Attachment 7 - Drawings Part-6.pdf
PDF 14 MB Posted
- Attached to
- Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
- Solicitation number
- 36C77623R0009
About this file
This document provides details for a federal contract solicitation to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The solicitation seeks a general contractor to upgrade electrical systems including panels, power, bonding and UPS; assess and potentially upgrade HVAC systems; renovate and expand existing space through demolition, new construction and finish work; renovate the existing data center; upgrade communication, security and fiber optic infrastructure; and conduct hazardous material abatement. The work will occur across 25 buildings on the campus including buildings 1 through 3, 3T, 18, 23 through 26, 51 through 61, 75 and other site locations. The soliciting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 50
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
CONNECTING CORRIDORS
TO BUILDING 23
CONNECTING CORRIDORS
TO BUILDING 24
UP
UP
UP
UP
EXTERIOR
SURFACE
BASEMENT
LEVEL
TRENCH
STAIRS TO
BASEMENT
LEVEL
ROOF
BELOW
A
A
A.1
A.1 A.3A.2 B C.1
D.2
D.2C
D.1
D.1D
E.1
E
F
F
G
G
H
H
J.1
J
H.2 J.2
K
L M
M
N
N
O
O
P
P Q
R.3
R.1
R.1 R.2
S U
V.3
V.3T V.2V V.1
A.4 B.1 B.2 C.2 R.4 T.1 T.2 U.1
4.7
8.1
10.1
G.1
G.1 K.2
N.1
N.1
R
01EP401a
01EP401b
01EP401a
01EP401b
TR
C102D
01EP401a
01EP401a
01EP401b
01EP401b
MEDICAL PROVIDERS
MEDICAL PROVIDERS
PREP
TRAINING
MENS RESTROOM/LOCKER
ROOM
CORRIDOR
110 KITCHENETTE
CORRIDOR
1-L11(S) 1-L11(L)
1-L12
H1
EC1
N1
N1A
MCC-EMSP
EM1
EM1A
1-L13A
1-L13R
1-L13L
EC13
1-L15
1-L14
RF
RF
SERVER RM
1E07
OPEN OFFICES
1E09
TR
1E15
OFFICE
C105
EXISTING DISPATCH
1E11A
GROUP ROOM
1W08B
GROUP ROOM
1W08A
OFFICE
1W09
VEST.
1W08
TOILET
1W07A
WAITING ROOM
1W07OFFICE
1W10
OFFICE
1W11A
CORRIDOR
H119
OFFICE
1W06
TOILET
1W05
VEST.
1W06A
OFFICE
1W11B
CONSULT
1W12 OFFICE
1W04
CORRIDOR
1W13
CONSULT
1W03
MECH. RM.
1W02CONSULT
1W14
OFFICE
1W15
ELEV 1
E1
MECH
1W01
CORRIDOR
H116
OFFICE
1W16
STAIR 3
S103
TOILET
1W31
CONSULT
1W17
STORAGE
1W18
WAITING
1W30A
OFFICE
1W18A
OFFICE
1W20
OFFICE
1W21
OFFICE
1W22A
OFFICE
1W30
OFFICE
1W29
TOILET
1W28
WAITING RM.
1W27
OFFICE
1W22
HALLWAY
1W24
TOILET
1W25
STORAGE
1W23
SHARED OFFICE
C106A
OFFICE
C106
OFFICE
C108
LACTATION
C108A
CORRIDOR
H111
OT GROUP ROOM
C104
CONTROL
C102E
FES UTILITY
C101
STAIR 2
S102
VEST.
H109
CLEAN UTILITY
C102J
CORRIDOR
H113
OFFICE
C110COPY RM.
C109
OFFICE
C111
OFFICE
C112
OFFICE
C113
OFFICE
C114
OFFICE
C115
OFFICE
C116
OFFICE
C117
OFFICE
C115A
OFFICE
C115B
AGENT CASHIER
C119
OFFICE
C122A
OFFICE
C122
VACANT
C120
HAC
C121
VACANT
C123C
OFFICE
C123B
OFFICE
C123A
LOBBY
C124
HALLWAY
C123
CORRIDOR
H106
TOILET, MALE
C127
TOILET, FEMALE
C126
OFFICE
C125
CLOSET
C126A
STAIRWELL NO. 1
S101
CLEAN LINEN RM.
1E136
COPY/STORAGE
1W13A
STORAGE
C129
WAITING RM.
C131
ALCOVE
H113A
CORRIDOR
H118
CORRIDOR
H117
CORRIDOR
1W28A
ALCOVE
H117A
CORRIDOR
H114 RECEPTION
C118
CORRIDOR
H110 CORRIDOR
H108
CORRIDOR
H107
WAITING RM.
C128
CORRIDOR
H115
TOILET
C103
CLOSET
1W06B
CHASE
CH-C-1
ELEVATOR NO. 2
E2
CHASE
CH-1W-4
CHASE
CH-1W-3
CHASE
CH-1W-2
CHASE
CH-C-2
CHASE
CH-C-3
CHASE
CH-1W-1
D.W.
E3
UTILITY
E4
WAITING RM.
H115A
MAIL RM.
C115C
AGENT CASHIER
C119B
TOILET
C127
STAIR 4
S104
CHASE
CH-E-2
CHASE
CH-E-1
CHASE
CH-C-5
CHASE
CH-1W-6
CHASE
CH-C-4
COMMUNITY BREAK ROOM
1W32
MVP
C102A
STORAGE
106A
HOLDING
ARMS
WOMENS RESTROOM/LOCKER
ROOM
STORAGE
1E13
INTERVIEW
STORAGE
1E02
STORAGE
1E01
STORAGE
1E14
MEDICATION/LOGISTICS
EXAM
EXAM
EXAM
SOILED UTILITY
EXAM
EXAM
DOCTOR OFFICE
IMAGING
RESTROOM
EXAM
EXAM
EXAM
LPN/VITALS
WAITING
RECEPTION
EXISTING STORAGE
1E11
CORRIDOR
CORRIDOR
BLDG 01
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
01EP101
BLDG 01 - FLOOR 1 - ELECTRICAL PLAN
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON
BARRACKS MO
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1/16" = 1'-0"
1 BLDG 01 - FLOOR 1 - ELECTRICAL PLAN
0' 8' 16' 32'
GENERAL NOTES
KEY PLAN
PROJECT
NORTH
KEY NOTES
PROJECT
NORTH
Revisions: Date:
LRL/WNM LLT/JPS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
A
A
A.1
A.1 A.3A.2 B C.1
D.2
D.2C
D.1
D.1D
E.1
E F G H
J.1
J
H.2 J.2
K
L
M N O P Q
R.2
R
R
R.1
R.1
S U
V.3
V.3T
V.2
V.2V V.1
A.4 B.1 B.2 C.2 R.3 T.1 T.2 U.1
10.1
8.1
01EP402
01EP402
LAB.
2C07
LAB.
2C08
UNDER CONSTRUCTION
2C09
CORRIDOR
H204
OFFICE
2C04
VETERAN HEALTH EDUCATION
2C03
LOW VISION THERAPY
2C02OFFICE
2C01A
LOW VISION CLINIC
2C01
RECEPTION
2C01B
WAITING RM.
2E27
TOILET
2E28
OXYGEN STORAGE
2E30
EXAM
2E29
TOILET, STAFF
2E31
OFFICE
2C05
HAC
2C06
CORRIDOR
H210 STORAGE
2E16A
EXAM
2E21
EXAM
2E20
TOILET
2E22A
CORRIDOR
H203
OFFICE
2E22
STAIR 1
S201
EXAM
2E26
TOILET
2E25B
EXAM
2E25A
OFFICE
2E23
TOILET
2E24
EXAM
2E25
HIMS WORK ROOM
2C19
CORRIDOR
H206
EXAM
2W22C
TOILET
2W23
OFFICE
2W26
OFFICE
2W24
MECH
2W25
CORRIDOR
H207
OFFICE
2W27
OFFICE
2W28
OFFICE
2W28A
OFFICE
2W29
OFFICE
2W28C
TELEHEALTH
2W28B
CLEAN SUPPLY
2W29A
STORAGE
SW29C
OFFICE
2W29B
TOILET, STAFF
2W29F
VEST.
2W29E
TELEHEALTH
2W29D
OFFICE
2W33
EXAM
2W32
OFFICE
2W30
HAC
2W36
TOILET
2W34
SHARED OFFICE
2W35
STAIR 3
S203
STORAGE
2C22
TOILET
2C24
STORAGE
2C21
LAB.
2C20
OFFICE
2C29
STAIR 2
S202
LAB.
2C23
TOILET, FEMALE
2C27
HAC
2C28
EXAM
2C25
EXAM
2C11
OPTICAL SHOP
2C12
NURSE STATION
2C13
EXAM
2C14
ELEC RM.
2C18
KITCHENETTE
2C17
SHARED OFFICE
2C15
TOILET, MALE
2C16
CORRIDOR
H205
CLOSET
2C20A
TOILET
2W03
MED. PREP.
2W04
STORAGE
2W05
BREAK RM.
2W06
TOILET
2W08
EXAM
2W07
TOILET
2W11
EXAM
2W10
EXAM
2W09
EXAM
2W12
RECEPTION
2W01
CORRIDOR
H208
CORRIDOR
H209
OFFICE
2W21
PATIENT NOUR.
2W22
OFFICE
2W22ACLEAN LINEN / STORAGE
2W22B
CORRIDOR
2W19
TOILET, STAFF
2W20
SHARED OFFICE
2W18
TOILET
2W17
TOILET
2W14
EXAM
2W15
EXAM
2W16
EXAM
2W13
FAX RM.
2W02
ELEV 1
E1
CHASE
CH-C-6
CHASE
CH-C-3
CHASE
CH-C-1
ELEC. CLOSET
2C03A
CHASE
CH-E-3
CHASE
CH-W-1
CHASE
CH-C-5
CHASE
CH-W-2
CHASE
CH-W-4
CHASE
CH-W-3
CHASE
CH-W-5
ELEVATOR NO. 2
E2
CHASE
CH-C-4
D.W.
E3
CHASE
CH-W-8
CHASE
CH-W-6
CHASE
CH-W-7
CHASE
CH-E-8
STAIR 4
S204
01EP402
01EP402
OI&T
2C10A
OI&T
2C10A
OI&T
2C10A
OI&T
2C10A
OI&T
2C10A
OI&T
2C10A
OI&T
2C10A
OI&T
2C10A
OI&T
2C10A
OI&T
2C10A
OI&T
2C10A
OI&T
2C10A
OI&T
2C10A
EC2A
1-L21L
1-L21R
1-L22L1-L22R
2CEC
EC2B
1-L23
TR
2C10A
LAB.
2C10
SERVER RM.
2C10B
2WMC
BLDG 01
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
01EP102
BLDG 01 - FLOOR 2 - ELECTRICAL PLAN
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON
BARRACKS MO
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 1/16" = 1'-0"
1 BLDG 01 - FLOOR 2 - ELECTRICAL PLAN
PROJECT
NORTH
0' 8' 16' 32'
GENERAL NOTES
KEY PLAN
PROJECT
NORTH
KEY NOTES
Revisions: Date:
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
CORRIDOR
H302
STAIRWELL NO.
S301
STORAGE
3E02
HAC
3E01
KITCHEN
3E03
CORRIDOR
H301
187 SF
OFFICE
3E04
131 SF
OFFICE
3E04A
OFFICE
3E05
TRAINING RM.
3E07
VOL. SERVICE
KIOSK
3E06
CLOTHING RM.
3E08
LAB.
3E12
STORAGE
3E12A
MECH. RM.
3E11
OFFICE
3E10
LAB.
3E09
OFFICE
W307
CONFERENCE
RM.
W308
OFFICE
W309
COPY ROOM
W306
OFFICE
W304
OFFICE
W305
TOILET, MALE
W301
STAFF LOUNGE
W302
MAIL RM.
W303
OFFICE
W319
OFFICE
H308
OFFICE
H307
STORAGE
W310
OFFICE
W311
LOBBY
W318
OFFICE
H306
COLD RM.
3E21A
TOILET, FEMALE
E311
BREAK RM.
E313
HAC
E312 TOILET, MALE
E310
OFFICE
E309
OFFICE
E308
OFFICE
E301
OFFICE, OPEN
E302
OFFICE
E305
OFFICE
E307
OFFICE
E306
STORAGE
E303A
TR
E303
OFFICE
E304
COLD RM.
3E21
HAC
3C20
LAB.
3C21
474 SF
SHARED OFFICE
3C26
MECH. RM.
3C23
LAB.
3C17
CORRIDOR
H304
LAB.
3C18
CORRIDOR
H305
LAB.
3C27
STAIRWELL NO.
S302
OFFICE
C305
OFFICE
C307
PREP. RM.
3C29
TOILET
C307A
PREP. RM.
3C28
OFFICE
C304
OFFICE
C306
MECH. RM.
W314
DATA CLOSET
W315
STAIRWELL NO.
S303
OFFICE
W312
TOILET, FEMALE
W313
TR
3C13
LAB.
3C15 LAB.
3C12
STERILIZATION
RM.
3C16
LAB.
3C09
LAB.
3C07
LAB.
3C08
CORRIDOR
H303
OFFICE
C303 OFFICE
C302
STORAGE
C301
MVP OFFICE
3C04
MECH. RM.
3C06
DARK RM.
3C06A
RECEPTION
W316
CHASE
CH-W-1
CHASE
CH-W-2
ELEV 1
E1
CHASE
CH-C-8
CHASE
CH-W-5
CHASE
CH-W-3
CHASE
CH-C-7
CHASE
CH-C-6
CHASE
CH-C-5
CHASE
CH-C-3
CHASE
CH-C-4
CHASE
CH-C-2
CHASE
CH-C-1
CHASE
CH-E-2
CHASE
CH-E-4
CHASE
CH-E-5
CHASE
CH-E-6
CHASE
CH-E-1
CHASE
CH-E-3
CHASE
CH-W-4
D.W.
E3
CHASE
CH-E-7
CHASE
CH-C-9
CHASE
CH-C-10
UP
SP
CHASE
CH-E-10
CHASE
CH-E-9
DNDN
DN
UP
DN
STAIRWELL NO.
S304
OFFICE
3C11
CORRIDOR
H302
A
A
A.1
A.1 A.3A.2 B C.1
D.2
D.2C
D.1
D.1D
E
F
F
G
G
H
H
J.1
J
H.2 J.2
K
L M
M
N
N
O
O
P
P Q
R.2
R
R R.1
S U
V.3
V.3T V.2V V.1
A.4 B.1 B.2 C.2 R.3 T.1 T.2 U.1
10.1
8.1
OFFICE
H309
OFFICE
W321
OFFICE
W320
01EP403b
1 - L31A
EC3A
1 - L31B
1 - L32R
1 - L32L
1 - L32A
3CEC
EP3 - L
EP3 - R
225A
ENCLOSED
CKT BKR
1 - L34
1 - L33
EC3B
ABANDONED PANEL
USED AS PULLBOX
H302
3LL1
3EML1 - 2
3EML1 - 1
01EP403a
01EP403a
01EP403a
01EP403a
01EP403b
01EP403b
01EP403b
BLDG 01
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
01EP103
BLDG 01 - FLOOR 3 - ELECTRICAL PLAN
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON
BARRACKS MO
657-21-701JB
03/31/2022 LRL/WNM JBB
CONSTRUCTION
DOCUMENTS
- 1/16" = 1'-0"
1 BLDG 01 - FLOOR 3 - ELECTRICAL PLAN
PROJECT
NORTH
0' 8' 16' 32'
GENERAL NOTES
KEY PLAN
PROJECT
NORTH
KEY NOTES
Revisions: Date:
UP
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
1 2 3 5 7 8 9 104 6
4.5 6.5
A
B
D
C
D.1
B
PRL - 1
MDP - L
MDP - R
ELEVATOR
MACHINE
AND MAIN
DISCONNECT
LB - 1
AC - EAST
02EP400
02EP400
2-DP-TRAB 1
MDP-2 1
02EP400
02EP400
E FG
H
I
MDP - R
STORAGE
G07
STORAGE
G06
STORAGE
G07A
TOILET
G05A
HAC
G05B
STORAGE
G05
TR
G04
STORAGE
G03
ELEVATOR
EQUIP.
G01
TRANSFORMER
RM.
G09
MECH. RM.
G08
STORAGE
G02
CORRIDOR
H003
STAIRWELL NO. 1
S001
ELEVATOR NO. 1
E-00 STORAGE/ COPY
RM.
G02A
STORAGE
G02B
CHASE
CH-0-1
CORRIDOR
H001
PANEL 2-G03A
PANEL 2-G03B
2-DP-TRAB
2-DP-TRAB
BLDG 02
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO
BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER
TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
9. REFERENCE ONE-LINE DIAGRAM ON SHEET 02EP601 FOR CONDUIT AND WIRE
SIZING.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
02EP100
BLDG 02 - FLOOR 0 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 3/16" = 1'-0"
1 BLDG 02 - FLOOR 0 - ELECTRICAL PLAN
KEY PLAN
GENERAL NOTES
0' 2' 4' 8'
KEY NOTES
Revisions: Date:
1 EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 02EP601
FOR ADDITIONAL INFORMATION.
EXISTING PANEL TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET
02EP601 FOR ADDITIONAL INFORMATION.
PROJECT
NORTH
PROJECT
NORTH
UP
UP
UP
UP
UP
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
OFFICE
CLOSET
116A
TOILET
CORRIDOR
H105
OFFICE
OFFICE
OFFICE
MECH. RM.
TR
OFFICE
STORAGE
110A
OFFICE
OFFICE
CORRIDOR
H101
OFFICE
OFFICE
105A
OFFICE
OFFICE
CORRIDOR
H103
CLOSET
118A
OFFICE
OFFICE
OFFICE
119A
OFFICE
TOILET
STAIRWELL NO.
S101
LOBBY
ELEVATOR
LOBBY
123A
VEST.
CORRIDOR
H102
ELEVATOR NO.
E-01
CLOSET
113ACORRIDOR
H104
DN
CHASE
CH-1-1
CHASE
CH-1-3
1 2 3 5 7 8 9 104 6
4.5 6.5
A
B
D
C
L1 - 4
L1 - 1
L1 - 2
L1 - 3
LE - 1
02EP401
02EP401
02EP401
02EP401
E FG
H
I
2-G03A-6,8
02-CU-3-G04
02-CU-3-111
02-CU-2-209 02-CU-3-308
2-111A-6,8 2-209A-6,8 2-308A-6,8
TYP.
BLDG 02
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO
BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER
TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
02EP101
BLDG 02 - FLOOR 1 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 3/16" = 1'-0"
1 BLDG 02 - FLOOR 1 - ELECTRICAL PLAN
KEY PLAN
GENERAL NOTES
0' 2' 4' 8'
KEY NOTES
Revisions: Date:
PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT
AS REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH
MECHANICAL CONTRACTOR AS REQUIRED.
PROJECT
NORTH
PROJECT
NORTH
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
CONFERENCE
RM.
OFFICE
212E
OFFICE
212C
OFFICE
212F
OFFICE
212A
TR
TOILET, MALE
TOILET, FEMALE
OFFICE
OFFICE
OFFICE
OFFICE
STAIRWELL NO.
S201
STORAGE
201A
HAC
FEC
FEC
OFFICE
CORRIDOR
H202
ELEVATOR NO.
E-02
8 SF
CHASE
CH-2-1
4 SF
CHASE
CH-2-2
DN
RAD
RAD
OFFICE
212D
UP
CHASE
CH-2-3
CHASE
CH-2-4
ROOF BELOW
FE
FAP
FAP
1 2 3 5 7 8 9 104 6
4.5 6.5
A
B
D
C
L2 - 1
L21 - A
02EP402
02EP402
02EP402
02EP402
E FG
H
I
BLDG 02
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO
BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER
TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
02EP102
BLDG 02 - FLOOR 2 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 3/16" = 1'-0"
1 BLDG 02 - FLOOR 2 - ELECTRICAL PLAN
KEY PLAN
GENERAL NOTES
0' 2' 4' 8'
KEY NOTES
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
DN
DN
RAD
DN
1 2 3 5 7 8 9 104 6
4.5 6.5
A
B
D
C
L3 - 1
L3 - 2
L1 - 4
L3 - 5
02EP403
02EP403
02EP403
02EP403
E FG
H
I
STAIRWELL NO. 2
S302
OFFICE
TOILET
OFFICE
OFFICE
316A
OFFICE
316B
KITCHENETTE
STAIRWELL NO. 1
S301
STORAGE
301A
OFFICE
302A
OFFICE
OFFICE
OFFICE
306OFFICE
OFFICE
307A
MECH. RM.
OFFICE
OFFICE
310A
OFFICE
STAIRWELL NO. 3
S303
OI&T
317A
MECH. RM.
317C
OI&T
317B
OFFICE
OFFICE
CLOSET
304A
OI&T
311A
CORRIDOR
H301
CORRIDOR
H302
CORRIDOR
H303
ELEVATOR NO. 1
E-03
CHASE
CH-3-1
TR
BLDG 02
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO
BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER
TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
02EP103
BLDG 02 - FLOOR 3 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
- 3/16" = 1'-0"
1 BLDG 02 - FLOOR 3 - ELECTRICAL PLAN
KEY PLAN
GENERAL NOTES
0' 2' 4' 8'
KEY NOTES
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
UP
DN
UP
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
RAD
UNEXCAVATED
UNEX. UNEX.
UNEX. UNEX.
ELEVATOR
MACHINE AND MAIN
DISCONNECT
P - 3
P - 1
MLP - L
MLP - R
P2
03EP400
03EP400
K L M
G H I J
3-DP-TRAB 1
MDP-31
STAIRWELL NO. 1
B001
GROUP RM.
B002
STORAGE
B003
GROUP
B004
ACTIVITY
B006
STORAGE
B008
MECH. RM.
B013
CLEAN STORAGE
B010
CORRIDOR
B011
STORAGE
B005
MECH. RM.
B009
ELEVATOR MACHINE RM.
B017
CORRIDOR
B015
SERVICE
B014
STORAGE
B024
MECH. RM.
B026
TR
B025A
STORAGE
B027
MECH. RM.
B029
STAIRWELL NO. 3
B028
TOILET
B023
CLOSET
B022
CORRIDOR
B030
LAUNDRY
B021
STAIRWELL NO. 2
B019
VENDING
B020
CORRIDOR
B012
CLOSET
B018
ENTRY
B016
OI&T
B002A
OI&T
B007
ELEVATOR
B031
VACANT
B025
03EP400
03EP400
A B C D E F N O P
BLDG 03
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
9. REFERENCE ONE-LINE DIAGRAM ON SHEET 03EP601 FOR CONDUIT AND WIRE
SIZING.
AREA OF WORK
- 1/8" = 1'-0"
1 BLDG 03 - FLOOR 0 - ELECTRICAL PLAN
0' 4' 8' 16'
KEY PLAN
GENERAL NOTES
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
03EP100
BLDG 03 - FLOOR 0 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM - INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
1 EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 03EP601
FOR ADDITIONAL INFORMATION.
EXISTING PANEL TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET
03EP601 FOR ADDITIONAL INFORMATION.
PROJECT
NORTH
PROJECT
NORTH
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
DN
UP
DN
-3'-8" FLOOR
ELEVATION
DN
UPMP1
D
03EP401
03EP401
K L M
G H I J
03-CU-3-B025
03-CU-3-224A
03EP401
03EP401
3-117A-6,8
03-CU-3-117A
TYP.
3-B025AA-6,8
3-224AA-6,8
STAIRWELL NO. 2
B019
PATIENT RM.
TOILET
103A
HAC
PATIENT RM.
TOILET, MALE
TOILET
PATIENT RM.
TELECOM
STAIRWELL NO. 2
OFFICE
OFFICE
SHOWER
TOILET
PATIENT RM.
PATIENT RM.
STAIRWELL NO. 3
PATIENT RM.
PATIENT RM.
PATIENT RM.
KITCHEN
RECEPTION
PATIENT ADA
PATIENT RM.
PATIENT RM.
PATIENT RM.
PATIENT RM.
CLOSET
PATIENT RM.
TOILET
102A
STAIRWELL NO. 1
S101
CORRIDOR
101A
CORRIDOR
ELEVATOR LOBBY
PATIENT LOUNGE
TELECOM
117A
ELEVATOR LOBBY
VESTIBULE
CORRIDOR
CHASE
CH-1-2
CHASE
CH-1-1
CHASE
CH-1-3
CHASE
CH-1-4
ELEVATOR
E1
A B C D E F N O P
BLDG 03
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
- 1/8" = 1'-0"
1 BLDG 03 - FLOOR 1 - ELECTRICAL PLAN
0' 4' 8' 16'
KEY PLAN
GENERAL NOTES
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
03EP101
BLDG 03 - FLOOR 1 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM - INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
1 PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS
REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
PROJECT
NORTH
PROJECT
NORTH
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
DN
DN
DN
LP2
03EP402
K L M
G H I J
DN
DN
DN
03EP402
03EP402
03EP402
PATIENT RM.
PATIENT RM.
PATIENT RM.
TOILET
PATIENT RM.
CLOSET
203A
CLOSET
205A
CLOSET
207A
CLOSET
209A
CLOSET
215A
CLOSET
FIRE SPRINKLER CLOSET
220A
STAIRWELL NO. 2
PATIENT RM.
PATIENT RM.
CLOSET
PATIENT RM.
CLOSET
229A
PATIENT RM.
CLOSET
233B
CLOSET
233A
MECH. RM.
235 STAIRWELL NO. 3
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
PATIENT RM.
PATIENT RM.
PATIENT RM.
PATIENT RM.
QUIET RM.
CLEAN LINEN
KITCHEN
TOILET
OFFICE
PATIENT RM.
PATIENT RM.
CLOSET
232A
CLOSET
230A
CLOSET
228A
HAC
CLOSET
210A
CLOSET
208ACLOSET
206A
CLOSET
204A
CLOSET
202A
ELEVATOR LOBBY
PATIENT RM.
CHASE
CH-2-1
CHASE
CH-2-2
ELEVATOR
E2
TR
224A
LOUNGE
PATIENT RM.
TOILET
STAIRWELL NO. 1
PATIENT RM.
OFFICE
A B C D E F N O P
BLDG 03
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
- 1/8" = 1'-0"
1 BLDG 03 - FLOOR 2 - ELECTRICAL PLAN
0' 4' 8' 16'
KEY PLAN
GENERAL NOTES
KEY NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
03EP102
BLDG 03 - FLOOR 2 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM - INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
DN
UP
UP
UP
4160 VO
LTS
DUST CO
LLECTO
R
LIQ UEFIED PETRO LEUM G AS
FLAM M ABLE G AS 2
TRASH COM
PACTO
R
P
SILVERBUILDING 1 23
VA PO
LICE
E
LECTRIC ACCESS
TRANSFO
RM
ER
TRANSFO
RM
ER
TRANSFO
RM
ER
HVAC UNIT
E
LECTRIC PANEL
HVAC UNIT
S&C PAD M
O
UNTED G
EAR
CATALO
G
# 55152-C3DGIG
2P1V M
O
DEL# PM
H-9
EE13299 SG
-52
13278
BUILDING
03TEP401
03TEP401
B C
VESTIBULE
H101
HAC
TOILET, MALE
TOILET, FEMALE
OFFICE
OFFICE
COPIER / FAX
OFFICE
OFFICE
OFFICE
COMPUTER LAB
OFFICE
OFFICE
OFFICE
CONFERENCE
RM.
OFFICE
BREAK RM.
OFFICE
OFFICE
CORRIDOR
H102
CORRIDOR
H105
CORRIDOR
H104
CORRIDOR
H103
TR
A D E F G H I
BLDG 03T
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER ,LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
- 1/4" = 1'-0"
1 BLDG 03T - FLOOR 1 - ELECTRICAL PLAN
KEY PLAN
KEY NOTES
GENERAL NOTES
0' 2' 4' 8'
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
03TEP101
BLDG 03T - FLOOR 1 - ELECTRICAL
PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM - INFRASTRUCTURE
UPGRADES
JEFFERSON BARRACKS - 1 JEFFERSON BARRACKS
DRIVE - ST. LOUIS, MO 63125
657-21-701JB
03T
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
File details come from the government source that posted it. Updated .