Attachment 14 - Drawings Part-13.pdf
PDF 14 MB Posted
- Attached to
- Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
- Solicitation number
- 36C77623R0009
About this file
This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, facility renovations including demolition, construction and finishes, data center renovations, physical security enhancements, fiber optic infrastructure assessment and upgrades, installation of a diversified wide area network path to the datacenter, and hazardous material abatement. Affected buildings on the campus include Buildings 1 through 3, 3T, 18, 23 through 26, 51 through 53, 53T, 55 through 61, 75. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 50
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
DN
DN
UP
J
S S
S S
Mo
205A
Q R S
TYP
TR
205A
156 SF
Q R S
24-205AA-2
DATA
RACK,
TYP.
24-205AA-2
24-205AA-2
24-205AB-2
24-205AB-2
24-205AB-2
24-205AB-2
24-205AA-2
1 263 24-AC-3-205A
24-205AB-7,9,11
24-205AA-7,9,11
TR
205A
156 SF
EP502
24-205AB-1,3,5
24-205AA-1,3,5
TYP
24-DP-TRAB 24-DP-TRAB
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR
ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
Q R S
24-205AA-4
TR
205A
156 SF
L3 L3
L3 L3
24-205AA 24-205AB
DATA
RACK,
TYP.
Q R S
A A A
TR
114B
156 SF
TYP
SOURCE A POWER PANELBOARD "24-205AA".
SOURCE B POWER PANELBOARD "24-205AB".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE
SHALL BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE
ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1)
POWER SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO
ADEQUATELY SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE
CONNECTIONS AS REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR HARDWARE.
COORDINATE WITH ARCHITECT AND DOOR INSTALLER.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
24EP402
BLDG 24 - FLOOR 2 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
0' 2' 4' 8' 0' 2' 4' 8'
0' 2' 4' 8' 0' 2' 4' 8'
1/4" = 1'-0"24EP102
1 RM 205A - DEMOLITION ELECTRICAL PLAN
1/4" = 1'-0"24EP102
2 RM 205A - ELECTRICAL PLAN
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
1/4" = 1'-0"24EP102
4 RM 205A - LIGHTING PLAN
1/4" = 1'-0"24EP102
3 RM 205A - DEMO LIGHTING PLAN
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
FUTURE DATA
RACK
LRL/WNM LLT/JPS
Mo
T ectonic Cop yright 2007
J
S S
Mo S
S
I J
TYP
TR
117A
85 SF
J
TR
117A
85 SF
TYP
117A
J
TR
117A
85 SF
1 2
25-117AA-2
25-117AA-2
25-117AB-2
25-117AB-2
25-117AB-2
25-117AB-2
25-117AA-2
25-117AA-2
DATA
RACK
25-117AA-1,3,5
25-117AB-1,3,5
EP502
25DP25-DP-TRAB
I J
L1 L1
25-117AA-4
TR
117A
85 SF
DATA RACK,
TYP.
L1
L1
25-117AA 25-117AAB
SOURCE A POWER PANELBOARD "25-117AA".
SOURCE B POWER PANELBOARD "25-117AB".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE
SHALL BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANCAL
CONTRACTOR AS REQUIRED.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE
ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1)
POWER SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO
ADEQUATELY SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE
CONNECTIONS AS REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR
HARDWARE. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
25EP401
BLDG 25 - FLOOR 1 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LTT
CONSTRUCTION
DOCUMENTS
1/4" = 1'-0"25EP101
3 RM 117A - DEMOLITION LIGHTING PLAN
1/4" = 1'-0"25EP101
1 RM 117A - DEMOLITION ELECTRICAL PLAN
1/4" = 1'-0"25EP101
2 RM 117A - ELECTRICAL PLAN
1/4" = 1'-0"25EP101
4 RM 117A - LIGHTING PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
0' 2' 4' 8'
0' 2' 4' 8'
0' 2' 4' 8' 0' 2' 4' 8'
KEY PLAN
GENERAL NOTES
PROJECT
NORTH
KEY NOTES
Revisions: Date:
J
S S
204B
I J
TYP
TR
204B
85 SF
I J
TYP
TR
204B
85 SF
I J
TR
204B
85 SF
25-204BA-2
25-204BB-2
25-204BB-2
25-204BB-2
25-204BB-2
25-204BA-2
25-204BA-2
25-204BA-2
25-204BA-1,3,5
25-204BB-1,3,5
1 2
DATA RACK
EP502
25-AC-3-204B 6
25-DP-TRAB 25DP
I J
TR
204B
85 SF
L1 L1
DATA RACK,
TYP.
25-204BA-4
25-204BA 25-204BB
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
SOURCE A POWER PANELBOARD "25-204BA".
SOURCE B POWER PANELBOARD "25-204BB".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE
SHALL BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE
ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1)
POWER SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO
ADEQUATELY SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE
CONNECTIONS AS REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR
HARDWARE. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 25EP402
BLDG 25 - FLOOR 2 - ENLARGED
ELECTRICAL PLANS 25
LRL/WNM JPS/LTT
CONSTRUCTION
DOCUMENTS
03/31/2022
1/4" = 1'-0"25EP102
1 RM 204B - DEMOLITION FLOOR PLAN
1/4" = 1'-0"25EP102
3 RM 204B - DEMOLITION LIGHTING PLAN
1/4" = 1'-0"25EP102
2 RM 204B - ELECTRICAL PLAN
1/4" = 1'-0"25EP102
4 RM 204B - LIGHTING PLAN
0' 2' 4' 8' 0' 2' 4' 8'
0' 2' 4' 8' 0' 2' 4' 8'
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
NON SPRINKLERED
Revisions: Date:
S S
Mo
313A
I J
TYP
TR
313A
85 SF
I J
TR
313A
85 SF
25-313AB-2
25-313AB-2
25-313AB-2
25-313AB-2
25-313AA-225-313AA-2
25-313AA-2 25-313AA-2
25-313AA-1,3,5
25-313AB-1,3,5
DATA RACK
EP502
25-AC-3-313A
25DP25-DP-TRAB
TR
313A
85 SF
I J
TYP
TR
313A
85 SF
I J
TR
313A
85 SF
L1 L1
DATA RACK,
TYP.
25-313AA-4
25-313AA 25-313AB
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
SOURCE A POWER PANELBOARD "25-313AA".
SOURCE B POWER PANELBOARD "25-313AB".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE
SHALL BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE
ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1)
POWER SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO
ADEQUATELY SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE
CONNECTIONS AS REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR
HARDWARE. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
25EP403
BLDG 25 - FLOOR 3 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LTT
CONSTRUCTION
DOCUMENTS
1/4" = 1'-0"25EP103
1 RM 313A - DEMOLITION ELECTRICAL PLAN
1/4" = 1'-0"25EP103
2 RM 313A - ELECTRICAL PLAN
1/4" = 1'-0"25EP103
3 RM 313A - DEMOLITION LIGHTING PLAN
1/4" = 1'-0"25EP103
4 RM 313A - LIGHTING PLAN
0' 2' 4' 8' 0' 2' 4' 8'
PROJECT
NORTH
0' 2' 4' 8' 0' 2' 4' 8'
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
S
SS
S
J
BE111
TYP
B A
DENTAL CLINIC
BE110
233 SF
TR
BE111
140 SF
B A
TR
BE111
140 SF
DATA
RACK,
TYP DENTAL CLINIC
BE110
233 SF
51-BE111A-4
L1
L1
L1
L1
Mo
51-BE111A
51-BE111B
J
TYP
B A
DENTAL CLINIC
BE110
233 SF
TR
BE111
140 SF
B A
DENTAL CLINIC
BE110
233 SF
TR
BE111
140 SF
DATA
RACK, TYP.
51-BE111B-2
51-BE111B-2
51-BE111A-2
51-AC-3-BE111
51-BE111A-2
51-BE111A-2
51-BE111A-2
51-BE111B-2
51-BE111A-1,3,5
51-BE111B-1,3,5
EP502
51-DP-TRA
51-DP-TRB
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED
BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
SOURCE A POWER PANELBOARD "51-BE111A".
SOURCE B POWER PANELBOARD "51-BE111B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
AREA OF WORK
1/4" = 1'-0"51EP100b
3 RM BE110 & BE111 - DEMOLITION LIGHTING PLAN
1/4" = 1'-0"51EP100b
4 RM BE111 - LIGHTING PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
0' 2' 4' 8' 0' 2' 4' 8'
0' 2' 4' 8' 0' 2' 4' 8'
1/4" = 1'-0"51EP100b
1 RM BE110 & BE111 - DEMOLITION ELECTRICAL PLAN
1/4" = 1'-0"51EP100b
2 RM BE111 - ELECTRICAL PLAN
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
51EP400
BLDG 51 - FLOOR 0 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
S S
S M o
P.4Q
OI&T
1A102
54 SF
TYP
P.4Q
DATA
RACK,
TYP.
TR
1A102
101 SF
51-1A102B-2
51-1A102B-2
51-1A102B-2
51-1A102B-2
51-1A102A-2 51-1A102A-2
51-1A102A-2
51-1A102A-2
51-AC-2-1A102
51-1A102A-1,3,5
51-1A102B-1,3,5
EP502
51-DP-TRA
51-DP-TRB
P.4Q
OI&T
1A102
54 SF
TYP
P.4Q
DATA
RACK,
TYP.
51-1A102A-4
TR
1A102
101 SF
L1
L1
L1
L1
51-1A102A
51-1A102B
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED
BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
SOURCE A POWER PANELBOARD "51-1A102A".
SOURCE B POWER PANELBOARD "51-1A102B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
1A102
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
51EP401a
BLDG 51 - FLOOR 1 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
1/4" = 1'-0"51EP101b
1 RM 1A102 - DEMOLITION ELECTRICAL PLAN
1/4" = 1'-0"51EP101b
2 RM 1A102 - ELECTRICAL PLAN
1/4" = 1'-0"51EP101b
3 RM 1A102 - DEMOLITION LIGHTING PLAN
1/4" = 1'-0"51EP101b
4 RM 1A102 - LIGHTING PLAN
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
Revisions: Date:
0' 2' 4' 8'
PROJECT
NORTH
0' 2' 4' 8'
PROJECT
NORTH
0' 2' 4' 8'
PROJECT
NORTH
0' 2' 4' 8'
PROJECT
NORTH
T
JT
J T
JT
J T
JT
JJJ
J T
JT
J T
JT
S
S
SS
S S
M o
J
J
2.2
CC.1
2.1
BHE
STG
1A179A
102 SF
LAUNDRY CHUTE
1A179
23 SF
TR
1A183
272 SF
TYP
2.2
CC.1
2.1
BHE
TR
1A183
272 SF
STG
1A179A
102 SF
LAUNDRY CHUTE
1A179
23 SF
DATA
RACK,
TYP.
51-1A183B-2
51-1A183A-2
51-1A183B-2 51-1A183B-2
51-1A183B-2
51-1A183A-2
51-1A183A-2
51-1A183A-2
51-1A183A-1,3,5 51-1A183B-1,3,5
51-AC-4-1A183
EP502
51-DP-TRA
51-DP-TRB
TYP
2.2
CC.1
2.1
BHE
TR
1A183
272 SF
2.2
CC.1
2.1
BHE
TR
1A183
272 SF
STG
1A179A
102 SF
LAUNDRY CHUTE
1A179
23 SF
DATA
RACK,
TYP.
51-1A183A-4
L1 L1
L1
L1
L1 L1
51-1A183A
51-1A183B
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED
BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
SOURCE A POWER PANELBOARD "51-1A183A".
SOURCE B POWER PANELBOARD "51-1A183B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNCTION BOX.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
1A183
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
51EP401b
BLDG 51 - FLOOR 1 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
1/4" = 1'-0"51EP101c
1 RM 1A183 - DEMOLITION ELECTRICAL PLAN
1/4" = 1'-0"51EP101c
2 RM 1A183 - ELECTRICAL PLAN
1/4" = 1'-0"51EP101c
3 RM 1A183 - DEMOLITION LIGHTING PLAN
1/4" = 1'-0"51EP101c
4 RM 1A183 - LIGHTING PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
0' 2' 4' 8' 0' 2' 4' 8'
0' 2' 4' 8' 0' 2' 4' 8'
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
Revisions: Date:
S
Mo
S
S
7' - 2 1/4"
HH.9K
CLEAN LINEN
1A139
160 SF
TYP
HH.9K
TR
1A139A
141 SF
51-AC-3-1A139
51-1A139A-2
51-1A139A-2
51-1A139A-2
51-1A139B-2
51-1A139B-2 51-1A139B-2
51-1A139B-2
3 1 2
51-1A139A-1,3,5 51-1A139B-1,3,5
DATA
RACK,
TYP.
CLEAN LINEN
1A139
160 SF
EP502
51-DP-TRB51-DP-TRA
HH.9K
CLEAN LINEN
1A139
160 SF
TYP
TR
1A139A
141 SF
HH.9K
L2
L2
51-1A139A-4
TR
1A139A
141 SF
DATA
RACK,
TYP.
CLEAN LINEN
1A139
160 SF
L2
L2
51-1A139A 51-1A139B
TOILET
1A137A
89 SF
1A139
1A139A
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED
BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
SOURCE A POWER PANELBOARD "51-1A139A".
SOURCE B POWER PANELBOARD "51-1A139B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
PROVIDE REQUIRED ELECTRICAL CONNECTIONS FOR RELOCATED MECHANICAL
EQUIPMENT.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
51EP401c
BLDG 51 - FLOOR 1 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
1/4" = 1'-0"51EP101a
1 RM 1A139 - DEMOLITION ELECTRICAL PLAN
1/4" = 1'-0"51EP101a
2 RM 1A139A - ELECTRICAL PLAN
1/4" = 1'-0"51EP101a
3 RM 1A139 - DEMOLITION LIGHTING PLAN
1/4" = 1'-0"51EP101a
4 RM 1A139A - LIGHTING PLAN
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
0' 2' 4' 8'
PROJECT
NORTH
0' 2' 4' 8'
PROJECT
NORTH
0' 2' 4' 8'
PROJECT
NORTH
0' 2' 4' 8'
PROJECT
NORTH
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
PP.4Q
51-CU-3-1A102
51-1A102A-6,8
EP503
2.2
CC.1
2.1
BHE
51-CU-4-1A183
51-1A183A-6,8
EP503
BHE
8E
51-CU-3-BE111
51-BE111A-6,8
EP503
51-CU-3-1A102
51-CU-4-1A183
51-CU-3-BE111
51-CU-3-1A139
H.9K
51-1A139A-6,8
51-CU-3-1A139 1
EP503
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
51EP402
BLDG 51 - ENLARGED ROOF PLANS
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
- 3/8" = 1'-0"
3 BLDG 51- ENLARGED ROOF PLAN - VIEW 3
- 3/8" = 1'-0"
1 BLDG 51- ENLARGED ROOF PLAN - VIEW 1
- 3/8" = 1'-0"
2 BLDG 51- ENLARGED ROOF PLAN - VIEW 2
0' 2' 4' 8'
PROJECT
NORTH
0' 2' 4' 8'
PROJECT
NORTH
0' 2' 4' 8'
PROJECT
NORTH
1 PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT
AS REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH
MECHANICAL CONTRACTOR AS REQUIRED.
- 3/8" = 1'-0"
4 BLDG 51- ENLARGED ROOF PLAN - VIEW 4
0' 2' 4' 8'
PROJECT
NORTH
5 6
A
B51T
TR
34 SF
BLDG ENTRANCE TERMINAL
TELEPHONE TERMINAL BOARD
BLDG ENTRANCE
TERMINAL
DATA RACK
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
IN-LINE TRANSFER FAN WITH SPEED CONTROLLER. COORDINATE SPEED
CONTROLLER INSTALLATION LOCATION WITH MECHANICAL CONTRACTOR.
UPS RECEPTACLE.
CONTRACTOR SHALL REPLACE EXISTING RACK-MOUNTED UPS WITH NEW UPS. UPS
SHALL BE 3kW, 120V, 1-PHASE, APC #SMX3000RMLV2U, OR EQUAL.
5 6
A
B51T
BLDG ENTRANCE TERMINAL
TELEPHONE TERMINAL BOARD
BLDG ENTRANCE
TERMINAL
DATA RACK
TR
34 SF
1/2
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
51TEP401
BLDG 51T - FLOOR 1 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
51T
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
KEY PLAN
KEY NOTES
GENERAL NOTES
PROJECT
NORTH
1/2" = 1'-0"51TEP101
1 RM 109 - DEMOLITION ELECTRICAL PLAN
PROJECT
NORTH
0' 1' 2' 4'
Revisions: Date:
PROJECT
NORTH
0' 1' 2' 4'
1/2" = 1'-0"51TEP101
2 RM 109 - ELECTRICAL PLAN
Mo
J
GN29
GN29A
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
M
52-GN29AA-4
TR
GN29A
101 SF
L3
L3
52-GN29AA
52-GN29AB
DATA RACK
TYP.
SOURCE A POWER PANELBOARD "52-GN29AA".
SOURCE A POWER PANELBOARD "52-GN29AB".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
PNM
ELEVATOR
LOBBY
GS24
TOILET
GN27
68 SF
CLOSET
GN27A
17 SF
VENDING ROOM
GN29
808 SF
PNM
ELEVATOR
LOBBY
GS24
TOILET
GN27
68 SF
CLOSET
GN27A
17 SF
HAC
GN28
19 SF
VENDING ROOM
GN29
808 SF
TYP
M
52-GN29AA-2
52-GN29AA-2
52-GN29AA-2
52-GN29AB-2
52-GN29AB-2
52-GN29AB-2
52-GN29AA-1,3,5
52-GN29AB-1,3,5
52-GN29AA-2
52-AC-3-GN29A
DATA
RACK,
TYP.
TR
GN29A
101 SF
6EP502
52-DP-TRA
52-DP-TRB
- AREA OF WORK
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
52EP400
BLDG 52 - FLOOR 0 - ENLARGED
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
JEFFERSON BARRACKS - 1 JEFFERSON BARRACKS
DRIVE - ST. LOUIS, MO 63125
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
GENERAL NOTES
KEY PLAN
KEY NOTESKEY NOTES
GENERAL NOTES
1/2" = 1'-0"52EP100
4 RM GN29A - LIGHTING PLAN
0' 1' 2' 4'
3/16" = 1'-0"52EP100
3 RM GN29 - DEMOLITION LIGHTING PLAN
0' 2' 4' 8' 0' 1' 2' 4'
3/16" = 1'-0"52EP100
1 RM GN29 - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"52EP100
2 RM GN29A - ELECTRICAL PLAN
0' 2' 4' 8'
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
S
S
S
Mo
1N82
1N82A
A
B
DAYROOM
1N82
578 SF
TYP
CORRIDOR
H111
370 SF
B
52-1N82AB-2
52-1N82AB-2
52-1N82AA-2
52-1N82AA-2
52-1N82AA-2
52-1N82AB-2
52-1N82AB-2
52-1N82AA-2
52-1N82AA-1,3,5
52-1N82AB-1,3,5
TR
1N82A
143 SF
52-AC-3-1N82A
DATA
RACK,
TYP.
EP502
52-1N82AA-7,9,11
52-1N82AB-7,9,11
TYP.
52-DP-TRA
52-DP-TRB
A
TYP
B
DAYROOM
1N82
578 SF
CORRIDOR
H111
370 SF
B
TR
1N82A
143 SF
L3
L3
L3
L3
52-1N82AA-4
52-1N82AA
52-1N82AB
DATA RACK
TYP.
SOURCE A POWER PANELBOARD "52-1N82AA".
SOURCE A POWER PANELBOARD "52-1N82AB".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
- AREA OF WORK
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
52EP401a
BLDG 52 - FLOOR 1 - ENLARGED
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
1/4" = 1'-0"52EP101
1 RM 1N82 & 1N82A - DEMOLITION ELECTRICAL PLAN
3/8" = 1'-0"52EP101
2 RM 1N82A - ELECTRICAL PLAN
0' 2' 4' 8' 0' 2' 4' 8'
1/4" = 1'-0"52EP101
3 RM 1N82 & 1N82A - DEMOLITION LIGHTING PLAN
0' 2' 4' 8' 3/8" = 1'-0"52EP101
4 RM 1N82A - LIGHTING PLAN
0' 2' 4' 8'
GENERAL NOTES
KEY PLAN
KEY NOTES
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
File details come from the government source that posted it. Updated .