About this file

This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, building renovations including demolition, construction and finishes, data center renovations, physical security improvements, fiber infrastructure assessment and upgrades between buildings, installation of a diversified path to the datacenter for the WAN, and hazardous material abatement. The project involves construction and renovation activities in buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75. The Department of Veterans Affairs Technology Acquisition Center located in Austin is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
FOLLOW-UP Technical Questions - St. Louis 4-6-23.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf PDF
Technical Questions - FINAL - St. Louis 3-28-23.pdf PDF
657-21-701JB - Addendum 1_03_24_23.pdf PDF
329000-5 - Sod Certificate.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-24-23.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
Attachment 45 - Site Visit Instructions Updated 2-16-23.pdf PDF
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 38 - Envr. Report - Drawings.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 5 - Drawings Part-4.pdf PDF
Attachment 9 - Drawings Part-8.pdf PDF
Attachment 16 - Drawings Part-15.pdf PDF
Attachment 22 - Drawings Part-21.pdf PDF
Attachment 24 - Drawings Part-23.pdf PDF
Attachment 36 - Envr. Report - Appendix B.pdf PDF
Attachment 41 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 44 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Attachment 33 - Drawings Part-32.pdf PDF
Attachment 34 - Envr. Report - Narrative.pdf PDF
Attachment 37 - Envr. Report - Appendix C.pdf PDF
Attachment 40 - NARA RM Contract Language Clause.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 1-20-23.pdf PDF
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RAD

FEC

FAP

FAP

FAP

FAPFAP

FAP

FAP

RETAIL STORE

G04

OFFICE

G02

OI&T

G02B

KITCHEN

STORAGE

G06

KITCHEN

G05

KITCHEN

G07

HAC

G08

MECHANICAL

RM.

G15

STORAGE

G100A

DISH WASH

G09

VESTIBULE

G11

TOILET, FEMALE

G12

TOILET, MALE

G13

VESTIBULE

G14

STAIRWELL NO.

S001DINING AREA

G01

DINING AREA

G01

RETAIL STORE

G03

STORAGE

G03A

CORRIDOR

H001

STORAGE

G010

STAIRWELL NO.

S002

DN

UP

UP

DN

UP

UP

UP

G02A

156 SF

TR

G02A

OFFICE

G02

T H

24-AC-3-G02A

M

24-CU-3-G02A 24-CU-3-205A24-CU-3-114B

D

RL

RS

D

RL

RS

R S

R L

R L

R S

R S

R L

D

D

D

156 SF

TR

G02A

196 SF

OFFICE

G02

174 SF

STAIRWELL NO. 1

S001

EXPOSED

OFFICE

G02A

OFFICE

G02

OFFICE

G02A

OFFICE

G02

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 24M-100

BLDG. 24 - FLOOR 0 - DEMO,

FLOOR PLANS & RCP 24

MGH MM/OB/JJ/CY

CONSTRUCTION

DOCUMENTS

03/31/2022

PROJECT

NORTH

1/4" = 1'-0"

RM G02A - DEMO FLOOR PLAN

1/4" = 1'-0"

RM G02A - FLOOR PLAN

1/4" = 1'-0"

RM G02A - DEMO RCP

1/4" = 1'-0"

RM G02A - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

Revisions: Date:

1 1

5 5

1. DEMO SPRINKLER.

2. DEMO WALL GRILLE. DEMO DUCT BACK TO MAIN. CAP/SEAL DUCT AT MAIN.

3. REMOVE PTAC. TURN OVER TO COR.

4. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.

5. INSTALL STANDARD RESPONSE SPRINKLER IN UPRIGHT POSITION. PROVIDE CAGE

GUARD.

6. INSTALL NEW REFRIGERANT LINES ( INDOOR UNIT TO OUTDOOR UNIT). PROVIDE PIPE

INSULATION. PROVIDE PIPE SUPPORT.

7. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE

SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.

PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.

8. REFER TO M-501 FOR CONDENSING UNIT GROUND MOUNT SUPPORT DETAIL.

9. REFER TO M-502 FOR PIPE THRU WALL DETAIL.

10. REFER TO M-502 FOR PIPE THRU FLOOR DETAIL.

1/4" Ø, 5/8" Ø

REFRIGERANT

LINE,5/8" Ø

CONDENSATE DRAIN

LINE AT FLOOR LEVEL

1/4" Ø, 5/8" Ø

REFRIGERANT

LINE,5/8" Ø

CONDENSATE

DRAIN LINE,DROP

TO L/L

-1/4"Ø, 5/8"Ø

REFRIGERANT

LINE,T/A,5/8" Ø

CONDENSATE DRAIN

LINE,F/A

-PROVIDE 1ST FLOOR

OPENING AND PIPE

SLEEVE

-1/4"Ø, 5/8"Ø

REFRIGERANT

LINE,T/A,5/8" Ø

CONDENSATE DRAIN

LINE,F/A

-PROVIDE 1ST FLOOR

OPENING AND PIPE

SLEEVE

CONDENSATE TO

BE DISCHARGED

TO THE GROUND

CONDENSATE TO BE DISCHARGED

TO THE GROUND

KEY PLAN

GENERAL NOTES

DEMOLITION GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS

OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL

BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON

THE PROJECT SITE IS PROHIBITED.

3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,

AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM

DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND

BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO

PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING

DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS

NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF

DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL

EQUIPMENT THAT IS TO REMAIN.

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE

BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS

AND SPECIFICATIONS.

3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH

MANUFACTURERS RECOMMENDATIONS.

4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.

5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC

EQUIPMENT.

6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER

PRIOR TO ANY CUTTING OF WALLS AND ROOF.

7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END

OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL

SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST

FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED

WITH STANDARD RESPONSE SPRINKLERS.

2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE

BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER

PROTECTION CAGE.

3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS

NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.

4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.

5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS

DEMOLISHED.

FIRE PROTECTION NOTES

KEYNOTES #

PROVIDE WALL

OPENING AND PIPE

SLEEVE

PROVIDE WALL

OPENING AND PIPE

SLEEVE

SP

RAD RAD RAD

RAD

RAD

RAD

RADRADRAD

RAD

FE

FE

FE

FE

FEC

AP

FAP

FAP

STORAGE

104B

KITCHEN

TOILET

105A

FIRE

APPARATUS

114A

CLOSET

OFFICE

STORAGE

104A

STAIRWELL NO.

S103

LIBRARY

MEDICAL

LIBRARY

STAIRWELL NO.

S101

STORAGE

101B

STORAGE

101C

ENTRY

BREAK RM.

101A

ELEVATOR

E-1

STAGE LEFT

TOILET, FEMALE

STORAGE

TOILET, MALE

107A

VESTIBULE

110A

STAGE RIGHT

STORAGE

107B

STAGE

AUDITORIUM

CORRIDOR

H100

DN

DN

DN

DN

UP

DN

UP

DN

DN

114B

114C

156 SF

TR

114B

MEDICAL

LIBRARY

OI&T

114C

T H

M

24-AC-3-114B

RS

RL

D

1/4" Ø, 5/8" Ø

REFRIGERANT

LINE,5/8" Ø

CONDENSATE

DRAIN

LINE ,DROP TO

L/L

-1/4" Ø, 5/8" Ø

REFRIGERANT LINE,5/8"

Ø CONDENSATE DRAIN

LINE,F/A-T/B.

-1/4"Ø, 5/8"Ø REFRIGERANT

LINE,5/8" Ø CONDENSATE

DRAIN LINE,T/B

PROVIDE 1ST FLOOR

OPENING AND PIPE

SLEEVE.

TR

114B

OI&T

114C

EXPOSED

6 6

MEDICAL

LIBRARY

114B

MEDICAL

LIBRARY

OI&T

114C

MEDICAL

LIBRARY

114B

MEDICAL

LIBRARY

OI&T

114C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 24M-101

BLDG. 24 - FLOOR 1 - DEMO,

FLOOR PLANS & RCP 24

MGH MM/OB/JJ/CY

CONSTRUCTION

DOCUMENTS

03/31/2022

PROJECT

NORTH

1/4" = 1'-0"

RM 114B & 114C - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 114B & 114C - FLOOR PLAN

1/4" = 1'-0"

RM 114B & 114C -RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

Revisions: Date:

1/4" = 1'-0"

RM 114B & 114C - DEMO RCP

1 1

1. DEMO SPRINKLER.

2. DEMO CEILING GRILLE. DEMO DUCT BACK TO MAIN. CAP/SEAL DUCT AT MAIN.

3. REMOVE PTAC. TURN OVER TO COR.

4. DEMO WALL HEATING CONVECTOR. DEMO PIPING BACK TO MAIN.

5. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.

6. INSTALL STANDARD RESPONSE SPRINKLER IN UPRIGHT POSITION. PROVIDE CAGE

GUARD.

7. INSTALL NEW REFRIGERANT LINES ( INDOOR UNIT TO OUTDOOR UNIT). PROVIDE PIPE

INSULATION. PROVIDE PIPE SUPPORT.

8. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE

SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.

PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.

9. REFER TO M-502 FOR PIPE THRU FLOOR DETAIL.

PROVIDE 1ST & 2ND

FLOOR OPENING AND

PIPE SLEEVE.

KEY PLAN

GENERAL NOTES

DEMOLITION GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS

OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL

BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON

THE PROJECT SITE IS PROHIBITED.

3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,

AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM

DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND

BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO

PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING

DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS

NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF

DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL

EQUIPMENT THAT IS TO REMAIN.

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE

BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS

AND SPECIFICATIONS.

3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH

MANUFACTURERS RECOMMENDATIONS.

4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.

5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC

EQUIPMENT.

6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER

PRIOR TO ANY CUTTING OF WALLS AND ROOF.

7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END

OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL

SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST

FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED

WITH STANDARD RESPONSE SPRINKLERS.

2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE

BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER

PROTECTION CAGE.

3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS

NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.

4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.

5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS

DEMOLISHED.

FIRE PROTECTION NOTES

KEYNOTES #

DN

64"X70" 64"X70"

64"X70"

64"X70" 64"X70"

24"X72"

15"X36"15"X36"

15"X23"

15"X23" 15"X23"

"X

RADIATOR

INSTALL DOOR STOP ON

FLOOR TO STOP DOOR

AT 90 DEGREES OPEN

RAD

RADRAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD RAD

RAD

FAP

FAP

FAP

OFFICE

201A

OFFICE

STAIR 5

S205

HAC

TOILET

MULTIPURPOSE

RM.

STORAGE

OFFICE

STORAGE

206A

STAIR 3

S203

STAIR 4

S204

OI&T

205C

SHARED OFFICE

WORK RM.

OFFICE

STORAGE

TOILET

STORAGE

STORAGE

VESTIBULE

STORAGE

STORAGE

216A

VACANT

210A

STORAGE

TOILET

215A

CORRIDOR

204B

DN

DN

DN

UP

205A

156 SF

TR

205A

T H

24-AC-3-205A

M

RS

RL

D

1/4" Ø, 5/8" Ø

REFRIGERANT LINE,5/8"

Ø CONDENSATE DRAIN

LINE,T/B.

PROVIDE 2ND

FLOOR

OPENING AND

PIPE SLEEVE EXPOSED

TR

205A

OFFICE

205A

OFFICE

205A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 24M-102

BLDG. 24 - FLOOR 2 - DEMO,

FLOOR PLANS & RCP 24

MGH MM/OB/JJ/CY

CONSTRUCTION

DOCUMENTS

03/31/2022

PROJECT

NORTH

1/4" = 1'-0"

RM 205A - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 205A - FLOOR PLAN

PROJECT

NORTH

PROJECT

NORTH

1/4" = 1'-0"

RM 205A - DEMO RCP

1/4" = 1'-0"

RM 205A - RCP

PROJECT

NORTH

PROJECT

NORTH

Revisions: Date:

1 1

6 6

1. DEMO SPRINKLER.

2. DEMO CEILING GRILLE. DEMO DUCT BACK TO MAIN. CAP/SEAL DUCT AT MAIN.

3. REMOVE PTAC. TURN OVER TO COR.

4. DEMO WALL HEATING CONVECTOR. DEMO PIPING BACK TO MAIN.

5. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.

6. INSTALL STANDARD RESPONSE SPRINKLER IN UPRIGHT POSITION. PROVIDE CAGE

GUARD.

7. INSTALL NEW REFRIGERANT LINES (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE PIPE

INSULATION. PROVIDE PIPE SUPPORT.

8. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE

SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.

PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.

9. REFER TO M-502 FOR PIPE THRU FLOOR DETAIL.

KEY PLAN

GENERAL NOTES

DEMOLITION GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS

OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL

BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON

THE PROJECT SITE IS PROHIBITED.

3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,

AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM

DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND

BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO

PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING

DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS

NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF

DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL

EQUIPMENT THAT IS TO REMAIN.

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE

BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS

AND SPECIFICATIONS.

3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH

MANUFACTURERS RECOMMENDATIONS.

4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.

5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC

EQUIPMENT.

6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER

PRIOR TO ANY CUTTING OF WALLS AND ROOF.

7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END

OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL

SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST

FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED

WITH STANDARD RESPONSE SPRINKLERS.

2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE

BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER

PROTECTION CAGE.

3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS

NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.

4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.

5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS

DEMOLISHED.

FIRE PROTECTION NOTES

UP

SPSPSPSP

RAD RAD

RADRAD

RAD

RAD

RADRADRAD

RAD

RAD

RAD RAD RAD RAD

RAD

RADRADRAD

RAD

RAD

RAD

RAD RAD

EJFEC

FE

FAP

FAPFAP

FAP

FAP

FAP

FAP

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

STAIRWELL NO.

S102

OFFICE

OFFICE

OFFICE

OFFICE

118A

OFFICE

OFFICE

OFFICE

OFFICE

COPY/BREAK

OI&T

113A

CORRIDOR

H103A

CORRIDOR

H103

OFFICE

MECH. RM.

MECH. RM.

108A

VESTIBULE

OFFICE

FIRE ALARM CL.

CORRIDOR

H104

RECEPTION

CORRIDOR

H102

OFFICE, OPEN

CORRIDOR

H101

HAC

STAIRWELL NO.

S101

STORAGE

S101B

TOILET, MALE

TOILET, FEMALE

OFFICE

ELEVATOR NO.

E-1

STORAGE

107A

UP

DN

UP

UP

DN

117A

194 SF

OFFICE

146 SF

OFFICE

M

H T

1/4" Ø,5/8" Ø REFRIGERANT

LINE, 5/8" Ø CONDENSATE

LINE WITH SLOPING, DROP

TO L/L

PROVIDE WALL OPENING AND PIPE

SLEEVE

25-CU-3-313A 25-CU-3-204B

25-CU-3-117A

-1/4" Ø, 5/8" Ø REFRIGERANT

LINE,F/A.

-TO BE CONNECTED TO 25-

CU-3-204B AND 25-

AC-2-313A

- PROVIDE 1ST FLOOR

OPENING AND PIPE SLEEVE

1/4" Ø, 5/8" Ø

REFRIGERANT

LINE AT H/L

1/4" Ø, 5/8" Ø

REFRIGERANT

LINE, DROP TO L/L

D R S

R L

RL

RS

RL

RS

RS

RL

RS

RL

RS

RS

RL

R S

R L

RL

RS

R L

R S

CONDENSATE TO

BE DISCHARGED

TO THE GROUND

TR

117A

85 SF1

25-AC-3-117A

RL

194 SF

OFFICE

146 SF

OFFICE

EXPOSED

TR

117A

85 SF

146 SF

OFFICE

194 SF

OFFICE

85 SF

OFFICE

117A

146 SF

OFFICE

194 SF

OFFICE

85 SF

OFFICE

117A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 25M-101

BLDG 25 - FLOOR 1 - DEMO,

FLOOR PLANS & RCPS 25

MGH MM/OB/JJ/CY

CONSTRUCTION

DOCUMENTS

03/31/2022

PROJECT

NORTH

1/4" = 1'-0"

RM 117A - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 117A - FLOOR PLAN

1/4" = 1'-0"

RM 117A - DEMO RCP

1/4" = 1'-0"

RM 117A - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

Revisions: Date:

1. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.

2. REMOVE EXISTING QUICK RESPONSE SPRINKLER AND INSTALL NEW STANDARD

RESPONSE SPRINKLER IN UPRIGHT POSITION. PROVIDE CAGE GUARD.

3. INSTALL NEW REFRIGERANT LINES (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE PIPE

INSULATION. PROVIDE PIPE SUPPORT.

4. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE

SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.

PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.

5. REFER TO M-502 FOR PIPE THRU WALL DETAIL.

6. REFER TO M-502 FOR PIPE THRU FLOOR DETAIL.

7. REFER TO M-501 FOR CONDENSING UNIT GROUND MOUNT SUPPORT DETAIL.

8. DEMO EXISTING WINDOW TYPE AC UNIT. TURN OVER TO COR.

KEY PLAN

GENERAL NOTES

DEMOLITION GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS

OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL

BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON

THE PROJECT SITE IS PROHIBITED.

3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,

AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM

DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND

BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO

PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING

DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS

NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF

DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL

EQUIPMENT THAT IS TO REMAIN.

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE

BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS

AND SPECIFICATIONS.

3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH

MANUFACTURERS RECOMMENDATIONS.

4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.

5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC

EQUIPMENT.

6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER

PRIOR TO ANY CUTTING OF WALLS AND ROOF.

7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END

OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL

SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST

FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED

WITH STANDARD RESPONSE SPRINKLERS.

2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE

BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER

PROTECTION CAGE.

3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS

NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.

4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.

5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS

DEMOLISHED.

FIRE PROTECTION NOTES

KEYNOTES #

PROVIDE WALL OPENING

AND PIPE SLEEVE

S P

S P

S P

S P

RAD

RADRADRAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RADRAD

RADRAD

RAD RAD

RADRAD

RAD RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD

RAD RAD RAD

EJ

FEC

FAP

FAP DN

DN

UP

204B85 SF

TR

204B

124 SF

TOILET, FEMALE

244 SF

OFFICE

204C

R L

R S

D D

D

D

D

5/8" Ø CONDENSATE LINE

WITH SLOPING AT H/L

-1/4" Ø, 5/8" Ø REFRIGERANT LINE,T/B -F/A

-TO BE CONNECTED TO 25-CU-3-204B

PROVIDE WALL

OPENING AND PIPE

SLEEVE

CONDENSATE LINE TO BE CONNECTED TO THE

EXISTING TOILET, FEMALE (205) SINK

PROVIDE 1ST AND 2ND

FLOOR OPENING AND PIPE

SLEEVE

25-AC-3-204B

85 SF

TR

204B

EXPOSED

124 SF

TOILET, FEMALE

244 SF

OFFICE

204C

85 SF

STORAGE

204B

124 SF

TOILET, FEMALE

244 SF

OFFICE

204C

85 SF

STORAGE

204B

124 SF

TOILET, FEMALE

244 SF

OFFICE

204C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 25M-102

BLDG 25 - FLOOR 2 - DEMO,

FLOOR PLANS & RCPS 25

MGH MM/OB/JJ/CY

CONSTRUCTION

DOCUMENTS

03/31/2022

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

1/4" = 1'-0"

RM 204B - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 204B - FLOOR PLAN

1/4" = 1'-0"

RM 204B - DEMO RCP

1/4" = 1'-0"

RM 204B - RCP

M

T H

1. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.

2. REMOVE EXISTING QUICK RESPONSE SPRINKLER AND INSTALL NEW STANDARD

RESPONSE SPRINKLER IN UPRIGHT POSITION. PROVIDE CAGE GUARD.

3. INSTALL NEW REFRIGERANT LINES (INDOOR UNIT TO OUTDOOR UNIT. PROVIDE PIPE

INSULATION. PROVIDE PIPE SUPPORT.

4. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE

SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.

PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.

5. REFER TO M-502 FOR PIPE THRU WALL DETAIL.

6. REFER TO M-502 FOR PIPE THRU FLOOR DETAIL.

7. REFER TO M-501 FOR INDIRECT DRAIN FOR SINK DETAIL.

8. DEMO FLOOR MOUNTED AC. DEMO REFRIGERANT COPPER PIPE BACK TO MAIN.

DEMO CONDENSATE PIPE.

Revisions: Date:

KEY PLAN

GENERAL NOTES

DEMOLITION GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS

OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL

BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON

THE PROJECT SITE IS PROHIBITED.

3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,

AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM

DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND

BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO

PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING

DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS

NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF

DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL

EQUIPMENT THAT IS TO REMAIN.

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE

BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS

AND SPECIFICATIONS.

3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH

MANUFACTURERS RECOMMENDATIONS.

4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.

5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC

EQUIPMENT.

6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER

PRIOR TO ANY CUTTING OF WALLS AND ROOF.

7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END

OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL

SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST

FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED

WITH STANDARD RESPONSE SPRINKLERS.

2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE

BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER

PROTECTION CAGE.

3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS

NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.

4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.

5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS

DEMOLISHED.

FIRE PROTECTION NOTES

S P

S P

S P

S P

FEC

EJ

FAP

FAP

DN

DN

313A

85 SF

TR

313A

172 SF

OFFICE

142 SF

OFFICE

25-AC-2-313A

5/8" Ø CONDENSATE LINE

WITH SLOPING AT H/L

CONDENSATE LINE TO BE

CONNECTED TO THE

EXISTING TOILET,FEMALE

(310) SINK

PROVIDE WALL

OPENING AND

PIPE SLEEVE

-1/4" Ø, 5/8" Ø REFRIGERANT LINE,T/B

-TO BE CONNECTED TO 25-CU-2-313A

-PROVIDE FLOOR OPENING AND PIPE

SLEEVE

7 5

R L

R S

D D

DD

145 SF

TOILET, FEMALE

172 SF

OFFICE

142 SF

OFFICE

85 SF

OFFICE

313A

172 SF

OFFICE

142 SF

OFFICE

85 SF

OFFICE

313A

85 SF

TR

313A

172 SF

OFFICE

142 SF

OFFICE

EXPOSED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 25M-103

BLDG 25 - FLOOR 3 - DEMO,

FLOOR PLANS & RCPS 25

MGH MM/OB/JJ/CY

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

PROJECT

NORTH

1/4" = 1'-0"

RM 313A - DEMO FLOOR PLAN

1/4" = 1'-0"

RM 313A - FLOOR PLAN

1/4" = 1'-0"

RM 313A - DEMO RCP

1/4" = 1'-0"

RM 313A - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

1. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.

2. REMOVE EXISTING QUICK RESPONSE SPRINKLER AND INSTALL NEW STANDARD

RESPONSE SPRINKLER IN UPRIGHT POSITION. PROVIDE CAGE GUARD.

3. INSTALL NEW REFRIGERANT LINES (INDOOR UNIT TO OUTDOOR UNIT). PROVIDE PIPE

INSULATION. PROVIDE PIPE SUPPORT.

4. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE

SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.

PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.

5. REFER TO M-502 FOR PIPE THRU WALL DETAIL.

6. REFER TO M-502 FOR PIPE THRU FLOOR DETAIL.

7. REFER TO M-501 FOR INDIRECT DRAIN FOR SINK DETAIL.

8. DEMO FLOOR MOUNTED AC. DEMO REFRIGERANT COPPER PIPE BACK TO MAIN.

DEMO CONDENSATE PIPE.

KEY PLAN

GENERAL NOTES

DEMOLITION GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS

OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL

BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON

THE PROJECT SITE IS PROHIBITED.

3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,

AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM

DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND

BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO

PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING

DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS

NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF

DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL

EQUIPMENT THAT IS TO REMAIN.

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE

BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS

AND SPECIFICATIONS.

3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH

MANUFACTURERS RECOMMENDATIONS.

4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.

5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC

EQUIPMENT.

6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER

PRIOR TO ANY CUTTING OF WALLS AND ROOF.

7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END

OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL

SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST

FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED

WITH STANDARD RESPONSE SPRINKLERS.

2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE

BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER

PROTECTION CAGE.

3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS

NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.

4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.

5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS

DEMOLISHED.

FIRE PROTECTION NOTES

AREAWELLAREAWELL

RAD

RAD

RAD

RADRAD

RAD

FAP

FAP

FAP

FAP

FAP

RECEIVING

BE109

OFFICE

BE101

517 SF

SHARED OFFICE

BE102

OFFICE

BE102A

OFFICE, OPEN

BE102C STORAGE

BE102D

OFFICE, OPEN

BE102E

TOILET

BE102B

OI&T

BE103

TUNNEL

ACCESS

BE104

SOILED UTILITY

BE106

SOILED LINEN

BE107

CORRIDOR

H001

ELEVATOR

LOBBY

BE100

MACHINE

REPAIR

BE105

STORAGE

BE105A

MECH. RM.

BE112

STORAGE

BE113

CORRIDOR

H003

EMERGENCY

GENERATOR

BA100A

ELEC. RM.

BA100

ELEC. RM.

BA101

MECH. RM.

BA102

LAUNDRY

CHUTE

BA103

STORAGE

BA108 OI&T

BE114

CORRIDOR

H004

STORAGE

BA109

STAIRWELL NO.

S001

ELEVATOR

PUMP RM.

BA104

STORAGE

BA106

CORRIDOR

H005

MECH. RM.

BE115

STAIRWELL NO.

S002

PIPE CHASE

Z004

PIPE CHASE

Z003

PIPE CHASE

Z005

PIPE CHASE

Z002

PIPE CHASE

BE100A

CRAWL SPACE

Z001

CORRIDOR

H002

STORAGE

BE110A

64 SF

ELEVATOR NO.2

E-2

ELEVATORS

ELEVATOR NO.1

E-1

CHASE

CH-BE-1

CHASE

CH-BA-1

CHASE

CH-BE-4

CHASE

CH-BE-3

CHASE

CH-BE-2

STAIRWELL NO.

S103

MECH. RM.

BA105

DN

DN

DN

DN

UP

UP

BE111,

BE110

T

H

T

M

51-AC-3-BE111

R L

R S

RL

RS

D

D

D

PROVIDE WALL OPENING AND

PIPE SLEEVE

5/8" Ø CONDENSATE DRAIN

LINE WITH SLOPING AT H/L

CONDENSATE LINE TO BE

CONNECTED TO THE

EXISTING DENTAL CLINIC

(BE110) SINK

TR

BE111

140 SF

DENTAL CLINIC

BE1105

2EXPOSED

DENTIST CLINIC

BE110

233 SF

OFFICE

BE111

140 SF

DENTIST CLINIC

BE110

233 SF

OFFICE

BE111

140 SF

CORRIDOR

H101

CORRIDOR

H101

NURSE STATION

1E130

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 51M-100

BLDG. 51 - FLOOR 00 - DEMO,

FLOOR PLANS & RCPS 51

MGH MM/OB/JJ/CY

CONSTRUCTION

DOCUMENTS

03/31/2022

PROJECT

NORTH

1/4" = 1'-0"

RM BE111 & BE110 - DEMO FLOOR PLAN

1/4" = 1'-0"

RM BE110 & BE111 - DEMO RCP

1/4" = 1'-0" 3A

RM BE111 & BE110 - FLOOR PLAN

1/4" = 1'-0"

RM BE110 & BE111 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

Revisions: Date:

1. DEMO SPRINKLER.

2. RELOCATE EXISTING CEILING SUPPLY GRILLE. EXTEND SUPPLY DUCT TO NEW

LOCATION.

3. REMOVE WALL THERMOSTAT/SENSOR. SAVE FOR RELOCATION.

4. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.

5. INSTALL NEW STANDARD RESPONSE SPRINKLER IN UPRIGHT POSITION. PROVIDE

CAGE GUARD.

6. RELOCATE EXISTING THERMOSTAT/SENSOR. EXTEND WIRING/TUBING TO NEW

LOCATION.

7. INSTALL NEW REFRIGERANT LINES ( INDOOR UNIT TO OUTDOOR UNIT ). PROVIDE PIPE

INSULATION. PROVIDE PIPE SUPPORT

8. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE

SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.

PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.

9. REFER TO M-501 FOR INDIRECT DRAIN FOR SINK DETAIL.

10. REFER TO M-502 FOR PIPE THRU WALL DETAIL.

11. REFER TO M-502 FOR PIPE THRU FLOOR DETAIL.

-1/4"Ø, 5/8"Ø REFRIGERANT

LINE ,T/A

-PROVIDE 1ST FLOOR

OPENING AND PIPE SLEEVE

1/4" Ø, 5/8" Ø

REFRIGERANT LINE AT H/L

KEY PLAN

GENERAL NOTES

DEMOLITION GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS

OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL

BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON

THE PROJECT SITE IS PROHIBITED.

3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,

AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM

DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND

BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO

PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING

DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS

NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF

DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL

EQUIPMENT THAT IS TO REMAIN.

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE

BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS

AND SPECIFICATIONS.

3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH

MANUFACTURERS RECOMMENDATIONS.

4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.

5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC

EQUIPMENT.

6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER

PRIOR TO ANY CUTTING OF WALLS AND ROOF.

7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END

OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL

SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST

FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED

WITH STANDARD RESPONSE SPRINKLERS.

2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE

BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER

PROTECTION CAGE.

3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS

NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.

4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.

5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS

DEMOLISHED.

FIRE PROTECTION NOTES

KEYNOTES #

T

1/4" = 1'-0" 3B

FLOOR 01 CORRIDOR - FLOOR PLAN

PROJECT

NORTH

-1/4"Ø, 5/8"Ø REFRIGERANT

LINE, (FROM RM BE111 TO

ROOF).

-PROVIDE FLOOR OPENING

AND PIPE

SLEEVE.

COURTYARD COURTYARD

FEC

FEC

FEC

FEC

FE

FE

TS

TS

CORRIDOR

H118A

ELEC CLOSET

1A147A

DAY RM.

1A147 2 BED PATIENT

RM.

1A148

TOILET

1A148A

2 BED PATIENT

RM.

1A149 2 BED PATIENT

RM.

1A150

CORRIDOR

H112

TOILET

1A150A

2 BED PATIENT

RM.

1A151

2 BED PATIENT

RM.

1A152

CORRIDOR

H112A

2 BED PATIENT

RM.

1A154

2 BED PATIENT

RM.

1A153

TOILET

1A152A

CORRIDOR

H113

DAY RM.

1A164

DAY RM.

1A165

OFFICE

1A162

WORK RM.

(COPY RM.)

1A161

HAC

1A160

MEDICATION

RM.

1A163B

NURSE STATION

1A163

CLEAN LINEN

1A159

LOCKER RM.

1A158

OFFICE

1A117

OFFICE

1A168

KITCHEN

1A116C

MED. PREP.

1A116B

CORRIDOR

H114

STORAGE

1A116A

NURSE STATION

1A116

LOCKER RM.

1A118

SECLUSION

1A156A

SECLUSION

1A155A

TOILET, MALE

1A118A

TOILET, FEMALE

1A118B

TOILET

1A157

LAUNDRY

1A125

STORAGE

1A123

SUPPLY RM.

1A119

STORAGE

1A120

EXAM RM.

1A121

HALLWAY

H119

SHOWER

1A124

CLOSET

1A115A

DAY RM.

1A115

CORRIDOR

H118B

CONFERENCE

RM.

1A108

EXAM RM.

1A122

2 BED PATIENT

RM.

1A114

TOILET

1A113A

2 BED PATIENT

RM.

1A1132 BED PATIENT

RM.

1A112

TOILET

1A111A

2 BED PATIENT

RM.

1A111

2 BED PATIENT

RM.

1A110

2 BED PATIENT

RM.

1A109

TOILET

1A109A

IRM EQUIPMENT

1A183

STG

1A179A

STAIRWELL

NO.1

S101

CORRIDOR

H111

LOUNGE

1A181

LOCKER RM.

1A181A

ELEC CLOSET

1A154B

DAY RM.

1A100 OFFICE, OPEN

1A169 STORAGE

1A166

OFFICE

1A101

OFFICE

1A174A

CONSULTATION

RM.

1A105

OI&T

1A107B

HAC

1A107A

CONSULTATION

RM.

1A106

OI&T

1A102

EXAM

1A103

OFFICE

1A104

TOILET

1A154A

LAUNDRY

CHUTE

1A178

MECH. RM.

1A180

CORRDIOR

H116

KITCHEN

1A172

CORRIDOR

H110

OFFICE

1E145D

KITCHEN

1E145C

F.A. PANELS

1E145B

STORAGE

1E145A

OFFICE

1E144

STORAGE

1E143

CORRIDOR

H105

CORRIDOR

H106

MAIN LOBBY

1E101

EXAM

1E134

TOILET

1E135B

TOILET

1E133A

TOILET

1E135D

LAUNDRY

1E135

STORAGE

1E137

TOILET

1E139

KITCHEN

1E140

STORAGE

1E129

TOILET

1E129A

HAC

1E131

LAUNDRY RM.

1E132

EXAM

1E133

CORRIDOR

H102

STORAGE

1E122

OFFICE, OPEN

1E120

CORRIDOR

H101

CORRIDOR

H103

TOILET, MALE

1E102

HAC

1E104

STORAGE

1E105

TOILET, FEMALE

1E103

OFFICE

1E107

OFFICE, OPEN

1E108

GROUP RM.

1E110

OI&T

1E109

LOCKER RM.

1E113

TOILET

1E113A

OFFICE

1E111

MED RM.

1E112

NURSE STATION

1E130

TOILET

1E127A

TOILET

1E126A

3 BED PATIENT

RM.

1E127

2 BED PATIENT

RM.

1E124

TOILET

1E124A

2 BED PATIENT

RM.

1E123

TOILET

1E123A

TOILET

1E141A

2 BED PATIENT

RM.

1E116

TOILET

1E115A

2 BED PATIENT

RM.

1E115

2 BED PATIENT

RM.

1E118

TOILET

1E117A

2 BED PATIENT

RM.

1E117

3 BED PATIENT

RM.

1E119

TOILET

1E114A

2 BED PATIENT

RM.

1E114

OFFICE

1W179

OFFICE

1W180

CLOSET

1W181A

OFFICE

1W181

STORAGE

1W182B

COPY RM.

1W182A

GROUP RM.

1W182

CORRIDOR

H106A

OFFICE

1W146A

GROUP RM.

1E145

OFFICE

1W147

TOILET

1W147A

OFFICE

1W148

STORAGE

1W146B

TOILET

1W178A

OFFICE

1W178

TOILET, STAFF

1W177A

REPORT RM.

1W177

TOILET

1W176A

LOUNGE

1W176

LINEN

1W176B

OFFICE

1W175

TOILET

1W174A

FILE RM.

1W174

TEST RM.

1W174B

OBSERVATION

1W170

OFFICE

1W171

OFFICE

1W172

CORRIDOR

H109

TOILET

1W173A

OFFICE

1W173

2 BED PATIENT

RM.

1W166

TOILET

1W166A

STORAGE

1W167

OFFICE

1W168

LOUNGE

1W169

CORRIDOR

H108

MED RM.

1W152

STORAGE

1W151TOILET, STAFF

1W150

KITCHEN

1W149

SHOWER

1W160

SOILED UTILITY

1W161

LAUNDRY RM.

1W157

HAC

1W158

TOILET

1W160A

CORRIDOR

H107

CORRIDOR

H109

NURSE STATION

1W159A

TOILET

1A127A

TOILET

1A128A

CORRIDOR

H118

TOILET

1E119A

WAITING RM.

1W155

TOILET

1W156A

TOILET

1W153A

3 BED RM.

1W162

2 BED PATIENT

RM.

1W165

TOILET

1W164A

2 BED PATIENT

RM.

1W164

2 BED PATIENT

RM.

1W163

TOILET

1W163A

TOILET

1W162A

OFFICE

1E128

TOILET

1E110A

2 BED PATIENT

RM.

1W156

SUPPLY RM.

1W155A

ELEVATOR NO.2

E-2

ELEVATOR NO.1

E-1

CHASE

CH-A-2

CHASE

CH-A-5

CHASE

CH-A-4

CHASE

CH-A-2

CHASE

CH-A-3

CHASE

CH-E-1

CHASE

CH-E-2

CHASE

CH-E-4

CHASE

CH-E-5

ENTRY FOYER

1E100

2 BED PATIENT

ROOM

1E126

2 BED PATIENT

RM.

1E125

TOILET, STAFF

1A133A

MED. PREP.

1A133B

NURSE STATION

1A133

OFFICE

1A131

STAFF LOUNGE

1A129

2 BED PATIENT

RM.

1A127

TOILET

1A129A

CORRIDOR

H120DAY RM.

1A135

DAY RM.

1A137

TOILET

1A137A

1A141A

2 BED PATIENT

RM.

1A141

STAIRWELL

NO.3

S103

ELEC. CLOSET

1A146

2 BED PATIENT

RM.

1A142

2 BED PATIENT

RM.

1A136

2 BED PATIENT

RM.

1A138

2 BED PATIENT

RM.

1A140

TOILET

1A138A

2 BED PATIENT

RM.

1A134

TOILET

1A134A

EXAM

1A132

TOILET

1A128A

2 BED PATIENT

RM.

1A128

TOILET

1A130A

2 BED PATIENT

RM.

1A130

STAIRWELL NO.

3A

S103A

CHASE

CH-A-1

1A139

51-AC-3-1A139

T

H

M

RL

RS

R L

R S

R L

R S

D D

CLEAN LINEN

1A139

TR

1A139A

141 SF

DAY RM.

1A137

TOILET

1A137A

CLEAN LINEN

1A139

DAY RM.

1A137

EXPOSED

CLEAN LINEN

1A139

TR

1A139A

141 SF

DAY RM.

1A137

TOILET

1A137A

CLEAN LINEN

1A139

DAY RM.

1A137

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

NON SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 51M-101a

BLDG. 51- FLOOR 01 - DEMO,

FLOOR PLANS & RCPS 51

MGH MM/OB/JJ/CY

CONSTRUCTION

DOCUMENTS

03/31/2022

PROJECT

NORTH

1/4" = 1'-0"

RM 1A139- FLOOR PLAN

1/4" = 1'-0"

RM 1A139- DEMO FLOOR PLAN

1/4" = 1'-0"

RM1A139 - DEMO RCP

1/4" = 1'-0"

RM1A139 - RCP

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

1. CEILING SUPPLY GRILLE TO REMAIN AND DUCTWORK TO ADJUST TO FAN COIL UNIT

NEW LOCATION.

2. CEILING EXHAUST/RETURN GRILLE TO REMAIN AND DUCTWORK TO ADJUST TO FAN

COIL UNIT NEW LOCATION.

3. RELOCATE FAN COIL UNIT & THERMOSTAT FROM WALL. EXTEND & INSULATE

HYDRONIC HEATING,CHILLED WATER & CONDENSATE PIPING TO THE NEW FAN COIL

LOCATION.

4. INSTALL NEW DUCTLESS SPLIT COOLING UNIT.

5. INSTALL NEW REFRIGERANT LINES ( INDOOR UNIT TO OUTDOOR UNIT). PROVIDE PIPE

INSULATION. PROVIDE PIPE SUPPORT.

6. INSTALL NEW CONDENSATE LINE. PROVIDE PIPE INSULATION. PROVIDE PIPE

SUPPORT. PITCH THE CONDENSATE DRAIN LINE IN THE DIRECTION OF FLOW.

PROVIDE CLEANOUTS AT EACH TURN IN THE DIRECTION OF FLOW.

7. DEMO SINK AND WATER CLOSET, INCLUDING WATER SUPPLIES OF BOTH AND

SANITARY OF WATER CLOSET. CAP WATER CLOSET'S SANITARY AND VENT PIPING IN

CONCEALED SPACE. DEMO HOT AND COLD WATER SUPPLIES BACK TO MAIN, CAP

WITHIN TWO PIPE DIAMETERS. REUSE SINK SANITARY AND VENT FOR CONDENSATE

DRAIN.

8. REFER TO M-501 FOR INDIRECT DRAIN FOR SINK DETAIL.

9. REFER TO M-501 FOR LINESET FLASHING DETAIL.

10. DEMO CEILING EXHAUST GRILLE. DEMO DUCT BACK TO MAIN, CAP AND SEAL DUCT.

CONDENSATE LINE TO

BE CONNECTED TO

THE EXISTING SINK

SANITARY DRAIN LINE.

5/8" Ø CONDENSATE

LINE AT H/L WITH

SLOPING

1/4" Ø, 5/8" Ø

REFRIGERANT LINE

AT H/L

-1/4" Ø, 5/8" Ø

REFRIGERANT

LINE,T/A.

- PROVIDE ROOF

FLOOR OPENING

AND PIPE SLEEVE.

Revisions: Date:

KEY PLAN

GENERAL NOTES

DEMOLITION GENERAL NOTES

1. REFER TO ALL DRAWINGS FOR COORDINATION BETWEEN DEMOLITION AND NEW

WORK. COORDINATE DEMOLITION WORK WITH THAT OF OTHER TRADES.

2. COORDINATE SALVAGE AND REUSE OF EXISTING EQUIPMENT WITH OWNER. ITEMS

OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL

BECOME THE PROPERTY OF THE CONTRACTOR. STORAGE OR SALE OF ITEMS ON

THE PROJECT SITE IS PROHIBITED.

3. PROTECTION: CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, COVERING,

AND SEALING EXISTING EQUIPMENT AND SURROUNDINGS DURING DEMOLITION FROM

DIRT, DUST AND DEBRIS. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND

BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO

PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE.

IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING

DAMAGED. TAKE EFFECTIVE MEASURES TO PREVENT DUST MIGRATION.

4. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR

RELOCATION. KEEP UTILITIES IN SERVICE AND PROTECT FROM DAMAGE. DO NOT

INTERRUPT UTILITIES SERVING AREAS OUTSIDE OF PRESENT SCOPE WITHOUT FIRST

OBTAINING PERMISSION FROM OWNER. PROVIDE TEMPORARY SERVICES AS

REQUIRED.

5. REMOVE AND DISPOSE OF EXISTING MECHANICAL EQUIPMENT AS SHOWN, UNLESS

NOTED OTHERWISE. COORDINATE WITH ARCHITECTURAL PLANS, AREAS OF

DEMOLITION AROUND, ADJACENT, OR CONNECTED TO EXISTING MECHANICAL

EQUIPMENT THAT IS TO REMAIN.

1. CONTRACTOR MUST VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE

BEGINNING ANY FABRICATION OR CONSTRUCTION.

2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, VA STANDARDS

AND SPECIFICATIONS.

3. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH

MANUFACTURERS RECOMMENDATIONS.

4. COORDINATE INSTALLATION OF EQUIPMENT AND MATERIALS WITH OTHER TRADES.

5. DO NOT ROUTE CONDENSATE PIPING OVER ELECTRICAL PANELS OR ELECTRONIC

EQUIPMENT.

6. CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR AND OWNER

PRIOR TO ANY CUTTING OF WALLS AND ROOF.

7. IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRE STOPPED AT THE END

OF THE WORK SHIFT, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL

SHALL BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST

FIRE/SMOKE SPREAD THROUGH THE UNSEALED PENETRATION.

1. ALL TELECOM ROOMS TO HAVE EXISTING QUICK RESPONSE SPRINKLERS REPLACED

WITH STANDARD RESPONSE SPRINKLERS.

2. ROOMS THAT DON’T HAVE CEILINGS (EXPOSED TO STRUCTURE) SHALL HAVE THE

BRANCH PIPING MODIFIED TO TURN THE SPRINKLER UPRIGHT. PROVIDE SPRINKLER

PROTECTION CAGE.

3. ROOMS WITH FINISHED CEILINGS SHALL HAVE SPRINKLER LOCATIONS ADJUSTED AS

NEEDED FOR APPROPRIATE COVERAGE PER LATEST EDITION OF NFPA 13.

4. TELECOM ROOMS CONSIDERED LIGHT HAZARD FOR SPRINKLER HEAD DENSITY.

5. SPRINKLER HEADS MUST BE REPLACED AT THE SAME TIME AS THE CEILING IS

DEMOLISHED.

FIRE PROTECTION NOTES

KEYNOTES #

7 10

COURTYARD COURTYARD

FEC

FEC

FEC

FEC

FE

FE

TS

TS

CORRIDOR

H118A

ELEC CLOSET

1A147A

DAY RM.

1A147 2 BED PATIENT

RM.

1A148

TOILET

1A148A

2 BED PATIENT

RM.

1A149 2 BED PATIENT

RM.

1A150

CORRIDOR

H112

TOILET

1A150A

2 BED PATIENT

RM.

1A151

2 BED PATIENT

RM.

1A152

CORRIDOR

H112A

2 BED PATIENT

RM.

1A154

2 BED PATIENT

RM.

1A153

TOILET

1A152A

CORRIDOR

H113

DAY RM.

1A164

DAY RM.

1A165

OFFICE

1A162

WORK RM.

(COPY RM.)

1A161

HAC

1A160

MEDICATION

RM.

1A163B

NURSE STATION

1A163

CLEAN LINEN

1A159

LOCKER RM.

1A158

OFFICE

1A117

OFFICE

1A168

KITCHEN

1A116C

MED. PREP.

1A116B

CORRIDOR

H114

STORAGE

1A116A

NURSE STATION

1A116

LOCKER RM.

1A118

SECLUSION

1A156A

SECLUSION

1A155A

TOILET, MALE

1A118A

TOILET, FEMALE

1A118B

TOILET

1A157

LAUNDRY

1A125

STORAGE

1A123

SUPPLY RM.

1A119

STORAGE

1A120

EXAM RM.

1A121

HALLWAY

H119

SHOWER

1A124

CLOSET

1A115A

DAY RM.

1A115

CORRIDOR

H118B

CONFERENCE

RM.

1A108

EXAM RM.

1A122

2 BED PATIENT

RM.

1A114

TOILET

1A113A

2 BED PATIENT

RM.

1A1132 BED PATIENT

RM.

1A112

TOILET

1A111A

2 BED PATIENT

RM.

1A111

2 BED PATIENT

RM.

1A110

2 BED PATIENT

RM.

1A109

TOILET

1A109A

IRM EQUIPMENT

1A183

STG

1A179A

STAIRWELL

NO.1

S101

CORRIDOR

H111

LOUNGE

1A181

LOCKER RM.

1A181A

ELEC CLOSET

1A154B

DAY RM.

1A100 OFFICE, OPEN

1A169 STORAGE

1A166

OFFICE

1A101

OFFICE

1A174A

CONSULTATION

RM.

1A105

OI&T

1A107B

HAC

1A107A

CONSULTATION

RM.

1A106

OI&T

1A102

EXAM

1A103

OFFICE

1A104

TOILET

1A154A

LAUNDRY

CHUTE

1A178

MECH. RM.

1A180

CORRDIOR

H116

KITCHEN

1A172

CORRIDOR

H110

OFFICE

1E145D

KITCHEN

1E145C

F.A. PANELS

1E145B

STORAGE

1E145A

OFFICE

1E144

STORAGE

1E143

CORRIDOR

H105

CORRIDOR

H106

MAIN LOBBY

1E101

EXAM

1E134

TOILET

1E135B

TOILET

1E133A

TOILET

1E135D

LAUNDRY

1E135

STORAGE

1E137

TOILET

1E139

KITCHEN

1E140

STORAGE

1E129

TOILET

1E129A

HAC

1E131

LAUNDRY RM.

1E132

EXAM

1E133

CORRIDOR

H102

STORAGE

1E122

OFFICE, OPEN

1E120

CORRIDOR

H101

CORRIDOR

H103

TOILET, MALE

1E102

HAC

1E104

STORAGE

1E105

TOILET, FEMALE

1E103

OFFICE

1E107

OFFICE, OPEN

1E108

GROUP RM.

1E110

OI&T

1E109

LOCKER RM.

1E113

TOILET

1E113A

OFFICE

1E111

MED RM.

1E112

NURSE STATION

1E130

TOILET

1E127A

TOILET

1E126A

3 BED PATIENT

RM.

1E127

2 BED PATIENT

RM.

1E124

TOILET

1E124A

2 BED PATIENT

RM.

1E123

TOILET

1E123A

TOILET

1E141A

2 BED PATIENT

RM.

1E116

TOILET

1E115A

2 BED PATIENT

RM.

1E115

2 BED PATIENT

RM.

1E118

TOILET

1E117A

2 BED PATIENT

RM.

1E117

3 BED PATIENT

RM.

1E119

TOILET

1E114A

2 BED PATIENT

RM.

1E114

OFFICE

1W179

OFFICE

1W180

CLOSET

1W181A

OFFICE

1W181

STORAGE

1W182B

COPY RM.

1W182A

GROUP RM.

1W182

CORRIDOR

H106A

OFFICE

1W146A

GROUP RM.

1E145

OFFICE

1W147

TOILET

1W147A

OFFICE

1W148

STORAGE

1W146B

TOILET

1W178A

OFFICE

1W178

TOILET, STAFF

1W177A

REPORT RM.

1W177

TOILET

1W176A

LOUNGE

1W176

LINEN

1W176B

OFFICE

1W175

TOILET

1W174A

FILE RM.

1W174

TEST RM.

1W174B

OBSERVATION

1W170

OFFICE

1W171

OFFICE

1W172

CORRIDOR

H109

TOILET

1W173A

OFFICE

1W173

2 BED PATIENT

RM.

1W166

TOILET

1W166A

STORAGE

1W167

OFFICE

1W168

LOUNGE

1W169

CORRIDOR

H108

MED RM.

1W152

STORAGE

1W151TOILET, STAFF

1W150

KITCHEN

1W149

SHOWER

1W160

SOILED UTILITY

1W161

LAUNDRY RM.

1W157

HAC

1W158

TOILET

1W160A

CORRIDOR

H107

CORRIDOR

H109

NURSE STATION

1W159A

TOILET

1A127A

TOILET

1A128A

CORRIDOR

H118

TOILET

1E119A

WAITING RM.

1W155

TOILET

1W156A

TOILET

1W153A

3 BED RM.

1W162

2 BED PATIENT

RM.

1W165

TOILET

1W164A

2 BED PATIENT

RM.

1W164

2 BED PATIENT

RM.

1W163

TOILET

1W163A

TOILET

1W162A

OFFICE

1E128

TOILET

1E110A

2 BED PATIENT

RM.

1W156

SUPPLY RM.

1W155A

ELEVATOR NO.2

E-2

ELEVATOR NO.1

E-1

CHASE

CH-A-2

CHASE

CH-A-5

CHASE

CH-A-4

CHASE

CH-A-2

CHASE

CH-A-3

CHASE

CH-E-1

CHASE

CH-E-2

CHASE

CH-E-4

CHASE

CH-E-5

ENTRY FOYER

1E100

2 BED PATIENT

ROOM

1E126

2 BED PATIENT

RM.

1E125

TOILET, STAFF

1A133A

MED. PREP.

1A133B

NURSE STATION

1A133

OFFICE

1A131

STAFF LOUNGE

1A129

2 BED PATIENT

RM.

1A127

TOILET

1A129A

CORRIDOR

H120DAY RM.

1A135

DAY RM.

1A137

TOILET

1A137A

CLEAN LINEN

1A139

2 BED PATIENT

RM.

1A143

TOILET

1A141A

2 BED PATIENT

RM.

1A141

STAIRWELL

NO.3

2 BED PATIENT

RM.

1A144

TOILET

1A142A

2 BED PATIENT

RM.

1A142

2 BED PATIENT

RM.

1A136

2 BED PATIENT

RM.

1A138

2 BED PATIENT

RM.

1A140

TOILET

1A138A

2 BED PATIENT

RM.

1A134

TOILET

1A134A

EXAM

1A132

TOILET

1A128A

2 BED PATIENT

RM.

1A128

TOILET

1A130A

2 BED PATIENT

RM.

1A130

STAIRWELL NO.

3A

J T

J T

1A102 1A183

H

T5

51-AC-2-1A102

M

D

RS

RL

R S

R L

PROVIDE WALL OPENING

AND PIPE SLEEVE

PROVIDE WALL OPENING

AND PIPE SLEEVE

1/4" Ø, 5/8" Ø

REFRIGERANT LINE AT H/L

-1/4" Ø, 5/8" Ø REFRIGERANT

LINE,T/A.

- PROVIDE ROOF FLOOR

OPENING AND PIPE SLEEVE. 11

CONDENSATE LINE TO BE

CONNECTED TO THE

EXISTING EXAM(1A103) SINK

5/8" Ø CONDENSATE LINE

AT H/L WITH SLOPING

TR

1A102

101 SF

EXAM

1A103

EXPOSED

EXAM

1A103

TR

1A102

101 SF

H

T

M

51-AC-4-1A183

RL

RS

R S

R L

-1/4" Ø, 5/8" Ø REFRIGERANT

LINE,T/A.

- PROVIDE ROOF FLOOR

OPENING AND PIPE SLEEVE.

1/4" Ø, 5/8" Ø REFRIGERANT

LINE AT H/L

PROVIDE WALL

OPENING AND

PIPE SLEEVE

5/8" Ø CONDENSATE LINE

AT H/L WITH SLOPING

CONDENSATE LINE TO BE

CONNECTED TO THE

EXISTING TOILET(1E135B)

LAVATORY

TR

1A183

272 SF

STG

1A179A

TOILET

1E135B

EXPOSED

STG

1A179A

TR

1A183

272 SF

OI&T

1A102

EXAM

1A103

OI&T

1A102

EXAM

1A103

STG

1A179A

IRM EQUIPMENT

1A183

STG

1A179A

IRM EQUIPMENT

1A183

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ENGINEERING DISCIPLINE:

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 51M-101b

BLDG 51 - FLOOR 01 - DEMO,

FLOOR PLANS & RCPS 51

MGH MM/OB/JJ/CY

CONSTRUCTION

DOCUMENTS

03/31/202…