Attachment 6 - Drawings Part-5.pdf
PDF 14 MB Posted
- Attached to
- Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
- Solicitation number
- 36C77623R0009
About this file
This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, building renovations including demolition, construction and finishes, data center renovations, physical security improvements, fiber infrastructure assessment and upgrades between buildings, installation of a diversified path to the datacenter for the WAN, and hazardous material abatement. The project involves construction and renovation activities in buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75. The Department of Veterans Affairs Technology Acquisition Center located in Austin is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 50
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RAD
FEC
FAP
FAP
FAP
FAPFAP
FAP
FAP
RETAIL STORE
G04
OFFICE
G02
OI&T
G02B
KITCHEN
STORAGE
G06
KITCHEN
G05
KITCHEN
G07
HAC
G08
MECHANICAL
RM.
G15
STORAGE
G100A
DISH WASH
G09
VESTIBULE
G11
TOILET, FEMALE
G12
TOILET, MALE
G13
VESTIBULE
G14
STAIRWELL NO.
S001DINING AREA
G01
DINING AREA
G01
RETAIL STORE
G03
STORAGE
G03A
CORRIDOR
H001
STORAGE
G010
STAIRWELL NO.
S002
DN
UP
UP
DN
UP
UP
UP
G02A
156 SF
TR
G02A
OFFICE
G02
T H
24-AC-3-G02A
M
24-CU-3-G02A 24-CU-3-205A24-CU-3-114B
D
RL
RS
D
RL
RS
R S
R L
R L
R S
R S
R L
D
D
D
156 SF
TR
G02A
196 SF
OFFICE
G02
174 SF
STAIRWELL NO. 1
S001
EXPOSED
OFFICE
G02A
OFFICE
G02
OFFICE
G02A
OFFICE
G02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 24M-100
BLDG. 24 - FLOOR 0 - DEMO,
FLOOR PLANS & RCP 24
MGH MM/OB/JJ/CY
CONSTRUCTION
DOCUMENTS
03/31/2022
PROJECT
NORTH
1/4" = 1'-0"
RM G02A - DEMO FLOOR PLAN
1/4" = 1'-0"
RM G02A - FLOOR PLAN
1/4" = 1'-0"
RM G02A - DEMO RCP
1/4" = 1'-0"
RM G02A - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
1 1
5 5
1. DEMO SPRINKLER.
2. DEMO WALL GRILLE. DEMO DUCT BACK TO MAIN. CAP/SEAL DUCT AT MAIN.
3. REMOVE PTAC. TURN OVER TO COR.
4. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.
5. INSTALL STANDARD RESPONSE SPRINKLER IN UPRIGHT POSITION. PROVIDE CAGE
GUARD.
6. INSTALL NEW REFRIGERANT LINES ( INDOOR UNIT TO OUTDOOR UNIT). PROVIDE PIPE
INSULATION. PROVIDE PIPE SUPPORT.
7. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE
SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.
PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.
8. REFER TO M-501 FOR CONDENSING UNIT GROUND MOUNT SUPPORT DETAIL.
9. REFER TO M-502 FOR PIPE THRU WALL DETAIL.
10. REFER TO M-502 FOR PIPE THRU FLOOR DETAIL.
1/4" Ø, 5/8" Ø
REFRIGERANT
LINE,5/8" Ø
CONDENSATE DRAIN
LINE AT FLOOR LEVEL
1/4" Ø, 5/8" Ø
REFRIGERANT
LINE,5/8" Ø
CONDENSATE
DRAIN LINE,DROP
TO L/L
-1/4"Ø, 5/8"Ø
REFRIGERANT
LINE,T/A,5/8" Ø
CONDENSATE DRAIN
LINE,F/A
-PROVIDE 1ST FLOOR
OPENING AND PIPE
SLEEVE
-1/4"Ø, 5/8"Ø
REFRIGERANT
LINE,T/A,5/8" Ø
CONDENSATE DRAIN
LINE,F/A
-PROVIDE 1ST FLOOR
OPENING AND PIPE
SLEEVE
CONDENSATE TO
BE DISCHARGED
TO THE GROUND
CONDENSATE TO BE DISCHARGED
TO THE GROUND
KEY PLAN
GENERAL NOTES
DEMOLITION GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,
AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM
DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND
BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO
PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING
DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST
OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL
EQUIPMENT THAT IS TO REMAIN.
1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS
AND SPECIFICATIONS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS.
4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.
5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC
EQUIPMENT.
6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER
PRIOR TO ANY CUTTING OF WALLS AND ROOF.
7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END
OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL
SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST
FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.
1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED
WITH STANDARD RESPONSE SPRINKLERS.
2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE
BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER
PROTECTION CAGE.
3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS
NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.
4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.
5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS
DEMOLISHED.
FIRE PROTECTION NOTES
KEYNOTES #
PROVIDE WALL
OPENING AND PIPE
SLEEVE
PROVIDE WALL
OPENING AND PIPE
SLEEVE
SP
RAD RAD RAD
RAD
RAD
RAD
RADRADRAD
RAD
FE
FE
FE
FE
FEC
AP
FAP
FAP
STORAGE
104B
KITCHEN
TOILET
105A
FIRE
APPARATUS
114A
CLOSET
OFFICE
STORAGE
104A
STAIRWELL NO.
S103
LIBRARY
MEDICAL
LIBRARY
STAIRWELL NO.
S101
STORAGE
101B
STORAGE
101C
ENTRY
BREAK RM.
101A
ELEVATOR
E-1
STAGE LEFT
TOILET, FEMALE
STORAGE
TOILET, MALE
107A
VESTIBULE
110A
STAGE RIGHT
STORAGE
107B
STAGE
AUDITORIUM
CORRIDOR
H100
DN
DN
DN
DN
UP
DN
UP
DN
DN
114B
114C
156 SF
TR
114B
MEDICAL
LIBRARY
OI&T
114C
T H
M
24-AC-3-114B
RS
RL
D
1/4" Ø, 5/8" Ø
REFRIGERANT
LINE,5/8" Ø
CONDENSATE
DRAIN
LINE ,DROP TO
L/L
-1/4" Ø, 5/8" Ø
REFRIGERANT LINE,5/8"
Ø CONDENSATE DRAIN
LINE,F/A-T/B.
-1/4"Ø, 5/8"Ø REFRIGERANT
LINE,5/8" Ø CONDENSATE
DRAIN LINE,T/B
PROVIDE 1ST FLOOR
OPENING AND PIPE
SLEEVE.
TR
114B
OI&T
114C
EXPOSED
6 6
MEDICAL
LIBRARY
114B
MEDICAL
LIBRARY
OI&T
114C
MEDICAL
LIBRARY
114B
MEDICAL
LIBRARY
OI&T
114C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 24M-101
BLDG. 24 - FLOOR 1 - DEMO,
FLOOR PLANS & RCP 24
MGH MM/OB/JJ/CY
CONSTRUCTION
DOCUMENTS
03/31/2022
PROJECT
NORTH
1/4" = 1'-0"
RM 114B & 114C - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 114B & 114C - FLOOR PLAN
1/4" = 1'-0"
RM 114B & 114C -RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
1/4" = 1'-0"
RM 114B & 114C - DEMO RCP
1 1
1. DEMO SPRINKLER.
2. DEMO CEILING GRILLE. DEMO DUCT BACK TO MAIN. CAP/SEAL DUCT AT MAIN.
3. REMOVE PTAC. TURN OVER TO COR.
4. DEMO WALL HEATING CONVECTOR. DEMO PIPING BACK TO MAIN.
5. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.
6. INSTALL STANDARD RESPONSE SPRINKLER IN UPRIGHT POSITION. PROVIDE CAGE
GUARD.
7. INSTALL NEW REFRIGERANT LINES ( INDOOR UNIT TO OUTDOOR UNIT). PROVIDE PIPE
INSULATION. PROVIDE PIPE SUPPORT.
8. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE
SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.
PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.
9. REFER TO M-502 FOR PIPE THRU FLOOR DETAIL.
PROVIDE 1ST & 2ND
FLOOR OPENING AND
PIPE SLEEVE.
KEY PLAN
GENERAL NOTES
DEMOLITION GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,
AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM
DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND
BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO
PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING
DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST
OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL
EQUIPMENT THAT IS TO REMAIN.
1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS
AND SPECIFICATIONS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS.
4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.
5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC
EQUIPMENT.
6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER
PRIOR TO ANY CUTTING OF WALLS AND ROOF.
7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END
OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL
SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST
FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.
1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED
WITH STANDARD RESPONSE SPRINKLERS.
2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE
BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER
PROTECTION CAGE.
3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS
NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.
4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.
5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS
DEMOLISHED.
FIRE PROTECTION NOTES
KEYNOTES #
DN
64"X70" 64"X70"
64"X70"
64"X70" 64"X70"
24"X72"
15"X36"15"X36"
15"X23"
15"X23" 15"X23"
"X
RADIATOR
INSTALL DOOR STOP ON
FLOOR TO STOP DOOR
AT 90 DEGREES OPEN
RAD
RADRAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD RAD
RAD
FAP
FAP
FAP
OFFICE
201A
OFFICE
STAIR 5
S205
HAC
TOILET
MULTIPURPOSE
RM.
STORAGE
OFFICE
STORAGE
206A
STAIR 3
S203
STAIR 4
S204
OI&T
205C
SHARED OFFICE
WORK RM.
OFFICE
STORAGE
TOILET
STORAGE
STORAGE
VESTIBULE
STORAGE
STORAGE
216A
VACANT
210A
STORAGE
TOILET
215A
CORRIDOR
204B
DN
DN
DN
UP
205A
156 SF
TR
205A
T H
24-AC-3-205A
M
RS
RL
D
1/4" Ø, 5/8" Ø
REFRIGERANT LINE,5/8"
Ø CONDENSATE DRAIN
LINE,T/B.
PROVIDE 2ND
FLOOR
OPENING AND
PIPE SLEEVE EXPOSED
TR
205A
OFFICE
205A
OFFICE
205A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 24M-102
BLDG. 24 - FLOOR 2 - DEMO,
FLOOR PLANS & RCP 24
MGH MM/OB/JJ/CY
CONSTRUCTION
DOCUMENTS
03/31/2022
PROJECT
NORTH
1/4" = 1'-0"
RM 205A - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 205A - FLOOR PLAN
PROJECT
NORTH
PROJECT
NORTH
1/4" = 1'-0"
RM 205A - DEMO RCP
1/4" = 1'-0"
RM 205A - RCP
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
1 1
6 6
1. DEMO SPRINKLER.
2. DEMO CEILING GRILLE. DEMO DUCT BACK TO MAIN. CAP/SEAL DUCT AT MAIN.
3. REMOVE PTAC. TURN OVER TO COR.
4. DEMO WALL HEATING CONVECTOR. DEMO PIPING BACK TO MAIN.
5. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.
6. INSTALL STANDARD RESPONSE SPRINKLER IN UPRIGHT POSITION. PROVIDE CAGE
GUARD.
7. INSTALL NEW REFRIGERANT LINES (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE PIPE
INSULATION. PROVIDE PIPE SUPPORT.
8. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE
SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.
PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.
9. REFER TO M-502 FOR PIPE THRU FLOOR DETAIL.
KEY PLAN
GENERAL NOTES
DEMOLITION GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,
AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM
DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND
BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO
PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING
DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST
OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL
EQUIPMENT THAT IS TO REMAIN.
1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS
AND SPECIFICATIONS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS.
4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.
5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC
EQUIPMENT.
6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER
PRIOR TO ANY CUTTING OF WALLS AND ROOF.
7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END
OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL
SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST
FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.
1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED
WITH STANDARD RESPONSE SPRINKLERS.
2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE
BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER
PROTECTION CAGE.
3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS
NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.
4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.
5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS
DEMOLISHED.
FIRE PROTECTION NOTES
UP
SPSPSPSP
RAD RAD
RADRAD
RAD
RAD
RADRADRAD
RAD
RAD
RAD RAD RAD RAD
RAD
RADRADRAD
RAD
RAD
RAD
RAD RAD
EJFEC
FE
FAP
FAPFAP
FAP
FAP
FAP
FAP
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STAIRWELL NO.
S102
OFFICE
OFFICE
OFFICE
OFFICE
118A
OFFICE
OFFICE
OFFICE
OFFICE
COPY/BREAK
OI&T
113A
CORRIDOR
H103A
CORRIDOR
H103
OFFICE
MECH. RM.
MECH. RM.
108A
VESTIBULE
OFFICE
FIRE ALARM CL.
CORRIDOR
H104
RECEPTION
CORRIDOR
H102
OFFICE, OPEN
CORRIDOR
H101
HAC
STAIRWELL NO.
S101
STORAGE
S101B
TOILET, MALE
TOILET, FEMALE
OFFICE
ELEVATOR NO.
E-1
STORAGE
107A
UP
DN
UP
UP
DN
117A
194 SF
OFFICE
146 SF
OFFICE
M
H T
1/4" Ø,5/8" Ø REFRIGERANT
LINE, 5/8" Ø CONDENSATE
LINE WITH SLOPING, DROP
TO L/L
PROVIDE WALL OPENING AND PIPE
SLEEVE
25-CU-3-313A 25-CU-3-204B
25-CU-3-117A
-1/4" Ø, 5/8" Ø REFRIGERANT
LINE,F/A.
-TO BE CONNECTED TO 25-
CU-3-204B AND 25-
AC-2-313A
- PROVIDE 1ST FLOOR
OPENING AND PIPE SLEEVE
1/4" Ø, 5/8" Ø
REFRIGERANT
LINE AT H/L
1/4" Ø, 5/8" Ø
REFRIGERANT
LINE, DROP TO L/L
D R S
R L
RL
RS
RL
RS
RS
RL
RS
RL
RS
RS
RL
R S
R L
RL
RS
R L
R S
CONDENSATE TO
BE DISCHARGED
TO THE GROUND
TR
117A
85 SF1
25-AC-3-117A
RL
194 SF
OFFICE
146 SF
OFFICE
EXPOSED
TR
117A
85 SF
146 SF
OFFICE
194 SF
OFFICE
85 SF
OFFICE
117A
146 SF
OFFICE
194 SF
OFFICE
85 SF
OFFICE
117A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 25M-101
BLDG 25 - FLOOR 1 - DEMO,
FLOOR PLANS & RCPS 25
MGH MM/OB/JJ/CY
CONSTRUCTION
DOCUMENTS
03/31/2022
PROJECT
NORTH
1/4" = 1'-0"
RM 117A - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 117A - FLOOR PLAN
1/4" = 1'-0"
RM 117A - DEMO RCP
1/4" = 1'-0"
RM 117A - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
1. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.
2. REMOVE EXISTING QUICK RESPONSE SPRINKLER AND INSTALL NEW STANDARD
RESPONSE SPRINKLER IN UPRIGHT POSITION. PROVIDE CAGE GUARD.
3. INSTALL NEW REFRIGERANT LINES (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE PIPE
INSULATION. PROVIDE PIPE SUPPORT.
4. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE
SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.
PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.
5. REFER TO M-502 FOR PIPE THRU WALL DETAIL.
6. REFER TO M-502 FOR PIPE THRU FLOOR DETAIL.
7. REFER TO M-501 FOR CONDENSING UNIT GROUND MOUNT SUPPORT DETAIL.
8. DEMO EXISTING WINDOW TYPE AC UNIT. TURN OVER TO COR.
KEY PLAN
GENERAL NOTES
DEMOLITION GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,
AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM
DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND
BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO
PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING
DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST
OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL
EQUIPMENT THAT IS TO REMAIN.
1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS
AND SPECIFICATIONS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS.
4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.
5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC
EQUIPMENT.
6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER
PRIOR TO ANY CUTTING OF WALLS AND ROOF.
7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END
OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL
SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST
FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.
1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED
WITH STANDARD RESPONSE SPRINKLERS.
2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE
BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER
PROTECTION CAGE.
3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS
NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.
4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.
5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS
DEMOLISHED.
FIRE PROTECTION NOTES
KEYNOTES #
PROVIDE WALL OPENING
AND PIPE SLEEVE
S P
S P
S P
S P
RAD
RADRADRAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RADRAD
RADRAD
RAD RAD
RADRAD
RAD RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD RAD RAD
EJ
FEC
FAP
FAP DN
DN
UP
204B85 SF
TR
204B
124 SF
TOILET, FEMALE
244 SF
OFFICE
204C
R L
R S
D D
D
D
D
5/8" Ø CONDENSATE LINE
WITH SLOPING AT H/L
-1/4" Ø, 5/8" Ø REFRIGERANT LINE,T/B -F/A
-TO BE CONNECTED TO 25-CU-3-204B
PROVIDE WALL
OPENING AND PIPE
SLEEVE
CONDENSATE LINE TO BE CONNECTED TO THE
EXISTING TOILET, FEMALE (205) SINK
PROVIDE 1ST AND 2ND
FLOOR OPENING AND PIPE
SLEEVE
25-AC-3-204B
85 SF
TR
204B
EXPOSED
124 SF
TOILET, FEMALE
244 SF
OFFICE
204C
85 SF
STORAGE
204B
124 SF
TOILET, FEMALE
244 SF
OFFICE
204C
85 SF
STORAGE
204B
124 SF
TOILET, FEMALE
244 SF
OFFICE
204C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 25M-102
BLDG 25 - FLOOR 2 - DEMO,
FLOOR PLANS & RCPS 25
MGH MM/OB/JJ/CY
CONSTRUCTION
DOCUMENTS
03/31/2022
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1/4" = 1'-0"
RM 204B - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 204B - FLOOR PLAN
1/4" = 1'-0"
RM 204B - DEMO RCP
1/4" = 1'-0"
RM 204B - RCP
M
T H
1. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.
2. REMOVE EXISTING QUICK RESPONSE SPRINKLER AND INSTALL NEW STANDARD
RESPONSE SPRINKLER IN UPRIGHT POSITION. PROVIDE CAGE GUARD.
3. INSTALL NEW REFRIGERANT LINES (INDOOR UNIT TO OUTDOOR UNIT. PROVIDE PIPE
INSULATION. PROVIDE PIPE SUPPORT.
4. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE
SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.
PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.
5. REFER TO M-502 FOR PIPE THRU WALL DETAIL.
6. REFER TO M-502 FOR PIPE THRU FLOOR DETAIL.
7. REFER TO M-501 FOR INDIRECT DRAIN FOR SINK DETAIL.
8. DEMO FLOOR MOUNTED AC. DEMO REFRIGERANT COPPER PIPE BACK TO MAIN.
DEMO CONDENSATE PIPE.
Revisions: Date:
KEY PLAN
GENERAL NOTES
DEMOLITION GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,
AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM
DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND
BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO
PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING
DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST
OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL
EQUIPMENT THAT IS TO REMAIN.
1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS
AND SPECIFICATIONS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS.
4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.
5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC
EQUIPMENT.
6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER
PRIOR TO ANY CUTTING OF WALLS AND ROOF.
7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END
OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL
SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST
FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.
1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED
WITH STANDARD RESPONSE SPRINKLERS.
2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE
BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER
PROTECTION CAGE.
3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS
NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.
4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.
5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS
DEMOLISHED.
FIRE PROTECTION NOTES
S P
S P
S P
S P
FEC
EJ
FAP
FAP
DN
DN
313A
85 SF
TR
313A
172 SF
OFFICE
142 SF
OFFICE
25-AC-2-313A
5/8" Ø CONDENSATE LINE
WITH SLOPING AT H/L
CONDENSATE LINE TO BE
CONNECTED TO THE
EXISTING TOILET,FEMALE
(310) SINK
PROVIDE WALL
OPENING AND
PIPE SLEEVE
-1/4" Ø, 5/8" Ø REFRIGERANT LINE,T/B
-TO BE CONNECTED TO 25-CU-2-313A
-PROVIDE FLOOR OPENING AND PIPE
SLEEVE
7 5
R L
R S
D D
DD
145 SF
TOILET, FEMALE
172 SF
OFFICE
142 SF
OFFICE
85 SF
OFFICE
313A
172 SF
OFFICE
142 SF
OFFICE
85 SF
OFFICE
313A
85 SF
TR
313A
172 SF
OFFICE
142 SF
OFFICE
EXPOSED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 25M-103
BLDG 25 - FLOOR 3 - DEMO,
FLOOR PLANS & RCPS 25
MGH MM/OB/JJ/CY
CONSTRUCTION
DOCUMENTS
03/31/2022
Revisions: Date:
PROJECT
NORTH
1/4" = 1'-0"
RM 313A - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 313A - FLOOR PLAN
1/4" = 1'-0"
RM 313A - DEMO RCP
1/4" = 1'-0"
RM 313A - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.
2. REMOVE EXISTING QUICK RESPONSE SPRINKLER AND INSTALL NEW STANDARD
RESPONSE SPRINKLER IN UPRIGHT POSITION. PROVIDE CAGE GUARD.
3. INSTALL NEW REFRIGERANT LINES (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE PIPE
INSULATION. PROVIDE PIPE SUPPORT.
4. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE
SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.
PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.
5. REFER TO M-502 FOR PIPE THRU WALL DETAIL.
6. REFER TO M-502 FOR PIPE THRU FLOOR DETAIL.
7. REFER TO M-501 FOR INDIRECT DRAIN FOR SINK DETAIL.
8. DEMO FLOOR MOUNTED AC. DEMO REFRIGERANT COPPER PIPE BACK TO MAIN.
DEMO CONDENSATE PIPE.
KEY PLAN
GENERAL NOTES
DEMOLITION GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,
AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM
DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND
BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO
PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING
DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST
OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL
EQUIPMENT THAT IS TO REMAIN.
1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS
AND SPECIFICATIONS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS.
4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.
5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC
EQUIPMENT.
6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER
PRIOR TO ANY CUTTING OF WALLS AND ROOF.
7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END
OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL
SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST
FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.
1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED
WITH STANDARD RESPONSE SPRINKLERS.
2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE
BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER
PROTECTION CAGE.
3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS
NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.
4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.
5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS
DEMOLISHED.
FIRE PROTECTION NOTES
AREAWELLAREAWELL
RAD
RAD
RAD
RADRAD
RAD
FAP
FAP
FAP
FAP
FAP
RECEIVING
BE109
OFFICE
BE101
517 SF
SHARED OFFICE
BE102
OFFICE
BE102A
OFFICE, OPEN
BE102C STORAGE
BE102D
OFFICE, OPEN
BE102E
TOILET
BE102B
OI&T
BE103
TUNNEL
ACCESS
BE104
SOILED UTILITY
BE106
SOILED LINEN
BE107
CORRIDOR
H001
ELEVATOR
LOBBY
BE100
MACHINE
REPAIR
BE105
STORAGE
BE105A
MECH. RM.
BE112
STORAGE
BE113
CORRIDOR
H003
EMERGENCY
GENERATOR
BA100A
ELEC. RM.
BA100
ELEC. RM.
BA101
MECH. RM.
BA102
LAUNDRY
CHUTE
BA103
STORAGE
BA108 OI&T
BE114
CORRIDOR
H004
STORAGE
BA109
STAIRWELL NO.
S001
ELEVATOR
PUMP RM.
BA104
STORAGE
BA106
CORRIDOR
H005
MECH. RM.
BE115
STAIRWELL NO.
S002
PIPE CHASE
Z004
PIPE CHASE
Z003
PIPE CHASE
Z005
PIPE CHASE
Z002
PIPE CHASE
BE100A
CRAWL SPACE
Z001
CORRIDOR
H002
STORAGE
BE110A
64 SF
ELEVATOR NO.2
E-2
ELEVATORS
ELEVATOR NO.1
E-1
CHASE
CH-BE-1
CHASE
CH-BA-1
CHASE
CH-BE-4
CHASE
CH-BE-3
CHASE
CH-BE-2
STAIRWELL NO.
S103
MECH. RM.
BA105
DN
DN
DN
DN
UP
UP
BE111,
BE110
T
H
T
M
51-AC-3-BE111
R L
R S
RL
RS
D
D
D
PROVIDE WALL OPENING AND
PIPE SLEEVE
5/8" Ø CONDENSATE DRAIN
LINE WITH SLOPING AT H/L
CONDENSATE LINE TO BE
CONNECTED TO THE
EXISTING DENTAL CLINIC
(BE110) SINK
TR
BE111
140 SF
DENTAL CLINIC
BE1105
2EXPOSED
DENTIST CLINIC
BE110
233 SF
OFFICE
BE111
140 SF
DENTIST CLINIC
BE110
233 SF
OFFICE
BE111
140 SF
CORRIDOR
H101
CORRIDOR
H101
NURSE STATION
1E130
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 51M-100
BLDG. 51 - FLOOR 00 - DEMO,
FLOOR PLANS & RCPS 51
MGH MM/OB/JJ/CY
CONSTRUCTION
DOCUMENTS
03/31/2022
PROJECT
NORTH
1/4" = 1'-0"
RM BE111 & BE110 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM BE110 & BE111 - DEMO RCP
1/4" = 1'-0" 3A
RM BE111 & BE110 - FLOOR PLAN
1/4" = 1'-0"
RM BE110 & BE111 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
1. DEMO SPRINKLER.
2. RELOCATE EXISTING CEILING SUPPLY GRILLE. EXTEND SUPPLY DUCT TO NEW
LOCATION.
3. REMOVE WALL THERMOSTAT/SENSOR. SAVE FOR RELOCATION.
4. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.
5. INSTALL NEW STANDARD RESPONSE SPRINKLER IN UPRIGHT POSITION. PROVIDE
CAGE GUARD.
6. RELOCATE EXISTING THERMOSTAT/SENSOR. EXTEND WIRING/TUBING TO NEW
LOCATION.
7. INSTALL NEW REFRIGERANT LINES ( INDOOR UNIT TO OUTDOOR UNIT ). PROVIDE PIPE
INSULATION. PROVIDE PIPE SUPPORT
8. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE
SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.
PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.
9. REFER TO M-501 FOR INDIRECT DRAIN FOR SINK DETAIL.
10. REFER TO M-502 FOR PIPE THRU WALL DETAIL.
11. REFER TO M-502 FOR PIPE THRU FLOOR DETAIL.
-1/4"Ø, 5/8"Ø REFRIGERANT
LINE ,T/A
-PROVIDE 1ST FLOOR
OPENING AND PIPE SLEEVE
1/4" Ø, 5/8" Ø
REFRIGERANT LINE AT H/L
KEY PLAN
GENERAL NOTES
DEMOLITION GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,
AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM
DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND
BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO
PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING
DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST
OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL
EQUIPMENT THAT IS TO REMAIN.
1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS
AND SPECIFICATIONS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS.
4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.
5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC
EQUIPMENT.
6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER
PRIOR TO ANY CUTTING OF WALLS AND ROOF.
7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END
OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL
SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST
FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.
1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED
WITH STANDARD RESPONSE SPRINKLERS.
2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE
BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER
PROTECTION CAGE.
3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS
NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.
4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.
5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS
DEMOLISHED.
FIRE PROTECTION NOTES
KEYNOTES #
T
1/4" = 1'-0" 3B
FLOOR 01 CORRIDOR - FLOOR PLAN
PROJECT
NORTH
-1/4"Ø, 5/8"Ø REFRIGERANT
LINE, (FROM RM BE111 TO
ROOF).
-PROVIDE FLOOR OPENING
AND PIPE
SLEEVE.
COURTYARD COURTYARD
FEC
FEC
FEC
FEC
FE
FE
TS
TS
CORRIDOR
H118A
ELEC CLOSET
1A147A
DAY RM.
1A147 2 BED PATIENT
RM.
1A148
TOILET
1A148A
2 BED PATIENT
RM.
1A149 2 BED PATIENT
RM.
1A150
CORRIDOR
H112
TOILET
1A150A
2 BED PATIENT
RM.
1A151
2 BED PATIENT
RM.
1A152
CORRIDOR
H112A
2 BED PATIENT
RM.
1A154
2 BED PATIENT
RM.
1A153
TOILET
1A152A
CORRIDOR
H113
DAY RM.
1A164
DAY RM.
1A165
OFFICE
1A162
WORK RM.
(COPY RM.)
1A161
HAC
1A160
MEDICATION
RM.
1A163B
NURSE STATION
1A163
CLEAN LINEN
1A159
LOCKER RM.
1A158
OFFICE
1A117
OFFICE
1A168
KITCHEN
1A116C
MED. PREP.
1A116B
CORRIDOR
H114
STORAGE
1A116A
NURSE STATION
1A116
LOCKER RM.
1A118
SECLUSION
1A156A
SECLUSION
1A155A
TOILET, MALE
1A118A
TOILET, FEMALE
1A118B
TOILET
1A157
LAUNDRY
1A125
STORAGE
1A123
SUPPLY RM.
1A119
STORAGE
1A120
EXAM RM.
1A121
HALLWAY
H119
SHOWER
1A124
CLOSET
1A115A
DAY RM.
1A115
CORRIDOR
H118B
CONFERENCE
RM.
1A108
EXAM RM.
1A122
2 BED PATIENT
RM.
1A114
TOILET
1A113A
2 BED PATIENT
RM.
1A1132 BED PATIENT
RM.
1A112
TOILET
1A111A
2 BED PATIENT
RM.
1A111
2 BED PATIENT
RM.
1A110
2 BED PATIENT
RM.
1A109
TOILET
1A109A
IRM EQUIPMENT
1A183
STG
1A179A
STAIRWELL
NO.1
S101
CORRIDOR
H111
LOUNGE
1A181
LOCKER RM.
1A181A
ELEC CLOSET
1A154B
DAY RM.
1A100 OFFICE, OPEN
1A169 STORAGE
1A166
OFFICE
1A101
OFFICE
1A174A
CONSULTATION
RM.
1A105
OI&T
1A107B
HAC
1A107A
CONSULTATION
RM.
1A106
OI&T
1A102
EXAM
1A103
OFFICE
1A104
TOILET
1A154A
LAUNDRY
CHUTE
1A178
MECH. RM.
1A180
CORRDIOR
H116
KITCHEN
1A172
CORRIDOR
H110
OFFICE
1E145D
KITCHEN
1E145C
F.A. PANELS
1E145B
STORAGE
1E145A
OFFICE
1E144
STORAGE
1E143
CORRIDOR
H105
CORRIDOR
H106
MAIN LOBBY
1E101
EXAM
1E134
TOILET
1E135B
TOILET
1E133A
TOILET
1E135D
LAUNDRY
1E135
STORAGE
1E137
TOILET
1E139
KITCHEN
1E140
STORAGE
1E129
TOILET
1E129A
HAC
1E131
LAUNDRY RM.
1E132
EXAM
1E133
CORRIDOR
H102
STORAGE
1E122
OFFICE, OPEN
1E120
CORRIDOR
H101
CORRIDOR
H103
TOILET, MALE
1E102
HAC
1E104
STORAGE
1E105
TOILET, FEMALE
1E103
OFFICE
1E107
OFFICE, OPEN
1E108
GROUP RM.
1E110
OI&T
1E109
LOCKER RM.
1E113
TOILET
1E113A
OFFICE
1E111
MED RM.
1E112
NURSE STATION
1E130
TOILET
1E127A
TOILET
1E126A
3 BED PATIENT
RM.
1E127
2 BED PATIENT
RM.
1E124
TOILET
1E124A
2 BED PATIENT
RM.
1E123
TOILET
1E123A
TOILET
1E141A
2 BED PATIENT
RM.
1E116
TOILET
1E115A
2 BED PATIENT
RM.
1E115
2 BED PATIENT
RM.
1E118
TOILET
1E117A
2 BED PATIENT
RM.
1E117
3 BED PATIENT
RM.
1E119
TOILET
1E114A
2 BED PATIENT
RM.
1E114
OFFICE
1W179
OFFICE
1W180
CLOSET
1W181A
OFFICE
1W181
STORAGE
1W182B
COPY RM.
1W182A
GROUP RM.
1W182
CORRIDOR
H106A
OFFICE
1W146A
GROUP RM.
1E145
OFFICE
1W147
TOILET
1W147A
OFFICE
1W148
STORAGE
1W146B
TOILET
1W178A
OFFICE
1W178
TOILET, STAFF
1W177A
REPORT RM.
1W177
TOILET
1W176A
LOUNGE
1W176
LINEN
1W176B
OFFICE
1W175
TOILET
1W174A
FILE RM.
1W174
TEST RM.
1W174B
OBSERVATION
1W170
OFFICE
1W171
OFFICE
1W172
CORRIDOR
H109
TOILET
1W173A
OFFICE
1W173
2 BED PATIENT
RM.
1W166
TOILET
1W166A
STORAGE
1W167
OFFICE
1W168
LOUNGE
1W169
CORRIDOR
H108
MED RM.
1W152
STORAGE
1W151TOILET, STAFF
1W150
KITCHEN
1W149
SHOWER
1W160
SOILED UTILITY
1W161
LAUNDRY RM.
1W157
HAC
1W158
TOILET
1W160A
CORRIDOR
H107
CORRIDOR
H109
NURSE STATION
1W159A
TOILET
1A127A
TOILET
1A128A
CORRIDOR
H118
TOILET
1E119A
WAITING RM.
1W155
TOILET
1W156A
TOILET
1W153A
3 BED RM.
1W162
2 BED PATIENT
RM.
1W165
TOILET
1W164A
2 BED PATIENT
RM.
1W164
2 BED PATIENT
RM.
1W163
TOILET
1W163A
TOILET
1W162A
OFFICE
1E128
TOILET
1E110A
2 BED PATIENT
RM.
1W156
SUPPLY RM.
1W155A
ELEVATOR NO.2
E-2
ELEVATOR NO.1
E-1
CHASE
CH-A-2
CHASE
CH-A-5
CHASE
CH-A-4
CHASE
CH-A-2
CHASE
CH-A-3
CHASE
CH-E-1
CHASE
CH-E-2
CHASE
CH-E-4
CHASE
CH-E-5
ENTRY FOYER
1E100
2 BED PATIENT
ROOM
1E126
2 BED PATIENT
RM.
1E125
TOILET, STAFF
1A133A
MED. PREP.
1A133B
NURSE STATION
1A133
OFFICE
1A131
STAFF LOUNGE
1A129
2 BED PATIENT
RM.
1A127
TOILET
1A129A
CORRIDOR
H120DAY RM.
1A135
DAY RM.
1A137
TOILET
1A137A
1A141A
2 BED PATIENT
RM.
1A141
STAIRWELL
NO.3
S103
ELEC. CLOSET
1A146
2 BED PATIENT
RM.
1A142
2 BED PATIENT
RM.
1A136
2 BED PATIENT
RM.
1A138
2 BED PATIENT
RM.
1A140
TOILET
1A138A
2 BED PATIENT
RM.
1A134
TOILET
1A134A
EXAM
1A132
TOILET
1A128A
2 BED PATIENT
RM.
1A128
TOILET
1A130A
2 BED PATIENT
RM.
1A130
STAIRWELL NO.
3A
S103A
CHASE
CH-A-1
1A139
51-AC-3-1A139
T
H
M
RL
RS
R L
R S
R L
R S
D D
CLEAN LINEN
1A139
TR
1A139A
141 SF
DAY RM.
1A137
TOILET
1A137A
CLEAN LINEN
1A139
DAY RM.
1A137
EXPOSED
CLEAN LINEN
1A139
TR
1A139A
141 SF
DAY RM.
1A137
TOILET
1A137A
CLEAN LINEN
1A139
DAY RM.
1A137
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 51M-101a
BLDG. 51- FLOOR 01 - DEMO,
FLOOR PLANS & RCPS 51
MGH MM/OB/JJ/CY
CONSTRUCTION
DOCUMENTS
03/31/2022
PROJECT
NORTH
1/4" = 1'-0"
RM 1A139- FLOOR PLAN
1/4" = 1'-0"
RM 1A139- DEMO FLOOR PLAN
1/4" = 1'-0"
RM1A139 - DEMO RCP
1/4" = 1'-0"
RM1A139 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1. CEILING SUPPLY GRILLE TO REMAIN AND DUCTWORK TO ADJUST TO FAN COIL UNIT
NEW LOCATION.
2. CEILING EXHAUST/RETURN GRILLE TO REMAIN AND DUCTWORK TO ADJUST TO FAN
COIL UNIT NEW LOCATION.
3. RELOCATE FAN COIL UNIT & THERMOSTAT FROM WALL. EXTEND & INSULATE
HYDRONIC HEATING,CHILLED WATER & CONDENSATE PIPING TO THE NEW FAN COIL
LOCATION.
4. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.
5. INSTALL NEW REFRIGERANT LINES ( INDOOR UNIT TO OUTDOOR UNIT). PROVIDE PIPE
INSULATION. PROVIDE PIPE SUPPORT.
6. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE
SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.
PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.
7. DEMO SINK AND WATER CLOSET, INCLUDING WATER SUPPLIES OF BOTH AND
SANITARY OF WATER CLOSET. CAP WATER CLOSET'S SANITARY AND VENT PIPING IN
CONCEALED SPACE. DEMO HOT AND COLD WATER SUPPLIES BACK TO MAIN, CAP
WITHIN TWO PIPE DIAMETERS. REUSE SINK SANITARY AND VENT FOR CONDENSATE
DRAIN.
8. REFER TO M-501 FOR INDIRECT DRAIN FOR SINK DETAIL.
9. REFER TO M-501 FOR LINESET FLASHING DETAIL.
10. DEMO CEILING EXHAUST GRILLE. DEMO DUCT BACK TO MAIN, CAP AND SEAL DUCT.
CONDENSATE LINE TO
BE CONNECTED TO
THE EXISTING SINK
SANITARY DRAIN LINE.
5/8" Ø CONDENSATE
LINE AT H/L WITH
SLOPING
1/4" Ø, 5/8" Ø
REFRIGERANT LINE
AT H/L
-1/4" Ø, 5/8" Ø
REFRIGERANT
LINE,T/A.
- PROVIDE ROOF
FLOOR OPENING
AND PIPE SLEEVE.
Revisions: Date:
KEY PLAN
GENERAL NOTES
DEMOLITION GENERAL NOTES
1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW
WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.
2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS
OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL
BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON
THE PROJECT SITE IS PROHIBITED.
3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,
AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM
DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND
BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO
PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.
IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING
DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.
4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR
RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT
INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST
OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS
REQUIRED.
5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS
NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF
DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL
EQUIPMENT THAT IS TO REMAIN.
1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS
AND SPECIFICATIONS.
3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURERS RECOMMENDATIONS.
4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.
5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC
EQUIPMENT.
6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER
PRIOR TO ANY CUTTING OF WALLS AND ROOF.
7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END
OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL
SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST
FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.
1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED
WITH STANDARD RESPONSE SPRINKLERS.
2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE
BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER
PROTECTION CAGE.
3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS
NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.
4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.
5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS
DEMOLISHED.
FIRE PROTECTION NOTES
KEYNOTES #
7 10
COURTYARD COURTYARD
FEC
FEC
FEC
FEC
FE
FE
TS
TS
CORRIDOR
H118A
ELEC CLOSET
1A147A
DAY RM.
1A147 2 BED PATIENT
RM.
1A148
TOILET
1A148A
2 BED PATIENT
RM.
1A149 2 BED PATIENT
RM.
1A150
CORRIDOR
H112
TOILET
1A150A
2 BED PATIENT
RM.
1A151
2 BED PATIENT
RM.
1A152
CORRIDOR
H112A
2 BED PATIENT
RM.
1A154
2 BED PATIENT
RM.
1A153
TOILET
1A152A
CORRIDOR
H113
DAY RM.
1A164
DAY RM.
1A165
OFFICE
1A162
WORK RM.
(COPY RM.)
1A161
HAC
1A160
MEDICATION
RM.
1A163B
NURSE STATION
1A163
CLEAN LINEN
1A159
LOCKER RM.
1A158
OFFICE
1A117
OFFICE
1A168
KITCHEN
1A116C
MED. PREP.
1A116B
CORRIDOR
H114
STORAGE
1A116A
NURSE STATION
1A116
LOCKER RM.
1A118
SECLUSION
1A156A
SECLUSION
1A155A
TOILET, MALE
1A118A
TOILET, FEMALE
1A118B
TOILET
1A157
LAUNDRY
1A125
STORAGE
1A123
SUPPLY RM.
1A119
STORAGE
1A120
EXAM RM.
1A121
HALLWAY
H119
SHOWER
1A124
CLOSET
1A115A
DAY RM.
1A115
CORRIDOR
H118B
CONFERENCE
RM.
1A108
EXAM RM.
1A122
2 BED PATIENT
RM.
1A114
TOILET
1A113A
2 BED PATIENT
RM.
1A1132 BED PATIENT
RM.
1A112
TOILET
1A111A
2 BED PATIENT
RM.
1A111
2 BED PATIENT
RM.
1A110
2 BED PATIENT
RM.
1A109
TOILET
1A109A
IRM EQUIPMENT
1A183
STG
1A179A
STAIRWELL
NO.1
S101
CORRIDOR
H111
LOUNGE
1A181
LOCKER RM.
1A181A
ELEC CLOSET
1A154B
DAY RM.
1A100 OFFICE, OPEN
1A169 STORAGE
1A166
OFFICE
1A101
OFFICE
1A174A
CONSULTATION
RM.
1A105
OI&T
1A107B
HAC
1A107A
CONSULTATION
RM.
1A106
OI&T
1A102
EXAM
1A103
OFFICE
1A104
TOILET
1A154A
LAUNDRY
CHUTE
1A178
MECH. RM.
1A180
CORRDIOR
H116
KITCHEN
1A172
CORRIDOR
H110
OFFICE
1E145D
KITCHEN
1E145C
F.A. PANELS
1E145B
STORAGE
1E145A
OFFICE
1E144
STORAGE
1E143
CORRIDOR
H105
CORRIDOR
H106
MAIN LOBBY
1E101
EXAM
1E134
TOILET
1E135B
TOILET
1E133A
TOILET
1E135D
LAUNDRY
1E135
STORAGE
1E137
TOILET
1E139
KITCHEN
1E140
STORAGE
1E129
TOILET
1E129A
HAC
1E131
LAUNDRY RM.
1E132
EXAM
1E133
CORRIDOR
H102
STORAGE
1E122
OFFICE, OPEN
1E120
CORRIDOR
H101
CORRIDOR
H103
TOILET, MALE
1E102
HAC
1E104
STORAGE
1E105
TOILET, FEMALE
1E103
OFFICE
1E107
OFFICE, OPEN
1E108
GROUP RM.
1E110
OI&T
1E109
LOCKER RM.
1E113
TOILET
1E113A
OFFICE
1E111
MED RM.
1E112
NURSE STATION
1E130
TOILET
1E127A
TOILET
1E126A
3 BED PATIENT
RM.
1E127
2 BED PATIENT
RM.
1E124
TOILET
1E124A
2 BED PATIENT
RM.
1E123
TOILET
1E123A
TOILET
1E141A
2 BED PATIENT
RM.
1E116
TOILET
1E115A
2 BED PATIENT
RM.
1E115
2 BED PATIENT
RM.
1E118
TOILET
1E117A
2 BED PATIENT
RM.
1E117
3 BED PATIENT
RM.
1E119
TOILET
1E114A
2 BED PATIENT
RM.
1E114
OFFICE
1W179
OFFICE
1W180
CLOSET
1W181A
OFFICE
1W181
STORAGE
1W182B
COPY RM.
1W182A
GROUP RM.
1W182
CORRIDOR
H106A
OFFICE
1W146A
GROUP RM.
1E145
OFFICE
1W147
TOILET
1W147A
OFFICE
1W148
STORAGE
1W146B
TOILET
1W178A
OFFICE
1W178
TOILET, STAFF
1W177A
REPORT RM.
1W177
TOILET
1W176A
LOUNGE
1W176
LINEN
1W176B
OFFICE
1W175
TOILET
1W174A
FILE RM.
1W174
TEST RM.
1W174B
OBSERVATION
1W170
OFFICE
1W171
OFFICE
1W172
CORRIDOR
H109
TOILET
1W173A
OFFICE
1W173
2 BED PATIENT
RM.
1W166
TOILET
1W166A
STORAGE
1W167
OFFICE
1W168
LOUNGE
1W169
CORRIDOR
H108
MED RM.
1W152
STORAGE
1W151TOILET, STAFF
1W150
KITCHEN
1W149
SHOWER
1W160
SOILED UTILITY
1W161
LAUNDRY RM.
1W157
HAC
1W158
TOILET
1W160A
CORRIDOR
H107
CORRIDOR
H109
NURSE STATION
1W159A
TOILET
1A127A
TOILET
1A128A
CORRIDOR
H118
TOILET
1E119A
WAITING RM.
1W155
TOILET
1W156A
TOILET
1W153A
3 BED RM.
1W162
2 BED PATIENT
RM.
1W165
TOILET
1W164A
2 BED PATIENT
RM.
1W164
2 BED PATIENT
RM.
1W163
TOILET
1W163A
TOILET
1W162A
OFFICE
1E128
TOILET
1E110A
2 BED PATIENT
RM.
1W156
SUPPLY RM.
1W155A
ELEVATOR NO.2
E-2
ELEVATOR NO.1
E-1
CHASE
CH-A-2
CHASE
CH-A-5
CHASE
CH-A-4
CHASE
CH-A-2
CHASE
CH-A-3
CHASE
CH-E-1
CHASE
CH-E-2
CHASE
CH-E-4
CHASE
CH-E-5
ENTRY FOYER
1E100
2 BED PATIENT
ROOM
1E126
2 BED PATIENT
RM.
1E125
TOILET, STAFF
1A133A
MED. PREP.
1A133B
NURSE STATION
1A133
OFFICE
1A131
STAFF LOUNGE
1A129
2 BED PATIENT
RM.
1A127
TOILET
1A129A
CORRIDOR
H120DAY RM.
1A135
DAY RM.
1A137
TOILET
1A137A
CLEAN LINEN
1A139
2 BED PATIENT
RM.
1A143
TOILET
1A141A
2 BED PATIENT
RM.
1A141
STAIRWELL
NO.3
2 BED PATIENT
RM.
1A144
TOILET
1A142A
2 BED PATIENT
RM.
1A142
2 BED PATIENT
RM.
1A136
2 BED PATIENT
RM.
1A138
2 BED PATIENT
RM.
1A140
TOILET
1A138A
2 BED PATIENT
RM.
1A134
TOILET
1A134A
EXAM
1A132
TOILET
1A128A
2 BED PATIENT
RM.
1A128
TOILET
1A130A
2 BED PATIENT
RM.
1A130
STAIRWELL NO.
3A
J T
J T
1A102 1A183
H
T5
51-AC-2-1A102
M
D
RS
RL
R S
R L
PROVIDE WALL OPENING
AND PIPE SLEEVE
PROVIDE WALL OPENING
AND PIPE SLEEVE
1/4" Ø, 5/8" Ø
REFRIGERANT LINE AT H/L
-1/4" Ø, 5/8" Ø REFRIGERANT
LINE,T/A.
- PROVIDE ROOF FLOOR
OPENING AND PIPE SLEEVE. 11
CONDENSATE LINE TO BE
CONNECTED TO THE
EXISTING EXAM(1A103) SINK
5/8" Ø CONDENSATE LINE
AT H/L WITH SLOPING
TR
1A102
101 SF
EXAM
1A103
EXPOSED
EXAM
1A103
TR
1A102
101 SF
H
T
M
51-AC-4-1A183
RL
RS
R S
R L
-1/4" Ø, 5/8" Ø REFRIGERANT
LINE,T/A.
- PROVIDE ROOF FLOOR
OPENING AND PIPE SLEEVE.
1/4" Ø, 5/8" Ø REFRIGERANT
LINE AT H/L
PROVIDE WALL
OPENING AND
PIPE SLEEVE
5/8" Ø CONDENSATE LINE
AT H/L WITH SLOPING
CONDENSATE LINE TO BE
CONNECTED TO THE
EXISTING TOILET(1E135B)
LAVATORY
TR
1A183
272 SF
STG
1A179A
TOILET
1E135B
EXPOSED
STG
1A179A
TR
1A183
272 SF
OI&T
1A102
EXAM
1A103
OI&T
1A102
EXAM
1A103
STG
1A179A
IRM EQUIPMENT
1A183
STG
1A179A
IRM EQUIPMENT
1A183
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 51M-101b
BLDG 51 - FLOOR 01 - DEMO,
FLOOR PLANS & RCPS 51
MGH MM/OB/JJ/CY
CONSTRUCTION
DOCUMENTS
03/31/202…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .