Attachment 10 - Drawings Part-9.pdf

PDF 15 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, interior renovations including demolition and new construction, data center renovations, physical security enhancements, fiber optic infrastructure assessment and upgrades, installation of a diversified wide area network path to the datacenter, and hazardous material abatement. The project involves buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75 and surrounding site work. The Department of Veterans Affairs Technology Acquisition Center located in Austin is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
36C77623R0009 0005.pdf PDF
FOLLOW-UP Technical Questions - St. Louis 4-6-23.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
Technical Questions - FINAL - St. Louis 3-28-23.pdf PDF
657-21-701JB - Addendum 1_03_24_23.pdf PDF
329000-5 - Sod Certificate.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-24-23.pdf PDF
36C77623R0009 0003.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
36C77623R0009 0001.pdf PDF
Attachment 45 - Site Visit Instructions Updated 2-16-23.pdf PDF
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 38 - Envr. Report - Drawings.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Attachment 33 - Drawings Part-32.pdf PDF
Attachment 34 - Envr. Report - Narrative.pdf PDF
Attachment 37 - Envr. Report - Appendix C.pdf PDF
Attachment 40 - NARA RM Contract Language Clause.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 1-20-23.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

UPDN

DN DN

ROOF BELOW

ROOF BELOW

ROOF BELOW ROOF BELOW

ROOF BELOW

ROOF BELOW

ROOF

BELOW

UPDN

DN DN

ROOF BELOW

ROOF BELOW

ROOF BELOW ROOF BELOW

ROOF BELOW

ROOF BELOW

ROOF

BELOW

J2 J1

L

P2 IN PH

ABOVE

H

GA

G

YX

U.7S.2

U

S

Q

P.5

PNMK

11.9 11.9

12.8

8.7

3 3

M.1

J

H.2E.1

HGFEDCA

B.1

9.9

Z

4 4

52EP402b

52EP402b

OFFICE

2S20A

OFFICE

2N80

OFFICE

2N79

OFFICE

2N77

TOILET, MALE

2N78

OFFICE

2N76

TOILET, MALE

2N88

F.E. CLOSET

2N90

OFFICE

2N89

TR

2N91 OFFICE

2N92

OFFICE

2N93

STAIR 3

S203

STORAGE

2N109

STORAGE

2N108

STORAGE

2N107

CONFERENCE RM.

2N72A

CHAPEL

2N72

CHAPEL

2N73

TOILET, FEMALE

2N75

TOILET, STAFF

2N74

KITCHEN

2N71

OFFICE, OPEN

2N69

CORRIDOR

H206

TOILET, STAFF

2N70

LIBRARY

2N68

OFFICE

2N66

TOILET, MALE

2N67

OFFICE

2N65

HAC

2N64

OFFICE

2N63

OFFICE

2N60

OFFICE

2N59

OFFICE

2N59A

CLOSET

2N59B

OFFICE

2N112

WHEELCHAIR STORAGE

2N110

EXAM RM.

2S08EXAM

2N118

EXAM

2S01 TREAT. RM.

2S05

CONTROL RM.

2S06

VEST.

2S06A

EXAM

2S04

SCI SERVICE PAIN REHAB. CENTER

2N117A

TOILET

2N113A

TOILET, STAFF

2N115

ELEV 1

E1

SCI SERVICE PAIN REHAB. CENTER

2N117

TOILET

2N116

STAIR 2

S202

ELEVATOR LOBBY

2S57

PAIN REHAB. CENTER

2S56A

P.T. / O.T.

2N58

CORRIDOR

H205HALLWAY

2N113

WAITING RM.

2N112A

OFFICE

2S51

CORRIDOR

H208

HAC

2S10

ELEC. CLOSET

2S9

OFFICE

2S11

OFFICE

2S11A

EXAM

2S12B

HALLWAY

2S13

BATH / SHOWER

2S12

EXAM

2S12A

EXAM

2S13A

STORAGE

2S16

STORAGE

2S17

STORAGE

2S14

TOILET, FEMALE

2S43A

TOILET, MALE

2S41HALLWAY

2S45

CONFERENCE RM.

2S44

OFFICE

2S46

TOILET

2S47

OFFICE

2S48

OFFICE

2S49

TOILET

2S50

CRAFTS RM.

2S21

OFFICE

2S22B

HALLWAY

2S20

HALLWAY

2S22

OFFICE

2S22A

TOILET, FEMALE

2S23

OFFICE

2S20B

PIPE CHASE

2S24A

OFFICE

2S24

OFFICE

2S19B

OFFICE

2S18

STORAGE

2S26

OFFICE

2S25

STORAGE

2S28

STAIR 1

S201

VA CONSULT

2S29

OFFICE

2S30

HAC

2S31

OFFICE

2S32

OFFICE

2S33

OFFICE

2S36

OFFICE

2S38

OFFICE

2S37

CLOSET

2S37A

TOILET

2S39

ADMIN.

2S34

CORRIDOR

H202

CORRIDOR

H201

CORRIDOR

H203

OFFICE

2S35

OFFICE

2S45A

PIPE CHASE

2N77A

PIPE CHASE

2N76A

PIPE CHASE

2N90A

OFFICE

2S33A

F.E. CLOSET

2S40

F.E. CLOSET

2S27

STORAGE

2S15

WORK RM.

2N81

TELECOM

2N86A

CORRIDOR

H207

ELEV 3

E3

STORAGE

2S43

PIPE CHASE

2S41A

PIPE CHASE

2S38A

STORAGE

2S52

CHASE

CH-S-1

F.E. CLOSET

H208A

PIPE CHASE

2N75A

PIPE CHASE

2N81A

CHASE

CH-N-3 CHASE

CH-S-2

CHASE

CH-N-1

CHASE

CH-N-2

CHASE

CH-S-5

CHASE

CH-S-3

CLOSET

2N115A

CHASE

CH-N-4

CHASE

CH-S-4

CHASE

CH-S-6

UTILITY

2N103

TRAINING TOILET

2N104

TOOL BENCH/ WORK STATION

2N98

STPRAGE

2N97

MECH RM.

2N106

CORRIDOR

2N95

VEST.

2N105

THERAPY

2N101

OFFICE

2S19A

HALLWAY

2S19

B

52EP402b

52EP402b

52EP402a

52EP402a

52EP402a

52EP402a

TR

2N86B

CONFERENCE RM.

2S56

BLDG 52

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

52EP102

BLDG 52 - FLOOR 2 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LTT

CONSTRUCTION

DOCUMENTS

- 1" = 20'-0"

1 BLDG 52 - FLOOR 2 - ELECTRICAL PLAN

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

0' 10' 20' 40'

PROJECT

NORTH

PROJECT

NORTH

LRL/WNM LLT/JPS

JT

JT

JT

JT

JT

JT

JT

JT

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

FEC

FEC

FEC

FEC

FEC

FEC FEC

FEFEC

GC2 GC - 1

GB

ECGA

GB1 - 1

GB1 - 2 ELGA

GA

GP

LOUNGE

GS16

MECH. RM.

GS12

MDS COORD.

GN38

STORAGE

GN44 OFFICE

GN43

EXAM

GN42OFFICE

GN39

OFFICE

GN48

OFFICE

GN41 OFFICE

GN45

OFFICE

GN45A

OFFICE

GN40

OFFICE

GN46

CORRIDOR

H008

SOILED LAUNDRY

GN50

TOILET, FEMALE

GN37

BREAK RM.

GN36

STORAGE

GS34A

CONFERENCE RM.

GS33

OFFICE

GS31OFFICE

GS32

OFFICE

GS29

OFFICE

GS26

OFFICE

GS23

CONTROL RM. 1

GS19A

SUITE 1

GS19B

SUITE 2

GS19C

CONTROL RM. 2

GS19D

TOILET, MALE

GS35

LAB.

GS28

OFFICE

GS24

OFFICE

GS22

CORRIDOR

H003

CORRIDOR

H005

CONTROL RM. 4

GS19E

SUITE 4

GS19F

SUITE 3

GS19GCONTROL RM. 3

GS19H

CORRIDOR

H004

ELEC. RM.

GS21

LOCKER RM.

GS17

CLOSET

GS16A

TOILET, MALE

GS14

CORRIDOR

H002

PIPE SPACE ACCESS

GS51

STAIRWELL NO. 2

S002

CORRIDOR

H001

LINEN CHUTE

GS04

HAC

GS05

STAIRWELL NO. 1

S001

OFFICE

GS07

LOADING DOCK

GS11

MECH. RM.

GS09

MECH. RM.

GS13

STORAGE

GS33A

LINEN CHUTE

GS08

LOCKER RM.

GS15

TOILET, FEMALE

GS18

ELEVATOR LOBBY

GS20

OFFICE

GS34

WAITING RM.

GS27

CORRIDOR

H006

CORRIDOR

H007

ELEVATOR LOBBY

GS01

ELEVATOR NO. 1

E1

PIPE CHASE

Z002

PIPE CHASE

Z003

PIPE CHASE

Z004

PIPE CHASE

Z005

PIPE CHASE

Z006

PIPE CHASE

Z007

CHASE

CH-GS-2

CHASE

CH-GS-3

CHASE

CH-GS-4

CHASE

CH-GS-5

CHASE

CH-GS-6

CHASE

CH-GN-1

CHASE

CH-GS-7

CHASE

CH-GS-8

CORRIDOR

H004

ELEVATOR NO. 2

E2

TV STORAGE

GS06

LOADING DOCK

GS11

TR

GS10

CHASE

CH-GS-7

CDP

3.43.4

A

A

C

C D.1 E H

E.1

E.1

E.2

E.2

H.2

H.2

6.56.5

M.1

M.1

P

P

W

WU

T.10

T.10

S.2

S.2 S.3

V.1

V.1

2.92.9

ATS#3

ATS - 53

PANEL GPD - 53

ATS#2

PANEL EMP

MAIN

SWITCHBOARD

MSB - 53

UP

ATS#1

MP53

53-DP-TRB

TR

GS02A

53EP400a

53EP400a

53EP400b

53EP400b

53EP400b

53EP400b

53EP400a

53EP400a

53-DP-TRA2

BLDG 53

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND LIGHTING DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

9. REFERENCE ONE-LINE DIAGRAM ON SHEET 53EP601 FOR CONDUIT AND WIRE SIZING.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

53EP100

BLDG 53 - FLOOR 0 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

- 1/16" = 1'-0"

1 BLDG 53 - FLOOR 0 - ELECTRICAL PLAN 0' 8' 16' 32'

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

PROJECT

NORTH

1 EXISTING PANEL TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET

53EP601 FOR ADDITIONAL INFORMATION.

2 EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 53EP601

FOR ADDITIONAL INFORMATION.

PROJECT

NORTH

UP

DN UP

DN

UP

DN

DN

DN

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

1C - 1

1C - 2

EC1B

KP

1A2

1A1

EC1A

53EP401b

53EP401a

53EP401a

53EP401b

STORAGE

1S005

CORRIDOR

H104

Office

1S074

TR

1S011

TR

1S002

NURSE STATION

1N081

OPEN OFFICE

1N077

BED RM. - 1 BED

1N106

CLEAN STORAGE

1N086

BED RM. - 3 BED

1N099

DAY RM.

1N096

BATH / SHOWER RM.

1N098

BED RM. - 1 BED

1N095

TOILET

1N094

BED RM. - 1 BED

1N092

BED RM. - 3 BED

1N100

BATH / SHOWER RM.

1N101

BATH / SHOWER RM.

1N103

TOILET

1N102

CORRIDOR

H106

TOILET, STAFF

1N091

LINEN RM., CLEAN

1N104

STAIRWELL NO. 3

S103

DAY RM.

1N117

CHASE

CH-N-2

OI&T

1N115

CHASE

CH-N-1

BATH / SHOWER RM.

1N114

BED RM. - 1 BED

1N113

CORRIDOR

H108

BED RM. - 1 BED

1N107

BATH / SHOWER RM.

1N105

BED RM. - 1 BED

1N112

UTILITY RM., SOILED

1N089

KITCHEN

1N088

CONFERENCE RM.

1N082

BATH / SHOWER RM.

1N108

BED RM. - 2 BED

1N109

BED RM. - 2 BED

1N110

BATH / SHOWER RM.

1N111

BED RM.

1N119

ANTE RM.

1N118

LINEN CHUTE

1N120A

CHASE

CH-N-5

TOILET

1N121

MED PREP.

1N080

ALCOVE

1N078

DISHWASHING RM.

1S073

OFFICE

1S074

OFFICE

1S075

ACTIVITY RM.

1S004

STAIRWELL NO. 2

S102 ELEVATOR NO.1

E1

CHASE

CH-S-10ELEC. CLOSET

1S006

ELEC. CLOSET

H105C

HAC

H105B

MAIN LOBBY

H105

TOILET

1S014

CHASE

CH-S-6

ELEC. CLOSET

1S015

BED RM. - 1 BED

1S013

DINING RM.

1S069

BED RM. - 1 BED

1S016

ELEVATOR NO. 2

E2

LOBBY

1S071

KITCHEN

1S072

VEST.

1S008

STORAGE

H105A

TOILET, FEMALE

1S007

TOILET, MALE

1S009

BED RM.

1S018

ANTE RM.

1S017 DAY RM.

1S021

CHASE

CH-S-7

ENGINEERING RM.

1S022

TOILET

1S023

CHASE

CH-S-11

CORRIDOR

H103

BED RM. - 1 BED

1S024

BED RM. - 1 BED

1S025

HAC

1S066

STORAGE

1S064

LOCKER RM.

1S062

MEDICATION PREP.

1S061

CORRIDOR

H101

CHASE

CH-S-4

SOILED UTILITY

1S035

CHASE

CH-S-8

CHASE

CH-S-9

TOILET

1S032

BED RM. - 1 BED

1S031

BED RM. - 1 BED

1S030

BED RM. - 2 BED

1S027

BED RM. - 2 BED

1S028

TOILET

1S029

TOILET

1S026

LOUNGE

1S058

NURSE STATION

1S059

OFFICE

1S063

OFFICE

1S065

LINEN RM., CLEAN

1S054

CORRIDOR

H102

KITCHEN

1S053

UTILITY RM., SOILED

1S052

UTILITY RM., CLEAN

1S051

BED RM. - 2 BED

1S057

TOILET

1S056 BED RM. - 2 BED

1S055

BED RM. - 1 BED

1S050

TOILET

1S048

BED RM. - 1 BED

1S046

CHASE

CH-S-3

HAC

1S047

BED RM. - 3 BED

1S045

TOILET

1S044

TOILET

1S043

CHASE

CH-S-2

BED RM. - 3 BED

1S042

BED RM. - 2 BED

1S041

TOILET

1S038

CHASE

CH-S-1

OXYGEN STORAGE

1S040

TOILET

1S039

BATH / SHOWER RM.

1S037

STAIRWELL NO. 1

S101

TOILET, STAFF

1S019

TOILET

1S020

A B C D.1 E E.1

2.9

3.4

6.5

N.1 N.6

P

N.5N.3

WV.1VMJH.1HF F.1 S

T.6T.1

UTS.3 T.9

53EP401a

53EP401a

53EP401b

53EP401b

N.8

N.8

Activity Room

1S004

Activity Room

1S004

EL1A

1B

BLDG 53

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND LIGHTING DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

9. REFERENCE ONE-LINE DIAGRAM ON SHEET 53EP601 FOR CONDUIT AND WIRE SIZING.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

53EP101

BLDG 53 - FLOOR 1 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

- 1/16" = 1'-0"

1 BUILDING 53 - FLOOR 1 - ELECTRICAL PLAN 0' 8' 16' 32'

GENERAL NOTES

KEY PLAN

KEY NOTES

PROJECT

NORTH

Revisions: Date:

PROJECT

NORTH

DN

JT

JT

JT

JT

JTJT

JT

JT

JT

JT

JT

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

RAD

FAP

FAS

2CA

2C

2B1

2B2

EL2A

2A1 2A2

EC2A

53EP402

53EP402

TR

2S001

O.T.

2N091

PT

2N096

PT

2N094

EQUIP. STORAGE

2N095

O.T. ADMIN.

2N092

STAIRWELL NO. 3

S203

TOILET, MALE

2N097

TOILET, FEMALE

2N098

OFFICE, OPEN

2N100A

EXAM

2N100B

EXAM

2N100D

EMG

2N100E

PT

2N100C

EXAM

2N102

ELEC. CLOSET

2N101

CHASE

CH-N-1

OFFICE

2N104

HAC

2N103

OFFICE, OPEN

2N106

CHASE

CH-N-2

LINEN CHUTE

2N105

WAITING RM.

2S003 OFFICE, OPEN

2S004

STAIRWELL NO. 2

S202

ELEVATOR NO. 1

E1

CHASE

CH-S-10

TOILET, FEMALE

2S014A

STORAGE

2S06

CHASE

CH-S-2

TREAT. RM.

2S007

OFFICE, OPEN

2S008

CHASE

CH-S-1

EXAM

2S009 STORAGE

2S015A

OFFICE

2S015

CONFERENCE RM.

2S017

OFFICE

2S10

OFFICE

2S011

OFFICE

2S012

OFFICE

2S013

EXAM

2S014

CORRIDOR

H206

OFFICE

2S016

COPY RM.

2S018

OFFICE

2S018A

BATH / SHOWER RM.

2S024TOILET, MALE

2S020

BED RM. - 3 BED

2S025

TOILET

2S027

CHASE

CH-S-9

CHASE

CH-S-12

BED- R. - 2 BED

2S028 BED RM.

2S030

ANTE RM.

2S029

ALCOVE

2S031

BATH / SHOWER RM.

2S032

CHASE

CH-S-4

ELEC. CLOSET

2S035

DAY RM.

2S034

BATH / SHOWER RM.

2S036 CHASE

CH-S-5

BED RM. - 1 BED

2S037

BED RM. - 1 BED

2S038

BATH / SHOWER RM.

2S039

BED RM. - 2 BED

2S040

BED RM. - 2 BED

2S041

TOILET

2S042

BED RM. - 1 BED

2S043

CORRIDOR

H203

BED RM. - 1 BED

2S044

BATH / SHOWER RM.

2S045

STAIRWELL NO. 1

S201

CHASE

CH-S-6 BATH / SHOWER RM.

2S049

ELEC. RM.

2S026

LINEN CHUTE

2S047

TOILET, STAFF

2S048

BED RM. - 2 BED

2S053

BED RM. - 3 BED

2S054

BATH / SHOWER RM.

2S055

TOILET

2S056

CHASE

CH-S-3

BED RM. - 3 BED

2S057

BED RM. - 1 BED

2S058

HAC

2S059

TOILET

2S060

BED RM. - 1 BED

2S061

UTILITY RM., CLEAN

2S062

LINEN RM., CLEAN

2S063

SOILED UTILITY

2S64

NURSE STATION

2S072

BED RM. - 2 BED

2S073

MEDICATION PREP.

2S069 KITCHEN

2S070

OFFICE

2S065

PATIENT RM. - 1 BED

2S066

BATH / SHOWER RM.

2S067

BREAK RM.

2S68

CORRIDOR

H202BED RM. - 3 BED

2S76

BED RM. - 3 BED

2S77

SERVICE LOBBY

2S081

ELEVATOR NO. 2

E2

LOCKER RM.

2S078

TOILET

2S079

CHASE

CH-S-11

STORAGE

2S080

OFFICE

2S082

OFFICE, OPEN

2S083

OFFICE

2S085

WHEELCHAIR STORAGE

2N086WAITING RM.

2N088RECEPTION

2N089

STORAGE

2N091C

CORRIDOR

H207

5.65.6

5.4

5.9

P P.1L.1LK

53EP402

53EP402

N.8

BLDG 53

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND LIGHTING DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

9. REFERENCE ONE-LINE DIAGRAM ON SHEET 53EP601 FOR CONDUIT AND WIRE SIZING.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

53EP102

BLDG 53 - FLOOR 2 - ELECTRICAL

PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

- 1/16" = 1'-0"

1 BLDG 53 - FLOOR 2 - ELECTRICAL PLAN 0' 8' 16' 32'

PROJECT

NORTH

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

PROJECT

NORTH

DN

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

FEC

FEC

53TEP401

53TEP401

CONFERENCE

RM.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

TOILET, FEMALE

TOILET, MALE

HAC

OFFICE

OFFICE

CORRIDOR

C105

FOYER

C101

TR

CORRIDOR

C103

CORRIDOR

C104

E F

A B C D G H I J

BLDG 53T

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

- 1/4" = 1'-0"

1 BLDG 53T - FLOOR 1 - ELECTRICAL PLAN

KEY PLAN

GENERAL NOTES

0' 2' 4' 8'

KEY NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

53TEP101

BLDG 53T - FLOOR 1 -

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

JEFFERSON BARRACKS - 1 JEFFERSON BARRACKS

DRIVE - ST. LOUIS, MO 63125

657-21-701JB

53T

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

Tectonic Copyright 2007

T ectonic Cop yright 2007

Tectonic Copyright 2007

UP

DN

FEC

FEC

F E

C

DATA

SYSTEMS

1C132

DATA

TECH

1C133

CORRIDOR

C1-57

BREAKDOWN,VERIFICATION

INVENTORY

1C135

55EP401a

55EP401a

A

55EP401a

55EP401a

DATA, SYSTEM

1A130

TR

1A129

CORE LAB AREA

1A126

Staff Lockers & Lounge

1A 139 Corridor

C1-30

Staff Toilet 1A

Storage 1A

Mobile X-Ray 1A

137a

PAC Office 1A

Path. Office 1A

Sup. Office 1A

Staff Lounge/ Lockers

1A

Training- Low Vision/ Poly

Trauma 1A

Exam- Low Vision 1A

Office, Eyecare Provider-L.V.

Multipurpose

1A

Optometry Exam- Large

1A

Staff Lounge 1A

Corridor

C1-18a

Agent Cashier 1B

Corridor

C1-15

Elec.

1A 111 Resident Exam

1A

Soiled Utility 1A

Crash Cart

C1-16 Optometry Exam 1A

Corridor

C1-12 Equipment/ Clean Supply

1A

Closet 1A

110a Staff Toilet

1A

Tele- Retinal Reading

1A

Photography Room

1A

Pre- Testing 2 1A

Pre- Testing 1 1A

Open Office 1A

Visual Field 1A

Dilation Waiting

C1-13

Waiting 1A

Eyeglass Fitting & Display

1A 100c

Storage, Wheelchair &

Stretcher 1B

House Keeping 1A

Office (Disposition)

1B

Pat. Toilet 1A

100b

Pat. Toilet 1A

Optometry Exam 1A

Office (Disposition)

1B 103b Office

(Disposition) 1B

Specimen Toilet 1A

124c

Specimen Toilet 1A

124b

Blood Collection 1A

Lab Reception 1A

124a

Elec.

1A

Waiting

C1-24

Corridor

C1-19

Kiosk

C1-23

Public Toilet 1A

Public Toilet 1A

Radiology Room 1 1A

Control 1A

153a

Control 1A

152a

Radiology Room 2 1A

Stair #1-1 Stair

#1

Corridor

C1-22

House Keeping 1A

IP Holding

C1-28

Sub- Waiting

C1-27 Dressing, ADA

1A

Patient Toilet 1A

Corridor

C1-25

Clean Supply 1A

Crash Cart 1A

147a

Soiled Utility 1A

PACS/Digital Control/

Tele-Radiology 1A

Bulk Storage 1A

Microbiology 1A

Ultrasound Room 1A

Housekeeping 1A

Office 1A

Office 1A

Corridor

C1-29

Office 1A

Office 1A

Mechanical 1M 1a

Generator Building

GB100

COURTYARD-

LOW VISION

SITE

C

F

H

B

E

G

J

K

8 8.2

MSB

ATS 55-C1

ATS 55-EQ1

GSB 55-1

55-DP-TRA 1

TR-55-DP-TRA 1

DP 55-LSI

DP 55-C1

DP 55-EQ1

DP 55-EQ2

MCC GG-1E

ATS 55-EQ2

MCC GG-1

ATS 55-LS1

A R

E A

A

A R

E A

B

S E

E S

H E

E T

E

P b

AREA A

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER,SIGNAL, LIGHTING DEVICES AND ASSOCIATED CIRCUITRY

AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED

BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

9. REFERENCE ONE-LINE DIAGRAM ON SHEET 55EP601 FOR CONDUIT AND WIRE SIZING.

- AREA OF WORK

KEY PLAN

GENERAL NOTES

KEY PLAN

KEY NOTES

GENERAL NOTES

- 1" = 10'-0"

1 BLDG 55 - FLOOR 1 - AREA A - ELECTRICAL PLAN

1 EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 55EP601 FOR

ADDITIONAL INFORMATION.

EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET

55EP601 FOR ADITIONAL INFORMATION.

0' 5' 10' 20'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

55EP101a

BLDG 55 - FLOOR 1 - AREA A -

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

Tectonic Copyright 2007

Tectonic Copyright 2007

F E

C F

E C

FEC

F E

C

F E

C

F E

C

F E

C

FEC

55EP401b

55EP401b

55EP401c

55EP401c

55EP401c

55EP401c

8.3 8.5 8.7 8.9

J.1

H.4

55EP401b

TR

1B104

AGENT CASHIER

WAITING

1B102

CORRIDOR

C1-4

TR

1B104

AGENT CASHIER

WAITING

1B102

TR

1C132

55EP401b

Staff Lounge 1A

Agent Cashier 1B

Eyeglass Fitting & Display

1A 100c

Storage, Wheelchair &

Stretcher 1B

House Keeping 1A

Office (Disposition)

1B

Office (Disposition)

1B 103b Office

(Disposition) 1B

DATA TECH

1C133

CORRIDOR

C1-57

BREAKDOWN,

VERIFICATION &

INVENTORY

1C135

Women's Toilet 1B

Elevator Lobby

C1-8

Cache 1C

Lockers 1C

130a

Lounge 1C

OP (Shared) Storage - Med

Supplies 1C

127a OP (Shared)

Storage Prepack.

Meds

1C

Vault Controlled Sub.

1C

124b

IP Storage, Active 1C

Aseptic Transfer, IV Admixture

1C 126a

Anteroom, IV Admixture

1C

Cubicle, Inventory Clerk

C1-45

Cubicle, Swing 1C

125h

IV Admix Freezer

C1-55

Dispensing, Controlled Sub

1C 124a

Cubicle, IP Process

1C 125d

Cubicle, IP Process

1C 125b

Cubicle, IP Process

1C 125c

Cubicle, IP Process

1C 125a

Cubicle, OP Spec.

1C

125f

Cubicle, OP Spec.

1C

125e

Invest. Drug Work Area & Stor.

1C

Pharm Teach Lab / Conf 1C

Storage, Sterile Fluids and Admixture

1C

IP Freezer

C1-54

Consult 1C

100a Consult

1C 100b

Consult 1C

100c

Consult 1C

100d

OP Waiting 1C

Dispensing

C1-40

Dispensing

C1-39

Drug Information Area

C1-47

OP Refrigerator

C1-52

Storage - Cart 1C

Mail Out 1C

P.C.

C1-53

Elec.

1C

Clinical Pharm Teaching

1C

Cubicle, Resident 1C

110a

Cubicle, Phone 1C

119e

Cubicle, Phone 1C

119b

Cubicle, Phone 1C

119a Cubicle, Pain

1C 118a

Cubicle, Phone & Telemed

1C 119f

Cubicle, Phone 1C

119c

Cubicle, Phone 1C

119d Office, Secretary /

Wait 1C

Office, Assistant Chief

1C

Cubicle, Resident 1C

110b

Office, Pharmacist 1C

Office, Pharmacist 1C

Office, Pharmacist 1C

Office, Pharmacist 1C

Office, Chief 1C

Office, Pharmacist 1C

Cubicle, Ancil.

1C

118e

Workstation, Tech- Lead

1C 125g

Workstation, Tech

C1-46

Mechanical 1M

Men's Toilet 1B

Electrical 1C

Staff Toilet 1C

Recycling 1B

Housekeeping Storage (Future Public Elev. #4)

1B

Stair #2-1 Stair

#2

Service Elev. #3

S-1

Elevator Lobby

C1-3

Stair #3-1 Stair

#3

Corridor

C1-7

Corridor

C1-9

Corridor

C1-5

Lobby

C1-2

Radiology Data Room

1B 109a

Corridor

C1-35

Corridor

C1-36

Corridor

C1-38

Corridor

C1-51 Corridor

C1-50

Corridor

C1-56

Stat. Counter

C1-43Med Assignment

C1-42

Repackaging, Extemp.

C1-44

Active Filling

C1-41

Prescription Filling and Assembly

C1-49

Gen Tech Work

C1-48

Staff Toilet 1C

H.K.

1C

Cubicle, Psych 1C

118d

Cubicle, LTC 1C

118c

Cubicle, LTC 1C

118b

Staff Toilet 1C

Corridor

C1-37

Reception 1B

Corridor

C1-6

Corridor

C1-58

COURTYARD-

LOW VISION

SITE

Public Elev. #1

2C148

Public Elev. #2

2C149

Service Elev. #3

2C150

Lobby

2C153

Service Elev. #3

2C158

C

F

H

B

E

G

J

K

L

1311109

8 8.2

8.8

L.9

LCP-2

TR-55-1C3

TR-55-EQ3

DP-551N3

PANEL 55-1EQ3-1

PANEL 55-1C3P

PANEL 55-1N3-2

TR-55-1N3

PANEL 55-1L3

55-DP-TRB2

A R

E A

A

A R

E A

B

S E

E S

H E

E T

E

P b

PANEL 55-1N3-1

PANEL 55-1C3

AREA B

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER,SIGNAL, LIGHTING DEVICES AND ASSOCIATED CIRCUITRY

AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED

BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

9. REFERENCE ONE-LINE DIAGRAM ON SHEET 55EP601 FOR CONDUIT AND WIRE SIZING.

- AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

55EP101b

BLDG 55 - FLOOR 1 - AREA B

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

- 1" = 10'-0"

1 BLDG 55 - FLOOR 1 - AREA B - ELECTRICAL PLAN 0' 5' 10' 20'

KEY PLAN

GENERAL NOTES

KEY PLAN

KEY NOTES

GENERAL NOTES

Revisions: Date:

EQUIPMENT TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET 55EP601

FOR ADDITIONAL INFORMATION.

EQUIPMENT TO BE ADDED. REFERENCE ONE-LINE DIAGRAM ON SHEET 55EP601 FOR

ADDITIONAL INFORMATION.

PROJECT

NORTH

PROJECT

NORTH

Tectonic Copyright 2007

T ectonic Cop yright 2007

Tectonic Copyright 2007

UP

DN

FEC

FEC

F E

C

DATA

SYSTEMS

1C132

DATA

TECH

1C133

CORRIDOR

C1-57

BREAKDOWN,VERIFICATION

INVENTORY

1C135

C

F

H

B

E

G

J

8765432 8.2

3.7

H.4

6.4

D.4

5.8

A

55EP402a

55EP402a

TR

2A136

CORRIDOR

C2-12

DATA SYSTEM

2A135

INTAKE/EXIT

2A137

A R

E A

B

S E

E S

H E

E T

E P b

55EP402a

55EP402a

A R

E A

A

J Exam 2A

Soiled Utility 2A

Staff Toilet 2A

I & J Intake / Exit Interview

2A

I Exam 2A

Office, Dietician 2A

Nurse Work 2A

103a

F Exam 2A

H Exam 2A

Procedure Room 2A

C Exam 2A

Clean Supply 2A

B Exam 2A

G Exam 2A

I Exam 2A

B Exam 2A

C Exam 2A

Soiled Utility 2A

Nurse Station, Communication

2A

Mechanical 2M

H Exam 2A

F Exam 2A

G Exam 2A

Staff Toilet 2A

E Exam 2A

Waiting, General 2A

D Exam 2A

A Exam 2A

Patient Toilet 2A

D Office, Provider 2A

A Office, Provider 2A

J Office, Provider 2A

E Office, Provider 2A

F Office, Provider 2A

G Office, Provider 2A

H Office, Provider 2A

Lab 2A

J Exam - Isolation 2A

Immunization 2A

Office, Psych.

2A

C Office, Provider 2A

Clean Supply 2A

Medicine 2A

B Office, Provider 2A

A Exam 2A

Office, Social Worker

2A

Classroom/Office Diabetic

Education 2A

D Exam 2A

Storage, Wheelchair

2B

Toilet, Isolation 2A

161a

Patient Toilet 2A

Office, Psych.

2A

Office, Pharmacist 2A

Patient Toilet 2A

Staff Toilet 2A

Storage, Equipment

2B 100a

Toilet, Female 2A

Toilet, Male 2A

House Keeping 2A

Education Kiosk 2A

102a

Crash Cart

C2-13

Women's Toilet 2B

Elec.

2A

Elec.

2A

Stair #1-2

2C151

I Office, Provider 2A

Lobby

2C153

Corridor

C2-4

Corridor

C2-9

Corridor

C2-10

Corridor

C2-11 Corridor

C2-15

Corridor

C2-16

Corridor

C2-17

Corridor

C2-8

Corridor

C2-6

E Exam 2A

Nurse Work 2A

103b

Nurse Work 2A

A Intake/Exit Interview

2A

D Intake/Exit Interview

2A

C Intake/Exit Interview

2A

B Intake/Exit Interview

2A

E Intake/Exit Interview

2A

F Intake/Exit Interview

2A

H Intake/Exit Interview

2A

Scales

C2-14

Housekeeping Storage (Future) Public Elev. #4

2B

AREA A

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER,SIGNAL, LIGHTING DEVICES AND ASSOCIATED CIRCUITRY

AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED

BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

- AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

55EP102a

BLDG 55 - FLOOR 2 - AREA A

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

- 1" = 10'-0"

1 BLDG 55 - FLOOR 2 - AREA A - ELECTRICAL PLAN 0' 5' 10' 20'

KEY PLAN

GENERAL NOTES

KEY PLAN

KEY NOTES

GENERAL NOTES

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

UP

DN

Tectonic Copyright 2007

Tectonic Copyright 2007

D

F

H

B

E

G

J

K

L

M

111098.2 8.8

K.6

K.3

D.4

55EP402b

55EP402b

A R

E A

A

S E

E S

H E

E T

E P a

A R

E A

B

DATA TECH

2C145

TR

2C144

55EP402b

55EP402b

Service Elev. #3

S-1 Procedure Room

2A

Classroom/Office Diabetic

Education 2A

Storage, Wheelchair

2B

Toilet, Isolation 2A

161a

Storage, Equipment

2B 100a

House Keeping 2A

Women's Toilet 2B

Service Elev. #3

2C150

Elevator Lobby

C2-1

Corridor

C2-4

Stair #2-2

2C155

Housekeeping Storage (Future) Public Elev. #4

2B

Service Elev. #3

2C158

Vending Area 2B

Stair #2-2

2C155

Public Elev. #1

P-2

Public Elev. #2

P-3

Exam, Gastro.

2C

Procedure Room 2C

Exam, Podiatry 2C

Exam/ Office, Employee Health

2C

Staff Toilet 2C

Exam, C/P 2C

Exam, Resident 2C

Nurse Work 2C

Exam, Resident 2C

Equipment Storage

2C 131a

Office, ACOS 2C

Elec.

2C

House Keeping 2C

Medicine 2C

Office, Head Nurse 2C

Exam, Resident 2C

Exam, Resident 2C

Exam, Resident 2C

Waiting, Resident Clinic/ C&P

2C

Reception/ Module Control Unit

2C 100a

Patient Toilet 2C

Staff Toilet 2C

Office, Supervisor HAS Admin.

2C

EKG Room 2C

Exam, Resident 2C

Exam, Resident 2C

Exam, Resident 2C

Clean Supply 2C

Cast Room 2C

Exam, Cardiology 2C

Elec.

2C

Exam, Gastro.

2C

Exam, Ortho.

2C

Patient Toilet 2C

Exam, Podiatry 2C

Laboratory 2C

Staff Toilet 2C

Exam, C/P 2C

Staff Lounge 2C

Lockers 2C

153a

Secretary

C2-23

Exam, Cardiology 2C

Nurse Work 2C

Soiled Utility 2C

Exam, Ortho.

2C

Exam/ Office, Employee Health

2C

Employee Health and C/P Clerk

2C

Storage, Forms 2C

Exam, Urology 2C

Resident Clinic Reception

2C

Waiting, Specialty Clinic

2C

Staff Toilet 2C

Records 2C

151a

Mechanical 2M

Men's Toilet 2B

Waiting

C2-26

Public Elev. #1

2C148

Public Elev. #2

2C149

Stair #3-2

2C152

Corridor

C2-2

Corridor

C2-5

Elevator Lobby

C2-3

CORRIDOR

C2-24

Corridor

C2-22

Corridor

C2-20

Corridor

C2-21

Corridor

C2-18

Work Alcove

C2-19

Exam, Resident 2C

Conference Room 2C

Education 2C

Nurse Work 2C

Urology Patient Toilet

2C 120a

Exam, Urology 2C

Corridor

C2-25

Public Elev. #1

2C156

Public Elev. #2

2C157

AREA B

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER,SIGNAL, LIGHTING DEVICES AND ASSOCIATED CIRCUITRY

AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED

BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

- AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

55EP102b

BLDG 55 - FLOOR 2 - AREA B

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

- 1" = 10'-0"

1 BLDG 55 - FLOOR 2 - AREA B - ELECTRICAL PLAN 0' 5' 10' 20'

KEY PLAN

KEY NOTES

GENERAL NOTES

KEY PLAN

KEY NOTES

GENERAL NOTES

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

Tectonic Copyright 2007

T ectonic Cop yright 2007

Tectonic Copyright 2007

UP

DN

FEC

FEC

F E

C

DATA

SYSTEMS

1C132

DATA

TECH

1C133

CORRIDOR

C1-57

BREAKDOWN,VERIFICATION

INVENTORY

1C135

C

F

H

B

E

G

J

876543 8.2

3.7

6.4

D.4

5.8

A

55EP403a

55EP403a

A R

E A

A

A R

E A

B

S E

E S

H E

E T

E P b

TR

3A120

PROGRAM

MANAGER

3A121

55EP403a

55EP403a

Group Room 3A

Work Area & Storage

3A

Waiting 3A

Group Room 3A

Reception 3A

Group Room 3A

Counseling A 3A

Counseling A 3A

Counseling A 3A

Counseling B 3A

Counseling B 3A

Counseling A 3A

SP

3A

SP

3A

Counseling B 3A

Counseling B 3A

Counseling B 3A

Counseling B 3A

Secretary GER 3A

Print Room 3A

Elec.

3A

Print Room 3A

Counseling, Student

3A

Counseling, Student

3A

Counseling B 3A

Counseling B 3A

Ger. Counseling 3A

Elec.

3A

Counseling A 3A

Counseling A 3A

Program Manager

GER

3A

Counseling A 3A

Patient Toilet 3A

Ger. Counseling 3A

Ger. Counseling 3A

Ger. Counseling 3A

Ger. Counseling 3A

Ger. Counseling 3A

Ger. Counseling 3A

Ger. Counseling 3A

Counseling A 3A

Counseling A 3A

Counseling B 3A

Counseling B 3A

Counseling B 3A

Counseling B 3A

Counseling A 3A

Patient Toilet 3A

Staff Toilet 3A

Lounge 3A

Patient Toilet 3A

Staff Toilet 3A

Counseling A 3A

SP

3A

P. Toilet 3A

Injection 3A

Intake 3A

Pharmacist Office 3A

Intake 3A

Counseling A 3A

Computer Kiosk 3A

DATA SYSTEM

3A

Women's Toilet 3B

Stair #1-3

2C159 Elevator Lobby

C3-1

Corridor

C3-4

Corridor

C3-6

Corridor

C3-7

Corridor

C3-8

Corridor

C3-9

Corridor

C3-11

Corridor

C3-12

Corridor

C3-13

Group Room, Large

3A

Secretary A & B 3A

Counseling B 3A

Counseling A 3A

PC Exam 3A

Counseling B 3A

P. Toilet 3A

Housekeeping 3A

Group Room Storage (Future Public Elev.) #4

3B

Oxygen 3M 1A

Corridor

C3-6

Corridor

C3-13

Corridor

C3-6

Corridor

C3-13

AREA A

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER,SIGNAL, LIGHTING DEVICES AND ASSOCIATED CIRCUITRY

AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH DEMOLISHED

BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

7. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

- AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

55EP103a

BLDG 55 - FLOOR 3 - AREA A -

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

- 1" = 10'-0"

1 BLDG. 55 - FLOOR 3 - AREA A - ELECTRICAL PLAN 0' 5' 10' 20'

KEY PLAN

GENERAL NOTES

KEY PLAN

KEY NOTES

GENERAL NOTES

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH