Attachment 15 - Drawings Part-14.pdf

PDF 15 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, interior renovations including demolition and new construction, data center renovations, physical security enhancements, fiber optic infrastructure assessment and upgrades between buildings, installation of a diversified wide area network path to the datacenter, and hazardous material abatement. The project involves construction and renovation activities in buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
36C77623R0009 0005.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
36C77623R0009 0003.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
36C77623R0009 0001.pdf PDF
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
Attachment 1 - Specifications.pdf PDF
Attachment 5 - Drawings Part-4.pdf PDF
Attachment 6 - Drawings Part-5.pdf PDF
Attachment 9 - Drawings Part-8.pdf PDF
Attachment 16 - Drawings Part-15.pdf PDF
Attachment 22 - Drawings Part-21.pdf PDF
Attachment 24 - Drawings Part-23.pdf PDF
Attachment 36 - Envr. Report - Appendix B.pdf PDF
Attachment 41 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 44 - Contractor Safety - Environmental Form.docx DOCX document
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 38 - Envr. Report - Drawings.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J

S

S

Mo

S

S

Z

TYP

EXAM

1S33

135 SF

TR

1S33A

75 SF

EXISTING FCU

Z

52-1S33A-2

52-1S33A-2

52-1S33B-2

52-1S33B-2

52-1S33B-2

52-1S33B-2 52-1S33A-252-1S33A-2

52-1S33A-1,3,5

52-1S33B-1,3,5

52-AC-3-1S33

TR

1S33A

75 SF

DATA RACK

EP502

RELOCATED FCU8

52-DP-TRA

52-DP-TRB

Z

52-1S33A-4

TR

1S33A

75 SF

L1

L1

DATA RACK

L1

L1

52-1S33A

52-1S33B

SOURCE A POWER PANELBOARD "52-1S33A".

SOURCE A POWER PANELBOARD "52-1S33B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

PROVIDE REQUIRED ELECTRICAL CONNECTIONS FOR RELOCATED MECHANICAL

EQUIPMENT

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

Z

EXAM

1S33

135 SF

TR

1S33A

75 SF

- AREA OF WORK

PROJECT

NORTH

1S33A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

52EP401b

BLDG 52 - FLOOR 1 - ENLARGED

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

1/4" = 1'-0"52EP101

1 RM 1S33 & 1S33A - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"52EP101

2 RM 1S33A - ELECTRICAL PLAN

1/2" = 1'-0"52EP101

4 RM 1S33A - LIGHTING PLAN

0' 2' 4' 8' 0' 1' 2' 4'

0' 1' 2' 4'0' 2' 4' 8'

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

1/4" = 1'-0"52EP101

3 RM 1S33 & 1S33A - DEMOLITION LIGHTING PLAN

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

LRL/WNM LLT/JPS

Mo

S S

J

2N91

B.1

TR

2N91

115 SF

TYP

B.1

TR

2N91

115 SF

L1

L1

52-2N91A-4

DATA RACK,

TYP

52-2N91A

52-2N91B

L1

L1

SOURCE A POWER PANELBOARD "52-2N91A".

SOURCE A POWER PANELBOARD "52-2N91B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

B.1

TR

2N91

115 SF 4

TYP

B.1

TR

2N91

115 SF

52-AC-3-2N91

52-2N91B-2

52-2N91A-2

52-2N91A-2

52-2N91B-2

52-2N91A-2

52-2N91A-2

52-2N91B-2

52-2N91B-2

52-2N91A-1,3,5

52-2N91B-1,3,5

DATA RACK,

TYP EP502

52-2N91A-1,3,5

52-2N91B-1,3,5

52-DP-TRA

52-DP-TRB

- AREA OF WORK

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

52EP402a

BLDG 52 - FLOOR 2 - ENLARGED

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LTT

CONSTRUCTION

DOCUMENTS

0' 2' 4' 8' 0' 2' 4' 8'

1/4" = 1'-0"52EP102

3 RM 2N91 - DEMOLITION LIGHTING PLAN

0' 2' 4' 8' 1/4" = 1'-0"52EP102

4 RM 2N91 - LIGHTING PLAN

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

0' 2' 4' 8'

1/4" = 1'-0"52EP102

1 RM 2N91 DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"52EP102

2 RM 2N91 - ELECTRICAL PLANPROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

JTJT

JTJT

Mo

JTJT

S S

Mo

S S

S

J

TR

2S53

158 SF4

TYP

COMBINER & SPLITTER

FIBER OPTIC

S

52-2N86BA-2

52-2N86BA-2

52-2N86BA-2

52-2N86BB-2

52-2N86BB-252-2N86BB-2

52-2N86BA-7,9,11

52-2N86BB-7,9,11

52-AC-3-2S53

DATA

RACK,

TYP.

155 SF

TR

2N86B

EP502

52-2N86BA-2

52-2N86BB-2

TYP

52-2N86BA-1,3,5

52-2N86BB-1,3,5

COMBINER &

SPLITTER

FIBER OPTIC

52-DP-TRA

52-DP-TRB

S

TR

2S53

158 SF

TYP

S

TR

2S53

158 SF

52-2N86BA-4

L1

L1

DATA

RACK,

TYP.

L1

L1

52-2N86BA

52-2N86BB

COMBINER & SPLITTER

FIBER OPTIC

SOURCE A POWER PANELBOARD "52-2N86BA".

SOURCE B POWER PANELBOARD "52-2N86BB".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

2N86B

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

10. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

52EP402b

BLDG 52 - FLOOR 2 - ENLARGED

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

JEFFERSON BARRACKS - 1 JEFFERSON BARRACKS

DRIVE - ST. LOUIS, MO 63125

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

3/8" = 1'-0"52EP102

1 RM 2S53 - DEMOLITION ELECTRICAL PLAN

3/8" = 1'-0"52EP102

2 RM 2N86B - ELECTRICAL PLAN

3/8" = 1'-0"52EP102

3 RM 2S53 - DEMOLITION LIGHTING PLAN

3/8" = 1'-0"52EP102

4 RM 2N86B - LIGHTING PLAN

GENERAL NOTES

KEY PLAN

KEY NOTES

GENERAL NOTES

0' 2' 4' 8'0' 2' 4' 8'

0' 2' 4' 8'0' 2' 4' 8'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

A

B

52-1N82AA-6,8

52-2N91A-6,8

52-CU-3-1N82A

52-CU-3-2N91A

EP503

TYP.

M

52-GN29AA-6,8

52-CU-3-GN29A

EP503

SQ

52-2S53A-6,8

52-CU-3-2S53

EP503

1 1

Y

Z

52-1S33A-6,852-CU-3-1S33

EP503

52-CU-3-1N82A

52-CU-3-2N86A 52-CU-3-2S53

52-CU-3-GN29A 52-CU-3-1S33

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT

TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

2. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

3. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

4. CONTRACTOR SHALL COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

5. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

6. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

7. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

- AREA OF WORK

PROJECT

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

52EP403

BLDG 52 - ENLARGED ROOF PLANS

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

KEY PLAN

KEY NOTES

GENERAL NOTES

- 1/4" = 1'-0"

1 BLDG 52 - ENLARGED ROOF PLAN - VIEW 1

- 1/4" = 1'-0"

3 BLDG 52 - ENLARGED ROOF PLAN - VIEW 3

- 1/4" = 1'-0"

2 BLDG 52 - ENLARGED ROOF PLAN - VIEW 2

- 1/4" = 1'-0"

4 BLDG 52 - ENLARGED ROOF PLAN - VIEW 4

0' 2' 4' 8'

0' 2' 4' 8' 0' 2' 4' 8'

0' 2' 4' 8'

PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT

AS REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH

MECHANICAL CONTRACTOR AS REQUIRED.

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

MoMo MoMo

M o

M o

S S

S S

MoMo

B

MoMo

M o

M o

GS02A

5.6

5.4

5.9

N.4

DATA RACK,TYP.

N.8

RECREATIONAL

THERAPY

GS02

TR

GS02A

105 SF

EP502

53-GS02A-2

53-GS10A-2

53-GS02A-2 53-GS02A-2

53-GS02B-2

53-GS02B-253-GS02B-2

53-GS02B-2

53-GS02A-1,3,5

53-GS02B-1,3,5

53-DP-TRA

53-DP-TRB

53-AC-3-GS02A

5.6

5.4

5.9

N.4 N.8

RECREATIONAL

THERAPY

GS02

TYP

TR

GS02A

105 SF

5.6

5.4

5.9

N.4 N.8

RECREATIONAL THERAPY

GS02

TYP

TR

GS02A

105 SF

5.6

5.4

5.9

N.4

L2 L2

L2 L2

N.8

RECREATIONAL THERAPY

GS02

TR

GS02A

105 SF

53-GS02A-4

53-GS02AA 53-GS02AB

DATA RACK TYP.

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

53EP400a

BLDG 53 - FLOOR 0 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

0' 2' 4' 8' 0' 2' 4' 8'

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

1/4" = 1'-0"53EP100

2 RM GS02A - ELECTRICAL PLAN

1/4" = 1'-0"53EP100

1 RM GS02 - DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"53EP100

3 RM GS02A - DEMOLITION LIGHTING PLAN

1/4" = 1'-0"53EP100

4 RM GS02A - LIGHTING PLAN

0' 2' 4' 8' 0' 2' 4' 8'

SOURCE A POWER PANELBOARD "53-GS02AA".

SOURCE B POWER PANELBOARD "53-GS02AB".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE

SHALL BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE

ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1)

POWER SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO

ADEQUATELY SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE

CONNECTIONS AS REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR

HARDWARE. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.

PROVIDE SWITCHING, RELOCATED LUMINAIRES, CONDUIT AND WIRE TO

PROVIDE A FULLY FUNCTIONAL LIGHTING SYSTEM FOR ROOM GS02; UTILIZE

EXISTING LIGHTING CIRCUIT.

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

LIGHT TO BE

RELOCATED

REVISED TO

ROOM GS02

S S

Mo

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

5.6 5.6

V.2V.1V

TYP

TR

GS10

94 SF

ACCESS DOOR

CONTROLLER

ACCESS POWER

CONTROLLER PANEL

FIBER OPTIC

PATCH PANEL

PANEL BOARD

TECHNOLOGY

PANEL

BLDG ENTRANCE

TERMINAL

TELEPHONE TERMINAL

BOARD

COMBINER & SPLITTER

FIBER OPTIC

5.65.6

V.2

V.2

V.1

V.1

V

V

3 5

TR

GS10

94 SF

53-GS10A-2

53-GS10A-2

53-GS10B-2

53-GS10B-2

53-GS10A-2

53-GS10A-2

53-GS10B-2

53-GS10B-2

53-GS10B-1,3,5

53-GS10B-1,3,5

DATA RACK

TYP.

EP502

TECHNOLOGY

PANEL

53-AC-3-GS10

53-DP-TRA

53-DP-TRB

ACCESS DOOR

CONTROLLER

ACCESS POWER

CONTROLLER PANEL

FIBER OPTIC

PATCH PANEL

PANEL BOARD

BLDG ENTRANCE

TERMINAL

TELEPHONE TERMINAL

BOARD

COMBINER & SPLITTER

FIBER OPTIC

5.65.6

V.2

V.2

V.1

V.1

V

V

TR

GS10

94 SF

TYP

5.65.6

V.2

V.2

V.1

V.1

V

V

TR

GS10

94 SF

53-GS10A-4

53-GS10B

53-GS10A

DATA RACK

TYP.

L2 L2

L2 L2

GS10

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

53EP400b

BLDG 53 - FLOOR 0 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 Checker JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

GENERAL NOTES

KEY PLAN

KEY NOTES

1/4" = 1'-0"53EP100

1 RM GS10 - DEMOLITION FLOOR PLAN

1/4" = 1'-0"53EP100

2 RM GS10- ELECTRICAL PLAN

1/4" = 1'-0"53EP100

3 RM GS10- DEMOLITION LIGHTING PLAN

1/4" = 1'-0"53EP100

4 RM GS10- LIGHTING PLAN

0' 2' 4' 8'

SOURCE A POWER PANELBOARD "53-GS10A".

SOURCE B POWER PANELBOARD "53-GS10B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE

SHALL BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

0' 2' 4' 8'

0' 2' 4' 8' 0' 2' 4' 8'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

JT

JT

JT

JT

JT

Mo

S S

1S002

J

TR

1S002

82 SF

CHASE

CH-S-5

K

K

L

L

5.45.4

L.1

L.1

Activity Room

1S004 4

TYP

TELEPHONE

TERMINAL BOARD

TR

1S002

82 SF

1 23

K

K

L

L

5.45.4

L.1

L.1

53-1S002A-253-1S002A-2

53-1S002B-2

53-1S002B-2

53-1S002A-2

53-1S002B-2

53-1S002A-1,3,5

53-1S002B-1,3,5

53-AC-3-1S002 6

EP502

DATA RACK

53-DP-TRA

53-DP-TRB

TELEPHONE

TERMINAL

BOARD

TR

1S002

82 SF

CHASE

CH-S-5

5.45.4

L.1

L.1

L

L

K

K

Activity Room

1S004

TYP

TR

1S002

82 SF

DATA

RACK,

TYP.

L.1LK

53-1S002A-4

5.45.4

L.1

L.1

L

L

K

K

53-1S002A 53-1S002B

L2 L2

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

53EP401a

BLDG 53 - FLOOR 1 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

1/2" = 1'-0"53EP101

1 RM 1S002 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"53EP101

2 RM 1S002 - ELECTRICAL PLAN

1/2" = 1'-0"53EP101

3 RM 1S002 - DEMOLITION LIGHTING PLAN 1/2" = 1'-0"53EP101

4 RM 1S002 - LIGHTING PLAN

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

0' 1' 2' 4'

SOURCE A POWER PANELBOARD "53-1S002A".

SOURCE B POWER PANELBOARD "53-1S002B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE

SHALL BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

0' 1' 2' 4'

0' 1' 2' 4'

0' 1' 2' 4'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

S

S S

MoMo

5.65.6

5.45.4

5.95.9

P

P

N.8

N.8

TR

1S011

127 SF

TYP

53-1S011A-1,3,5 53-1S011B-1,3,5

53-1S011B-2

53-1S011A-2 53-1S011A-2

53-1S011A-2

53-1S011A-2

53-1S011B-2

53-1S011B-2

53-1S011B-2

53-AC-3-1S011

5.6 5.6

5.45.4

5.95.9

P

P

N.8

N.8

53-1S011A-7,9,11 53-1S011B-7,9,11

TYP

TR

1S011

DATA

RACK,

TYP.

EP502

453-DP-TRA

53-DP-TRB

127 SF

TR

1S011

127 SF

5.65.6

5.45.4

5.95.9

P

P

N.8

N.8

TYP

DATA

RACK,TYP.

53-1S011A-4

L2

L2

L2

L2

5.65.6

5.45.4

5.95.9

P

P

N.8

N.8

53-1S01A

TR

1S011

127 SF

53-1S01A

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

1S011

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

53EP401b

BLDG 53 - FLOOR 1 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

1/4" = 1'-0"53EP101

1 RM 1S011 - DEMOLITION ELECTRICAL PLAN

1/4" = 1'-0"53EP101

2 RM 1S011 - ELECTRICAL PLAN

1/4" = 1'-0"53EP101

3 RM 1S011 - DEMOLITION LIGHTING PLAN

1/4" = 1'-0"53EP101

4 RM 1S011 - LIGHTING PLAN

0' 2' 4' 8'

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

0' 2' 4' 8'

0' 2' 4' 8'0' 2' 4' 8'

SOURCE A POWER PANELBOARD "53-1S01A".

SOURCE B POWER PANELBOARD "53-1S01B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE

SHALL BE DEMOLISHED BACK TO SOURCE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE

ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1)

POWER SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO

ADEQUATELY SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE

CONNECTIONS AS REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR

HARDWARE. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

J

S S

S S

MoMo

S S

2S001 2S002

TYP

P.27 P.27

TR

2S001

184 SF

5.65.6

5.45.4

5.95.9

L.1

L.1

L

L

TELEPHONE

TERMINAL

BOARD

ACCESS POWER

CONTROLLER PANEL

ACCESS DOR

CONTROLLER

TECHNOLOGY

PANEL

ACCESS DOOR

CONTROLLER

TECHNOLOGY

PANEL

DATA

RACK,

TYP.

53-2S001B-2 53-2S001B-2

53-2S001B-7,9,11

53-2S001B-2

53-2S001-2

53-2S001A-2

53-2S001A-2

53-2S001B-2

53-2S001A-2

53-2S001A-7,9,11

53-AC-3-2S001

P.27 P.27

5.65.6

5.45.4

5.95.9

L.1

L.1

L

L

EP502

53-2S001B-1,3,5

53-2S001A-1,3,5

TYP.

TR

2S001

184 SF

53-DP-TRB

53-DP-TRA

RELOCATED

TELEPHONE TERMINAL

BOARD

ACCESS POWER

CONTROLLER PANEL

ACCESS DOR

CONTROLLER

TECHNOLOGY

PANEL

RELOCATED

ACCESS DOOR

CONTROLLER

1 1

TYP

P.27 P.27

TR

2S001

184 SF

5.65.6

5.45.4

5.95.9

L.1

L.1

L

L

L2

L2 L2

L2

53-2S001A-4

P.27 P.27

5.65.6

5.45.4

5.95.9

L.1

L.1

L

L

DATA

RACK,

TYP.

L2

L2

TR

2S001

184 SF

53-2S001B

53-2S001A

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

53EP402

BLDG 53 - FLOOR 2 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

1/4" = 1'-0"53EP102

1 RM 2S001 & 2S002 - DEMOLITION ELECTRICAL PLAN

0' 2' 4' 8' 1/4" = 1'-0"53EP102

2 RM 2S001 - ELECTRICAL PLAN

1/4" = 1'-0"53EP102

3 RM 2S001 & 2S002 - DEMOLITION LIGHTING PLAN

1/4" = 1'-0"53EP102

4 RM 2S001 - LIGHTING PLAN

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

53EP102

0' 2' 4' 8'

0' 2' 4' 8'0' 2' 4' 8'

SOURCE A POWER PANELBOARD "53-2S001A".

SOURCE B POWER PANELBOARD "53-2S001B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA MANUFACTURER'S

CONNECTIONS. COORDINATE WITH MECHANCAL CONTRACTOR AS REQUIRED.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

EXISTING EQUIPMENT SHALL BE RELOCATED AS SHOWN. EXTEND ALL RACEWAYS

AND CONDUCTORS AS REQUIRED.

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

B

P

P

53-CU-3-1S011

53-1S011A-6,8

53-CU-3-GS02

53-GS02AA-6,8

E503

TYP

V.1

V.1

53-CU-2-GS10

53-GS10A-6,8

E503

TYP

53-CU-3-1S00253-CU-3-2S001

53-1S002A-6,853-2S001A-6,8

L

1 1

E503

TYP

53-CU-3-2S001

53-CU-3-1S002

53-CU-3-1S011

53-CU-3-GS02

53-CU-2-GS10

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

53EP403

BLDG 53 - ENLARGED ROOF

PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

GENERAL NOTES

KEY PLAN

KEY NOTES

- 1/2" = 1'-0"

2 BLDG 53 - ENLARGED ROOF PLAN - VIEW 3

- 1/2" = 1'-0"

3 BLDG 53 - ENLARGED ROOF PLAN - VIEW 4

- 1/2" = 1'-0"

1 BLDG 53 - ENLARGED ROOF PLAN - VIEW 2

1 PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT AS

REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH MECHANICAL

CONTRACTOR AS REQUIRED.

0' 2' 4' 8' 0' 2' 4' 8'

0' 2' 4' 8'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

TR

35 SF

PANEL NSR251

FIRE ALARM

PANEL

E F

ACCESS POWER

CONTROLLER

PANEL

TELEPHONE

TERMINAL BOARD

BLDG ENTRANCE

TERMINAL

DATA RACK

E F

TR

35 SF

1/2

FIRE ALARM

PANEL

E F

TELEPHONE

TERMINAL BOARD

BLDG ENTRANCE

TERMINAL

ACCESS POWER

CONTROLLER

PANEL

DATA RACK

EXISTING PANEL

NSR251

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO

BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS

OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL

REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL

CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

EXISTING PANEL TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM ON SHEET

53EP601.

IN-LINE TRANSFER FAN WITH SPEED CONTROLLER. COORDINATE SPEED

CONTROLLER INSTALLATION LOCATION WITH MECHANICAL CONTRACTOR.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE

ACCESSIBLE CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1)

POWER SUPPLY FOR EACH DOOR OPENING. PROVIDE 120V POWER TO

ADEQUATELY SERVE DOORS WITH ELECTRIFIED DOOR HARDWARE AND MAKE

CONNECTIONS AS REQUIRED. SEE REQUIREMENTS IN 087100 - DOOR

HARDWARE. COORDINATE WITH ARCHITECT AND DOOR INSTALLER.

CONTRACTOR SHALL REPLACE EXISTING RACK-MOUNTED UPS WITH NEW UPS.

UPS SHALL BE 3kW, 120V, 1-PHASE, APC #SMX3000RMLV2U, OR EQUAL.

UPS RECEPTACLE.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

53TEP401

BLDG 53T - FLOOR 1 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

JEFFERSON BARRACKS - 1 JEFFERSON BARRACKS

DRIVE - ST. LOUIS, MO 63125

657-21-701JB

53T

03/31/2022 LRL/WNM LLT/JPS

CONSTRUCTION

DOCUMENTS

KEY PLAN

GENERAL NOTES

1/2" = 1'-0"53TEP101

1 RM 109 - DEMOLITION ELECTRICAL PLAN

0' 1' 2' 4'

1/2" = 1'-0"53TEP101

2 RM 109 - ELECTRICAL PLAN

0' 1' 2' 4'

KEY NOTES

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH PROJECT

NORTH

S

Mo

Tectonic Copyright 2007

Tectonic Copyright 2007

T ectonic Cop yright 2007

Tectonic Copyright 2007

Tectonic Copyright 2007

UP

UP

UP

DN

TYP

F

TR

1A129

85 SF

TELEPHONE

TERMINAL

BOARD

F

55-1A129A-2 55-1A129A-2

55-1A129B-2

55-1A129A-2

55-1A129B-2

55-1A129B-255-1A129B-2

55-1A129B-1,3,5

55-1A129A-1,3,5

DATA RACK,

TYP

55-AC-3-1A129

TR

1A129

85 SF

55-1A129A-2

EP502

F

55-DP-TRA 55-DP-TRB

TELEPHONE

TERMINAL

BOARD

B

TYP

CORE LAB AREA

1A126

F

TR

1A129

85 SF

55-1A129A-4

L1

L1

L1

DATA RACK,

TYP.

TR

1A129

85 SF

F

55-1A129A 55-1A129B

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

1A129

- AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

55EP401a

BLDG 55 - FLOOR 1 - ENLARGED

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

1/2" = 1'-0"55EP101a

1 RM 1A129 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"55EP101a

2 RM 1A129 - ELECTRICAL PLAN

1/2" = 1'-0"55EP101a

3 RM 1A129 - DEMOLITION LIGHTING PLAN

1/2" = 1'-0"55EP101a

4 RM 1A129 - LIGHTING PLAN

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

0' 1' 2' 4' 0' 1' 2' 4'

0' 1' 2' 4' 0' 1' 2' 4'

SOURCE A POWER PANELBOARD "55-1A129A".

SOURCE B POWER PANELBOARD "55-1A129B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

File details come from the government source that posted it. Updated .