Attachment 31 - Drawings Part-30.pdf
PDF 14 MB Posted
- Attached to
- Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
- Solicitation number
- 36C77623R0009
About this file
This document contains details for a federal contract solicitation to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The solicitation seeks a general contractor to upgrade electrical systems including panels and power, implement bonding and UPS improvements, integrate building management systems with HVAC upgrades and expansions, renovate existing spaces and the data center involving demolition, construction and finishes work, enhance communication infrastructure with new data outlets and cabling upgrades, and implement physical security and fiber optic improvements across multiple buildings. The work locations involve Buildings 1 through 3 and 18 through 61 as well as sites 75. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 50
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
SS
S
S
SS
S
C
W
TR
2S001
184 SF
5.6
5.4
5.9
L.1
ACCESS POWER
CONTROLLER PANEL
ACCESS DOOR CONTROLLER
TYP
TECHNOLOGY
PANEL
ACCESS DOOR
CONTROLLER
TELEPHONE
TERMINAL
BOARD
TECHNOLOGY
PANEL
TR
2S001
184 SF
5.6
5.4
5.9
L.1
ACCESS POWER
CONTROLLER PANEL
ACCESS DOOR
CONTROLLER
TECHNOLOGY
PANEL
RELOCATED
ACCESS DOOR
CONTROLLER
RELOCATED
TELEPHONE
TERMINAL
BOARD
RELOCATED
TECHNOLOGY
PANEL
DATA
RACK,
TYP.
ET502
B-SIDE:
TO TR 2S001 FROM
GS10 TDU, FROM
FLR 01 TO 02
A-SIDE:
TO TR 2S001 FROM
BLDG 01 GC12
2S001 2S002
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,
UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE
UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS
NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY
VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO
ASSOCIATED TR.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED
TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL
LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED
FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION
OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY
INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT6A
CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND
INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP
MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;
DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS
OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED
PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE
DRAWINGS AS REQUIRED.
14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
8' - 0"
5.6
5.4
5.9
L.1
TR
2S001
184 SF
TYP
ET502
4DATA
RACK,
TYP.
AREA OF WORK
3/8" = 1'-0"53ET102
1 RM 2S001 AND 2S002 - DEMOLITION FLOOR PLAN
3/8" = 1'-0"53ET102
2 RM 2S001 - TELECOMMUNICATIONS PLAN
GENERAL NOTES
KEY PLAN
0' 2' 4' 8'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 53ET402
BLDG 53 - FLOOR 2 - ENLARGED
TELECOMMUNICATION PLANS 53
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
KEY NOTES
1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING
SHALL BE DEMOLISHED BACK TO SOURCE.
PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES
SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE
DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.
EXISTING EQUIPMENT TO BE RELOCATED AS SHOWN IN DETAIL '2' ON THIS SHEET.
EXTEND ALL EXISTING RACEWAYS AND CONDUCTORS/CABLING AS REQUIRED.
0' 2' 4' 8'
0' 2' 4' 8'3/8" = 1'-0"53ET102
3 RM 2S001 - OVERHEAD PLAN LEVEL 1 4 NOT USED
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
ALL BACKBONE CABLING ROUTES ARE
DIAGRAMMATICAL; CONTRACTOR SHALL
ENSURE A-SIDE AND B-SIDE ROUTING IS
AS DIVERSE AS PRACTICAL. REFERENCE
COMMUNICATIONS DRAWINGS FOR ALL
REQUIRED FIBER-OPTIC CABLING.
A
IM
W
180°
W
C
E F
TR
35 SF
WALL
MOUNTED
DATA RACK
TELEPHONE
TERMINAL BOARD
BLDG. ENTRANCE
TERMINAL
ACCESS POWER
CONTROLLER PANEL
TYP
EXISTING
PANEL NSR251
FA/MN
TR
35 SF
E F
WALL
MOUNTED
DATA RACK
TELEPHONE
TERMINAL BOARD
BLDG. ENTRANCE
TERMINAL
ACCESS POWER
CONTROLLER PANEL
EXISTING
PANEL NSR251
FA/MN
B-SIDE
CONTINUE TO
SHEET 53TET101
A-SIDE:
TO TR 109 FROM
BLDG 1 GC12
TR
35 SF
E F
WALL
MOUNTED
DATA
RACK EXISTING
PANEL
NSR251
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,
UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 5E AND BELOW SHALL BE
UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS
NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY
VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO
ASSOCIATED TR.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED
TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL
LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED
FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION
OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY
INDICATED.
7. PROVIDE 1" CONDUIT FROM NEW BACKBOX TO ACCESSIBLE CEILING SPACE FOR
ALL OUTLETS IDENTIFIED AS NEW.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND
INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP
MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IF FIELD;
DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS
OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED
PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE
DRAWINGS AS REQUIRED.
14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
- AREA OF WORK
PROJECT
NORTH
1/2" = 1'-0"53TET101
1 RM 109 - DEMOLITION FLOOR PLAN
1/2" = 1'-0"53TET101
2 RM 109 - TELECOMMUNICATIONS PLAN
KEY PLAN
KEY NOTES
GENERAL NOTES
1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING
SHALL BE DEMOLISHED BACK TO SOURCE.
PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES
SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE
DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.
REPLACE EXISTING FIBER DISTRIBUTION CABINET WITH NEW FIBER DISTRIBUTION
CABINET AND CASSETTES AS REQUIRED. LEVITON ANGLED OPT-X UHDX WITH HDX
ENTERPRISES MTP CASSETTES, OR EQUAL.
UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED
PACS SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END
LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR
PACS SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS
REQUIRED. COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL
VERIFY EXACT HEAD END LOCATION AS REQUIRED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 53TET401
BLDG 53T - FLOOR 1 - ENLARGED
TELECOMMUNICATIONS PLANS 53T
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
0' 1' 2' 4'
1/2" = 1'-0"53TET101
3 RM 109 - OVERHEAD PLAN LEVEL 1
PROJECT
NORTH
0' 1' 2' 4'
PROJECT
NORTH
0' 1' 2' 4'
4 NOT USED
PROJECT
NORTH
ALL BACKBONE CABLING ROUTES ARE
DIAGRAMMATICAL; CONTRACTOR SHALL
ENSURE A-SIDE AND B-SIDE ROUTING IS AS
DIVERSE AS PRACTICAL. REFERENCE
COMMUNICATIONS DRAWINGS FOR ALL
REQUIRED FIBER-OPTIC CABLING.
W
C
180°
W
Tectonic Copyright 2007
Tectonic Copyright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
UP
UP
UP
DN
F
TYP
TR
1A129
85 SF TYP
TELEPHONE TERMINAL BOARD
DATA RACK, TYP.
F F
TR
1A129
85 SF
TELEPHONE TERMINAL BOARD
DATA
RACK,
TYP.
ET502
CONTINUE TO
SHEET
55ET101a
B-SIDE:
TO TR 2A136
AND 3A120
FROM 1C132
TDU
A-SIDE:
TO TR 1A129 FROM
BLDG 1 GC12
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,
UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE
UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS
NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY
VACATED BY EXISTING CABLING AS CONDUIT FILL ALLOWS. PROVIDE RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED
TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL
LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED
FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION
OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY
INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A
CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND
INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP
MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;
DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS
OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED
PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE
DRAWINGS AS REQUIRED.
14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
F F
TR
1A129
85 SF
TYP
DATA
RACK,
TYP.
ET502
1A129
AREA OF WORK
1/4" = 1'-0"55ET101a
1 RM 1A129 - DEMOLITION FLOOR PLAN
1/4" = 1'-0"55ET101a
2 RM 1A129 - TELECOMMUNICATIONS PLAN
KEY PLAN
GENERAL NOTES
KEY PLAN
KEY NOTES
GENERAL NOTES
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING
SHALL BE DEMOLISHED BACK TO SOURCE.
PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES
SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE
DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 55ET401a
BLDG 55 - FLOOR 1 - ENLARGED
TELECOMMUNICATIONS PLAN 55
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
0' 2' 4' 8' 0' 2' 4' 8'
1/4" = 1'-0"55ET101a
3 RM 1A129 - OVERHEAD PLAN LEVEL 1
0' 2' 4' 8'
4 NOT USED
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
ALL BACKBONE CABLING ROUTES ARE
DIAGRAMMATICAL; CONTRACTOR SHALL
ENSURE A-SIDE AND B-SIDE ROUTING IS AS
DIVERSE AS PRACTICAL. REFERENCE
COMMUNICATIONS DRAWINGS FOR ALL
180° W
C
Tectonic Copyright 2007
Tectonic Copyright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
UP
UP
UP
DN
F E
C F
E C
FEC
F E
C
F E
C
F E
C
F E
C
FEC
FEC
FEC
FEC
F E
C
DATA
SYSTEMS
1C132
DATA
TECH
1C133
CORRIDOR
C1-57
BREAKDOWN,VERIFICATION
INVENTORY
1C135
DATA, SYSTEM
1A130
85 SF
DATA, TECH
1A129
CORE LAB
1A126
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,
UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE
UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS
NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY
VACATED BY EXISTING CABLING AS CONDUIT FILL ALLOWS. PROVIDE RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED
TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL
LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED
FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION
OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY
INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A
CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND
INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP
MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;
DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS
OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED
PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE
DRAWINGS AS REQUIRED.
14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
E
8.2
DATA
RACK,
TYP.
TYP
ET502
TR
1B104
110 SF
E
8.2
TYP
TELEPHONE
TERMINAL
BOARD
FIRE ALARM PANEL
TELEPHONE
TERMINAL
BOARD
TR
1B104
110 SF
E
8.2
TR
1B104
110 SF
DATA
RACK,
TYP.
ET502
TELEPHONE
TERMINAL
BOARD
FIRE ALARM PANEL
TELEPHONE
TERMINAL
BOARD
B-SIDE:
CONTINUE
TO SHEET
55ET101b
A-SIDE:
TO TR 1B104 FROM
BLDG 1 GC12
1B104
Cable Entrance Room
1B 104
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 55ET401b
BLDG 55 - FLOOR 1 - ENLARGED
TELECOMMUNICATIONS PLAN 55
LRL/WNM JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
KEY PLAN
GENERAL NOTES
KEY PLAN
KEY NOTES
GENERAL NOTES
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING
SHALL BE DEMOLISHED BACK TO SOURCE.
PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES
SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE
DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.
1/4" = 1'-0"55ET101b
3 RM 1B104 - OVERHEAD PLAN LEVEL 1
0' 2' 4' 8'
1/4" = 1'-0"55ET101b
1 RM 1B104 - DEMOLITION FLOOR PLAN
1/4" = 1'-0"55ET101b
2 RM 1B104 - TELECOMMUNICATIONS PLAN
0' 2' 4' 8' 0' 2' 4' 8'
55ET101b55ET101b
4 NOT USED
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
ALL BACKBONE CABLING ROUTES ARE
DIAGRAMMATICAL; CONTRACTOR SHALL
ENSURE A-SIDE AND B-SIDE ROUTING IS
AS DIVERSE AS PRACTICAL. REFERENCE
COMMUNICATIONS DRAWINGS FOR ALL
180°
C
W
Tectonic Copyright 2007
Tectonic Copyright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
UP
UP
UP
DN
F E
C F
E C
FEC
F E
C
F E
C
F E
C
F E
C
FEC
FEC
FEC
FEC
F E
C
DATA
TECH
1C133
CORRI DOR
C1- 57
BREAKDOWN,VERI FICATION
INVENTORY
1C135
DATA, SYSTEM
1A130
85 SF
DATA, TECH
1A129
CORE LAB
1A126
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,
UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE
UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS
NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY
VACATED BY EXISTING CABLING AS CONDUIT FILL ALLOWS. PROVIDE RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED
TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL
LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED
FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION
OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY
INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A
CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND
INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP
MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;
DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS
OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED
PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE
DRAWINGS AS REQUIRED.
14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
LL
DATA
RACK,
TYP.
1 TYP
TR
1C132
96 SF
TELEPHONE
TERMINAL
BOARD
LTR
1C132
96 SF
TELEPHONE
TERMINAL
BOARD
TDU 3
B-SIDE:
BUILDING FEED
CONTINUE TO
SHEET 55ET101b
A-SIDE:
TO TR 1C132 FROM
BLDG 1 GC12
B-SIDE: TO TR 2C144
AND 3C149 FROM
1C132 TDU
DATA
RACK ET502
B-SIDE:
CONTINUE TO
TRs 1A129, 1B104, 2A136, AND 3A120; SEE
SHEET 55ET101b
L
TR
1C132
96 SF2
TYP
DATA
RACK ET502
1C132
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 55ET401c
BLDG 55 - FLOOR 1 - ENLARGED
TELECOMMUNICATIONS PLAN 55
Checker Author
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
KEY PLAN
KEY NOTES
GENERAL NOTES
KEY PLAN
GENERAL NOTES
1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING
SHALL BE DEMOLISHED BACK TO SOURCE.
PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES
SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE
DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.
TUBE DISTRIBUTION UNIT (TDU). REFERENCE COMMUNICATION DRAWINGS FOR
ADDITIONAL INFORMATION.
1/4" = 1'-0"55ET101b
1 RM 1C132 - DEMOLITION FLOOR PLAN
1/4" = 1'-0"55ET101b
2 RM 1C132 - TELECOMMUNICATIONS PLAN
0' 2' 4' 8' 0' 2' 4' 8'
1/4" = 1'-0"55ET101a
3 RM 1C132 - OVERHEAD PLAN LEVEL 1
0' 2' 4' 8'
4 NOT USED
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
b
ALL BACKBONE CABLING ROUTES ARE
DIAGRAMMATICAL; CONTRACTOR SHALL
ENSURE A-SIDE AND B-SIDE ROUTING IS
AS DIVERSE AS PRACTICAL. REFERENCE
COMMUNICATIONS DRAWINGS FOR ALL
UP
DN
UP
DN
UP
DN
W W
180° C
2A136
TR
2A136
85 SF
F
DATA RACK,
TYP.
TYP
TR
2A136
85 SF
F
B-SIDE:
TO TR 2A136 AND 3A120
FROM 1C132 TDU
DATA RACK
ET502
A-SIDE:
TO TR 2A136 FROM
BLDG 1 GC12
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,
UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE
UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS
NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY
VACATED BY EXISTING CABLING AS CONDUIT FILL ALLOWS. PROVIDE RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED
TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL
LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED
FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION
OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY
INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A
CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND
INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP
MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;
DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS
OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED
PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE
DRAWINGS AS REQUIRED.
14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
F
TR
2A136
85 SF
TYP
DATA RACK
ET502
AREA OF WORK
1/4" = 1'-0"55ET102a
1 RM 2A136 - DEMOLITION FLOOR PLAN
1/4" = 1'-0"55ET102a
2 RM 2A136 TELECOMMUNICATIONS PLAN
0' 2' 4' 8' 0' 2' 4' 8'
KEY PLAN
GENERAL NOTES
KEY PLAN
KEY NOTES
GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 55ET402a
BLDG 55 - FLOOR 2 - ENLARGED
TELECOMMUNICATIONS PLAN 55
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING
SHALL BE DEMOLISHED BACK TO SOURCE.
PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES
SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE
DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.
1/4" = 1'-0"55ET102a
3 RM 2A136 - OVERHEAD PLAN LEVEL 1
0' 2' 4' 8'
4 NOT USED
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
ALL BACKBONE CABLING ROUTES ARE
DIAGRAMMATICAL; CONTRACTOR SHALL
ENSURE A-SIDE AND B-SIDE ROUTING IS AS
DIVERSE AS PRACTICAL. REFERENCE
COMMUNICATIONS DRAWINGS FOR ALL
W
C
UP
DN
UP
DN
UP
DN
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,
UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE
UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS
NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY
VACATED BY EXISTING CABLING AS CONDUIT FILL ALLOWS. PROVIDE RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED
TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL
LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED
FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION
OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY
INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A
CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND
INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP
MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;
DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS
OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED
PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE
DRAWINGS AS REQUIRED.
14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
L
TR
2C144
101 SF
TYP
DATA
RACK,
TYP.
ET502
LL
TR
2C144
101 SF
TYP
TELEPHONE
TERMINAL
BOARD
COMBINER & SPLITTER
FIBER OPTIC
DATA RACK,
TYP.
LLTR
2C144
101 SF
180°
DATA
RACK,
TYP.
ET502
TELEPHONE
TERMINAL
BOARD
COMBINER & SPLITTER
FIBER OPTIC
B-SIDE:
TO TR 2C144 AND 3C149
FROM 1C132 TDU
A-SIDE :
TO TR 2C144 FROM
BLDG 1 GC12
2C144
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 55ET402b
BLDG 55 - FLOOR 2 - ENLARGED
TELECOMMUNICATIONS PLAN 55
LRL/WNM JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
KEY PLAN
GENERAL NOTES
KEY PLAN
KEY NOTES
GENERAL NOTES
1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING
SHALL BE DEMOLISHED BACK TO SOURCE.
PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES
SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE
DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.
1/4" = 1'-0"55ET102b
3 RM 2C144 - OVERHEAD PLAN LEVEL 1
0' 2' 4' 8'
1/4" = 1'-0"55ET102b
1 RM 2C144 - DEMOLITION FLOOR PLAN
1/4" = 1'-0"55ET102b
2 RM 2C144 - TELECOMMUNICATIONS PLAN
0' 2' 4' 8' 0' 2' 4' 8'
55ET102b
4 NOT USED
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
ALL BACKBONE CABLING ROUTES ARE
DIAGRAMMATICAL; CONTRACTOR SHALL
ENSURE A-SIDE AND B-SIDE ROUTING IS
AS DIVERSE AS PRACTICAL. REFERENCE
COMMUNICATIONS DRAWINGS FOR ALL
UP
DN
DN
29' - 4"
4' - 0"
180° C
C C
C
W
W W
W
3A120
F
TR
3A120
85 SF
F
TYP
DATA
RACK,
TYP.
TELEPHONE TERMINAL BOARD
TR
3A120
85 SF
F
DATA
RACK,
TYP.ET502
TELEPHONE TERMINAL BOARD
B-SIDE:
TO TR 3A120
FROM 1C132 TDU 2
A-SIDE:
TO TR 3A120
FROM
BLDG 1 GC12
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,
UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE
UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS
NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY
VACATED BY EXISTING CABLING AS CONDUIT FILL ALLOWS. PROVIDE RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED
TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL
LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED
FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION
OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY
INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A
CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND
INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP
MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;
DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS
OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED
PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE
DRAWINGS AS REQUIRED.
14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
F
TR
3A120
85 SF
DATA
RACK,
TYP.
TYP
ET502
AREA OF WORK
1/4" = 1'-0"55ET103a
1 RM 3A120 - DEMOLITION FLOOR PLAN
1/4" = 1'-0"55ET103a
2 RM 3A120 - TELECOMMUNICATIONS PLAN
0' 2' 4' 8'
0' 2' 4' 8'
0' 2' 4' 8'
KEY PLAN
GENERAL NOTES
KEY PLAN
KEY NOTES
GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 55ET403a
BLDG 55 - FLOOR 3 - ENLARGED
TELECOMMUNICATIONS PLANS 55
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
1/4" = 1'-0"55ET103a
3 RM 3A120 - OVERHEAD PLAN LEVEL 1
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING
SHALL BE DEMOLISHED BACK TO SOURCE.
PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES
SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE
DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.
4 NOT USED
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
ALL BACKBONE CABLING ROUTES ARE
DIAGRAMMATICAL; CONTRACTOR SHALL
ENSURE A-SIDE AND B-SIDE ROUTING IS
AS DIVERSE AS PRACTICAL. REFERENCE
COMMUNICATIONS DRAWINGS FOR ALL
180°
W
C
DN
DN
UP
DN
DN
29' - 4"
4' - 0"
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,
UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE
UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS
NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY
VACATED BY EXISTING CABLING AS CONDUIT FILL ALLOWS. PROVIDE RACEWAYS
TO EXTEND TO ASSOCIATED TR AS REQUIRED.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED
TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL
LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED
FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION
OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY
INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A
CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND
INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP
MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;
DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS
OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED
PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE
DRAWINGS AS REQUIRED.
14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
L
TR
3C149
100 SF2
TYP
DATA
RACK,
TYP.
ET502
L
TR
3C149
100 SF
L
DATA
RACK,
TYP
TYP
PATCH PANEL
ACCESS DOOR
CONTROLLER
ACCESS POWER
CONTROLLER
PANEL
ACCESS DOOR
CONTROLLER
ACCESS POWER
CONTROLLER
PANEL
FIRE ALARM
PANEL
PANEL BOARD
L
TR
3C149
100 SF
L
DATA
RACK,
TYP.
ET502
PATCH PANEL
ACCESS DOOR
CONTROLLER
ACCESS POWER
CONTROLLER
PANEL
ACCESS DOOR
CONTROLLER
ACCESS POWER
CONTROLLER
PANEL
FIRE ALARM
PANEL
PANEL BOARD
B-SIDE:
TO TR 3C149 FROM
1C132 TDU
A-SIDE:
TO TR 3C149
FROM BLDG 1
GC12
3C149
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 55ET403b
BLDG 55 - FLOOR 3 - ENLARGED
TELECOMMUNICATIONS PLANS 55
LRL/WNM JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
KEY PLAN
GENERAL NOTES
KEY PLAN
KEY NOTES
GENERAL NOTES
1/4" = 1'-0"55ET103b
3 RM 3C149 - OVERHEAD PLAN LEVEL 1
0' 2' 4' 8'
1/4" = 1'-0"55ET103b
1 RM 3C149 - DEMOLITION FLOOR PLAN
1/4" = 1'-0"55ET103b
2 RM 3C149 - TELECOMMUNICATIONS PLAN
0' 2' 4' 8' 0' 2' 4' 8'
55ET103b
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING
SHALL BE DEMOLISHED BACK TO SOURCE.
PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES
SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE
DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.
4 NOT USED
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
ALL BACKBONE CABLING ROUTES ARE
DIAGRAMMATICAL; CONTRACTOR SHALL
ENSURE A-SIDE AND B-SIDE ROUTING IS
AS DIVERSE AS PRACTICAL. REFERENCE
COMMUNICATIONS DRAWINGS FOR ALL
W
C
W
5.5
E
TR
BA 105
76 SF
COMBINER & SPLITTER
FIBER OPTIC
5.5
E
TYP
DATA RACK, TYP.
TELEPHONE TERMINAL
BOARD
5.5
E
TR
BA 105
76 SF
5.5
E
COMBINER & SPLITTER
FIBER OPTIC
TELEPHONE TERMINAL
BOARD
DATA
RACK,
TYP.
ET502
B-SIDE:
TO TRs 1A109, 2A122, AND 3A122
FROM MCR BB102,
FROM FLR 00 TO 01
B-SIDE:
CONTINUE TO MCR BB102;
MCR FEEDS TRs BA105, 1A109, 2A122, AND 3A122;
SEE SHEET 56ET100
A-SIDE:
TO TR BA 105 FROM
BLDG 56 BB 102
BA 105
TR
BA 105
76 SF2
TYP
5.5
E
DATA
RACK,
TYP.
ET502
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,
UNLESS OTHERWISE NOTED.
2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE
UPGRADED WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS
NOTED OTHERWISE.
5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY
VACATED BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO
ASSOCIATED TR.
6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED
TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL
LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED
FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION
OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY
INDICATED.
7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A
CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.
8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT
CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180
DEGREES.
9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND
INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP
MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO
ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.
10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;
DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS
INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL
SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS
OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL
SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS;
ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS
REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.
13. ALL TELECOMMUNICATION ROOMS SHALL BE PROVIDED WITH FIRE-RATED
PLYWOOD BACKBOARDS. REFERENCE EXACT PLACEMENTS WITH ARCHITECTURE
DRAWINGS AS REQUIRED.
14. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE
DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,
ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND
ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.
AREA OF WORK
GENERAL NOTES
KEY PLAN
1/4" = 1'-0"56ET100
1 RM BA 105 - DEMOLITION FLOOR PLAN
1/4" = 1'-0"56ET100
2 RM BA 105 - TELECOMMUNICATIONS PLAN
0' 2' 4' 8'0' 2' 4' 8'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 56ET400
BLDG 56 - FLOOR 0 - ENLARGED
TELECOMMUNICATIONS PLANS 56
LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
KEY NOTES
1 EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED RACEWAYS AND CABLING
SHALL BE DEMOLISHED BACK TO SOURCE.
PROVIDE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AS REQUIRED. SLEEVES
SHALL BE HILTI QUICK RELEASE SLEEVES, OR REVIEWED EQUAL. REFERENCE
DETAIL '2' ON SHEET ET503 FOR ADDITIONAL INFORMATION.
1/4" = 1'-0"56ET100
3 RM BA 105 - OVERHEAD PLAN LEVEL 1
0' 2' 4' 8'
4 NOT USED
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
ALL BACKBONE CABLING ROUTES ARE
DIAGRAMMATICAL; CONTRACTOR SHALL ENSURE
A-SIDE AND B-SIDE ROUTING IS AS DIVERSE AS
PRACTICAL. REFERENCE COMMUNICATIONS
DRAWINGS FOR ALL REQUIRED FIBER-OPTIC
CABLING.