Attachment 14 - Drawings Part-13.pdf

PDF 14 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, facility renovations including demolition, construction and finishes, data center renovations, physical security enhancements, fiber optic infrastructure assessment and upgrades, installation of a diversified wide area network path to the datacenter, and hazardous material abatement. Affected buildings on the campus include Buildings 1 through 3, 3T, 18, 23 through 26, 51 through 53, 53T, 55 through 61, 75. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
36C77623R0009 0005.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf PDF
36C77623R0009 0003.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
36C77623R0009 0001.pdf PDF
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 38 - Envr. Report - Drawings.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 5 - Drawings Part-4.pdf PDF
Attachment 6 - Drawings Part-5.pdf PDF
Attachment 9 - Drawings Part-8.pdf PDF
Attachment 16 - Drawings Part-15.pdf PDF
Attachment 22 - Drawings Part-21.pdf PDF
Attachment 24 - Drawings Part-23.pdf PDF
Attachment 36 - Envr. Report - Appendix B.pdf PDF
Attachment 41 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 44 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

DN

UP

J

S S

S S

Mo

205A

Q R S

TYP

TR

205A

156 SF

Q R S

24-205AA-2

DATA

RACK,

TYP.

24-205AA-2

24-205AA-2

24-205AB-2

24-205AB-2

24-205AB-2

24-205AB-2

24-205AA-2

1 263 24-AC-3-205A

24-205AB-7,9,11

24-205AA-7,9,11

TR

205A

156 SF

EP502

24-205AB-1,3,5

24-205AA-1,3,5

TYP

24-DP-TRAB 24-DP-TRAB

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE,

UNLESS OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

Q R S

24-205AA-4

TR

205A

156 SF

L3 L3

L3 L3

24-205AA 24-205AB

DATA

RACK,

TYP.

Q R S

A A A

TR

114B

156 SF

TYP

SOURCE A POWER PANELBOARD "24-205AA".

SOURCE B POWER PANELBOARD "24-205AB".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE

SHALL BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE

ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1)

POWER SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO

ADEQUATELY SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE

CONNECTIONS AS REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR HARDWARE.

COORDINATE WITH ARCHITECT AND DOOR INSTALLER.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

24EP402

BLDG 24 - FLOOR 2 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

0' 2' 4' 8' 0' 2' 4' 8'

0' 2' 4' 8' 0' 2' 4' 8'

1/4" = 1'-0"24EP102

1 RM 205A - DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"24EP102

2 RM 205A - ELECTRICAL PLAN

KEY PLAN

KEY NOTES

GENERAL NOTES

PROJECT

NORTH

1/4" = 1'-0"24EP102

4 RM 205A - LIGHTING PLAN

1/4" = 1'-0"24EP102

3 RM 205A - DEMO LIGHTING PLAN

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

FUTURE DATA

RACK

LRL/WNM LLT/JPS

Mo

T ectonic Cop yright 2007

J

S S

Mo S

S

I J

TYP

TR

117A

85 SF

J

TR

117A

85 SF

TYP

117A

J

TR

117A

85 SF

1 2

25-117AA-2

25-117AA-2

25-117AB-2

25-117AB-2

25-117AB-2

25-117AB-2

25-117AA-2

25-117AA-2

DATA

RACK

25-117AA-1,3,5

25-117AB-1,3,5

EP502

25DP25-DP-TRAB

I J

L1 L1

25-117AA-4

TR

117A

85 SF

DATA RACK,

TYP.

L1

L1

25-117AA 25-117AAB

SOURCE A POWER PANELBOARD "25-117AA".

SOURCE B POWER PANELBOARD "25-117AB".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE

SHALL BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANCAL

CONTRACTOR AS REQUIRED.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE

ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1)

POWER SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO

ADEQUATELY SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE

CONNECTIONS AS REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR

HARDWARE. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

25EP401

BLDG 25 - FLOOR 1 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LTT

CONSTRUCTION

DOCUMENTS

1/4" = 1'-0"25EP101

3 RM 117A - DEMOLITION LIGHTING PLAN

1/4" = 1'-0"25EP101

1 RM 117A - DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"25EP101

2 RM 117A - ELECTRICAL PLAN

1/4" = 1'-0"25EP101

4 RM 117A - LIGHTING PLAN

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

0' 2' 4' 8'

0' 2' 4' 8'

0' 2' 4' 8' 0' 2' 4' 8'

KEY PLAN

GENERAL NOTES

PROJECT

NORTH

KEY NOTES

Revisions: Date:

J

S S

204B

I J

TYP

TR

204B

85 SF

I J

TYP

TR

204B

85 SF

I J

TR

204B

85 SF

25-204BA-2

25-204BB-2

25-204BB-2

25-204BB-2

25-204BB-2

25-204BA-2

25-204BA-2

25-204BA-2

25-204BA-1,3,5

25-204BB-1,3,5

1 2

DATA RACK

EP502

25-AC-3-204B 6

25-DP-TRAB 25DP

I J

TR

204B

85 SF

L1 L1

DATA RACK,

TYP.

25-204BA-4

25-204BA 25-204BB

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

SOURCE A POWER PANELBOARD "25-204BA".

SOURCE B POWER PANELBOARD "25-204BB".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE

SHALL BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE

ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1)

POWER SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO

ADEQUATELY SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE

CONNECTIONS AS REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR

HARDWARE. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 25EP402

BLDG 25 - FLOOR 2 - ENLARGED

ELECTRICAL PLANS 25

LRL/WNM JPS/LTT

CONSTRUCTION

DOCUMENTS

03/31/2022

1/4" = 1'-0"25EP102

1 RM 204B - DEMOLITION FLOOR PLAN

1/4" = 1'-0"25EP102

3 RM 204B - DEMOLITION LIGHTING PLAN

1/4" = 1'-0"25EP102

2 RM 204B - ELECTRICAL PLAN

1/4" = 1'-0"25EP102

4 RM 204B - LIGHTING PLAN

0' 2' 4' 8' 0' 2' 4' 8'

0' 2' 4' 8' 0' 2' 4' 8'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

KEY PLAN

KEY NOTES

GENERAL NOTES

PROJECT

NORTH

NON SPRINKLERED

Revisions: Date:

S S

Mo

313A

I J

TYP

TR

313A

85 SF

I J

TR

313A

85 SF

25-313AB-2

25-313AB-2

25-313AB-2

25-313AB-2

25-313AA-225-313AA-2

25-313AA-2 25-313AA-2

25-313AA-1,3,5

25-313AB-1,3,5

DATA RACK

EP502

25-AC-3-313A

25DP25-DP-TRAB

TR

313A

85 SF

I J

TYP

TR

313A

85 SF

I J

TR

313A

85 SF

L1 L1

DATA RACK,

TYP.

25-313AA-4

25-313AA 25-313AB

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

SOURCE A POWER PANELBOARD "25-313AA".

SOURCE B POWER PANELBOARD "25-313AB".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE

SHALL BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE

ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1)

POWER SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO

ADEQUATELY SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE

CONNECTIONS AS REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR

HARDWARE. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

25EP403

BLDG 25 - FLOOR 3 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LTT

CONSTRUCTION

DOCUMENTS

1/4" = 1'-0"25EP103

1 RM 313A - DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"25EP103

2 RM 313A - ELECTRICAL PLAN

1/4" = 1'-0"25EP103

3 RM 313A - DEMOLITION LIGHTING PLAN

1/4" = 1'-0"25EP103

4 RM 313A - LIGHTING PLAN

0' 2' 4' 8' 0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8' 0' 2' 4' 8'

KEY PLAN

KEY NOTES

GENERAL NOTES

PROJECT

NORTH

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

S

SS

S

J

BE111

TYP

B A

DENTAL CLINIC

BE110

233 SF

TR

BE111

140 SF

B A

TR

BE111

140 SF

DATA

RACK,

TYP DENTAL CLINIC

BE110

233 SF

51-BE111A-4

L1

L1

L1

L1

Mo

51-BE111A

51-BE111B

J

TYP

B A

DENTAL CLINIC

BE110

233 SF

TR

BE111

140 SF

B A

DENTAL CLINIC

BE110

233 SF

TR

BE111

140 SF

DATA

RACK, TYP.

51-BE111B-2

51-BE111B-2

51-BE111A-2

51-AC-3-BE111

51-BE111A-2

51-BE111A-2

51-BE111A-2

51-BE111B-2

51-BE111A-1,3,5

51-BE111B-1,3,5

EP502

51-DP-TRA

51-DP-TRB

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED

BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

SOURCE A POWER PANELBOARD "51-BE111A".

SOURCE B POWER PANELBOARD "51-BE111B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

AREA OF WORK

1/4" = 1'-0"51EP100b

3 RM BE110 & BE111 - DEMOLITION LIGHTING PLAN

1/4" = 1'-0"51EP100b

4 RM BE111 - LIGHTING PLAN

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

0' 2' 4' 8' 0' 2' 4' 8'

0' 2' 4' 8' 0' 2' 4' 8'

1/4" = 1'-0"51EP100b

1 RM BE110 & BE111 - DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"51EP100b

2 RM BE111 - ELECTRICAL PLAN

KEY PLAN

KEY NOTES

GENERAL NOTES

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

51EP400

BLDG 51 - FLOOR 0 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

S S

S M o

P.4Q

OI&T

1A102

54 SF

TYP

P.4Q

DATA

RACK,

TYP.

TR

1A102

101 SF

51-1A102B-2

51-1A102B-2

51-1A102B-2

51-1A102B-2

51-1A102A-2 51-1A102A-2

51-1A102A-2

51-1A102A-2

51-AC-2-1A102

51-1A102A-1,3,5

51-1A102B-1,3,5

EP502

51-DP-TRA

51-DP-TRB

P.4Q

OI&T

1A102

54 SF

TYP

P.4Q

DATA

RACK,

TYP.

51-1A102A-4

TR

1A102

101 SF

L1

L1

L1

L1

51-1A102A

51-1A102B

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED

BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

SOURCE A POWER PANELBOARD "51-1A102A".

SOURCE B POWER PANELBOARD "51-1A102B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

1A102

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

51EP401a

BLDG 51 - FLOOR 1 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

1/4" = 1'-0"51EP101b

1 RM 1A102 - DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"51EP101b

2 RM 1A102 - ELECTRICAL PLAN

1/4" = 1'-0"51EP101b

3 RM 1A102 - DEMOLITION LIGHTING PLAN

1/4" = 1'-0"51EP101b

4 RM 1A102 - LIGHTING PLAN

KEY PLAN

KEY NOTES

GENERAL NOTES

PROJECT

NORTH

Revisions: Date:

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

T

JT

J T

JT

J T

JT

JJJ

J T

JT

J T

JT

S

S

SS

S S

M o

J

J

2.2

CC.1

2.1

BHE

STG

1A179A

102 SF

LAUNDRY CHUTE

1A179

23 SF

TR

1A183

272 SF

TYP

2.2

CC.1

2.1

BHE

TR

1A183

272 SF

STG

1A179A

102 SF

LAUNDRY CHUTE

1A179

23 SF

DATA

RACK,

TYP.

51-1A183B-2

51-1A183A-2

51-1A183B-2 51-1A183B-2

51-1A183B-2

51-1A183A-2

51-1A183A-2

51-1A183A-2

51-1A183A-1,3,5 51-1A183B-1,3,5

51-AC-4-1A183

EP502

51-DP-TRA

51-DP-TRB

TYP

2.2

CC.1

2.1

BHE

TR

1A183

272 SF

2.2

CC.1

2.1

BHE

TR

1A183

272 SF

STG

1A179A

102 SF

LAUNDRY CHUTE

1A179

23 SF

DATA

RACK,

TYP.

51-1A183A-4

L1 L1

L1

L1

L1 L1

51-1A183A

51-1A183B

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED

BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

SOURCE A POWER PANELBOARD "51-1A183A".

SOURCE B POWER PANELBOARD "51-1A183B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNCTION BOX.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

1A183

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

51EP401b

BLDG 51 - FLOOR 1 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

1/4" = 1'-0"51EP101c

1 RM 1A183 - DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"51EP101c

2 RM 1A183 - ELECTRICAL PLAN

1/4" = 1'-0"51EP101c

3 RM 1A183 - DEMOLITION LIGHTING PLAN

1/4" = 1'-0"51EP101c

4 RM 1A183 - LIGHTING PLAN

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

0' 2' 4' 8' 0' 2' 4' 8'

0' 2' 4' 8' 0' 2' 4' 8'

KEY PLAN

KEY NOTES

GENERAL NOTES

PROJECT

NORTH

Revisions: Date:

S

Mo

S

S

7' - 2 1/4"

HH.9K

CLEAN LINEN

1A139

160 SF

TYP

HH.9K

TR

1A139A

141 SF

51-AC-3-1A139

51-1A139A-2

51-1A139A-2

51-1A139A-2

51-1A139B-2

51-1A139B-2 51-1A139B-2

51-1A139B-2

3 1 2

51-1A139A-1,3,5 51-1A139B-1,3,5

DATA

RACK,

TYP.

CLEAN LINEN

1A139

160 SF

EP502

51-DP-TRB51-DP-TRA

HH.9K

CLEAN LINEN

1A139

160 SF

TYP

TR

1A139A

141 SF

HH.9K

L2

L2

51-1A139A-4

TR

1A139A

141 SF

DATA

RACK,

TYP.

CLEAN LINEN

1A139

160 SF

L2

L2

51-1A139A 51-1A139B

TOILET

1A137A

89 SF

1A139

1A139A

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED

BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

SOURCE A POWER PANELBOARD "51-1A139A".

SOURCE B POWER PANELBOARD "51-1A139B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

PROVIDE REQUIRED ELECTRICAL CONNECTIONS FOR RELOCATED MECHANICAL

EQUIPMENT.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

51EP401c

BLDG 51 - FLOOR 1 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

1/4" = 1'-0"51EP101a

1 RM 1A139 - DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"51EP101a

2 RM 1A139A - ELECTRICAL PLAN

1/4" = 1'-0"51EP101a

3 RM 1A139 - DEMOLITION LIGHTING PLAN

1/4" = 1'-0"51EP101a

4 RM 1A139A - LIGHTING PLAN

KEY PLAN

KEY NOTES

GENERAL NOTES

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

PP.4Q

51-CU-3-1A102

51-1A102A-6,8

EP503

2.2

CC.1

2.1

BHE

51-CU-4-1A183

51-1A183A-6,8

EP503

BHE

8E

51-CU-3-BE111

51-BE111A-6,8

EP503

51-CU-3-1A102

51-CU-4-1A183

51-CU-3-BE111

51-CU-3-1A139

H.9K

51-1A139A-6,8

51-CU-3-1A139 1

EP503

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

51EP402

BLDG 51 - ENLARGED ROOF PLANS

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

KEY PLAN

KEY NOTES

GENERAL NOTES

PROJECT

NORTH

- 3/8" = 1'-0"

3 BLDG 51- ENLARGED ROOF PLAN - VIEW 3

- 3/8" = 1'-0"

1 BLDG 51- ENLARGED ROOF PLAN - VIEW 1

- 3/8" = 1'-0"

2 BLDG 51- ENLARGED ROOF PLAN - VIEW 2

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

0' 2' 4' 8'

PROJECT

NORTH

1 PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT

AS REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH

MECHANICAL CONTRACTOR AS REQUIRED.

- 3/8" = 1'-0"

4 BLDG 51- ENLARGED ROOF PLAN - VIEW 4

0' 2' 4' 8'

PROJECT

NORTH

5 6

A

B51T

TR

34 SF

BLDG ENTRANCE TERMINAL

TELEPHONE TERMINAL BOARD

BLDG ENTRANCE

TERMINAL

DATA RACK

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

IN-LINE TRANSFER FAN WITH SPEED CONTROLLER. COORDINATE SPEED

CONTROLLER INSTALLATION LOCATION WITH MECHANICAL CONTRACTOR.

UPS RECEPTACLE.

CONTRACTOR SHALL REPLACE EXISTING RACK-MOUNTED UPS WITH NEW UPS. UPS

SHALL BE 3kW, 120V, 1-PHASE, APC #SMX3000RMLV2U, OR EQUAL.

5 6

A

B51T

BLDG ENTRANCE TERMINAL

TELEPHONE TERMINAL BOARD

BLDG ENTRANCE

TERMINAL

DATA RACK

TR

34 SF

1/2

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

51TEP401

BLDG 51T - FLOOR 1 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

51T

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

KEY PLAN

KEY NOTES

GENERAL NOTES

PROJECT

NORTH

1/2" = 1'-0"51TEP101

1 RM 109 - DEMOLITION ELECTRICAL PLAN

PROJECT

NORTH

0' 1' 2' 4'

Revisions: Date:

PROJECT

NORTH

0' 1' 2' 4'

1/2" = 1'-0"51TEP101

2 RM 109 - ELECTRICAL PLAN

Mo

J

GN29

GN29A

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

M

52-GN29AA-4

TR

GN29A

101 SF

L3

L3

52-GN29AA

52-GN29AB

DATA RACK

TYP.

SOURCE A POWER PANELBOARD "52-GN29AA".

SOURCE A POWER PANELBOARD "52-GN29AB".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

PNM

ELEVATOR

LOBBY

GS24

TOILET

GN27

68 SF

CLOSET

GN27A

17 SF

VENDING ROOM

GN29

808 SF

PNM

ELEVATOR

LOBBY

GS24

TOILET

GN27

68 SF

CLOSET

GN27A

17 SF

HAC

GN28

19 SF

VENDING ROOM

GN29

808 SF

TYP

M

52-GN29AA-2

52-GN29AA-2

52-GN29AA-2

52-GN29AB-2

52-GN29AB-2

52-GN29AB-2

52-GN29AA-1,3,5

52-GN29AB-1,3,5

52-GN29AA-2

52-AC-3-GN29A

DATA

RACK,

TYP.

TR

GN29A

101 SF

6EP502

52-DP-TRA

52-DP-TRB

- AREA OF WORK

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

52EP400

BLDG 52 - FLOOR 0 - ENLARGED

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

JEFFERSON BARRACKS - 1 JEFFERSON BARRACKS

DRIVE - ST. LOUIS, MO 63125

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

GENERAL NOTES

KEY PLAN

KEY NOTESKEY NOTES

GENERAL NOTES

1/2" = 1'-0"52EP100

4 RM GN29A - LIGHTING PLAN

0' 1' 2' 4'

3/16" = 1'-0"52EP100

3 RM GN29 - DEMOLITION LIGHTING PLAN

0' 2' 4' 8' 0' 1' 2' 4'

3/16" = 1'-0"52EP100

1 RM GN29 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"52EP100

2 RM GN29A - ELECTRICAL PLAN

0' 2' 4' 8'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

S

S

S

Mo

1N82

1N82A

A

B

DAYROOM

1N82

578 SF

TYP

CORRIDOR

H111

370 SF

B

52-1N82AB-2

52-1N82AB-2

52-1N82AA-2

52-1N82AA-2

52-1N82AA-2

52-1N82AB-2

52-1N82AB-2

52-1N82AA-2

52-1N82AA-1,3,5

52-1N82AB-1,3,5

TR

1N82A

143 SF

52-AC-3-1N82A

DATA

RACK,

TYP.

EP502

52-1N82AA-7,9,11

52-1N82AB-7,9,11

TYP.

52-DP-TRA

52-DP-TRB

A

TYP

B

DAYROOM

1N82

578 SF

CORRIDOR

H111

370 SF

B

TR

1N82A

143 SF

L3

L3

L3

L3

52-1N82AA-4

52-1N82AA

52-1N82AB

DATA RACK

TYP.

SOURCE A POWER PANELBOARD "52-1N82AA".

SOURCE A POWER PANELBOARD "52-1N82AB".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

- AREA OF WORK

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

52EP401a

BLDG 52 - FLOOR 1 - ENLARGED

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

1/4" = 1'-0"52EP101

1 RM 1N82 & 1N82A - DEMOLITION ELECTRICAL PLAN

3/8" = 1'-0"52EP101

2 RM 1N82A - ELECTRICAL PLAN

0' 2' 4' 8' 0' 2' 4' 8'

1/4" = 1'-0"52EP101

3 RM 1N82 & 1N82A - DEMOLITION LIGHTING PLAN

0' 2' 4' 8' 3/8" = 1'-0"52EP101

4 RM 1N82A - LIGHTING PLAN

0' 2' 4' 8'

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

File details come from the government source that posted it. Updated .