Attachment 33 - Drawings Part-32.pdf

PDF 9 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation seeks a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center campus. The scope of work includes electrical system upgrades including panels, power, bonding and UPS; building management system interfaces; HVAC assessments, renovations and expansions; data center renovations; communication infrastructure upgrades including new data outlets, patch panels and Cat6A cabling; physical security upgrades; and fiber infrastructure assessments and upgrades both within and between buildings. The buildings included are 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61 and 75. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
FOLLOW-UP Technical Questions - St. Louis 4-6-23.pdf PDF
36C77623R0009 0005.pdf PDF
Technical Questions - FINAL - St. Louis 3-28-23.pdf PDF
657-21-701JB - Addendum 1_03_24_23.pdf PDF
329000-5 - Sod Certificate.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-24-23.pdf PDF
32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
36C77623R0009 0003.pdf PDF
Attachment 45 - Site Visit Instructions Updated 2-16-23.pdf PDF
36C77623R0009 0001.pdf PDF
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Attachment 34 - Envr. Report - Narrative.pdf PDF
Attachment 37 - Envr. Report - Appendix C.pdf PDF
Attachment 40 - NARA RM Contract Language Clause.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 1-20-23.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 5 - Drawings Part-4.pdf PDF
Attachment 6 - Drawings Part-5.pdf PDF
Attachment 9 - Drawings Part-8.pdf PDF
Attachment 16 - Drawings Part-15.pdf PDF
Attachment 22 - Drawings Part-21.pdf PDF
Attachment 24 - Drawings Part-23.pdf PDF
Attachment 36 - Envr. Report - Appendix B.pdf PDF
Attachment 41 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 44 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TYP

TYP

TYP

TYP

TYP

TYP

TYP

86"

BOTTOM 3RD SECTION

OF RACK IS

DESIGNATED TO

POWER DISTRIBUTION

EQUIPMENT.

REFERENCE

ELECTRICAL SHEET

EP502 FOR MORE

INFORMATION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

BOTTOM 3RD SECTION

OF RACK IS

DESIGNATED TO

POWER DISTRIBUTION

EQUIPMENT.

REFERENCE

ELECTRICAL SHEET

EP502 FOR MORE

INFORMATION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

BOTTOM 3RD SECTION

OF RACK IS

DESIGNATED TO

POWER DISTRIBUTION

EQUIPMENT.

REFERENCE

ELECTRICAL SHEET

EP502 FOR MORE

INFORMATION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

TYP

TYP

TYP

TYP

TYP

TYP

TYP

86"

BOTTOM 3RD SECTION

OF RACK IS

DESIGNATED TO

POWER DISTRIBUTION

EQUIPMENT.

REFERENCE

ELECTRICAL SHEET

EP502 FOR MORE

INFORMATION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

BOTTOM 3RD SECTION

OF RACK IS

DESIGNATED TO

POWER DISTRIBUTION

EQUIPMENT.

REFERENCE

ELECTRICAL SHEET

EP502 FOR MORE

INFORMATION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

BOTTOM 3RD SECTION

OF RACK IS

DESIGNATED TO

POWER DISTRIBUTION

EQUIPMENT.

REFERENCE

ELECTRICAL SHEET

EP502 FOR MORE

INFORMATION

TYP

TYP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 4825 26 27 28 29 30 31 32 33 34 35 36

TYP

TYP

TYP

TYP

TYP

86"

TYP

TYP

86"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES ET502

TELECOMMUNICATIONS DETAILS

LRL/WNM JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

- NTS

1 TR DATA RACK ELEVATION - THREE RACK

- NTS

3 TR DATA RACK ELEVATION - TWO RACK

- NTS

4 TR DATA RACK ELEVATION - SINGLE RACK

GENERAL NOTES (FOR THIS SHEET ONLY)

1. ALL TELECOMMUNICATIONS ROOM (TR) DATA RACK DETAIL ELEVATIONS

ARE SHOWN TO PROVIDE GENERAL LAYOUT REQUIREMENTS. EXACT

QUANTITIES OF UTP PATCH PANELS AND NETWORK SWITCHES PER TR ARE

SHOWN IN THE TELECOMMUNICATIONS WAO AND CABLE TRAY SCHEDULE

LOCATED ON SHEET ET701. IF MORE THAN (1) RACK IS PRESENT IN THE TR

BEING EVALUATED, CONTRACTOR SHALL DIVIDE THE PATCH PANEL AND

NETWORK SWITCH EQUIPMENT EVENLY AMONG THE RACKS [IE: IF (6)

PATCH PANELS AND (6) NETWORK SWITCHES ARE REQUIRED IN A TR THAT

HAS (2) DATA RACKS, PROVIDE EACH DATA RACK WITH (3) PATCH PANELS

AND (3) NETWORK SWITCHES].

2. VA DATA RACKS FOLLOW A RULE OF THIRDS FOR POSITIONING EQUIPMENT

ON THE RACK. THE TOP THIRD IS DESIGNATED FOR FIBER AND UTP PATCH

EQUIPMENT, THE MIDDLE THIRD IS DESIGNATED FOR NETWORK SWITCH

EQUIPMENT, AND THE BOTTOM THIRD IS DESIGNAZTED FOR DATA RACK

POWER DISTRIBUTION EQUIPMENT.

3. PRIOR TO CONSTRUCTING TR DATA RACKS AND DURING THE SUBMITTAL

PROCESS, CONTRACTOR SHALL SUBMIT ALL TR DATA RACK ELEVATIONS

(FRONT, BACK, AND SIDE VIEWS) FOR ENGINEER AND VA REVIEW AND

APPROVAL. SUBMITTAL SHALL SHOW ALL DIMENSIONS, CABLE

MANAGEMENT EQUIPMENT, LABELING AND ASSOCIATED CUTSHEETS WITH

INDICATED PART NUMBERS AND OPTIONS FOR ALL EQUIPMENT.

4. CONTRACTOR SHALL LABEL EACH PATCH PANEL PORT WITH PORT NUMBER

AND ROOM NUMBER.

5. ALL DATA RACKS SHALL BE PROVIDED WITH SEISMIC BRACING KITS AND

INSTALLED PER MANUFACTURER'S INSTRUCTIONS.

6. ALL EQUIPMENT, CABLING, CONNECTORS AND APPURTENANCES SHALL BE

LABELED PER THE VA STANDARD "INFRASTRUCTURE STANDARD FOR

TELECOMMUNICATIONS SPACE" VERSION 3.1 OR NEWER.

7. WHERE RACK EQUIPMENT IS NOT REQUIRED FOR CABLING REQUIREMENTS

PROVIDE BLANKING PLATES IN ABSENT SPACES.

KEY NOTES (FOR THIS SHEET ONLY)

DATA RACK, 4-POST, WHITE FINISH, ORTRONICS #MM2073038-W, OR

APPROVED EQUAL.

VERTICAL CABLE MANAGER WITH DOOR, 6" WIDE, ORTRONICS

#MM20VMD706, OR APPROVED EQUAL.

FIBER DISTRIBUTION CABINET, ANGLED, 1RU, LEVITON ANGLED OPT-X

UHDX, OR APPROVED EQUAL; CABINET POPULATED WITH (12) CASSETTES,

LEVITON HDX ENTERPRISE MTP, OR APPROVED EQUAL. SIDE-A AND SIDE-B

FIBER BACKBONE SHALL TERMINATE TO SEPARATE SIDES OF DISTRIBUTION

CABINET.

CAT 6A UTP PATCH PANEL, ANGLED, 48-PORT WITH REAR CABLE MANAGER,

LEVITON #E2XHD-BLK, OR APPROVED EQUAL.

BLANKING PANEL, 1RU, LEVITON, OR APPROVED EQUAL.

HORIZONTAL CABLE MANAGER, 1RU OR 2RU AS SHOWN, LEVITON, OR

APPROVED EQUAL.

NETWORK SWITCH. VA PROVIDED, CONTRACTOR INSTALLED.

COORDINATE WITH VA FOR EXACT REQUIREMENTS AS NECESSARY.

DETAIL IS GENERIC IN NATURE AND SHOWS

GENERAL LAYOUT INFORMATION. REFERENCE

GENERAL AND KEY NOTES FOR SPECIFIC

INFORMATION

DETAIL IS GENERIC IN NATURE AND SHOWS GENERAL

LAYOUT INFORMATION. REFERENCE GENERAL AND

KEY NOTES FOR SPECIFIC INFORMATION

DETAIL IS GENERIC IN NATURE AND SHOWS GENERAL LAYOUT INFORMATION.

REFERENCE GENERAL AND KEY NOTES FOR SPECIFIC INFORMATION

Revisions: Date:

- NTS

2 TR DATA RACK ELEVATION - FIBER-OPTIC BACKBONE TERMINATION RACK

DETAIL IS GENERIC IN NATURE AND SHOWS

GENERAL LAYOUT INFORMATION.

REFERENCE GENERAL AND KEY NOTES FOR

SPECIFIC INFORMATION

SINGLE GANG WORKBOX

WITH TWO CONNECTOR

CHASSIS

FOUR CATEGORY 6A 8P8C

OUTLETS ACTIVE FOR

TELEPHONY/DATA

FOUR POSITION FACEPLATE

MOUNTED ON SINGLE GANG

WORKBOX. FACEPLATE

COLOR SPECIFIED BY

OTHERS.

1 2

3 4

SINGLE GANG WORKBOX WITH

ONE CONNECTOR CHASSIS.

TWO CATEGORY 6A 8P8C

OUTLETS ACTIVE FOR

TELEPHONY/DATA

FOUR POSITION FACEPLATE

MOUNTED ON SINGLE GANG

WORKBOX. FACEPLATE

COLOR SPECIFIED BY

OTHERS.

1 2

3 4

T568B 8P8C

T568B

B N

/W H

B N

O R

/W H

O R

G N

/W H

G N

B L /W

H

B L

EXISTING CONDUIT

(ASSUMED SIZE = 3/4")

EXISTING FACEPLATE

LABEL WINDOW

EXISTING JACK MODULES

PROVIDE CAT-6A MODULES

TO REPLACE EXISTING JACKS

PROVIDE BLANK MODULES TO

FILL UNUSED PORT OPENINGS

PROVIDE CAT-6A

CABLING THROUGH

EXISTING CONDUIT

EXISTING DATA OUTLET CONFIGURATION REVISED DATA OUTLET CONFIGURATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES ET503

TELECOMMUNICATIONS DETAILS

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

- NTS

4 TYPICAL HIGH DENSITY WALL MOUNTED WORK AREA OUTLET CONFIGURATION

- NTS

5 STANDARD DENSITY WALL MOUNTED WORK AREA OUTLET CONFIGURATION

- NTS

3 DATA CABLING TERMINATION DETAIL

- NTS

1 EXISTING DATA OUTLET MODIFICATION

NTS

FIRE STOP SLEEVE AND GANGPLATE DETAIL2

FIRE STOP GANGPLATE, SIZE AS

REQUIRED, HILTI #CFS-SL GP, OR

APPROVED EQUAL.

DO NOT USE FOR FLOOR

PENETRATIONS UNLESS

SPECIFICALLY APPROVED BY

MANUFACTURER FOR THAT

APPLICATION.

FIRE STOP SPEED SLEEVE, HILTI

#CFS-SL GA L, OR APPROVED EQUAL

1. ALL LABELING SHALL BE ANSI/TIA/EIA/606C COMPLIANT. BLACK LETTERING ON WHITE

FIELD. MACHINE PRINTED. FURTHER GUIDANCE ON ADMINISTRATION MAY BE SPECIFIED

IN OTHER SECTIONS OF THIS DESIGN PACKAGE.

2. TYPICAL WORK AREA OUTLET FACEPLATE WILL BE INSTALLED WITH CATEGORY 6A

COMPONENT-COMPLIANT 8P8C MEDIA INTERFACE CONNECTORS (RJ45). EACH

CONNECTOR WILL BE TERMINATED TO HIGH QUALITY CATEGORY 6A HORIZONTAL

CABLING WHICH WILL TERMINATE IN THE TELECOMMUNICATIONS ROOM AS SPECIFIED

ELSEWHERE IN THIS DESIGN PACKAGE. ALL HORIZONTAL UTP SHALL BE CATEGORY 6A

AND TERMINATED TO T568B.

3. TYPICAL FACEPLATE WILL BE INSTALLED WITH TWO (2) RJ45s. HIGH DENSITY FACEPLATES WILL BE INSTALLED WITH FOUR (4) RJ45s.

4. FACEPLATE MATERIAL AND COLOR DETERMINED BY OTHERS.

GENERAL NOTES (FOR THIS SHEET ONLY)

Revisions: Date:

CABLOFIL WIRE

BASKET CABLE TRAY

BY LEGRAND, OR

APPROVED EQUAL

LENGTH AS

REQUIRED

- 1 : 30

6 WIRE BASKET CABLE TRAY

PROVIDE FIRE PROOFING,

CAULKING, AND ANY REQUIRED

APPURTENANCES PER THE

SPECIFICATIONS AND

MANUFACTURER'S REQUIREMENTS

AS REQUIRED

NOTE 1

NOTE 1

DETAILS NOTES (FOR THIS DETAIL ONLY)

NOTE 1. REFERENCE TELECOMMUNICATIONS WAO AND CABLE TRAY

SCHEDULE ON SHEET ET701 FOR DIMENSIONS

NOTE 2. CONTRACTOR MAY USE TEMPORARY CABLE HANGERS OR OTHER MEANS WHILE

ROUTING CABLE TO ITS INTENDED DESTINATION; HOWEVER, PRIOR TO FINAL

INSTALLATION, CABLE SHALL BE INSTALLED TO BE HOUSED WITHIN CABLE TRAY

AND NOT ON TEMPORARY CABLE HANGERS.

SIDE-B FIBER OPTIC

BACKBONE

TERMINATION RACK

BUILDING 1

GC12

B

FIBER OPTIC PATCH

PANEL

C102D

FIBER OPTIC PATCH

PANEL

2C10A

FIBER OPTIC PATCH

PANEL

1E15

FIBER OPTIC PATCH

PANEL

E303

FIBER OPTIC PATCH

PANEL

3C13

FIBER OPTIC PATCH

PANEL

BUILDING 2

G04

BA

FIBER OPTIC PATCH

PANEL

A B

FIBER OPTIC PATCH

PANEL

A B

FIBER OPTIC PATCH

PANEL

BUILDING 3

B025A

BA

FIBER-OPTIC PATCH

PANEL

A B

FIBER-OPTIC PATCH

PANEL

FIBER OPTIC PATCH

PANEL

BUILDING 3T

FIBER OPTIC PATCH

PANEL

BUILDING 23

G09B

BA

FIBER OPTIC PATCH

PANEL

121A

FLOOR 1

FLOOR 0

FLOOR 2

FLOOR 3

FLOOR 0

FLOOR 1

FLOOR 0

FLOOR 1

FLOOR 2

FLOOR 3

FLOOR 0

FLOOR 1

FLOOR 2

A

B

A B

A

A

SIDE-A FIBER OPTIC

BACKBONE

TERMINATION RACK

WALL MOUNTED

TDU AIR BLOWN

FIBER

AB

A

A B B

B

A

B

B

ALL CAMPUS SIDE A

TERMINATES HERE

RACK MOUNTED

SPLICE CASE

WALL MOUNTED

TDU AIR BLOWN

FIBER

A

B

FLOOR 1

FIBER OPTIC PATCH

PANEL

BUILDING 18

011A

BA

FIBER OPTIC PATCH

PANEL

A B

FIBER OPTIC PATCH

PANEL

A B

FIBER OPTIC PATCH

PANEL

FLOOR 0

FLOOR 1

FLOOR 2

FLOOR 3

A

BRACK MOUNTED

SPLICE CASE

WALL MOUNTED

TDU AIR BLOWN

FIBER

A

B

RACK MOUNTED

SPLICE CASE

WALL MOUNTED TDU

AIR BLOWN FIBER

A

A B B

FIBER OPTIC PATCH

PANEL

BUILDING 24

G02A

BA

FIBER OPTIC PATCH

PANEL

114B

A B

FIBER OPTIC PATCH

PANEL

205A

FLOOR 0

FLOOR 1

FLOOR 2

A

BRACK MOUNTED

SPLICE CASE

WALL MOUNTED

TDU AIR BLOWN

FIBER

A

B

FIBER OPTIC PATCH

PANEL

A

BRACK MOUNTED

SPLICE CASE

WALL MOUNTED

TDU AIR BLOWN

FIBER

A

B

G05 - NOT A TR

1. REFERENCE COMMUNICATIONS DRAWINGS FOR ADDITIONAL SITE WIDE

FIBER-OPTIC BACKBONE CABLING INFORMATION.

2. REFERENCE COMMUNICATIONS DRAWINGS FOR ALL FIBER-OPTIC CABLING AS

REQUIRED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES ET601

FIBER OPTIC NETWORK DIAGRAM

LRL/WNM JBB/JGE

CONSTRUCTION

DOCUMENTS

03/31/2022

GENERAL NOTE

KEY NOTE

A-SIDE FIBER-OPTIC BACKBONE.

B-SIDE FIBER-OPTIC BACKBONE.

A

B

Revisions: Date: 432 OF 435

1. REFERENCE COMMUNICATIONS DRAWINGS FOR ADDITIONAL SITE WIDE

FIBER-OPTIC BACKBONE CABLING INFORMATION.

2. REFERENCE COMMUNICATIONS DRAWINGS FOR ALL FIBER-OPTIC CABLING AS

REQUIRED.

FIBER OPTIC PATCH

PANEL

BUILDING 25

117A

BA

FIBER OPTIC PATCH

PANEL

204B

A B

FIBER OPTIC PATCH

PANEL

313A

FLOOR 1

FLOOR 2

FLOOR 3

A

BRACK MOUNTED

SPLICE CASE

WALL MOUNTED

TDU AIR BLOWN

FIBER

A

B

BUILDING 51

B A

1A102

BA B

BE111

1A1831A139A

FLOOR 0

FLOOR 1

RACK MOUNTED

SPLICE CASE

FIBER OPTIC PATCH

PANEL

FIBER OPTIC PATCH

PANEL

FIBER OPTIC PATCH

PANEL

A

FIBER OPTIC PATCH

PANEL

WALL MOUNTED

TDU AIR BLOWN

FIBER

A B

A B

BUILDING 51T

FIBER OPTIC PATCH

PANEL

A B

FLOOR 1

FIBER OPTIC PATCH

PANEL

BUILDING 52

GN29A

B

FIBER OPTIC PATCH

PANEL

1N82A

FIBER OPTIC PATCH

PANEL

1S33

FIBER OPTIC PATCH

PANEL

2S53

FIBER OPTIC PATCH

PANEL

2N91

FLOOR 1

FLOOR 0

FLOOR 2

A

A

RACK MOUNTED

SPLICE CASE

WALL MOUNTED

TDU AIR BLOWN

FIBER

AB

A B BA

B

A B

FIBER OPTIC PATCH

PANEL

BUILDING 53

GS10

FIBER OPTIC PATCH

PANEL

1S002

FIBER OPTIC PATCH

PANEL

2S001

FIBER OPTIC PATCH

PANEL

1S011

FLOOR 1

FLOOR 0

FLOOR 2

A

RACK MOUNTED

SPLICE CSE

WALL MOUNTED

TDU AIR BLOWN

FIBER

A

A B B

B

A

B

A B

FIBER OPTIC PATCH

PANEL

GS02A

A B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES ET602

FIBER OPTIC NETWORK DIAGRAM

LRL/WNM JBB/JGE

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

GENERAL NOTE

KEY NOTE

A-SIDE FIBER-OPTIC BACKBONE.

B-SIDE FIBER-OPTIC BACKBONE.

A

1. REFERENCE COMMUNICATIONS DRAWINGS FOR ADDITIONAL SITE WIDE

FIBER-OPTIC BACKBONE CABLING INFORMATION.

2. REFERENCE COMMUNICATIONS DRAWINGS FOR ALL FIBER-OPTIC CABLING AS

REQUIRED.FIBER OPTIC PATCH

PANEL

BUILDING 53T

A B

FLOOR 1

FIBER OPTIC PATCH

PANEL

BUILDING 54

BA

FIBER OPTIC PATCH

PANEL

FLOOR 0

PENTHOUSE

A

B

RACK MOUNTED

SPLICE CASE

WALL MOUNTED

TDU AIR BLOWN

FIBER

A

B

FIBER OPTIC PATCH

PANEL

FIBER OPTIC PATCH

PANEL

FLOOR 1

PENTHOUSE

1A133

A AB B

BA-100 BB-115

FIBER OPTIC PATCH

PANEL

BUILDING 55

1C132

FIBER OPTIC PATCH

PANEL

2A136

FIBER OPTIC PATCH

PANEL

2C144

FLOOR 2

FLOOR 1

FLOOR 3

A

RACK MOUNTED

SPLICE CSE

WALL MOUNTED

TDU AIR BLOWN

FIBER

A B BA

B

A B

FIBER OPTIC PATCH

PANEL

1B104

A B

FIBER OPTIC PATCH

PANEL

3C149

FIBER OPTIC PATCH

PANEL

3A120

A B BA

FIBER OPTIC PATCH

PANEL BB-102

BUILDING 56

BA

FIBER OPTIC PATCH

PANEL

BA-105

A B

FIBER OPTIC PATCH

PANEL

2A-122

A B

FIBER OPTIC PATCH

PANEL

3A-122

FLOOR B

FLOOR 0

FLOOR 1

FLOOR 2

A

B

RACK MOUNTED

SPLICE CASE TO

BUILDING 1 MCR

AIR BLOWN FIBER

TO RACK/s 7,8,9

BB102

A

B

BUILDING 56 BB-102

A B

FIBER OPTIC PATCH

PANEL

1A-109

FLOOR 3

FIBER OPTIC PATCH

PANEL

BUILDING 58

A B

FLOOR 1

FIBER OPTIC PATCH

PANEL

BUILDING 60

A B

FLOOR 1

FIBER OPTIC PATCH

PANEL

BUILDING 75

1B105

A B

FLOOR 1

FIBER OPTIC PATCH

PANEL

BUILDING 60T

A B

FLOOR 1

FIBER OPTIC PATCH

PANEL

1B139

BUILDING 57

FLOOR 1

A RACK MOUNTED

SPLICE CSE

WALL MOUNTED

TDU AIR BLOWN

FIBER

B

A B

FIBER OPTIC PATCH

PANEL

1B120

A B

FIBER OPTIC PATCH

PANEL

1A129

A B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES ET603

FIBER OPTIC NETWORK DIAGRAM

LRL/WNM JBB/JGE

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

GENERAL NOTE

KEY NOTE

A-SIDE FIBER-OPTIC BACKBONE.

B-SIDE FIBER-OPTIC BACKBONE.

A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ET701

TELECOMMUNICATIONS

SCHEDULESSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS,

MO

657-21-701JB

03/31/2022 LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

Revisions: Date: 435 OF 435

File details come from the government source that posted it. Updated .