Attachment 15 - Drawings Part-14.pdf
PDF 15 MB Posted
- Attached to
- Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
- Solicitation number
- 36C77623R0009
About this file
This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, interior renovations including demolition and new construction, data center renovations, physical security enhancements, fiber optic infrastructure assessment and upgrades between buildings, installation of a diversified wide area network path to the datacenter, and hazardous material abatement. The project involves construction and renovation activities in buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 50
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
S
S
Mo
S
S
Z
TYP
EXAM
1S33
135 SF
TR
1S33A
75 SF
EXISTING FCU
Z
52-1S33A-2
52-1S33A-2
52-1S33B-2
52-1S33B-2
52-1S33B-2
52-1S33B-2 52-1S33A-252-1S33A-2
52-1S33A-1,3,5
52-1S33B-1,3,5
52-AC-3-1S33
TR
1S33A
75 SF
DATA RACK
EP502
RELOCATED FCU8
52-DP-TRA
52-DP-TRB
Z
52-1S33A-4
TR
1S33A
75 SF
L1
L1
DATA RACK
L1
L1
52-1S33A
52-1S33B
SOURCE A POWER PANELBOARD "52-1S33A".
SOURCE A POWER PANELBOARD "52-1S33B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
PROVIDE REQUIRED ELECTRICAL CONNECTIONS FOR RELOCATED MECHANICAL
EQUIPMENT
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
Z
EXAM
1S33
135 SF
TR
1S33A
75 SF
- AREA OF WORK
PROJECT
NORTH
1S33A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
52EP401b
BLDG 52 - FLOOR 1 - ENLARGED
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
1/4" = 1'-0"52EP101
1 RM 1S33 & 1S33A - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"52EP101
2 RM 1S33A - ELECTRICAL PLAN
1/2" = 1'-0"52EP101
4 RM 1S33A - LIGHTING PLAN
0' 2' 4' 8' 0' 1' 2' 4'
0' 1' 2' 4'0' 2' 4' 8'
GENERAL NOTES
KEY PLAN
KEY NOTES
Revisions: Date:
1/4" = 1'-0"52EP101
3 RM 1S33 & 1S33A - DEMOLITION LIGHTING PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
LRL/WNM LLT/JPS
Mo
S S
J
2N91
B.1
TR
2N91
115 SF
TYP
B.1
TR
2N91
115 SF
L1
L1
52-2N91A-4
DATA RACK,
TYP
52-2N91A
52-2N91B
L1
L1
SOURCE A POWER PANELBOARD "52-2N91A".
SOURCE A POWER PANELBOARD "52-2N91B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
B.1
TR
2N91
115 SF 4
TYP
B.1
TR
2N91
115 SF
52-AC-3-2N91
52-2N91B-2
52-2N91A-2
52-2N91A-2
52-2N91B-2
52-2N91A-2
52-2N91A-2
52-2N91B-2
52-2N91B-2
52-2N91A-1,3,5
52-2N91B-1,3,5
DATA RACK,
TYP EP502
52-2N91A-1,3,5
52-2N91B-1,3,5
52-DP-TRA
52-DP-TRB
- AREA OF WORK
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
52EP402a
BLDG 52 - FLOOR 2 - ENLARGED
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LTT
CONSTRUCTION
DOCUMENTS
0' 2' 4' 8' 0' 2' 4' 8'
1/4" = 1'-0"52EP102
3 RM 2N91 - DEMOLITION LIGHTING PLAN
0' 2' 4' 8' 1/4" = 1'-0"52EP102
4 RM 2N91 - LIGHTING PLAN
GENERAL NOTES
KEY PLAN
KEY NOTES
Revisions: Date:
0' 2' 4' 8'
1/4" = 1'-0"52EP102
1 RM 2N91 DEMOLITION ELECTRICAL PLAN
1/4" = 1'-0"52EP102
2 RM 2N91 - ELECTRICAL PLANPROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
JTJT
JTJT
Mo
JTJT
S S
Mo
S S
S
J
TR
2S53
158 SF4
TYP
COMBINER & SPLITTER
FIBER OPTIC
S
52-2N86BA-2
52-2N86BA-2
52-2N86BA-2
52-2N86BB-2
52-2N86BB-252-2N86BB-2
52-2N86BA-7,9,11
52-2N86BB-7,9,11
52-AC-3-2S53
DATA
RACK,
TYP.
155 SF
TR
2N86B
EP502
52-2N86BA-2
52-2N86BB-2
TYP
52-2N86BA-1,3,5
52-2N86BB-1,3,5
COMBINER &
SPLITTER
FIBER OPTIC
52-DP-TRA
52-DP-TRB
S
TR
2S53
158 SF
TYP
S
TR
2S53
158 SF
52-2N86BA-4
L1
L1
DATA
RACK,
TYP.
L1
L1
52-2N86BA
52-2N86BB
COMBINER & SPLITTER
FIBER OPTIC
SOURCE A POWER PANELBOARD "52-2N86BA".
SOURCE B POWER PANELBOARD "52-2N86BB".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
2N86B
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
52EP402b
BLDG 52 - FLOOR 2 - ENLARGED
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
JEFFERSON BARRACKS - 1 JEFFERSON BARRACKS
DRIVE - ST. LOUIS, MO 63125
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
3/8" = 1'-0"52EP102
1 RM 2S53 - DEMOLITION ELECTRICAL PLAN
3/8" = 1'-0"52EP102
2 RM 2N86B - ELECTRICAL PLAN
3/8" = 1'-0"52EP102
3 RM 2S53 - DEMOLITION LIGHTING PLAN
3/8" = 1'-0"52EP102
4 RM 2N86B - LIGHTING PLAN
GENERAL NOTES
KEY PLAN
KEY NOTES
GENERAL NOTES
0' 2' 4' 8'0' 2' 4' 8'
0' 2' 4' 8'0' 2' 4' 8'
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
A
B
52-1N82AA-6,8
52-2N91A-6,8
52-CU-3-1N82A
52-CU-3-2N91A
EP503
TYP.
M
52-GN29AA-6,8
52-CU-3-GN29A
EP503
SQ
52-2S53A-6,8
52-CU-3-2S53
EP503
1 1
Y
Z
52-1S33A-6,852-CU-3-1S33
EP503
52-CU-3-1N82A
52-CU-3-2N86A 52-CU-3-2S53
52-CU-3-GN29A 52-CU-3-1S33
1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT
TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
- AREA OF WORK
PROJECT
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
52EP403
BLDG 52 - ENLARGED ROOF PLANS
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
KEY PLAN
KEY NOTES
GENERAL NOTES
- 1/4" = 1'-0"
1 BLDG 52 - ENLARGED ROOF PLAN - VIEW 1
- 1/4" = 1'-0"
3 BLDG 52 - ENLARGED ROOF PLAN - VIEW 3
- 1/4" = 1'-0"
2 BLDG 52 - ENLARGED ROOF PLAN - VIEW 2
- 1/4" = 1'-0"
4 BLDG 52 - ENLARGED ROOF PLAN - VIEW 4
0' 2' 4' 8'
0' 2' 4' 8' 0' 2' 4' 8'
0' 2' 4' 8'
PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT
AS REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH
MECHANICAL CONTRACTOR AS REQUIRED.
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
MoMo MoMo
M o
M o
S S
S S
MoMo
B
MoMo
M o
M o
GS02A
5.6
5.4
5.9
N.4
DATA RACK,TYP.
N.8
RECREATIONAL
THERAPY
GS02
TR
GS02A
105 SF
EP502
53-GS02A-2
53-GS10A-2
53-GS02A-2 53-GS02A-2
53-GS02B-2
53-GS02B-253-GS02B-2
53-GS02B-2
53-GS02A-1,3,5
53-GS02B-1,3,5
53-DP-TRA
53-DP-TRB
53-AC-3-GS02A
5.6
5.4
5.9
N.4 N.8
RECREATIONAL
THERAPY
GS02
TYP
TR
GS02A
105 SF
5.6
5.4
5.9
N.4 N.8
RECREATIONAL THERAPY
GS02
TYP
TR
GS02A
105 SF
5.6
5.4
5.9
N.4
L2 L2
L2 L2
N.8
RECREATIONAL THERAPY
GS02
TR
GS02A
105 SF
53-GS02A-4
53-GS02AA 53-GS02AB
DATA RACK TYP.
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
53EP400a
BLDG 53 - FLOOR 0 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
0' 2' 4' 8' 0' 2' 4' 8'
GENERAL NOTES
KEY PLAN
KEY NOTES
Revisions: Date:
1/4" = 1'-0"53EP100
2 RM GS02A - ELECTRICAL PLAN
1/4" = 1'-0"53EP100
1 RM GS02 - DEMOLITION ELECTRICAL PLAN
1/4" = 1'-0"53EP100
3 RM GS02A - DEMOLITION LIGHTING PLAN
1/4" = 1'-0"53EP100
4 RM GS02A - LIGHTING PLAN
0' 2' 4' 8' 0' 2' 4' 8'
SOURCE A POWER PANELBOARD "53-GS02AA".
SOURCE B POWER PANELBOARD "53-GS02AB".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE
SHALL BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE
ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1)
POWER SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO
ADEQUATELY SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE
CONNECTIONS AS REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR
HARDWARE. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.
PROVIDE SWITCHING, RELOCATED LUMINAIRES, CONDUIT AND WIRE TO
PROVIDE A FULLY FUNCTIONAL LIGHTING SYSTEM FOR ROOM GS02; UTILIZE
EXISTING LIGHTING CIRCUIT.
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
LIGHT TO BE
RELOCATED
REVISED TO
ROOM GS02
S S
Mo
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
5.6 5.6
V.2V.1V
TYP
TR
GS10
94 SF
ACCESS DOOR
CONTROLLER
ACCESS POWER
CONTROLLER PANEL
FIBER OPTIC
PATCH PANEL
PANEL BOARD
TECHNOLOGY
PANEL
BLDG ENTRANCE
TERMINAL
TELEPHONE TERMINAL
BOARD
COMBINER & SPLITTER
FIBER OPTIC
5.65.6
V.2
V.2
V.1
V.1
V
V
3 5
TR
GS10
94 SF
53-GS10A-2
53-GS10A-2
53-GS10B-2
53-GS10B-2
53-GS10A-2
53-GS10A-2
53-GS10B-2
53-GS10B-2
53-GS10B-1,3,5
53-GS10B-1,3,5
DATA RACK
TYP.
EP502
TECHNOLOGY
PANEL
53-AC-3-GS10
53-DP-TRA
53-DP-TRB
ACCESS DOOR
CONTROLLER
ACCESS POWER
CONTROLLER PANEL
FIBER OPTIC
PATCH PANEL
PANEL BOARD
BLDG ENTRANCE
TERMINAL
TELEPHONE TERMINAL
BOARD
COMBINER & SPLITTER
FIBER OPTIC
5.65.6
V.2
V.2
V.1
V.1
V
V
TR
GS10
94 SF
TYP
5.65.6
V.2
V.2
V.1
V.1
V
V
TR
GS10
94 SF
53-GS10A-4
53-GS10B
53-GS10A
DATA RACK
TYP.
L2 L2
L2 L2
GS10
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
53EP400b
BLDG 53 - FLOOR 0 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 Checker JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
GENERAL NOTES
KEY PLAN
KEY NOTES
1/4" = 1'-0"53EP100
1 RM GS10 - DEMOLITION FLOOR PLAN
1/4" = 1'-0"53EP100
2 RM GS10- ELECTRICAL PLAN
1/4" = 1'-0"53EP100
3 RM GS10- DEMOLITION LIGHTING PLAN
1/4" = 1'-0"53EP100
4 RM GS10- LIGHTING PLAN
0' 2' 4' 8'
SOURCE A POWER PANELBOARD "53-GS10A".
SOURCE B POWER PANELBOARD "53-GS10B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE
SHALL BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
0' 2' 4' 8'
0' 2' 4' 8' 0' 2' 4' 8'
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
JT
JT
JT
JT
JT
Mo
S S
1S002
J
TR
1S002
82 SF
CHASE
CH-S-5
K
K
L
L
5.45.4
L.1
L.1
Activity Room
1S004 4
TYP
TELEPHONE
TERMINAL BOARD
TR
1S002
82 SF
1 23
K
K
L
L
5.45.4
L.1
L.1
53-1S002A-253-1S002A-2
53-1S002B-2
53-1S002B-2
53-1S002A-2
53-1S002B-2
53-1S002A-1,3,5
53-1S002B-1,3,5
53-AC-3-1S002 6
EP502
DATA RACK
53-DP-TRA
53-DP-TRB
TELEPHONE
TERMINAL
BOARD
TR
1S002
82 SF
CHASE
CH-S-5
5.45.4
L.1
L.1
L
L
K
K
Activity Room
1S004
TYP
TR
1S002
82 SF
DATA
RACK,
TYP.
L.1LK
53-1S002A-4
5.45.4
L.1
L.1
L
L
K
K
53-1S002A 53-1S002B
L2 L2
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
53EP401a
BLDG 53 - FLOOR 1 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
1/2" = 1'-0"53EP101
1 RM 1S002 - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"53EP101
2 RM 1S002 - ELECTRICAL PLAN
1/2" = 1'-0"53EP101
3 RM 1S002 - DEMOLITION LIGHTING PLAN 1/2" = 1'-0"53EP101
4 RM 1S002 - LIGHTING PLAN
GENERAL NOTES
KEY PLAN
KEY NOTES
Revisions: Date:
0' 1' 2' 4'
SOURCE A POWER PANELBOARD "53-1S002A".
SOURCE B POWER PANELBOARD "53-1S002B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE
SHALL BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
0' 1' 2' 4'
0' 1' 2' 4'
0' 1' 2' 4'
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
S
S S
MoMo
5.65.6
5.45.4
5.95.9
P
P
N.8
N.8
TR
1S011
127 SF
TYP
53-1S011A-1,3,5 53-1S011B-1,3,5
53-1S011B-2
53-1S011A-2 53-1S011A-2
53-1S011A-2
53-1S011A-2
53-1S011B-2
53-1S011B-2
53-1S011B-2
53-AC-3-1S011
5.6 5.6
5.45.4
5.95.9
P
P
N.8
N.8
53-1S011A-7,9,11 53-1S011B-7,9,11
TYP
TR
1S011
DATA
RACK,
TYP.
EP502
453-DP-TRA
53-DP-TRB
127 SF
TR
1S011
127 SF
5.65.6
5.45.4
5.95.9
P
P
N.8
N.8
TYP
DATA
RACK,TYP.
53-1S011A-4
L2
L2
L2
L2
5.65.6
5.45.4
5.95.9
P
P
N.8
N.8
53-1S01A
TR
1S011
127 SF
53-1S01A
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
1S011
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
53EP401b
BLDG 53 - FLOOR 1 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
1/4" = 1'-0"53EP101
1 RM 1S011 - DEMOLITION ELECTRICAL PLAN
1/4" = 1'-0"53EP101
2 RM 1S011 - ELECTRICAL PLAN
1/4" = 1'-0"53EP101
3 RM 1S011 - DEMOLITION LIGHTING PLAN
1/4" = 1'-0"53EP101
4 RM 1S011 - LIGHTING PLAN
0' 2' 4' 8'
GENERAL NOTES
KEY PLAN
KEY NOTES
Revisions: Date:
0' 2' 4' 8'
0' 2' 4' 8'0' 2' 4' 8'
SOURCE A POWER PANELBOARD "53-1S01A".
SOURCE B POWER PANELBOARD "53-1S01B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE
SHALL BE DEMOLISHED BACK TO SOURCE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE
ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1)
POWER SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO
ADEQUATELY SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE
CONNECTIONS AS REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR
HARDWARE. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
J
S S
S S
MoMo
S S
2S001 2S002
TYP
P.27 P.27
TR
2S001
184 SF
5.65.6
5.45.4
5.95.9
L.1
L.1
L
L
TELEPHONE
TERMINAL
BOARD
ACCESS POWER
CONTROLLER PANEL
ACCESS DOR
CONTROLLER
TECHNOLOGY
PANEL
ACCESS DOOR
CONTROLLER
TECHNOLOGY
PANEL
DATA
RACK,
TYP.
53-2S001B-2 53-2S001B-2
53-2S001B-7,9,11
53-2S001B-2
53-2S001-2
53-2S001A-2
53-2S001A-2
53-2S001B-2
53-2S001A-2
53-2S001A-7,9,11
53-AC-3-2S001
P.27 P.27
5.65.6
5.45.4
5.95.9
L.1
L.1
L
L
EP502
53-2S001B-1,3,5
53-2S001A-1,3,5
TYP.
TR
2S001
184 SF
53-DP-TRB
53-DP-TRA
RELOCATED
TELEPHONE TERMINAL
BOARD
ACCESS POWER
CONTROLLER PANEL
ACCESS DOR
CONTROLLER
TECHNOLOGY
PANEL
RELOCATED
ACCESS DOOR
CONTROLLER
1 1
TYP
P.27 P.27
TR
2S001
184 SF
5.65.6
5.45.4
5.95.9
L.1
L.1
L
L
L2
L2 L2
L2
53-2S001A-4
P.27 P.27
5.65.6
5.45.4
5.95.9
L.1
L.1
L
L
DATA
RACK,
TYP.
L2
L2
TR
2S001
184 SF
53-2S001B
53-2S001A
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
53EP402
BLDG 53 - FLOOR 2 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JGE/JBB
CONSTRUCTION
DOCUMENTS
1/4" = 1'-0"53EP102
1 RM 2S001 & 2S002 - DEMOLITION ELECTRICAL PLAN
0' 2' 4' 8' 1/4" = 1'-0"53EP102
2 RM 2S001 - ELECTRICAL PLAN
1/4" = 1'-0"53EP102
3 RM 2S001 & 2S002 - DEMOLITION LIGHTING PLAN
1/4" = 1'-0"53EP102
4 RM 2S001 - LIGHTING PLAN
GENERAL NOTES
KEY PLAN
KEY NOTES
Revisions: Date:
53EP102
0' 2' 4' 8'
0' 2' 4' 8'0' 2' 4' 8'
SOURCE A POWER PANELBOARD "53-2S001A".
SOURCE B POWER PANELBOARD "53-2S001B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA MANUFACTURER'S
CONNECTIONS. COORDINATE WITH MECHANCAL CONTRACTOR AS REQUIRED.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
EXISTING EQUIPMENT SHALL BE RELOCATED AS SHOWN. EXTEND ALL RACEWAYS
AND CONDUCTORS AS REQUIRED.
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
B
P
P
53-CU-3-1S011
53-1S011A-6,8
53-CU-3-GS02
53-GS02AA-6,8
E503
TYP
V.1
V.1
53-CU-2-GS10
53-GS10A-6,8
E503
TYP
53-CU-3-1S00253-CU-3-2S001
53-1S002A-6,853-2S001A-6,8
L
1 1
E503
TYP
53-CU-3-2S001
53-CU-3-1S002
53-CU-3-1S011
53-CU-3-GS02
53-CU-2-GS10
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
53EP403
BLDG 53 - ENLARGED ROOF
PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
GENERAL NOTES
KEY PLAN
KEY NOTES
- 1/2" = 1'-0"
2 BLDG 53 - ENLARGED ROOF PLAN - VIEW 3
- 1/2" = 1'-0"
3 BLDG 53 - ENLARGED ROOF PLAN - VIEW 4
- 1/2" = 1'-0"
1 BLDG 53 - ENLARGED ROOF PLAN - VIEW 2
1 PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS
REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH MECHANICAL
CONTRACTOR AS REQUIRED.
0' 2' 4' 8' 0' 2' 4' 8'
0' 2' 4' 8'
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
TR
35 SF
PANEL NSR251
FIRE ALARM
PANEL
E F
ACCESS POWER
CONTROLLER
PANEL
TELEPHONE
TERMINAL BOARD
BLDG ENTRANCE
TERMINAL
DATA RACK
E F
TR
35 SF
1/2
FIRE ALARM
PANEL
E F
TELEPHONE
TERMINAL BOARD
BLDG ENTRANCE
TERMINAL
ACCESS POWER
CONTROLLER
PANEL
DATA RACK
EXISTING PANEL
NSR251
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS
REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO
BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS
OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL
REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL
CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR
ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
EXISTING PANEL TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET
53EP601.
IN-LINE TRANSFER FAN WITH SPEED CONTROLLER. COORDINATE SPEED
CONTROLLER INSTALLATION LOCATION WITH MECHANICAL CONTRACTOR.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE
ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1)
POWER SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO
ADEQUATELY SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE
CONNECTIONS AS REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR
HARDWARE. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.
CONTRACTOR SHALL REPLACE EXISTING RACK-MOUNTED UPS WITH NEW UPS.
UPS SHALL BE 3kW, 120V, 1-PHASE, APC #SMX3000RMLV2U, OR EQUAL.
UPS RECEPTACLE.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
53TEP401
BLDG 53T - FLOOR 1 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
JEFFERSON BARRACKS - 1 JEFFERSON BARRACKS
DRIVE - ST. LOUIS, MO 63125
657-21-701JB
53T
03/31/2022 LRL/WNM LLT/JPS
CONSTRUCTION
DOCUMENTS
KEY PLAN
GENERAL NOTES
1/2" = 1'-0"53TEP101
1 RM 109 - DEMOLITION ELECTRICAL PLAN
0' 1' 2' 4'
1/2" = 1'-0"53TEP101
2 RM 109 - ELECTRICAL PLAN
0' 1' 2' 4'
KEY NOTES
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH PROJECT
NORTH
S
Mo
Tectonic Copyright 2007
Tectonic Copyright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
UP
UP
UP
DN
TYP
F
TR
1A129
85 SF
TELEPHONE
TERMINAL
BOARD
F
55-1A129A-2 55-1A129A-2
55-1A129B-2
55-1A129A-2
55-1A129B-2
55-1A129B-255-1A129B-2
55-1A129B-1,3,5
55-1A129A-1,3,5
DATA RACK,
TYP
55-AC-3-1A129
TR
1A129
85 SF
55-1A129A-2
EP502
F
55-DP-TRA 55-DP-TRB
TELEPHONE
TERMINAL
BOARD
B
TYP
CORE LAB AREA
1A126
F
TR
1A129
85 SF
55-1A129A-4
L1
L1
L1
DATA RACK,
TYP.
TR
1A129
85 SF
F
55-1A129A 55-1A129B
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR
ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
1A129
- AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
55EP401a
BLDG 55 - FLOOR 1 - ENLARGED
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
1/2" = 1'-0"55EP101a
1 RM 1A129 - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"55EP101a
2 RM 1A129 - ELECTRICAL PLAN
1/2" = 1'-0"55EP101a
3 RM 1A129 - DEMOLITION LIGHTING PLAN
1/2" = 1'-0"55EP101a
4 RM 1A129 - LIGHTING PLAN
GENERAL NOTES
KEY PLAN
KEY NOTES
Revisions: Date:
0' 1' 2' 4' 0' 1' 2' 4'
0' 1' 2' 4' 0' 1' 2' 4'
SOURCE A POWER PANELBOARD "55-1A129A".
SOURCE B POWER PANELBOARD "55-1A129B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
File details come from the government source that posted it. Updated .