Attachment 5 - Drawings Part-4.pdf
PDF 15 MB Posted
- Attached to
- Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
- Solicitation number
- 36C77623R0009
About this file
This solicitation seeks a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center campus. The scope of work includes electrical panel upgrades and power systems work; building management system integration; HVAC assessments, renovations and expansions; data center renovations; communication infrastructure upgrades including network cabling and fiber backbone; physical security enhancements; and hazardous material abatement. Affected buildings are 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75 across the campus. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 50
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JT JT
DN
RQ.2
TR
2S53
158 SF
CONFERENCE
RM.
2S56
CORRIDOR
H204
CORRIDOR
H208
E X
IS
T
F
L O
O R
IN
G
N E
W F
L O
O R
IN
G
EXISTING EXPOSED
STRUCTURE TO
REMAIN, NO WORK
RQ.2
TR
2S53
158 SF
CONFERENCE
RM.
2S56
CORRIDOR
H204
CORRIDOR
H208
EXPOSED
R
OI&T
2S53
158 SF
CONFERENCE
RM.
2S56
321 SF
CORRIDOR
H204
125 SF
CORRIDOR
H208
871 SF
RQ.2
OI&T
2S53
158 SF
CONFERENCE
RM.
2S56
321 SF
CORRIDOR
H204
125 SF
CORRIDOR
H208
871 SF
52A-1021
/4 " 4
OFFICE
2N89
OFFICE
2N92
CORRIDOR
H206
OFFICE
2N91
115 SF
OFFICE
2N89
OFFICE
2N92
CORRIDOR
H206
OFFICE
2N91
115 SF
TR
2N91
115 SF
OFFICE
2N92
211 SF
OFFICE
2N89
145 SF
CORRIDOR
H206
1134 SF
N
N E
W
F L O
O R
IN
G
E X
IS
T
F
L O
O R
IN
G
11 OFFICE
2N89
145 SF
CORRIDOR
H206
1134 SF
OFFICE
2N92
211 SFTR
2N91
115 SF
EXPOSED
LEVEL 02
401' - 1"
4.084.0921
TR
2N91
115 SF
SEAL EXISTING CHUTE DOOR
COMPLETELY
2N91 2S53
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
2 HR FIRE RATED WALL
EXISTING LIGHTS TO DEMOLISH
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 52A-102
BLDG 52 - FLOOR 2 - DEMO,
FLOOR PLANS & RCPS 52
EM AJ/MGA
CONSTRUCTION
DOCUMENTS
03/31/2022
LEGEND
KEY PLAN
1/4" = 1'-0"
RM 2S53 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 2S53 - FLOOR PLAN
1/4" = 1'-0"
RM 2S53 - DEMO RCP
1/4" = 1'-0"
RM 2S53 - RCP PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
GENERAL NOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
4. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
5. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
KEYNOTES
1 DEMO EXISTING ACT/GWB COMPLETELY INCLUDING ALL GRID, SUPPORTING
WIRES, CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE
OF STRUCTURE ABOVE. PATCH WALLS WHERE CEILINGS REMOVED.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH. REMOVE
EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRIP AT EXISTING FLOORING TRANSITION.
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING WINDOW.
REFERENCE DETAIL 4/A-603.
DEMO EXISTING DOOR/ FRAME, PREP FOR NEW DOOR/FRAME.
INSTALL NEW DOOR/FRAME.
FASTEN EXISTING CHUTE DOOR SHUT AND SEAL COMPLETELY WITH CAULK.
PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF
CONSTRUCTION AREA, TYP.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
1/4" = 1'-0"
RM 2N91 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 2N91 - DEMO RCP
1/4" = 1'-0"
RM 2N91 - FLOOR PLAN
1/4" = 1'-0"
RM 2N91 - RCP PROJECT
NORTH
1/4" = 1'-0"
RM 2N91 - INTERIOR ELEVATION
ICRA LEGEND
anaj Image
UP
UP
UP
UP
5.6
V.2V V.1
/2
5.6
V.2V V.1
TR
GS10
94 SF
E X
IS
T
F
L O
O R
IN
G
N E
W F
L O
O R
IN
G
5.6
V.2V V.1
EXISTING EXPOSED
STRUCTURE TO REMAIN,
NO WORK.
5.6
V.2V V.1
EXPOSED
TR
GS10
94 SF
GS10
GS02
OI&T
GS10
94 SF
CORRIDOR
H001
781 SF
MECH. RM.
GS09
236 SF
LOADING DOCK
GS11
197 SF
OI&T
GS10
94 SF
CORRIDOR
H001
781 SF
MECH. RM.
GS09
236 SF
LOADING DOCK
GS11
197 SF
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
EXISTING LIGHTS TO DEMOLISH
2 HR FIRE RATED WALL
5.6
6.5
5.4
5-9
N.7 N.8N.6N.5N.4
DEMO EXISTING LIGHT
12' - 5 1/4"
/4
8 4
3' - 4" 1' - 1 1/4"
4' - 7 3/4"
53A-100
9Sim
TR
GS02A
105 SF
RECREATIONAL
THERAPY
GS02
166 SF
PIPE SPACE
ACCESS
GS51
178 SF
CORRIDOR
H002
824 SF
G S
A
12' - 0 1/4"
0' - 4 1/2"
10 01a
E X
IS
T
F
L O
O R
IN
G
N E
W F
L O
O R
IN
G
5.6
6.5
5.4
5-9
N.7 N.8N.6N.5N.4
TR
GS02A
105 SF
RECREATIONAL
THERAPY
GS02
166 SF
PIPE SPACE
ACCESS
GS51
178 SF
EXPOSED
RECREATIONAL
THERAPY
GS02
279 SF
PIPE SPACE
ACCESS
GS51
178 SF
PIPE CHASE
Z002
2862 SF
CORRIDOR
H002
824 SF
RECREATIONAL
THERAPY
GS02
279 SF
PIPE SPACE
ACCESS
GS51
178 SF
CORRIDOR
H002
824 SF
EXISTING RESILIENT BASE:
CUT AS REQUIRED FOR NEW
DOOR AND PATCH CLEANLY TO
NEW FRAME.
WHERE NEW DOOR OCCURS: CAREFULLY CUT
EXISTING RAILING AND KICK-RAIL. SALVAGE END CAPS
FOR REUSE. REINSTALL RAILING AND KICK-RAIL AND
INSTALL SALVAGED END CAPS. PROVIDE ADDITIONAL
BLOCKING AND SUPPORTS FOR NEW END OF RAILING
AND KICK-RAIL AS NEEDED.
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 53A-100
BLDG 53 - FLOOR 0 - DEMO,
FLOOR PLANS & RCPS 53
EM AJ
CONSTRUCTION
DOCUMENTS
3/31/2022
KEY PLAN
PROJECT
NORTH
LEGEND
1/4" = 1'-0"
RM GS10 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM GS10 - FLOOR PLAN
1/4" = 1'-0"
RM GS10 - DEMO RCP
1/4" = 1'-0"
RM GS10 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
GENERAL NOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
4. PATCH AND REPAIRT CEILING GRID AND TILES WHERE NEW WALLS INSTALLED.
5. PATCH AND REPAIR GWB HERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
6. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
KEYNOTES
DEMO EXISTING DOOR/FRAME, PREP AREA FOR NEW DOOR/FRAME.
CONSTRUCT NEW WALL, PATCH/PAINT TO MATCH EXISTING UNLESS OTHERWISE
NOTED.
INSTALL NEW DOOR/FRAME.
DEMO EXISTING RAILING & WALL, PREP FOR NEW DOOR/FRAME. SEE DETAIL
9/53A-100.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH. REMOVE
EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRIP AT EXISTING FLOORING TRANSITION.
PATCH AND REPAINT WALL AS NECESSARY TO MATCH EXISTING ON CORRIDOR
SIDE.
DEMO EXISTING CABINETRY AND SINK. PATCH AND PAINT WALL.
DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,
CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF
STRUCTURE ABOVE. PATCH WALLS WHERE CEILINGS REMOVED.
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
DEMO ALL EXISTING TILE ON WALL. SUBSTRATE DOWN TO BARE STUDS.
PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF
CONSTRUCTION AREA, TYP.
ADD GWB OVER EXPOSED STUDS.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
PROJECT
NORTH
1/4" = 1'-0"
RM GS02 - DEMO RCP
1/4" = 1'-0"
RM GS02 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM GS02 - FLOOR PLAN
1/4" = 1'-0"
RM GS02 - RCP
PROJECT
NORTH
PROJECT
NORTH
1 1/2" = 1'-0"
H002 - CORRIDOR
ICRA LEGEND
DN
UP
DN
UP
DN
DN
DN
JT
JT
JT
JT
JT
JT
JT
JT
JT
JT
JT
JT
JT
JT
JT
JT
JT
JT
JT
1S002 1S011
K LJ1
5-9
L.1 M
LINEN CHUTE
1N120A
/2
/4
" 4
/2
DOOR TO REMAIN CLOSED AND SEALED
DURING ENTIRETY OF CONSTRUCTION PHASE.
53A-101
5Sim
5.6
K LJ1 L.1
TR
1S002
82 SF
LINEN CHUTE
1N120A
ON CALL RM.
1S001
142 SF ACTIVITY RM.
1S004
180 SF
CHASE
CH-S-5
CORRIDOR
H106
1S001
1301a
01b
01a01a
E X
IS
T
F
L O
O R
IN
G
N E
W F
L O
O R
IN
G
01a
5.6
K L L.1 M
7' - 0 1/4"
/2
1' - 11"
/4
5.6
K L L.1 M
TR
1S002
82 SF
ON CALL RM.
1S001
ACTIVITY RM.
1S004
CHASE
CH-S-5
CORRIDOR
H106
EXPOSED
5.6
5.4
5-9
N.7 N.8 PN.6 P.1
/2
3' - 2 1/4"
5.6
5.4
N.8 P
TR
1S011
127 SF
S
3' - 0"
6' - 3"
2' - 5 1/2"
CORRIDOR
H104
547 SF
01b
01b
E X
IS
T
F
L O
O R
IN
G
N E
W F
L O
O R
IN
G
5.6
5.4
N.8 P
EXPOSED
TR
1S011
127 SF
5.6
5.4
N.8 P
VENDING
1S011
127 SF
CORRIDOR
H104
547 SF
BED RM. - 1 BED
1S013
174 SF
VENDING
1S011
127 SF
CORRIDOR
H104
547 SF
BED RM. - 1 BED
1S013
174 SF
OI&T
1S002
34 SF
ACTIVITY RM.
1S004
190 SF
CHASE
CH-S-5
17 SF
CORRIDOR
H106
1188 SF
ON CALL RM.
1S001
182 SF
OI&T
1S002
ACTIVITY RM.
1S004
CHASE
CH-S-5
CORRIDOR
H106
ON CALL RM.
1S001
WHERE NEW DOOR OCCURS:
CAREFULLY CUT EXISTING RAILING
AND KICK-RAIL. SALVAGE END CAPS
FOR REUSE. REINSTALL RAILING AND
KICK-RAIL AND INSTALL SALVAGED
END CAPS. PROVIDE ADDITIONAL
BLOCKING AND SUPPORTS FOR NEW
END OF RAILING AND KICK-RAIL AS
NEEDED.
EXISTING RESILIENT BASE:
CUT AS REQUIRED FOR NEW DOOR
AND PATCH CLEANLY TO NEW
FRAME
TO DEMOLISH
EXISTING DOOR
TO REMAIN
EXISTING DOOR
TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
SMOKE RATED WALL
EXISTING LIGHTS TO DEMOLISH
2HR RATED WALL
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 53A-101
BLDG 53 - FLOOR 1 - DEMO,
FLOOR PLANS & RCPS 53
EM AJ/MGA
CONSTRUCTION
DOCUMENTS
3/31/2022
KEY PLAN
PROJECT
NORTH
LEGEND
1/4" = 1'-0"
RM 1S002 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 1S002 - FLOOR PLAN
1/4" = 1'-0"
RM 1S002 - DEMO RCP
1/4" = 1'-0"
RM 1S002 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1/4" = 1'-0"
RM 1S011 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 1S011 - FLOOR PLAN
1/4" = 1'-0"
RM 1S011 - RCP PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1/4" = 1'-0"
RM 1S011 - DEMO RCP
Revisions: Date:
GENERAL NOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
4. PATCH AND REPAIRT CEILING GRID AND TILES WHERE NEW WALLS INSTALLED.
5. PATCH AND REPAIR GWB HERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
6. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
7. PATCH CONCRETE FLOOR WHERE CONDUIT OCCUR AT EXISTING WALL
LOCATIONS.
KEYNOTES
INFILL WALL, INSTALL NEW DOOR/FRAME.
DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,
CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF
STRUCTURE ABOVE. PATCH WALLS WHERE CEILINGS REMOVED.
DEMO EXISTING DOOR.
INFILL WALL. PATCH AND PAINT TO MATCH EXISTING.
DEMO WALL, PREP FOR NEW DOOR/FRAME. DEMO EXISTING RAILING AS
NECESSARY. SEE DETAIL 5/53A-101.
CONSTRUCT NEW WALL AND WALL BASE. PAINT TO MATCH EXISTING ON
ONCALL AND ACTIVITY ROOM.
DEMO LIGHT FOR NEW WALL.
DEMO EXISTING WALLS.
INSTALL NEW DOOR/FRAME.
PATCH AND REPAINT ENTIRE WALL AS NECESSARY TO MATCH EXISTING ON
CORRIDOR SIDE.
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.
REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRIP AT EXISTING FLOORING TRANSITION.
PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF
CONSTRUCTION AREA, TYP.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
EXISTING FLOOR EXPANSION JOINT TO REMAIN. EXISTING EXPANSION JOINT AT
FLOOR ABOVE TO REMAIN.
EXISTING WALL EXPANSION JOINT TO REMAIN.
NEW BUILDING EXPANSION JOINT AT BOTH SIDES OF NEW WALL. SEE DETAIL
8/A-603.
1" = 1'-0"
H106 - CORRIDOR
ICRA LEGEND
F A PF E C
R A D
DN
DN
DN
2S001 2S002
5.6
K L
5.4
5-9
L.1 M
/4
5.6
5.4
5-9
L.1
DEMO EXISTING OFFICE
ACT CEILING & LIGHTS
5.6
5.4
5-9
L.1
TR
2S001
184 SF
CHASE TO BE ASESSED
CORRIDOR
H20401b
E X
IS
T
F
L O
O R
IN
G
N E
W F
L O
O R
IN
G
5.6
5.4
5-9
L.1
EXPOSED
TR
2S001
184 SF
OI&T
2S002
41 SF
OFFICE
2S001
139 SF
CORRIDOR
H204
OI&T
2S002
41 SF
OFFICE
2S001
139 SF
( + ) PRESSURE
CONSTRUCTION ZONE, ( - - ) PRESSURE
ANTE ROOM, ( - ) PRESSURE
TEMPORARY ICRA BARRIER
TEMPORARY ICRA DOOR
CONSTRUCTION TACKY MATT
NEGATIVE AIR MACHINE
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
EXISTING LIGHTS TO DEMOLISH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 53A-102
BLDG 53 - FLOOR 2 - DEMO,
FLOOR PLANS & RCPS 53
EM AJ/MGA
CONSTRUCTION
DOCUMENTS
3/31/2022
KEY PLAN
PROJECT
NORTH
LEGEND
1/4" = 1'-0"
RM 2S02 & 2S01- DEMO FLOOR PLAN
1/4" = 1'-0"
RM 2S02 & 2S01 - DEMO RCPPROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1/4" = 1'-0"
RM 2S02 & 2S01 - FLOOR PLAN
1/4" = 1'-0"
RM 2S02 & 2S01- RCP PROJECT
NORTH
Revisions: Date:
GENERAL NOTES
KEYNOTES
DEMO EXISTING DOOR/FRAME, PREP FOR WALL INFILL.
DEMO EXISTING WALLS.
INFILL WALL, PATCH & PAINT TO MATCH EXISTING ON CORRIDOR SIDE.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH.
REMOVE EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR. PROVIDE VINYL
REDUCER STRIP AT EXISTING FLOORING TRANSITION.
DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,
CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF
STRUCTURE ABOVE. PATCH WALLS WHERE CEILINGS REMOVED
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING
WINDOW, REFERENCE DETAIL 4/A-603.
SEE DETAIL 5/A-603 FOR EXTENDING WALL UP TO STRUCTURE ABOVE.
PLACE ADHESIVE WALK OFF MATS AT ENTRANCE AND EXIT SIDE OF
CONSTRUCTION AREA, TYP.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
ICRA LEGEND
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
4. PATCH AND REPAIR GWB HERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
5. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
6. PATCH CONCRETE FLOOR WHERE CONDUITS OCCUR AT EXISTING WALL
LOCATIONS.
S S
S
S
WAP
OC
D
WAP
OC
D
Tectonic Copyright 2007
Tectonic Copyright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
UP
UP
UP
DN
F E
C F
E C
FEC
F E
C
F E
C
F E
C
F E
C
FEC
FEC
FEC
FEC
F E
C
F
NO ARCHITECTURAL
WORK
F
5 EXISTING EXPOSED
STRUCTURE TO REMAIN,
NO WORK
F
85 SF
DATA, SYSTEM
1A130
85 SF
TR
1A129
1305 SF
CORE LAB AREA
1A126
NO ARCHITECTURAL
WORK
F
EXPOSED
85 SF
TR
1A129
85 SF
DATA, SYSTEM
1A130
1305 SF
CORE LAB AREA
1A126
E
8.2
110 SF
TR
1B104
88 SF
AGENT CASHIER
WAITING
1B102
264 SF
CORRIDOR
C1-4
NO ARCHITECTURAL
WORK
E
8.2
EXPOSED
264 SF
CORRIDOR
C1-4 110 SF
TR
1B104
88 SF
AGENT CASHIER
WAITING
1B102
EXISTING EXPOSED
STRUCTURE TO
REMAIN, NO WORK
E
8.2
110 SF
TR
1B104
88 SF
AGENT CASHIER
WAITING
1B102
264 SF
CORRIDOR
C1-4
NO ARCHITECTURAL
WORK
E
8.2
EXPOSED
110 SF
TR
1B104
264 SF
CORRIDOR
C1-4
88 SF
AGENT CASHIER
WAITING
1B102
L
NO
ARCHITECTURAL
WORK
L
EXISTING EXPOSED
STRUCTURE TO REMAIN,
NO WORK
L
96 SF
TR
1C132
99 SF
DATA TECH
1C133
215 SF
CORRIDOR
C1-57
420 SF
BREAKDOWN,
VERIFICATION &
INVENTORY
1C135
NO
ARCHITECTURAL
WORK
L
96 SF
TR
1C132
99 SF
DATA TECH
1C133
215 SF
CORRIDOR
C1-57
1A129
1C132
1B104
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
1 HR FIRE RATED WALL
2 HR FIRE RATED WALL
EXISTING LIGHTS
96 SF
DATA SYSTEMS
1C 132
99 SF
DATA TECH
1C 133
215 SF
CORRIDOR
C1-57
420 SF
BREAKDOWN,
VERIFICATION &
INVENTORY
1C 131
85 SF
DATA, TECH
1A 129
85 SF
DATA, SYSTEM
1A 130
1305 SF
CORE LAB AREA
1A 126
85 SF
DATA, TECH
1A 129
85 SF
DATA, SYSTEM
1A 130
1305 SF
CORE LAB AREA
1A 126
96 SF
DATA SYSTEMS
1C 132
99 SF
DATA TECH
1C 133
215 SF
CORRIDOR
C1-57
420 SF
BREAKDOWN,
VERIFICATION &
INVENTORY
1C 131
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 55A-101
BLDG 55 - FLOOR 1 - DEMO,
FLOOR PLANS & RCPS 55
EM AJ/MGA/CO
CONSTRUCTION
DOCUMENTS
03/31/2022
LEGEND
KEY PLAN
PROJECT
NORTH
1/4" = 1'-0"
RM 1A129 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 1A129 - DEMO RCP
1/4" = 1'-0"
RM 1A129 - FLOOR PLAN
1/4" = 1'-0"
RM 1A129 - RCPPROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1/4" = 1'-0"
RM 1B104 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 1B104 - DEMO RCP
1/4" = 1'-0"
RM 1B104 - FLOOR PLAN
1/4" = 1'-0"
RM 1B104 - RCP
1/4" = 1'-0"
RM 1C132 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 1C132 - DEMO RCP
1/4" = 1'-0"
RM 1C132 - FLOOR PLAN
1/4" = 1'-0"
RM 1C132 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
GENERAL NOTES
KEYNOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
22 22
DN
UP
DN
UP
DN
F
NO ARCHITECTURAL
WORK
F
EXISTING EXPOSED
STRUCTURE TO
REMAIN, NO WORK
F
85 SF
TR
2A136
331 SF
CORRIDOR
C2-12
85 SF
DATA SYSTEM
2A135
131 SF
INTAKE/EXIT
2A137
NO ARCHITECTURAL
WORK
F
85 SF
TR
2A136
85 SF
DATA SYSTEM
2A135
331 SF
CORRIDOR
C2-12
131 SF
INTAKE/EXIT
2A137
L
NO
ARCHITECTURAL
WORK
L
NO
ARCHITECTURAL
WORK
EXISTING EXPOSED
STRUCTURE TO
REMAIN, NO WORK
L
DATA TECH
2C145
101 SF
TR
2C144
NO
ARCHITECTURAL
WORK
L
101 SF
TR
2C144
104 SF
DATA TECH
2C145
2A136
2C144
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
1 HR FIRE RATED WALL
2 HR FIRE RATED WALL
EXISTING LIGHTS
85 SF
DATA TECH
2A 136
85 SF
DATA SYSTEM
2A 135
131 SF
INTAKE/EXIT
2A 137
331 SF
CORRIDOR
C2-12
85 SF
DATA TECH
2A 136
85 SF
DATA SYSTEM
2A 135
131 SF
INTAKE/EXIT
2A 137
331 SF
CORRIDOR
C2-12
104 SF
DATA TECH
2C 145
101 SF
DATA SYSTEMS
2C 144
104 SF
DATA TECH
2C 145
101 SF
DATA SYSTEMS
2C 144
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 55A-102
BLDG 55 - FLOOR 2 - DEMO,
FLOOR PLANS & RCPS 55
EM AJ/MGA/CO
CONSTRUCTION
DOCUMENTS
03/31/2022
LEGEND
KEY PLAN
PROJECT
NORTH
1/4" = 1'-0"
RM 2A136 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 2A136 - DEMO RCP
1/4" = 1'-0"
RM 2A136 - FLOOR PLAN
1/4" = 1'-0"
RM 2A136 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1/4" = 1'-0"
RM 2C144 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 2C144 - DEMO RCP
1/4" = 1'-0"
RM 2C144 - FLOOR PLAN
1/4" = 1'-0"
RM 2C144 - RCP
Revisions: Date:
GENERAL NOTES
KEYNOTES
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
UP
DN
DN
29' - 4"
4' - 0"
LS
LS
S
S
3A120 3C149
F
NO ARCHITECTURAL
WORK
F
EQ.
EXISTING EXPOSED
STRUCTURE TO REMAIN,
NO WORK
F
85 SF
TR
3A120
134 SF
PROGRAM
MANAGER
3A121
NO ARCHITECTURAL
WORK
85 SF
DATA SYSTEM
3A 119
F
85 SF
TR
3A120
134 SF
PROGRAM
MANAGER
3A121
85 SF
DATA SYSTEM
3A 119
L
NO
ARCHITECTURAL
WORK
L
12 EXISTING EXPOSED
STRUCTURE TO
REMAIN,
NO WORK
L
100 SF
TR
3C149
104 SF
DATA TECH
3C150
404 SF
CORRIDOR
C3-21
NO
ARCHITECTURAL
WORK
L
100 SF
TR
3C149
404 SF
CORRIDOR
C3-21
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
1 HR FIRE RATED WALL
2 HR FIRE RATED WALL
EXISTING LIGHTS
85 SF
DATA TECH
3A 120
85 SF
DATA SYSTEM
3A 119
819 SF
PROGRAM
MANAGER
3A 121
100 SF
DATA SYSTEMS
3C 149
104 SF
DATA TECH
3C 150
85 SF
DATA TECH
3A 120
85 SF
DATA SYSTEM
3A 119
819 SF
PROGRAM
MANAGER
3A 121
100 SF
DATA SYSTEMS
3C 149
104 SF
DATA TECH
3C 150
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 55A-103
BLDG 55 - FLOOR 3 - DEMO,
FLOOR PLANS & RCPS 55
EM AJ/MGA/CO
CONSTRUCTION
DOCUMENTS
03/31/2022
LEGEND
KEY PLAN
PROJECT
NORTH
1/4" = 1'-0"
RM 3A120 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 3A120 - DEMO RCP
1/4" = 1'-0"
RM 3A120 - FLOOR PLAN
1/4" = 1'-0"
RM 3A120 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1/4" = 1'-0"
RM 3C149 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 3C149 - DEMO RCP
1/4" = 1'-0"
RM 3C149 - FLOOR PLAN
1/4" = 1'-0"
RM 3C149 - RCP
Revisions: Date:
GENERAL NOTES
KEYNOTES
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
A
5.5
E
NO ARCHITECTURAL WORK
5.5
E
76 SF
TR
BA 105
NO ARCHITECTURAL WORK
5.5
E
EXPOSED
EXISTING EXPOSED
STRUCTURE TO REMAIN,
NO WORK
76 SF
TR
BA 105
75 SF
DATA
BA 106
5.5
E
EXPOSED
76 SF
TR
BA105
BA 105
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
1HR FIRE RATED WALL
2HR FIRE RATED WALL
76 SF
TECH
BA 105
139 SF
CORRIDOR
CB-5
75 SF
DATA
BA 106
97 SF
CORRIDOR
CB-3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 56A-100
BLDG 56 - FLOOR 0 - DEMO,
FLOOR PLANS & RCPS 56
03/31/2022 EM AJ/MGA/CO
CONSTRUCTION
DOCUMENTS
1/2" = 1'-0"
RM BA105 - DEMO FLOOR PLAN
1/2" = 1'-0"
RM BA105 - FLOOR PLAN
KEY PLAN
PROJECT
NORTH
LEGEND
Revisions: Date:
1/2" = 1'-0"
RM BA105 - DEMO RCP
1/2" = 1'-0"
RM BA105 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
GENERAL NOTES
KEYNOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
5.5
E
NO ARCHITECTURAL WORK
5.5
E
78 SF
TR
1A 109
NO ARCHITECTURAL WORK
5.5
E
EXPOSED
EXISTING EXPOSED
STRUCTURE TO REMAIN,
NO WORK
5.5
E
EXPOSED
78 SF
TR
1A 109
1A 109
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
1HR FIRE RATED WALL
2HR FIRE RATED WALL
78 SF
TECH
1A 109
79 SF
DATA
1A 108162 SF
CORR
C1-6
588 SF
LOBBY
C1-5
78 SF
TECH
1A 109
79 SF
DATA
1A 108162 SF
CORR
C1-6
588 SF
LOBBY
C1-5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 56A-101
BLDG 56 - FLOOR 1 - DEMO,
FLOOR PLANS & RCPS 56
03/31/2022 EM AJ/MGA/CO
CONSTRUCTION
DOCUMENTS
Revisions: Date:
1/2" = 1'-0"
RM 1A109 - DEMO FLOOR PLAN
1/2" = 1'-0"
RM 1A109 - FLOOR PLAN
1/2" = 1'-0"
RM1A109 - DEMO RCP
1/2" = 1'-0"
RM1A109 - RCP
KEY PLAN
PROJECT
NORTH
LEGEND
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
GENERAL NOTES
KEYNOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
5.5
F
NO ARCHITECTURAL WORK
5.5
F
76 SF
TR
2A 122
NO ARCHITECTURAL WORK
5.5
F
EXPOSED
EXISTING EXPOSED
STRUCTURE TO REMAIN,
NO WORK
5.5
F
EXPOSED
76 SF
TR
2A 122
2A 122
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
1HR FIRE RATED WALL
2HR FIRE RATED WALL
76 SF
TECH
2A 122
173 SF
CORR
C2-4
77 SF
DATA
2A 121
274 SF
CORR
C2-6
76 SF
TECH
2A 122173 SF
CORR
C2-4
77 SF
DATA
2A 121
274 SF
CORR
C2-6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 56A-102
BLDG 56 - FLOOR 2 - DEMO,
FLOOR PLANS & RCPS 56
03/31/2022 EM AJ/MGA/CO
CONSTRUCTION
DOCUMENTS
Revisions: Date:
KEY PLAN
PROJECT
NORTH
LEGEND
1/2" = 1'-0"
RM 2A122 - DEMO FLOOR PLAN
1/2" = 1'-0"
RM 2A122 - FLOOR PLAN
1/2" = 1'-0"
RM 2A122 - DEMO RCP
1/2" = 1'-0"
RM 2A122 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
GENERAL NOTES
KEYNOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
5.5
E
76 SF
TR
3A 122
76 SF
DATA
3A 121
NO ARCHITECTURAL WORK
5.5
E
NO ARCHITECTURAL WORK
5.5
E
EXISTING EXPOSED
STRUCTURE TO REMAIN,
NO WORK
5.5
E
EXPOSED
76 SF
TR
3A 122
3A 122
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
1HR FIRE RATED WALL
2HR FIRE RATED WALL
76 SF
TECH
3A 122
76 SF
DATA
3A 121
76 SF
TECH
3A 122 76 SF
DATA
3A 121
EXPOSED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 56A-103
BLDG 56 - FLOOR 3 - DEMO,
FLOOR PLANS & RCPS 56
03/31/2022 EM AJ/MGA/CO
CONSTRUCTION
DOCUMENTS
Revisions: Date:
KEY PLAN
LEGEND
1/2" = 1'-0"
RM 3A122 - FLOOR PLAN
1/2" = 1'-0"
RM 3A122 - DEMO FLOOR PLAN
1/2" = 1'-0"
RM 3A122 - DEMO RCP
1/2" = 1'-0"
RM 3A122 - RCP
GENERAL NOTES
KEYNOTES
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
AA AA
E
C F
E C
FEC
FECFEC
FECFEC
FEC
F E
C F
E C
F E
C F
E C
FECFEC
FECFEC
F E
C F
E C
F E
C F
E C
FEC
FECFEC
F E
C F
E C
F E
C F
E C
FEC
FECFEC
FEC
F E
C F
E C
FEC
GFI
GFI
AE721B2
AE721
C7
F7
A A
D.4
6.1
NO ARCHITECTURAL WORK
D.4
6.1
81 SF
TR
1B 120
NO ARCHITECTURAL WORK
D.4
6.1
EXISTING EXPOSED STRUCTURE
TO REMAIN, NO WORK
D.4
6.1
81 SF
TR
1B 120
EXPOSED
1B120
1B139
H
8.4
NO ARCHITECTURAL WORK
H
8.4
85 SF
TR
1B 139
NO ARCHITECTURAL WORK
EXISTING EXPOSED STRUCTURE
TO REMAIN, NO WORK
H
8.4
85 SF
TR
1B 139
EXPOSED
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
81 SF
DATA
1B 120
111 SF
CORR
C1-7
81 SF
DATA
1B 120
111 SF
CORR
C1-7
85 SF
DATA
1B 139
H
8.4
85 SF
DATA
1B 139
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 57A-101
BLDG 57 - FLOOR 1 - DEMO,
FLOOR PLANS & RCPS 57
EM AJ/MGA
CONSTRUCTION
DOCUMENTS
03/31/2022
KEY PLAN
PROJECT
NORTH
LEGEND
1/2" = 1'-0"
RM1B120 - DEMO FLOOR PLAN
1/2" = 1'-0"
RM 1B120 - FLOOR PLAN
1/2" = 1'-0"
RM1B120 - DEMO RCP
1/2" = 1'-0"
RM 1B120 - RCP
1/2" = 1'-0"
RM 1B139 - DEMO FLOOR PLAN
1/2" = 1'-0"
RM 1B139 - FLOOR PLAN
1/2" = 1'-0"
RM 1B139 - DEMO RCP
1/2" = 1'-0"
RM 1B139 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
GENERAL NOTES
KEYNOTES
Revisions: Date:
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD
RAD RAD RAD RAD RAD RAD RAD RAD
RAD
RADRADRADRAD
RAD
RADRADRADRADRADRAD
RAD
RAD
FAP
FAP
FAP
FAP FAP
FAP
FAP
FE
FEC
FEC
DC1
117 SF
TR
580 SF
CORRIDOR
C105
DC1
E X
IS
T
F
L O
O R
IN
G
N E
W
L O
O R
IN
G
9' - 0"
DC1
117 SF
TR
580 SF
CORRIDOR
C105
EXPOSED
DC1
117 SF
OFFICE
117 SF
OFFICE
116 SF
OFFICE
117 SF
OFFICE
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
EXISTING LIGHTS TO DEMOLISH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 58A-101
BLDG 58 - FLOOR 1 - DEMO,
FLOOR PLANS & RCPS 58
EM AJ/MGA/CO
CONSTRUCTION
DOCUMENTS
03/31/2022
LEGEND
KEY PLAN
PROJECT
NORTH
1/4" = 1'-0"
RM 104 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 104 - FLOOR PLAN
1/4" = 1'-0"
RM 104 - DEMO RCP
1/4" = 1'-0"
RM 104 - RCP
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
GENERAL NOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. ICRA BARRIERS NOT SHOWN. COORDINATE DIRECTLY WITH COR & SAFETY TO
MEET ICRA REQUIREMENTS.
3. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
4. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
5. PATCH AND REPAIR GWB WHERE DOORS ARE DEMO'D AND NEW DOORS ARE
INSTALLED.
6. PROTECT FINISHES IN ROOMS ADJACENT TO NEW TELECOMMUNICATION ROOMS
AND AREAS NOT SCHEDULED FOR NEW WORK.
KEYNOTES
1 DEMO EXISTING DOOR/FRAME, PREP FOR NEW DOOR/FRAME.
INSTALL NEW DOOR/FRAME.
DEMO EXISTING FLOORING TO EXPOSED CONCRETE SLAB UNDERNEATH. REMOVE
EXISTING ADHESIVE AND PREP FOR NEW FLOORING.
APPLY ANTI-STATIC COATING TO EXPOSED CONCRETE FLOOR.
DEMO EXISTING ACT COMPLETELY INCLUDING ALL GRID, SUPPORTING WIRES,
CLIPS, AND PERIMETER WALL ANGLES IN ROOM TO EXPOSE UNDERSIDE OF
STRUCTURE ABOVE. PATCH WALLS WHERE CEILINGS REMOVED.
NEW FRT PLYWOOD OVER WALLS PER DETAIL 4/AE421.
INSTALL PHYSICAL SECURITY AT INTERIOR AND EXTERIOR OF EXISTING WINDOW.
REFERENCE DETAIL 4/A-603.
SEE DETAIL 5/A-603 FOR EXTENDING WALLS UP TO STRUCTURE ABOVE.
DEMO EXISTING BASE, PREP FOR NEW BASE.
INSTALL NEW BASE ON ALL WALLS OF NEW TELECOM ROOM.
PROJECT
NORTH
LOADING DOCK
FE
FE
FE
FE
FAP
FAP
FAP
FAP FAP
FAP
RAD
RAD
RAD
RAD
RAD
RADRAD
RAD
RADRADRADRADRAD
RAD
RAD
RAD
RAD
RAD
RAD RAD
RAD
UP
UP
A
H
NO
ARCHITECTURAL
WORK
10' - 3"
H
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
54 SF
IT
SHARED WORK
AREA
214 SF
CORRIDOR
54 SF
TR
200 SF
SHARED WORK
AREA
214 SF
CORRIDOR
H
NO
ARCHITECTURAL
WORK
54 SF
IT
200 SF
SHARED WORK
AREA
214 SF
CORRIDOR
EXPOSED
54 SF
TR
H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 60A-101
BLDG 60 - FLOOR 1 - DEMO,
FLOOR PLANS & RCPS 60
EM AJ/MGA
CONSTRUCTION
DOCUMENTS
03/31/2022
1/4" = 1'-0"
RM 102 - DEMO FLOOR PLAN
1/4" = 1'-0"
RM 102 - DEMO RCP
LEGEND
KEY PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
GENERAL NOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
KEYNOTES
1/4" = 1'-0"
RM 102 - FLOOR PLAN
1/4" = 1'-0"
RM 102 - RCP
PROJECT
NORTH
UP
EXISTING EXPOSED
STRUCTURE TO REMAIN,
NO WORK
108 SF
TR
1B 105
EXPOSED83 SF
CORRIDOR
C1-6
103 SF
TERMINAL ROOM
A
1B 107
NO ARCHITECTURAL WORK
108 SF
TR
1B 105
83 SF
CORRIDOR
C1-6
NO ARCHITECTURAL WORK
103 SF
TERMINAL ROOM
A
1B 107
1B105
TO DEMOLISH
EXISTING DOOR TO REMAIN
EXISTING DOOR TO DEMOLISH
NEW DOOR
EXISTING WALL TO DEMOLISH (NON-BEARING METAL STUD WALL)
108 SF
TERMINAL ROOM
B
1B 105
103 SF
TERMINAL ROOM
A
1B 107
83 SF
CORRIDOR
C1-6
108 SF
TERMINAL ROOM
B
1B 105
103 SF
TERMINAL ROOM
A
1B 107
83 SF
CORRIDOR
C1-6
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
EHRM INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
SPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES 75A-101
BLDG 75 - FLOOR 1 - DEMO,
FLOOR PLANS & RCPS 75
RM AJ/MGA/PKQ
CONSTRUCTION
DOCUMENTS
03/31/2022
1/2" = 1'-0"
RM 1B105 - DEMO RCP
1/2" = 1'-0"
RM 1B105 - RCP
1/2" = 1'-0"
RM 1B105 - DEMO FLOOR PLAN
1/2" = 1'-0"
RM 1B105 - FLOOR PLAN
LEGEND
KEY PLAN
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Revisions: Date:
GENERAL NOTES
KEYNOTES
1. ALL PRODUCTS AND WALL FINISHES SHALL MATCH EXISTING OR ADJACENT
EXISTING UNLESS OTHERWISE NOTED.
2. PATCH AND REPAIR WALLS WHERE MECHANICAL, PLUMBING, AND ELECTRICAL
ITEMS DEMO'D.
3. PATCH AND REPAIR FLOOR WHERE CONDUITS, PIPING AND SIMILAR ARE DEMO'D.
LEVEL 4 TAPE & FINISH ON
GWB & CLG IN TR SIDE, TYP UNDERSIDE OF
STRUCTURE ABOVE
LENGTH OF WALL SHALL VARY, TYP
DEMO EXIST SUSP
CEILING AS INDICATED
ON RCP, TYP
EXPOSED WALL
FINISH SHALL
BE PAINTED
WHITE (P-01),
TYP
RUBBER BASE, TYP
EXIST SUSPENDED CEILING TO
REMAIN ON CORRIDOR SIDE
UNDERSIDE OF STRUCTURE ABOVE
EXIST WALL
TO REMAIN
EXIST WALL
TO REMAIN
2" HM DOOR FRAME, TYP
LENGTH SHALL VARY LENGTH SHALL VARY
REPAINT FULL HEIGHT FROM SUSP CEILING TO
FINISH FLOOR WHERE DOOR/FRAME ARE TO BE
INSTALLED
PAINT EXIST WALL TO
NEAREST BREAK, TYP
INSTALL NEW DOOR OR
INFILL WALL AS INDICATED ON
PLANS
LEVEL 4 TAPE & FINISH GWB& CLG IN TR SIDE, TYP
UNDERSIDE OF STRUCTURE ABOVE
DEMO EXIST SUSP CEILING AS
INDICATED ON DEMO RCP, TYP
3/4" FR PLYWOOD
EXPOSED WALL FINISH SHALL BE PAINTED WHITE (P-01), TYP
RUBBER BASE, TYP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
AE421
INTERIOR ELEVATIONS & TR PLAN
VIEWSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 EM AJ/ST
CONSTRUCTION
DOCUMENTS
GENERAL NOTES
1. CONTRACTOR SHALL LEAVE FIRE RATING STAMP
UNPAINTED AND VISIBLE ON NEW INSTALLED FRT
PLYWOOD.
2. PROVIDE NEW 3/4" FRT PLYWOOD ON WALLS WHERE
INDICATED ON PLANS. PAINT WITH FIRE RETARDANT
PAINT (P-02), REFERENCE DETAIL 4/AE421.
3. REFER TO DETAIL #4 ON SHEET AE421 FOR A TYPICAL
TELECOM ROOM INTERIOR ELEVATION.
4. INSTALL VERTICAL STUD OR HORIZONTAL BLOCKING AT
ALL GWB EDGES.
5. ALL PRODUCTS AND WALL FINISHES SHALL MATCH
EXISTING OR ADJACENT UNLESS OTHERWISE NOTED.
3/4" = 1'-0"
INTERIOR TR ENTRANCE - TYP INTERIOR ELEVATION
3/4" = 1'-0"
EXTERIOR TR ENTRANCE - TYP DOOR ELEVATION
3/4" = 1'-0"
TYPICAL TR WALL - PLAN VIEW
3/4" = 1'-0"
INTERIOR TR ELEVATION - TYP PLYWOOD
Revisions: Date: 69 OF 436
INTERIOR FINISH SCHEDULE
BLDG
ROOM
ROOM
NAME
FLOOR BASE WALLS
CLG COMMENTSMAT FIN MAT HT
NORTH EAST SOUTH WEST
MAT FIN MAT FIN MAT FIN MAT FIN
1 C102D TELECOM CONC AST RB-01 4" - P-01 - P-01 - P-01 - P-01 EXP
1 1E15 TELECOM CONC AST - - - P-01 - P-01 - P-01 - P-01 EXP
1 2C10A TELECOM CONC AST RB-01 4" - P-01 - P-01 - P-01 GWB P-01 EXP
1 E303 TELECOM - - - - - P-01 - P-01 - P-01 - P-01 EXP
1 3C13 TELECOM CONC AST RB-01 4" - P-01 GWB P-01 - P-01 - P-01 EXP
1 2C10 LAB - - EXST EXST - - - - - - GWB P-03 -
1 3C12 LAB - - EXST EXST - - - - - - GWB P-03 -
1 H304 CORRIDOR - - EXST EXST GWB P-03 - - - - - - -
2 111 TELECOM CONC AST - - - P-01 - P-01 - P-01 - P-01 EXP
2 209 TELECOM CONC AST RB-01 4" - P-01 - P-01 GWB P-01 - P-01 EXP
2 308 TELECOM CONC AST RB-01 4" - P-01 GWB P-01 - P-01 - P-01 EXP
2 H202 CORRIDOR - - EXST EXST - - GWB P-03 - - - - -
3 B025A TELECOM CONC AST RB-01 4" GWB P-01 - P-01 - P-01 GWB P-01 EXP
3 117 TELECOM CONC AST - - - P-01 - P-01 - P-01 - P-01 EXP
3 224A TELECOM CONC AST RB-01 4" - P-01 - P-01 - P-01 GWB P-01 EXP
3 B025A VACANT - - EXST EXST GWB P-03 GWB P-03 - - - - -
3 236 CORRIDOR - - - - - - - - - P-03 - - -
3 224 LOUNGE - - EXST EXST GWB P-03 - - - - - - -
18 011A TELECOM CONC AST RB-01 4" - P-01 - P-01 - P-01 GWB P-01 EXP
18 119 TELECOM CONC AST RB-01 4" GWB P-01 - P-01 GWB P-01 GWB P-01 EXP
18 213 TELECOM CONC AST RB-01 4" - P-01 - P-01 GWB P-01 GWB P-01 EXP
18 312 TELECOM CONC AST RB-01 4" - P-01 GWB P-01 GWB P-01 - P-01 EXP
18 H002 CORRIDOR - - - - GWB P-03 - - - - - P-03 -
18 011 OFFICE - - EXST EXST GWB P-03 - - - - - - -
18 013 OFFICE - - EXST EXST - - - - GWB P-03 - - -
18 H102 CORRIDOR - - EXST EXST GWB P-03 GWB P-03 - - - - -
18 H101 CORRIDOR - - EXST EXST GWB P-03 - - - - - - -
18 H103 CORRIDOR - - EXST EXST - - - - GWB P-03 - - -
18 H202 CORRIDOR - - EXST EXST GWB P-03 - - - - - - -
18 H201 CORRIDOR - - EXST EXST GWB P-03 - - - - - - -
18 H301 CORRIDOR - - EXST EXST - - - - - - GWB P-03 -
18 H302 CORRIDOR - - EXST EXST GWB P-03 - - - - - - -
23 G09B TELECOM CONC AST RB-01 4" - P-01 GWB P-01 P-01 - P-01 EXP
23 121A TELECOM CONC AST RB-01 4" - P-01 P-01 GWB P-01 GWB P-01 EXP
23 G09 LOCKSHOP - - EXST EXST - - - - - - GWB P-03 -
23 H002 CORRIDOR - - - - - P-03 - - - - - - -
23 121 LAB EXST - EXST EXST - - GWB P-03 - - - - -
23 C119 CORRIDOR - - - - - P-03 - - - - - - -
24 G02A TELECOM CONC AST - - - P-01 - P-01 - P-01 - P-01 EXP
24 114B TELECOM CONC AST - - - P-01 - P-01 - P-01 - P-01 EXP
24 205A TELECOM CONC AST - - - P-01 - P-01 - P-01 - P-01 EXP
25 117A TELECOM CONC AST - - - P-01 - P-01 - P-01 - P-01 EXP
25 204B TELECOM CONC AST - - - P-01 - P-01 - P-01 - P-01 EXP
25 313A TELECOM CONC AST - - - P-01 - P-01 - P-01 - P-01 EXP
51 BE111 TELECOM CONC AST RB-01 4" - P-01 GWB P-01 - P-01 - P-01 EXP
51 1A102 TELECOM CONC AST RB-01 4" GWB P-01 GWB P-01 - P-01 - P-01 EXP
51 1A183 TELECOM CONC AST RB-01 4" GWB P-01 - P-01 - P-01 - P-01 EXP
51 1A139A TELECOM CONC AST RB-01 4" GWB P-01 GWB P-01 GWB P-01 GWB P-01 EXP
51 BE110 DENTAL CLINIC - - EXST EXST - - - - - - GWB P-03 -
51 1A139 CLEAN LINEN - - EXST EXST - - GWB P-03 GWB P-03 - - -
51 1A137 DAYROOM - - EXST EXST GWB P-03 - - - - - - -
51 H120 CORRIDOR - - EXST EXST - - - - - - GWB P-03 -
51 1A103 EXAM - - EXST EXST - - - - GWB P-03 - - -
51 CORRIDOR - - EXST EXST - - - - - - GWB P-03 -
51 1A179A STG - - EXST EXST - - - - GWB P-03 - - -
52 GN29A TELECOM CONC AST RB-01 4" - P-01 GWB P-01 GWB P-01 - P-01 EXP
52 1N82A TELECOM CONC AST RB-01 4" GWB P-01 - P-01 - P-01 - P-01 EXP
52 1S33A TELECOM CONC AST RB-01 4" GWB P-01 - P-01 GWB P-01 GWB P-01 EXP
52 2N91 TELECOM CONC AST - - - P-01 - P-01 - P-01 - P-01 EXP
52 2S53 TELECOM CONC AST - - - P-01 - P-01 - P-01 - P-01 EXP
52 GN29 VENDING ROOM - - EXST EXST GWB P-03 - - - - GWB P-03 -
52 H003 CORRIDOR - - - - - - - P-03 - - - - -
52 1N82A DAYROOM - - EXST EXST - - - - GWB P-03 - - -
52 H111 CORRIDOR - - - - - - - P-03 - - - - -
52 VESTIBULE - - - - - - - - - P-03 - - -
52 1S33 EXAM - - EXST EXST - - GWB P-03 GWB P-03 - - -
53 GS02A TELECOM CONC AST RB-01 4" - P-01 - P-01 GWB P-01 GWB P-01 EXP
53 GS10 TELECOM CONC AST - - - P-01 - P-01 - P-01 - P-01 EXP
53 1S002 TELECOM CONC AST RB-01 4" GWB P-01 - P-01 GWB P-01 GWB P-01 EXP
53 1S011 TELECOM CONC AST RB-01 4" - P-01 GWB P-01 - P-01 - P-01 EXP
53 2S001 TELECOM CONC AST RB-01 4" - P-01 GWB P-01 - P-01 - P-01 EXP
53 GS02 REC. THERAPY - - EXST EXST GWB P-03 - - GWB P-03 - - -
53 H002 CORRIDOR - - - - - - - - - - - P-03 -
53 H104 CORRIDOR - - EXST EXST - - - - - - GWB P-03 -
53 H106 CORRIDOR - - EXST EXST - - - - - - GWB P-03 -
53 1S001 ON-CALL ROOM - - EXST EXST - - GWB P-03 GWB P-03 - - -
53 1S004 ACTIVITY ROOM - - EXST EXST GWB P-03 GWB P-03 - - - - -
53 H204 CORRIDOR - - EXST EXST - - - - - - GWB P-03 -
58 104 TELECOM CONC AST - - - P-01 - P-01 - P-01 - P-01 EXP
DOOR SCHEDULE
BLDG DOOR #
DOOR SIZE
DOOR
TYPE HW
DOOR
DOOR
FRAME
FIRE
RATING COMMENTSWIDTH HT THCK MAT FINISH MAT FINISH
1 C102D 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
1 1E15 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
1 2C10A 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
1 3C13 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
2 111 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
2 209 3'-0" 8'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
2 308 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
2 307A 3'-0" 7'-0" 1 3/4" 1A 3E WOOD FF HM P-04 N/R OFFICE
3 B025A 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
3 B025 3'-0" 7'-0" 1 3/4" 1A 3E WOOD FF HM P-04 N/R PIPE ROOM
3 117 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
3 224A 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
18 013 3'-0" 7'-0" 1 3/4" 1A 3E WOOD FF HM P-04 N/R OFFICE
18 011A 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
18 213 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
18 312 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
23 121A 3'-0" 8'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
23 G09 3'-0" 7'-0" 1 3/4" 1A 3E WOOD FF HM P-04 N/R LOCK SHOP
23 G09B 3'-0" 8'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
24 114B 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
24 205A 3'-4" 8'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
25 117A 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
25 204B 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
25 313A 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
51 BE111 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
51 1A183 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
51 1A139A 3'-0" 7'-0" 1 3/4" EXIST EXIST WOOD FF HM P-04 N/R CLEAN LINEN - PSYCH WARD
51 1A139 3'-0" 7'-0" 1 3/4" 2A SH-3 WOOD FF HM P-04 N/R TELECOM - PSYCH WARD
51 1A102 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
52 GN29A 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
52 1N82A 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
52 1S33A 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
52 2N91 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
53 GS02 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
53 1S001 3'-0" 7'-0" 1 3/4" 1A 3E WOOD FF HM P-04 N/R ON-CALL ROOM
53 1S011 3'-0" 7'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
58 104 3'-0" 8'-0" 1 3/4" 2A SH-3 HM P-04 HM P-04 N/R TELECOM
GWB GYPSUM BOARD
P PAINT
AST ANTI-STATIC COATING
CONC CONCRETE
EXST EXISTING
EXP EXPOSED
FF FACTORY FINISHED
FINISH ABBREVIATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
A-601
INTERIOR FINISH & DOOR
SCHEDULESSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 EM AJ
CONSTRUCTION
DOCUMENTS
60 OF 416Revisions: Date:
GENERAL NOTES
1. SEE SPECIFICATION SECTION 08 71 00 - DOOR HARDWARE
FOR HW SETS.
2. CONTRACTOR TO VERIFY DOOR SIZE AND WALL THICKNESS
PRIOR TO ORDERING DOORS AND FRAMES.
DOOR HEIGHTS AND WIDTHS PER SCHEDULEDOOR HEIGHTS AND WIDTHS PER SCHEDULE
1A 2A
MTL DOOR
FRAME
SHIM AS
REQ'D
RUNNER
BETWEEN
STUDS
1/2"
CONST
JOINT
SEE NOTE 1
VERTICAL STUDS @ 2'-0" MAX. W/
GYPSUM WALL BOARD. 1'-4" W/ GYPSUM
LATH & PLASTER DOUBLE STUDS FOR
SUPPORTING CONC. BACKER BOARD
PROVIDE CONTINUOUS BRACING
WHEN STUDS EXCEED 10'-0" AND
ARE FINISHED BOTH SIDES
JAMB ANCHOR CLIPS 3 PER
SIDE - COORDINATE W/
HINGE REINFORCEMENT
NOTE 1: OMIT BRACE WHEN 'D' DIMENSION
IS LESS THAN 2'-0" FOR GYP. WALL BOARD
OR 16" FOR PLASTER PARTITION
ELEVATION AT DOOR FRAME
DETAIL D
JAMB ANCHORS
(FURNISHED W/ FRAME)
DETAIL C
FRAME FACE
MIN
US 3/16"
E Q
E Q
D
E Q
E Q
V A
R
IE
S S
E E
D O
O R
S C
H E
D
VARIES SEE DOOR SCHED
DETAIL B
A A
1/2" M
IN
5/8" M
AX
FRAME FACE
MIN
US 3/16"
/4
M
IN
STUD
W
IDTH
/4
M
IN
JAMB DEPTH
MINUS 3/16"
STUD
W
IDTH
1/2"
DETAIL D, TYP
M A
X
DETAIL B
PROVIDE SOUND
DEADENING WHERE
REQUIRED
/8
SECTION A
DOUBLE STUDS JAMB ANCHOR
GYPSUM WALL
BOARD PANELS
CONTROL JOINT
ISOMETRIC OF CONSTRUCT JOINT
/4
M
IN
DETAIL C
SANITARY
STOP
MTL DOOR FRAME
MTL ANCHOR CLIP
SHIM AS
REQ'D
CRIPPLE STUD, DO NOT
ANCHOR TO BEARING STUD
1/2" M
IN
UNDERSIDE OF STRUCTURE
OR INTERSTITIAL FLOOR
MTL STUD HEADER, TYP
MTL RUNNER, TYP
MTL STUD, TYP
HM DOOR FRAME, TYP
JAMB ANCHOR TYP
EXIST GB & MTL
STUD WALL TO
REMAIN
EXIST GB &
MTL STUD
WALL TO
REMAIN
HEIGHT SHALL VARY
0' - 4" TYP 0' - 4" TYP
DOOR WIDTH AS
SCHEDULED
01b
STRUCTURE ABV
5/8"
MATCH
5/8"
5/8"
3 5/8" 5/8"
01a
TYPE 'X' GYP
STEEL STUD FRAMING
TYPE 'X' GYP
TYPE 'X' GYP
STEEL STUD FRAMING
TYPE 'X' GYP
FINISH CLG
WIDTH
OF EXIST
WALL STUDS
WHERE
CONSTRUCTED
ON PLANS
INFILL WALL NEW WALL
, PAINT
, PAINT, PAINT
, PAINT
BASE WHERE INDICATED, TYP BASE WHERE INDICATED, TYP
CAULK ALL
AROUND
ADJUSTABLE
ANCHOR
STANDARD FRAME
EXPOSED MASONRY OR BRICK
1/2"
S.F.T.U.
NOMINAL
CMU OR 1/2"
FRAMES IN MASONRY PARTITION
CASING BEAD
ADJUSTABLE
ANCHOR
STANDARD FRAME
MASONRY BLOCK PLASTERED
GROUT
5/8"
S.F.T.U.
NOMINAL
CMU OR 7/8"
PLASTER ON
METAL LATH
CAULK ALL
AROUND
GROUT
CERAMIC TILE
ADJUSTABLE
ANCHOR
STANDARD FRAME
MASONRY BLOCK WITH CERAMIC TILE FINISH
GROUT
SETTING BED
CAULK ALL
AROUND
1/2"
S.F.T.U.
NOMINAL
CMU OR 3/4"
*** FRAME WIDTH FOR NOMINAL MASONRY
4 3/4" W/ 4" CMU
6 3/4" W/ 6" CMU
8 3/4" W/ 8" CMU
METAL STUD AND PLASTER FINISH
FRAMES WITH METAL STUD
AND PLASTER PARTITIONS
GAUGE AS
SPECIFIED
ADD RETURN ON
FRAME WHERE
DRYWALL FINISH
IS REQUIRED
STANDARD DOOR FRAME
FRAMES IN METAL STUD PARTITIONS
CERAMIC TILE
FINISH WHERE
REQUIRED
CAULK ALL
AROUND BOTH
SIDES
STANDARD FRAME
FOR DRYWALL
JAMB ANCHORS
DOUBLE STUDS
BACK TO BACK
DRYWALL, THICKNESS
SINGLE OR DOUBLE AS
REQUIRED
FRAMES IN MASONRY PARTITION
FACED WITH GWB
STANDARD FRAME
ADJUSTABLE
ANCHORS
GROUT
CAULK ALL
AROUND
CERAMIC TILE
FINISH WHERE
REQUIRED
TILE FINISH
FRAME AT CONCRETE WALLS
DOUBLE EGRESS DOOR FRAME
PLAN
JAMB 'B'
HEAD 'A'
NOTE: SHOWING SWING OF
DOUBLE EGRESS DOORS
A B
C
A C
B
NOTE: SHOWING SWING OF
DOUBLE EGRESS DOORS
DOOR
DOOR
DOOR STOP (BEYOND)
PLATE WELDED
TO FRAME
/2
"2 1/2" MIN
+/- 1/4"
/4
7/8"
08 11 13-01
METAL STUDS
PER STD DTL 3/4"
1/4"
7/8"
08 11 13-01
MTL STUDS
PER STD DTL 11/16"
1/4"
1/4"
1/4"
CAULK ALL
AROUND
CASING BEAD
WHERE PLASTER
IS REQUIRED
CONCRETE
GROUT
VENEER
PLASTER ON
PLASTER BASE
TROWEL CUT
AT FRAME
EDGES
ANCHOR
STANDARD
FRAME
CONVENTIONAL
PLASTER
GYP LATH
CERAMIC TILE
CAULK BOTH
SIDES
ANCHOR
STANDARD
FRAME
CERAMIC TILE
GWB
CEMENT
BACKER BOARD
PIPE SEPARATORS
WELDED TO PLATE
F.H. CSK.
EXP. BOLT
THROAT OPENING = PARTITION
WIDTH + 1/8" MIN
1/2" 1/2"
/8
1 15/16"VARIESVARIES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
A-602
DOOR DETAILS, TYPES & WALL
TYPESSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 EM AJ
CONSTRUCTION
DOCUMENTS
GENERAL NOTES
1. SEE SPECIFICATION SECTION 08 71 00 - DOOR HARDWARE
FOR HW SETS.
2. CONTRACTOR TO VERIFY DOOR SIZE AND WALL THICKNESS
PRIOR TO ORDERING DOORS AND FRAMES.
1/4" = 1'-0"
DOOR TYPES
3/4" = 1'-0"
PARTITION FRAMING AT DOORS
3/4" = 1'-0"
DOOR FRAME DETAIL
Revisions: Date:
1" = 1'-0"
WALL TYPES
3" = 1'-0"
DOOR FRAME DETAILS
5/8"
3"3 1/2"
5 3/16"
10"
2 1/4"
INSULATION INSULATION
R O
U N
D P
E N
E T
R A
T
IO
N
SUBSTRATE SUBSTRATE
EXISTING ROOF MEMBRANE
PRE-MOLDED QUICKSEAM
PIPE FLASHING
STAINLESS STEEL CLAMPING RING
CONTINUOUS BEAD OF AP…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .