NOTES

1/4" = 1'-0"01EP102

1 RM 2C10, 2C10A - DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"01EP102

2 RM 2C10A - ELECTRICAL PLAN

1/4" = 1'-0"01EP102

3 RM 2C10, 2C10 A - DEMOLITION LIGHTING PLAN

1/4" = 1'-0"01EP102

4 RM 2C10 A - LIGHTING PLAN

0' 2' 4' 8' 0' 2' 4' 8'

0' 2' 4' 8' 0' 2' 4' 8'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

SOURCE A POWER PANELBOARD "1-2C10AA".

SOURCE B POWER PANELBOARD "1-2C10AB".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. CONDUCTORS SHALL BE DEMOLISHED

BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR AS

REQUIRED.

Revisions: Date:

S S

S S

Mo

3C14

3C13

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

K.2

AA BB

TR

3C13

276 SF

TYP

K.2

TR

3C13

276 SF

AA BB

DATA

RACK,

TYP

1-3C13A-2 1-3C13A-2

1-3C13A-2 1-3C13A-2

1-3C13B-2 1-3C13B-2

1-3C13B-21-3C13B-2

1-3C13A-1,3,5 1-3C13B-1,3,5

01-AC-3-3C13

EP502

1-DP-TRB

1-DP-TRA

K.2

AA BB

TR

3C13

276 SF

TYP

K.2

AA BB

TR

3C13

276 SF

1-3C13A-4

L2

DATA RACK,

TYP

L2

L2

L2

L2

L2

1-3C13A

1-3C13B

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

01EP403a

BLDG 01 - FLOOR 3 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON

BARRACKS MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

GENERAL NOTES

KEY PLAN

PROJECT

NORTH

KEY NOTES

1/4" = 1'-0"01EP103

1 RM 3C13 & 3C14 - DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"01EP103

3 RM 3C13 - ELECTRICAL PLAN

1/4" = 1'-0"01EP103

2 RM 3C13 & 3C14 - DEMOLITION LIGHTING PLAN

1/4" = 1'-0"01EP103

4 RM 3C13 - LIGHTING PLAN

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

SOURCE A POWER PANELBOARD "1-3C13A".

SOURCE B POWER PANELBOARD "1-3C13B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. CONDUCTORS SHALL BE DEMOLISHED

BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

Revisions: Date:

Mo

Mo

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

S U

TR

E303

541 SF

S U

TR

E303

541 SF

OS OS

DPP-1(1)-4

7 7 7 7

7 7 7 7

DATA RACK,

TYP

DPP-1(1)

DPP-1(2)

S U

DPP - 1(1)

DPP - 1(2)

TR

E303

541 SF

EXISTING

DATA

RACK

ELECTRICAL STRIP

MOLD ON WALL

TYP

STORAGE

E303A

116 SF

OFFICE

E304

166 SF

TYP

S U

DPP-1(1)

DPP-1(2)

DATA

RACK,

TYP

TR

E303

541 SF

DPP-1(1)-2

DPP-1(1)-2

DPP-1(1)-2 DPP-1(2)-2

DPP-1(2)-2

DPP-1(2)-2

DPP-1(2)-2

DPP-1(1)-2

DPP-1(1)-1,3,5

DPP-1(2)-1,3,5

EP502

E303

E303B

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

01EP403b

BLDG 01- FLOOR 3 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON

BARRACKS MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

GENERAL NOTES

KEY PLAN

PROJECT

NORTH

KEY NOTES

3/16" = 1'-0"01EP103

3 RM E303 & E303B - DEMOLITION LIGHTING PLAN

3/16" = 1'-0"01EP103

4 RM E303 - LIGHTING PLAN

3/16" = 1'-0"01EP103

1 RM E303 & E303B - DEMOLITION ELECTRICAL PLAN

3/16" = 1'-0"01EP103

2 RM E303 - ELECTRICAL PLAN

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

EXISTING PANELBOARD DPP-1(1) TO BE REVISED TO PROVIDE SOURCE A POWER.

EXISTING PANELBOARD DPP-1(2) TO BE REVISED TO PROVIDE SOURCE B POWER.

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. CONDUCTORS SHALL BE DEMOLISHED BACK

TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

EXISTING CRAC UNIT TO REMAIN.

LIGHT SWITCH AND CEILING OCCUPANCY SENSORS SHALL CONTROL EXISTING

LUMINAIRES AS NOTED. PROVIDE ALL CONTROL DEVICES WITH REQUIRED

APPURTENANCES AND CONDUIT AND WIRE TO PROVIDE A COMPLETE AND FULLY

FUNCTIONAL LIGHTING SYSTEM.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

EXISTING UNDERFLOOR RECEPTACLE TO BE DEMOLISHED. AFTER DEMOLITION, FILL OR

REPLACE FLOOR TILE TO PROVIDE A STRUCTURALLY SOUND FLOOR.

Revisions: Date:

H

1-C102DA-6,8

01-CU-3-C102D

EP503

MK.2

AA BB

01-CU-3-3C13

1-2C10AA-6,8 1-3C13A-6,8

01-CU-3-2C10A

EP503

TYP

TYP.

01-CU-3-C102D

01-CU-3-2C10A

01-CU-3-3C13

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

01EP404

BLDG 01 - ENLARGED ROOF PLANS

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON

BARRACKS MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

GENERAL NOTES

KEY PLAN

PROJECT

NORTH

KEY NOTES

PROJECT

NORTH

0' 1' 2' 4'- 1/2" = 1'-0"

1 BLDG 01 - ENLARGED ROOF PLAN - VIEW 1

- 1/2" = 1'-0"

2 BLDG 01 - ENLARGED ROOF PLAN - VIEW 2

PROJECT

NORTH

0' 1' 2' 4'

PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS

REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

Revisions: Date:

Mo

S

5 6

CHASE

CH-0-1

7 SF

59 SF

TR

G04

EXISTING

FIRE ALARM

EQUIPMENT

EXISTING

TELEPHONE

EQUIPMENT

EXISTING

FIRE ALARM

EQUIPMENT

TYP

E G

I

EXISTING

FIRE ALARM

EQUIPMENT

FATC

TELECOMMUNICATIONS

ENCLOSURE

2-G03A-1,3,5

2-G03B-1,3,5

1 2

E G

I

TR

G04

59 SF

CHASE

CH-0-1

7 SF

2-G03A-2

2-G03A-2

EP502

EXISTING

FIRE ALARM

EQUIPMENT

EXISTING

TELEPHONE

EQUIPMENT

EXISTING

FIRE ALARM

EQUIPMENT

EXISTING

FIRE ALARM

EQUIPMENT

FATC

G04

5 6

TYP

E G

I

CHASE

CH-0-1

7 SF

59 SF

TR

G04

CHASE

CH-0-1

7 SF

PANEL-X

L1

E G

I

L1

TELECOMMUNICATIONS

ENCLOSURE

59 SF

TR

G04

SECONDARY BONDING BUS BAR.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

02EP400

BLDG 02 - FLOOR 0 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

KEY PLAN

GENERAL NOTES

PROJECT

NORTH

1/2" = 1'-0"02EP100

1 RM G04 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"02EP100

2 RM G04 - ELECTRICAL PLAN

KEY NOTES

1/2" = 1'-0"02EP100

3 RM G04 - DEMOLITION LIGHTING PLAN

1/2" = 1'-0"02EP100

4 RM G04 - LIGHTING PLAN

Revisions: Date:

0' 4' 8' 16'

0' 4' 8' 16'

0' 4' 8' 16'

0' 4' 8' 16'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

SS

SS

Mo

DN

A

TR

217 SF

FG

H

I

DATA

RACK,

TYP.

TR

217 SF

2-111A-1,3,5 2-111B-1,3,5

2-111A-2

2-111B-2

2-111A-2

2-111A-2

2-111B-2

2-111B-2

2-111A-2

2-111B-2

02-AC-3-111

FG

H

I

EP502

2-DP-TRAB

2-DP-TRAB

A

TR

217 SF

FG

H

I

TYP

A

DATA

RACK,

TYP.

TR

217 SF

2-111A-4L3 L3

L3 L3

FG

H

I

2-111A

2-111B

SOURCE A POWER PANELBOARD "2-111A".

SOURCE B POWER PANELBOARD "2-111B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

02EP401

BLDG 02 - FLOOR 1 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

KEY PLAN

GENERAL NOTES

KEY NOTES

1/4" = 1'-0"02EP101

1 RM 111 - DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"02EP101

2 RM 111 - ELECTRICAL PLAN

1/4" = 1'-0"02EP101

3 RM 111 - DEMOLITION LIGHTING PLAN

Revisions: Date:

1/4" = 1'-0"02EP101

4 RM 111 - LIGHTING PLAN

0' 2' 4' 8' 0' 2' 4' 8'

0' 2' 4' 8' 0' 2' 4' 8'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

TYP

S

Mo

RAD

A

TR

99 SF

G

H

TYP

TR

99 SF

DATA

RACK

2-209A-1,3,5

2-209B-1,3,5

2-209B-2

2-209A-2

2-209A-2

2-209A-2

2-209A-2

2-209B-2

2-209B-2

02-AC-2-209

G

H

EP502

2-209B-2

2-DP-TRAB

2-DP-TRAB

A

TR

99 SF

G

H

TYP

A

DATA

RACK,

TYP.

TR

99 SF

2-209A-4

L2 L2

L2

G

H

2-209A

2-209B

SOURCE A POWER PANELBOARD "2-209A".

SOURCE B POWER PANELBOARD "2-209B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS

WITH ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

02EP402

BLDG 02 - FLOOR 2 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

KEY PLAN

GENERAL NOTES

KEY NOTES

3/8" = 1'-0"02EP102

1 RM 209 - DEMOLITION ELECTRICAL PLAN

3/8" = 1'-0"02EP102

2 RM 209 - ELECTRICAL PLAN

3/8" = 1'-0"02EP102

3 RM 209 - DEMOLITION LIGHTING PLAN

3/8" = 1'-0"02EP102

4 RM 209 - LIGHTING PLAN

PROJECT

NORTH

0' 1' 2' 4' 0' 1' 2' 4'

0' 1' 2' 4'0' 1' 2' 4'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

JJ

RAD

DN

DN

DN

FAP

FAP

FAP

UP

Mo

SS

S SS

Mo

SS

A

B

FG

H

I

EXISTING

L1-3

OFFICE

307A

205 SF

TR

129 SF

TYP

DATA

RACK,

TYP.

TR

129 SF OFFICE

307A

205 SF

2-308B-7,9,11

2-308B-2

2-308A-2

2-308A-2 2-308A-2

2-308A-2

2-308B-2

02-AC-3-308

FG

H

I

EP502

2-308A-1,3,5 2-308B-1,3,5

TYP

2-308A-7,9,11

RELOCATED L1-3

2-308B-2

2-308A-2

2-DP-TRAB

2-DP-TRAB

308 307A

A

TYP

FG

H

I

OFFICE

307A

205 SF

TR

129 SF

A

TR

129 SF

OFFICE

307A

205 SF

2-308A-4

DATA

RACK,

TYP.

L2 L2

L2 L2

FG

H

I

2-308A

2-308B

SOURCE A POWER PANELBOARD "2-308A".

SOURCE B POWER PANELBOARD "2-308B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS

WITH ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

EXISTING EQUIPMENT SHALL BE RELOCATED AS SHOWN. EXTEND ALL RACEWAYS

AND CONDUCTORS AS REQUIRED.

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

02EP403

BLDG 02 - FLOOR 3 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

KEY PLAN

GENERAL NOTES

KEY NOTES

1/4" = 1'-0"02EP103

1 RM 307A - DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"02EP103

2 RM 308 - ELECTRICAL PLAN

0' 2' 4' 8' 0' 2' 4' 8'

1/4" = 1'-0"02EP103

3 RM 308 - DEMOLITION LIGHTING PLAN

1/4" = 1'-0"02EP103

4 RM 308 - LIGHTING PLAN

0' 2' 4' 8' 0' 2' 4' 8'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

SS

Mo

K L M

200 SF

VACANT

B025

TYP

K L M

3-B025AA-2

3-B025AA-2 3-B025AA-2

3-B025AB-2

3-B025AA-2

3-B025AB-2

3-B025AB-2 3-B025AB-2

3-B025AB-1,3,5

DATA

RACK

3-B025AA-1,3,5

TR

B025A

53.94 SF

200 SF

VACANT

B025

03-AC-3-B025

EP502

3-DP-TRAB

3-DP-TRAB

WG

K L M

B

B

TYP

200 SF

VACANT

B025

TR

B025A

53.94 SF

K L M

TR

B025A

53.94 SF

3-B025AA-4

200 SF

VACANT

B025

DATA

RACK,

TYP.

3-B025AA 3-B025AB

L3 L3

B025

B025A

SOURCE A POWER PANELBOARD "3-B025AA".

SOURCE B POWER PANELBOARD "3-B025AB".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE

SHALL BE DEMOLISHED BACK TO SOURCE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

OVERHEAD TR RACK SOURCE A AND B POWER RECEPTACLE.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE

ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER

SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY

SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS

REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH

ARCHITECT AND DOOR INSTALLER.

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

03EP400

BLDG 03 - FLOOR 0 - ENLARGED -

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM - INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

3/8" = 1'-0"03EP100

1 RM B025 - DEMOLITION ELECTRICAL PLAN

3/8" = 1'-0"03EP100

2 RM B025A - ELECTRICAL PLAN

3/8" = 1'-0"03EP100

3 RM B025 - DEMOLITION LIGHTING PLAN 3/8" = 1'-0"03EP100

4 RM B025A - LIGHTING PLAN

KEY PLAN

GENERAL NOTES

KEY NOTES

0' 1' 2' 4'

Revisions: Date:

0' 1' 2' 4'

0' 1' 2' 4'

0' 1' 2' 4'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

File details come from the government source that posted it. Updated .