Attachment 24 - Drawings Part-23.pdf

PDF 14 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details of a federal contract solicitation for infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The solicitation seeks a general contractor to provide electrical panel upgrades, power system work, bonding and grounding, UPS installations, building management system integration, HVAC assessments and work, building reconfigurations and renovations including demolition, construction and finishes, data center renovations, communications infrastructure upgrades including network cabling and fiber backbone work, physical security upgrades, hazardous material abatement across multiple buildings. The work locations include Buildings 1 through 3, 3T, 18, 23 through 25, 51 through 53, 53T, 55 through 61, 75. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
36C77623R0009 0005.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0003.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
36C77623R0009 0001.pdf PDF
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 38 - Envr. Report - Drawings.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 5 - Drawings Part-4.pdf PDF
Attachment 6 - Drawings Part-5.pdf PDF
Attachment 9 - Drawings Part-8.pdf PDF
Attachment 16 - Drawings Part-15.pdf PDF
Attachment 22 - Drawings Part-21.pdf PDF
Attachment 36 - Envr. Report - Appendix B.pdf PDF
Attachment 41 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 44 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JT

J T

J

TJ

T

J T

JT

JT

JT

JT

JT

J T

2 2

2 2

AREA B

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

51ET401b

51ET401b

X6.8

X7

X8

XG

XH

XG.3

FF.2HH.9K F.7

X2 X2.6 X3 X3.3 X4 X4.2

X5

X6

XC.2

XC.9

XD

XD.8

XE

XF

GJLMM.9NPP.4Q

4.1

X1

MENEPE

TYP

W

AP

LOCKER RM.

1A158

OFFICE

1A117

OFFICE

1A168

KITCHEN

1A116C

MED. PREP.

1A116B CORRIDOR

H114

STORAGE

1A116A

NURSE STATION

1A116

LAUNDRY

1A125

TELECOM

1A123

SUPPLY RM.

1A119

STORAGE

1A120

EXAM RM.

1A121

HALLWAY

H119

SHOWER

1A124

CLOSET

1A115A

DAY RM.

1A115

CORRIDOR

H118B

CONFERENCE

RM.

1A108

EXAM RM.

1A122

2 BED PATIENT

RM.

1A114

TOILET

1A113A2 BED PATIENT

RM.

1A113

2 BED PATIENT

RM.

1A112

TOILET

1A111A2 BED PATIENT

RM.

1A111

2 BED PATIENT

RM.

1A110

2 BED PATIENT

RM.

1A109

TOILET

1A109A

DAY RM.

1A100

OFFICE, OPEN

1A169OFFICE

1A101

CONSULTATION

RM.

1A105

OI&T

1A107B

HAC

1A107A

CONSULTATION

RM.

1A106

TR

1A102

EXAM

1A103

OFFICE

1A104

CORRIDOR

H108

OFFICE

1A131

STAFF LOUNGE

1A129

2 BED PATIENT

RM.

1A127

TOILET

1A129A

TOILET

1A127A

CORRIDOR

H118

CHASE

CH-A-2

51ET401b

ELEC CLOSET

1A147A

LOCKER RM.

1A118

SECLUSION

1A156A

TOILET, MALE

1A118A

TYP

EXISTING SIDE-A FIBER-OPTIC BACKBONE BUILDING

ENTRY POINT (APPROXIMATE LOCATION). ROUTE

FIBER-OPTIC CABLES TO TRs AS INDICATED ON

COMMUNICATIONS DRAWINGS; REFERENCE

COMMUNICATIONS DRAWINGS FOR ALL FIBER-

OPTIC CABLING, RACEWAY TYPES,

SPECIFICATIONS, AND RATINGS. REFERENCE KEY

NOTES ON THIS SHEET REGARDING CABLE TRAY

AND VERTICAL/HORIZONTAL ROUTING FOR

ADDITIONAL FIBER BACKBONE CABLING

REQUIREMENTS.

ALL BACKBONE CABLING ROUTES ARE

DIAGRAMMATICAL; CONTRACTOR SHALL ENSURE A-

SIDE AND B-SIDE ROUTING IS AS DIVERSE AS

PRACTICAL. REFERENCE COMMUNICATIONS

DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.

DATA OUTLETS AND DEVICES IN

THIS AREA SHALL BE SERVED

FROM TELECOMMUNICATION

ROOM 1A139

DATA OUTLETS AND DEVICES IN

THIS AREA SHALL BE SERVED

FROM TELECOMMUNICATION

ROOM 1A102

AREA A : SEE SHEET 51ET101a

AREA B AREA A : SEE SHEET 51ET101c

AREA D : SEE SHEET 51ET101d

AREA B

TYP

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD

VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL

RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE

DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED

MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT

THE EXPENSE OF THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH

CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY

EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH

THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT6A CABLING FROM

EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT

RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF

HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND

AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES

AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT

VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA

AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED THROUGH

CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED

THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE

SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS, ARCHITECTURAL

FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS

PRIOR TO INSTALLATION.

AREA OF WORK

KEY PLAN

PROJECT

NORTH

GENERAL NOTES

- 1/8" = 1'-0"

1 BLDG 51 - FLOOR 1 - AREA B - TELECOMMUNICATIONS PLAN

PROJECT

NORTH

0' 4' 8' 16'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 51ET101b

BLDG 51 - FLOOR 1 - AREA B -

TELECOMMUNICATIONS PLAN 51

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE

EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE

UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE

GENERAL NOTES ON THIS SHEET FOR ADDITIONAL INFORMATION. COORDINATE WITH VA FOR

EXACT OUTLET PLACEMENT.

EXISTING WIRELESS ACCESS POINT TO BE RE-FED WITH CAT6A CABLING.

REMOVE AND REPLACE EXISTING CABLE TRAY IN THE AREAS SHOWN AS REQUIRED; IF CABLE

TRAY IS NON-EXISTENT, PROVIDE CABLE TRAY AS INDICATED. REFERENCE DETAIL '6' ON SHEET

ET503 AND TELECOMMUNICATIONS WAO AND CABLE TRAY SCHEDULE ON SHEET ET701. WHERE

WALL EXTENDS TO CEILING, CABLE TRAY SHALL STOP AND TRANSITION TO CONDUIT SLEEVES

[(2) 4", MINIMUM] WITH APPROPRIATE FIRE-PROOFING AND CAULKING TO PASS THROUGH WALL.

WHERE EXISTING CABLE TRAY AND/OR SLEEVES ARE DISCOVERED, EVALUATE CONDITION AND

RACEWAY CAPACITY; IF CABLE TRAY AND/OR SLEEVES APPEAR TO BE REUSABLE, NOTIFY COR

FOR POSSIBLE REUSE.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS

SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS REQUIRED

TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM. PROVIDE

EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA PRIOR TO

CONSTRUCTION. CONTRACTOR SHALL VERIFY EXACT HEAD END LOCATION AS REQUIRED.

JT

J T J T

JT

JT

J T

J T

J T J T

JT

JT

JT

J T J T

J T

JT

J T J T

JT

JT

J T

J T

J T J T

JT

JT

JT

J T J T

J T

FEC

FEC

FAP

TS

COURTYARD

DN

FAP

FAP

1A123

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

51ET401c

51ET401c

X6.8

X7

X8

XG

XH

XG.3

FF.2H F.7

X3.3

X4

X4.2

X5

X6

XC.2

XD

XD.8

XE

XF

G

4.1

2.2

XA

XB

XB.4

XC

DE

2.1

EEFEGEHEKELEMENEPE JE

W

AP 4

CORRIDOR

H112A

2 BED PATIENT

RM.

1A154

2 BED PATIENT

RM.

1A153

TOILET

1A152A

2 BED PATIENT

RM.

1A152

2 BED PATIENT

RM.

1A151

TOILET

1A150A

2 BED PATIENT

RM.

1A150

2 BED PATIENT

RM.

1A148

TOILET

1A148A 2 BED PATIENT

RM.

1A149

DAY RM.

1A147

ELEC CLOSET

1A147A

CORRIDOR

H112

CORRIDOR

H118A

CORRIDOR

H113

DAY RM.

1A164

DAY RM.

1A165

OFFICE

1A162

WORK RM. (COPY

RM.)

1A161

HAC

1A160 MEDICATION RM.

1A163B

NURSE STATION

1A163

CLEAN LINEN

1A159

LOCKER RM.

1A158

OFFICE

1A168

CORRIDOR

H114

LOCKER RM.

1A118

SECLUSION

1A156A

SECLUSION

1A155A

TOILET, MALE

1A118A

TOILET, FEMALE

1A118B

TOILET

1A157

CLOSET

1A115A

STG

1A179A

STAIRWELL NO.1

S101

CORRIDOR

H111

LOUNGE

1A181

LOCKER RM.

1A181A

ELEC CLOSET

1A154B

STORAGE

1A166

OFFICE

1A174A

TOILET

1A154A

LAUNDRY CHUTE

1A178

MECH. RM.

1A180

EXAM

1A132

TOILET

1A128A

2 BED PATIENT

RM.

1A128

TOILET

1A130A

2 BED PATIENT

RM.

1A130

KITCHEN

1A163A

ELEVATOR NO.2

E-2

LAUNDRY CHUTE

1A179

CHASE

CH-A-5 CHASE

CH-A-4

CHASE

CH-A-2

CHASE

CH-A-3

51ET401c

CORRDIOR

H116

TR

1A183

AREA C

AREA E : SEE SHEET 51ET101e

DATA OUTLETS AND DEVICES IN

THIS AREA SHALL BE SERVED

FROM TELECOMMUNICATION

ROOM 1A139

DATA OUTLETS AND DEVICES IN

THIS AREA SHALL BE SERVED

FROM TELECOMMUNICATION

ROOM 1A183

DATA OUTLETS AND DEVICES IN

THIS AREA SHALL BE SERVED

FROM TELECOMMUNICATION

ROOM 1A102

DATA OUTLETS AND DEVICES IN

THIS AREA SHALL BE SERVED

FROM TELECOMMUNICATION

ROOM 1A183

AREA A : SEE SHEET 51ET101a

AREA A : SEE SHEET

51ET101b

AREA A : SEE SHEET 51ET101a

AREA C

ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;

CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING IS

AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS

DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.

TYP

TYP

2 2

AREA C

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD

VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL

RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE

DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED

MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT

THE EXPENSE OF THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH

CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY

EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH

THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT6A CABLING FROM

EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT

RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF

HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND

AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES

AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT

VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA

AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED THROUGH

CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED

THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE

SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS, ARCHITECTURAL

FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS

PRIOR TO INSTALLATION.

AREA OF WORK

KEY PLAN

PROJECT

NORTH

GENERAL NOTES

- 1/8" = 1'-0"

1 BLDG 51 - FLOOR 1 - AREA C - TELECOMMUNICATIONS PLAN

PROJECT

NORTH

0' 4' 8' 16'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 51ET101c

BLDG 51 - FLOOR 1 - AREA C -

TELECOMMUNICATIONS PLAN 51

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE

EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE

UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE

GENERAL NOTES ON THIS SHEET FOR ADDITIONAL INFORMATION. COORDINATE WITH VA FOR

EXACT OUTLET PLACEMENT.

EXISTING WIRELESS ACCESS POINT TO BE RE-FED WITH CAT6A CABLING.

REMOVE AND REPLACE EXISTING CABLE TRAY IN THE AREAS SHOWN AS REQUIRED; IF CABLE

TRAY IS NON-EXISTENT, PROVIDE CABLE TRAY AS INDICATED. REFERENCE DETAIL '6' ON

SHEET ET503 AND TELECOMMUNICATIONS WAO AND CABLE TRAY SCHEDULE ON SHEET

ET701. WHERE WALL EXTENDS TO CEILING, CABLE TRAY SHALL STOP AND TRANSITION TO

CONDUIT SLEEVES [(2) 4", MINIMUM] WITH APPROPRIATE FIRE-PROOFING AND CAULKING TO

PASS THROUGH WALL. WHERE EXISTING CABLE TRAY AND/OR SLEEVES ARE DISCOVERED,

EVALUATE CONDITION AND RACEWAY CAPACITY; IF CABLE TRAY AND/OR SLEEVES APPEAR

TO BE REUSABLE, NOTIFY COR FOR POSSIBLE REUSE.

2 2

2 2 2

2 2

J T

J T

JT

JT

JT

JT

JT

JT

JT

JT

OFFICE

1W179

OFFICE

1W180

CLOSET

1W181A

OFFICE

1W181

STORAGE

1W182B

COPY RM.

1W182A

GROUP RM.

1W182

GROUP RM.

1E145

OFFICE

1W146A

CORRIDOR

H106A

OFFICE

1W147

TOILET

1W147A

OFFICE

1W148

STORAGE

1W146B

TOILET

1W178A

OFFICE

1W178

TOILET, STAFF

1W177A

REPORT RM.

1W177

TOILET

1W176A

LOUNGE

1W176

LINEN

1W176B

OFFICE

1W175

TOILET

1W174A

FILE RM.

1W174

TEST RM.

1W174B

OBSERVATION

1W170

OFFICE

1W171

CORRIDOR

H109

OFFICE

1W172

TOILET

1W173A

OFFICE

1W173

2 BED PATIENT

RM.

1W166

TOILET

1W166A

STORAGE

1W167

OFFICE

1W168

LOUNGE

1W169

KITCHEN

1W149

STORAGE

1W151

TOILET, STAFF

1W150

MED RM.

1W152

LAUNDRY RM.

1W157

HAC

1W158

TOILET

1W160A

SHOWER

1W160

SOILED UTILITY

1W161

CORRIDOR

H107

CORRIDOR

H109

NURSE STATION

1W159A

3 BED RM.

1W162

TOILET

1W162ATOILET

1W163A

2 BED PATIENT

RM.

1W163

2 BED PATIENT

RM.

1W164

TOILET

1W164A

2 BED PATIENT

RM.

1W165

2 BED PATIENT

RM.

1W156

TOILET

1W156A

WAITING RM.

1W155

TOILET

1W153A

SUPPLY RM.

1W155A

WAP 1 WAP 1

WAP 1

WAP 1

WAP 1WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

PE

QERESE

3E

2E

1E

4E

10E

CCE BBE ZE TEUEVEX.EYE

9E

AAE

AREA B : SEE SHEET 51ET101b

AREA D

WAP 4

WAP 4

WAP 4

3TYP

AREA B : SEE SHEET 51ET101b

AREA D

TYP

2 2 2

ALL BACKBONE CABLING ROUTES ARE

DIAGRAMMATICAL; CONTRACTOR SHALL ENSURE A-SIDE

AND B-SIDE ROUTING IS AS DIVERSE AS PRACTICAL.

REFERENCE COMMUNICATIONS DRAWINGS FOR ALL

REQUIRED FIBER-OPTIC CABLING.

DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE

SERVED FROM TELECOMMUNICATION ROOM 1A102.

AREA D

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD

VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL

RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE

DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED

MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT

THE EXPENSE OF THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH

CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY

EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH

THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT6A CABLING FROM

EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT

RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF

HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND

AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES

AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT

VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA

AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED THROUGH

CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED

THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE

SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS

REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS, ARCHITECTURAL

FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS

PRIOR TO INSTALLATION.

AREA OF WORK

- 1/8" = 1'-0"

1 BLDG 51 - FLOOR 1 - AREA D - TELECOMMUNICATIONS PLAN

PROJECT

NORTH

KEY PLAN

PROJECT

NORTH

GENERAL NOTES

0' 4' 8' 16'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 51ET101d

BLDG 51 - FLOOR 1 - AREA D -

TELECOMMUNICATIONS PLAN 51

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE

EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE

UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE

GENERAL NOTES ON THIS SHEET FOR ADDITIONAL INFORMATION. COORDINATE WITH VA FOR

EXACT OUTLET PLACEMENT.

EXISTING WIRELESS ACCESS POINT TO BE RE-FED WITH CAT6A CABLING.

REMOVE AND REPLACE EXISTING CABLE TRAY IN THE AREAS SHOWN AS REQUIRED; IF CABLE

TRAY IS NON-EXISTENT, PROVIDE CABLE TRAY AS INDICATED. REFERENCE DETAIL '6' ON

SHEET ET503 AND TELECOMMUNICATIONS WAO AND CABLE TRAY SCHEDULE ON SHEET ET701.

WHERE WALL EXTENDS TO CEILING, CABLE TRAY SHALL STOP AND TRANSITION TO CONDUIT

SLEEVES [(2) 4", MINIMUM] WITH APPROPRIATE FIRE-PROOFING AND CAULKING TO PASS

THROUGH WALL. WHERE EXISTING CABLE TRAY AND/OR SLEEVES ARE DISCOVERED,

EVALUATE CONDITION AND RACEWAY CAPACITY; IF CABLE TRAY AND/OR SLEEVES APPEAR TO

BE REUSABLE, NOTIFY COR FOR POSSIBLE REUSE.

2 2

J T J T

JT

JT

JT

JT

JT

JT

J T J T

JT

JT

JT

JT

SM

2 2

AREA A

STAIRWELL NO.1

S101

CORRDIOR

H116

KITCHEN

1A172

CORRIDOR

H110

OFFICE

1E145D

KITCHEN

1E145C

F.A. PANELS

1E145B

STORAGE

1E145A

OFFICE

1E144

STORAGE

1E143

CORRIDOR

H105

CORRIDOR

H106

MAIN LOBBY

1E101

EXAM

1E134

TOILET

1E135B

TOILET

1E133A

TOILET

1E135D

LAUNDRY

1E135

STORAGE

1E137

TOILET

1E139

KITCHEN

1E140

STORAGE

1E129

TOILET

1E129A

HAC

1E131

LAUNDRY RM.

1E132

EXAM

1E133

CORRIDOR

H102

STORAGE

1E122

OFFICE, OPEN

1E120

CORRIDOR

H101

CORRIDOR

H103

TOILET, MALE

1E102

HAC

1E104

STORAGE

1E105

TOILET, FEMALE

1E103

OFFICE

1E107

OFFICE, OPEN

1E108

GROUP RM.

1E110

OI&T

1E109

LOCKER RM.

1E113

TOILET

1E113A

OFFICE

1E111

MED RM.

1E112

NURSE STATION

1E130

TOILET

1E127A

TOILET

1E126A

3 BED PATIENT

RM.

1E127

2 BED PATIENT

RM.

1E124

TOILET

1E124A

2 BED PATIENT

RM.

1E123

TOILET

1E123A

TOILET

1E141A

TOILET

1E115A

2 BED PATIENT

RM.

1E115

2 BED PATIENT

RM.

1E116

2 BED PATIENT

RM.

1E118

TOILET

1E117A

2 BED PATIENT

RM.

1E117

3 BED PATIENT

RM.

1E119

TOILET

1E114A

2 BED PATIENT

RM.

1E114

GROUP RM.

1E145

TOILET

1E119A

OFFICE

1E128

TOILET

1E110A

ELEVATOR NO.1

E-1

ENTRY FOYER

1E100

CHASE

CH-E-1

CHASE

CH-E-2

CHASE

CH-E-4

CHASE

CH-E-5

CHASE

CH-E-3

LINEN CHUTE

1E128A

2 BED PATIENT

ROOM

1E126

2 BED PATIENT

RM.

1E125

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 4

WAP 1

WAP 1

WAP 4

WAP 1 WAP 1

WAP 1

WAP 4 WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

2.1

EEFEGEHEKELEMENE JE

3E

2E

1E

4E

10E

9E

AEBECEDE

TYP

TYP

TYP

DATA OUTLETS AND DEVICES IN

THIS AREA SHALL BE SERVED

FROM TELECOMMUNICATION

ROOM 1A102

DATA OUTLETS AND DEVICES IN

THIS AREA SHALL BE SERVED

FROM TELECOMMUNICATION

ROOM 1A183

AREA D : SEE

SHEET

51ET101d AREA E

AREA C : SEE

SHEET 51ET101c

AREA E

REFERENCE COMMUNICATIONS DRAWING C-506 FOR ALL

FIBER-OPTIC CABLING AS REQUIRED.

ALL BACKBONE CABLING ROUTES ARE

DIAGRAMMATICAL; CONTRACTOR SHALL ENSURE A-SIDE

AND B-SIDE ROUTING IS AS DIVERSE AS PRACTICAL.

REFERENCE COMMUNICATIONS DRAWINGS FOR ALL

REQUIRED FIBER-OPTIC CABLING.

AREA OF WORK

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS

REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED..

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED

WITH CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED

BY EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO

REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR,

MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE

INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY

FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT6A

CABLING FROM EACH WAO (WORK AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT

CONDUIT RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180

DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION

OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL

IN AND AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR

PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD;

DOCUMENT VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS

INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL

SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN

RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL SYSTEMS

CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS; ADDITIONALLY,

CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS AS REQUIRED TO

SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND ANY

OTHER OBSTRUCTIONS PRIOR TO INSTALLATION.

KEY PLAN

PROJECT

NORTH

GENERAL NOTES

- 1/8" = 1'-0"

1 BLDG 51 - FLOOR 1 - AREA E - TELECOMMUNICATIONS PLAN

PROJECT

NORTH

0' 4' 8' 16'

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 51ET101e

BLDG 51 - FLOOR 1 - AREA E -

TELECOMMUNICATIONS PLAN 51

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

1 PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE

EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN

AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET

ET503 AND THE GENERAL NOTES ON THIS SHEET FOR ADDITIONAL INFORMATION.

COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.

EXISTING WIRELESS ACCESS POINT TO BE RE-FED WITH CAT6A CABLING.

REMOVE AND REPLACE EXISTING CABLE TRAY IN THE AREAS SHOWN AS REQUIRED;

IF CABLE TRAY IS NON-EXISTENT, PROVIDE CABLE TRAY AS INDICATED. REFERENCE

DETAIL '6' ON SHEET ET503 AND TELECOMMUNICATIONS WAO AND CABLE TRAY

SCHEDULE ON SHEET ET701. WHERE WALL EXTENDS TO CEILING, CABLE TRAY SHALL

STOP AND TRANSITION TO CONDUIT SLEEVES [(2) 4", MINIMUM] WITH APPROPRIATE

FIRE-PROOFING AND CAULKING TO PASS THROUGH WALL. WHERE EXISTING CABLE

TRAY AND/OR SLEEVES ARE DISCOVERED, EVALUATE CONDITION AND RACEWAY

CAPACITY; IF CABLE TRAY AND/OR SLEEVES APPEAR TO BE REUSABLE, NOTIFY COR

FOR POSSIBLE REUSE.

UP

UPUP

DN

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

FEC

FEC

FEC

FEC

1 2 3 4 5 6 7 8 9 10 11

A

B

C

D

E

F

51TET401

51TET401

WAP 1

WAP 1

WAP 1

TYP

OFFICE

OFFICE

OFFICE

BREAK RM.

EXAM /

TREATMENT

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE / EXAM

WORK RM.

WAITING RM.

TOILET, FEMALE

TOILET, MALE

HAC

CORRIDOR

C106

VESTIBULE

C101

CORRIDOR

C103

TR

CORRIDOR

C105

CORRIDOR

C102

CORRIDOR

C104

51TET401

SIDE-B FIBER-OPTIC BACKBONE:

REFERENCE COMMUNICATION

SHEETS FOR ADDITIONAL

INFORMATION REGARDING

HANDHOLE, CONDUIT, BUILDING

PENETRATIONS, FIBER-OPTIC

CABLING, AND RACEWAY

INFORMATION

HANDHOLE

EXISTING SIDE-A FIBER-OPTIC BACKBONE BUILDING

ENTRY POINT (APPROXIMATE LOCATION). ROUTE

FIBER-OPTIC CABLES TO TRs AS INDICATED ON

COMMUNICATIONS DRAWINGS; REFERENCE

COMMUNICATIONS DRAWINGS FOR ALL FIBER-OPTIC

CABLING, RACEWAY TYPES, SPECIFICATIONS, AND

RATINGS. REFERENCE KEY NOTES ON THIS SHEET

REGARDING CABLE TRAY AND

VERTICAL/HORIZONTAL ROUTING FOR ADDITIONAL

FIBER BACKBONE CABLING REQUIREMENTS.

ALL BACKBONE CABLING ROUTES ARE DIAGRAMMATICAL;

CONTRACTOR SHALL ENSURE A-SIDE AND B-SIDE ROUTING

IS AS DIVERSE AS PRACTICAL. REFERENCE COMMUNICATIONS

DRAWINGS FOR ALL REQUIRED FIBER-OPTIC CABLING.

REFERENCE COMMUNICATIONS DRAWING C-506 FOR

ALL FIBER-OPTIC CABLING AS REQUIRED.

AREA OF WORK

PROJECT

NORTH

BLDG 51T

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD

VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL

RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE

DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED

MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED

AT THE EXPENSE OF THE CONTRACTOR TO THE ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR

NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS

REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH

CAT6A PORTS AND CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY

EXISTING CABLING. PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO

REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR,

MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE

INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A FULLY

FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT6A CABLING FROM

EACH WAO (WORK AREA OUTLET) TO RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT

RUNS, OR CONDUIT CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF

HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND

AROUND CONDUIT PER CODE. REFER TO ARCHITECTURAL DRAWINGS FOR PARTITION TYPES

AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IF FIELD; DOCUMENT

VARIANCES ON AS-BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH

VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT

NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED

THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS

ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED

WITH LIKE SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY DIVIDERS

AS REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE

DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS,

ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER

OBSTRUCTIONS PRIOR TO INSTALLATION

KEY NOTES

- 1/4" = 1'-0"

1 BLDG 51T - FLOOR 1 - TELECOMMUNICATIONS PLAN

GENERAL NOTES

0' 2' 4' 8'

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 51TET101

BLDG 51T - FLOOR 1 -

TELECOMMUNICATIONS PLAN 51T

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE

EXISTING TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE

UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE

GENERAL NOTES ON THIS SHEET FOR ADDITIONAL INFORMATION. COORDINATE WITH VA FOR

EXACT OUTLET PLACEMENT.

EXISTING WIRELESS ACCESS POINT TO BE RE-FED WITH CAT6A CABLING.

FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP CEILING

WHEREVER POSSIBLE. UTILIZE CABLE TRAY AS APPLICABLE.

PROVIDE CONDUIT SLEEVE WITH FIREPROOFING AS REQUIRED WHERE WALL

PENETRATIONS ARE REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL

INFORMATION.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS

SECURITY TR EQUIPMENT. UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS REQUIRED

TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM. PROVIDE

EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED. COORDINATE WITH VA PRIOR TO

CONSTRUCTION. CONTRACTOR SHALL VERIFY EXACT HEAD END LOCATION AS REQUIRED.

Revisions: Date:

PROJECT

NORTH

DN

JT

22 2

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

FE FE FE

FE

FE

FE

FE

FE

UPUP

UP

52ET400

52ET400

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1 WAP 1

WAP 1 WAP 1

WAP 1

WAP 1 WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

Y.1YXW.1V.2 W.2U.5U.2US.3S.1S RQ Q.2P.3P P.2NM.2LK L.1 L.2

2.3

9.5

11.9

12.8

8.7

7.3

JH.1F.1 HGFE F.3DCBA.1A

6.2

4.8

9.9

Z

MECH. RM.

GS08

PHYSICAL THERAPY

GN31

HAC

GS60

VAULT

GS61

HAC

GS57

HAC

GS58

HAC

GS59

MECH. RM.

GS08A

LINEN CHUTE

GS07

STORAGE

GS06A

UTILITY RM., SOILED

GS06B

FOYER

GS05

STAIR 1

S001

DARK RM.

GS04

F.E. CLOSET

GS03

ENGINEERING

GS09A

MECH. RM.

GS09

WORK RM.

GS14

TOILET, MALE

GS18A

TOILET, FEMALE

GS18B

MECH. RM.

GS20A

ENGINEERING

GS20B

CORRIDOR

H004

TOILET

GS22F

OFFICE

GS22A

OFFICE

GS22B

OFFICE

GS22C

OFFICE

GS22D

OFFICE

GS22E

OFFICE

GS22

ELEVATOR LOBBY

GS24

ELEV. NO. 3

E2

TOILET

GN27

CLOSET

GN27A

HAC

GN28

STORAGE

GN30

OFFICE

GN32

WORK RM.

GN33

WORK RM.

GN34

TOILET

GN35

STORAGE

GN36

OFFICE

GN37TOILET

GN38

MECH. RM.

GN39

P.T. STORAGE

GN43

WHEELCHAIRS

GN43A

OFFICE

GN44

FOYER

GN57

DRIVER'S TRAINING

GN48

MECH. RM.

GN50

LINEN CHUTE

GN52 STORAGE

GN53F.E. CLOSET

GN51

STAIR 3

S003

STORAGE

GN54

F.E. CLOSET

GN55

PIPE CHASE

Z004

PIPE CHASE

Z005

PIPE CHASE

Z001

PIPE CHASE

Z002

PIPE CHASE

Z003

ELEV. NO. 1

E1

STAIR 2

S002

OI&T

GS01A

WHEELCHAIR STORAGE

GS01

HAC

GS02

F.E. CLOSET

GS23

ELEV. NO. 2

E3

CORRIDOR

H004A

CORRIDOR

H001

CORRIDOR

H002

CORRIDOR

H003

CORRIDOR

H005

CORRIDOR

H006

SHOP

GS58A

CHASE

CH-S-2

CHASE

CH-S-1

CHASE

CH-N-1

CHASE

CH-N-3

CHASE

CH-N-4

CHASE

CH-N-2

CHASE

CH-S-3

OFFICE

GS14A

WORK RM.

GS14B

MECH. RM.

GS09B

CHASE

CH-S-5

CHASE

CH-S-4

VENDING ROOM

GN29

TR

GN29A

WAP 1

52ET400

EXISTING SIDE A FIBER-OPTIC BACKBONE BUILDING

ENTRY POINT (APPROXIMATE LOCATION). EXTEND

FIBER-OPTIC CABLE TO TRs SHOWN IN FIBER-OPTIC

NETWORK DIAGRAMS ON SHEETS ET601 AND ET602.

REFERENCE COMMUNICATIONS DRAWINGS FOR ALL

FIBER-OPTIC CABLING AND RACEWAY TYPES,

SPECIFICATIONS, AND RATINGS. REFERENCE KEY

NOTES ON THIS SHEET REGARDING CABLE TRAY AND

VERTICAL/HORIZONTAL ROUTING FOR ADDITIONAL

FIBER BACKBONE CABLING REQUIREMENTS.

B-SIDE:

TO TR 2N91 FROM

GN29A TDU, FROM

FLR 00 TO 01

B-SIDE:

TO TR 1N82A FROM

GN29A TDU, FROM

FLR 00 TO 01

B-SIDE:

TO TR 2S53 FROM

GN29A TDU, FROM

FLR 00 TO 01

TYP

HANDHOLE

SIDE-B FIBER-OPTIC BACKBONE:

REFERENCE COMMUNICATION SHEETS

FOR ADDITIONAL INFORMATION

REGARDING HANDHOLE, CONDUIT,

BUILDING PENETRATIONS, FIBER-

OPTIC CABLING, AND RACEWAY

INFORMATION.

TYP

B-SIDE:

TO TR 1S33 FROM

GN29A TDU, FROM

FLR 00 TO 01

DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE

SERVED FROM TELECOMMUNICATION ROOM GN29A.

ALL BACKBONE CABLING ROUTES ARE

DIAGRAMMATICAL; CONTRACTOR SHALL ENSURE A-SIDE

AND B-SIDE ROUTING IS AS DIVERSE AS PRACTICAL.

REFERENCE COMMUNICATIONS DRAWINGS FOR ALL

REQUIRED FIBER OPTIC CABLING.

TYP

2 2

2 2

2 2

BLDG 52

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO

THE ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW FIRE RATING, IF

REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH CAT6A PORTS AND

CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY EXISTING CABLING.

PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A

FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING FROM EACH WAO (WORK

AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT RUNS, OR CONDUIT

CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO

ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT VARIANCES ON AS-

BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING TRANSPORTATION, FOR ALL

WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY

DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS, ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION

AREA OF WORK

PROJECT

NORTH

- 1" = 20'-0"

1 BLDG 52 - FLOOR - 0 - TELECOMMUNICATIONS PLAN

GENERAL NOTES

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 52ET100

BLDG 52 - FLOOR 0 -

TELECOMMUNICATIONS PLAN 52

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE EXISTING

TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING;

REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET FOR ADDITIONAL

INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.

EXISTING WIRELESS ACCESS POINT RE-FED WITH CAT6A CABLING.

REMOVE AND REPLACE EXISTING CABLE TRAY IN THE AREAS SHOWN AS REQUIRED; IF CABLE TRAY IS NON-EXISTENT, PROVIDE CABLE TRAY AS INDICATED. REFERENCE DETAIL ‘6’ ON SHEET ET503 AND TELECOMMUNICATIONS WAO AND CABLE TRAY SCHEDULE ON SHEET ET701. WHERE WALL EXTENDS TO CEILING, CABLE TRAY SHALL STOP AND TRANSITION TO CONDUIT SLEEVES [(2) 4”, MINIMUM] WITH APPROPRIATE FIRE-PROOFING AND CAULKING TO PASS THROUGH WALL WHERE EXISTING CABLE TRAY AND/OR SLEEVES ARE DISCOVERED, EVALUATE CONDITION AND RACEWAY CAPACITY; IF CABLE TRAY AND/OR SLEEVES APPEAR TO BE REUSABLE, NOTIFY COR FOR POSSIBLE

REUSE.

FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL REQUIRED APPURTENANCES AS REQUIRED. REFERENCE DETAIL 2

ON SHEET ET503 FOR ADDITIONAL INFORMATION.

FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP CEILING WHEREVER POSSIBLE.

UTILIZE CABLE TRAY AS APPLICABLE. PROVIDE CONDUIT SLEEVE WITH FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS ARE REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.

UTILIZE EXISTING PACS SECURITY HEAD END LOCATION FOR NEW OR RELOCATED PACS SECURITY TR EQUIPMENT.

UPGRADE OR MODIFY EXISTING HEAD END LOCATION AS REQUIRED TO PROVIDE A COMPLETE AND FULLY FUNCTIONAL TR PACS SECURITY SYSTEM. PROVIDE EQUIPMENT, RACEWAYS, AND CABLING AS REQUIRED.

COORDINATE WITH VA PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY EXACT HEAD END LOCATION AS

REQUIRED.

0' 10' 20' 40'

PROJECT

NORTH

UP

2 2

2 2

2 2

22 2

8 8

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

52ET401c

52ET401a

WAP 4

WAP 4

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

W A

P

WAP 1

WAP 1 WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1 WAP 1

WAP 1 WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1 WAP 1

WAP 1

Y.1YXW.1V.2 W.2U.5U.2US.3S.1S RQ Q.2P.3P P.2NM.2LK L.1 L.2

2.3

9.5

11.9

12.8

8.7

7.3

JH.1F.1 HGFE F.3DCBA.1A

6.2

4.8

9.9

Z

DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE

SERVED FROM TELECOMMUNICATION ROOM 1N82A

DATA OUTLETS AND DEVICES IN THIS AREA SHALL BE

SERVED FROM TELECOMMUNICATION ROOM 1S33

52ET401a

WAP 1

WAP 1

22 2

WAP 1

WAP 1

WAP 4

WAP 1

52ET401c

52ET401b

52ET401b

52ET401a

52ET401c

DAYROOM

1N82

EQUIP. STORAGE

1N83

STORAGE

1N85

TOILET, STAFF

1N90B

TOILET, STAFF

1N90A

CORRIDOR

H111

UTILITY RM., SOILED

1N91

BED RM. - 1 BED

1N92

LAUNDRY

1N81

BED RM. - 1 BED

1N80

TOILET

1N79

BED RM. - 1 BED

1N78

CORRIDOR

H108

MEDICATION PREP

1N72

DAYROOM

1N74

STAIRWELL NO. 3

S103

KITCHEN

1N94

LINEN STORAGE

1N95

STORAGE

1N106

TOILET

1N107

HAC

1N108

MECH. RM.

1N105

CLEAN SUPPLY

1N104

BED RM. - 2 BED

1N97

TOILET

1N98

BED RM. - 2 BED

1N102

BED RM. - 1 BED

1N99

BED RM. - 1 BED

1N100

BED RM. - 1 BED

1N101

CORRIDOR

H110

TOILET

1N68

BED RM. - 2 BED

1N66

BED RM. - 2 BED

1N110

HAC

1N64

NURSE SUP. OFFICE

1N62

FAMILY/ ULTRASOUND

1S60

ELEVATOR LOBBY

1S59

SERVICE ELEVATOR

ES

KITCHEN PREP

1N61A DINING RM.

1N61

F.E. CLOSET

1S58

BED RM.

1S09

STAIRWELL NO. 2

S102

ELEVATOR NO. 1

E1

REHAB. APARTMENT

1N112A

CORRIDOR

H107

REHAB. APARTMENT

1N114

OI&T

1N115A

CLOSET

1N114B

TOILET, MALE

1S07

FOYER

1S01

OFFICE

1S02A

KITCHEN

1S14

WHEELCHAIR STORAGE/ MECH RM.

1S15

HAC

1S13

STORAGE

1S12

O2 TANK STORAGE

1S11

MEDICATION RM.

1S11A

BED RM.

1S10

TOILET

1S09A

MECH. RM.

1S54

BED RM.

1S50

CORRIDOR

H103

DAYROOM

1S45

STAFF LOUNGE

1S42

BED RM.

1S41

BATH / SHOWER RM.

1S39

F.E. CLOSET

1S40

STAIRWELL NO. 1

S101

SUPPLY RM.

1S23

BED RM.

1S22

SUPPLY RM.

1S16

TOILET

1S20A

BED RM.

1S20

BED RM.

1S19A

CORRIDOR

H105

STORAGE

1S30A

PATIENT LAUNDRY

1S35

EQUIP. STORAGE

1S34

NURSE STATION

1N73

HALLWAY

1N90

STAFF LOUNGE

1N77 TRANSCRIPTION

1N71

TOILET

1N114A

SECURE STORAGE

1S34A

NOURSH

1S25

F.E. CLOS

1S24

PIPE CHASE

1S21A

TOILET

1S10A

HALLWAY

1N112

REHAB. APARTMENT

1N111

TOILET

1N92A

PIPE CHASE

1N78A

PIPE CHASE

1N77A

CORRIDOR

H109

ELEVATOR NO. 2

E2

PHYS. CHART

1S46

MECH. CHASE

1S42A

MECH. CHASE

1S41A

CHASE

CH-N-2

CHASE

CH-N-3

TOILET, FEMALE

1S04

TOILET

1N101A

TOILET

1N100A

CORRIDOR

1H106

BED RM.

1S19

BED RM.

1S17

BED RM.

1S38

DINING RM.

1S57

CHASE

CH-N-1

CHASE

CH-N-7

CHASE

CH-N-9

CHASE

CH-N-8

CHASE

CH-S-1

CHASE

CH-S-2

CHASE

CH-N-12

CHASE

CH-S-3

CHASE

CH-S-4

CHASE

CH-S-5

CHASE

CH-S-6

STAFF TOILET

1S35

CHASE

CH-S-7

CHASE

CH-N-11

CHASE

CH-N-13

Room

CH22

CHASE

CH-N-5

CONSULT RM.

1N115

TOILET

1S22A

TOILET

1S17A

TR

1S33A

CORRIDOR

H104

CORRIDOR

H106

KITCHEN SERVING

1N61B TOILET

1S49

MED

1S47

CORRIDOR

H103A

NURSE STATION

1S43

TR

1N82A

EXAM

1S33

BEDROOM

1S30

STAFF TOILET

1S32A

TOILET

1S29

SOIL UTILITY

1S28

TOILET

1S26A

BEDROOM

1S26

B-SIDE:

TO TR 2N91 FROM GN29A

TDU, FROM FLR 00 TO 01

B-SIDE:

TO TR 1N82A FROM GN29A

TDU, FROM FLR 00 TO 01

B-SIDE:

TO TR 2S53 FROM

GN29A TDU, FROM

FLR 01 TO 02

B-SIDE:

TO TR 1S33

FROM GN29A

TDU, FROM FLR

00 TO 01

TYP

TYP

B-SIDE:

TO TR 2N91 FROM

GN29A TDU, FROM

FLR 01 TO 02

ALL BACKBONE CABLING ROUTES ARE

DIAGRAMMATICAL; CONTRACTOR SHALL ENSURE A-SIDE

AND B-SIDE ROUTING IS AS DIVERSE AS PRACTICAL.

REFERENCE COMMUNICATIONS DRAWINGS FOR ALL

REQUIRED FIBER-OPTIC CABLING.

TYP

TYP

BLDG 52

1. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

2. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO

THE ACCEPTANCE OF THE OWNER.

3. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE RATING OR NEW FIRE RATING, IF

REQUIRED. COORDINATE WITH ARCHITECTURAL DRAWINGS AS REQUIRED.

4. ALL TELECOMMUNICATIONS CABLING CATEGORY 6 AND BELOW SHALL BE UPGRADED WITH CAT6A PORTS AND

CABLE QUANTITIES INDICATED, UNLESS NOTED OTHERWISE.

5. TELECOMMUNICATIONS CABLES SHALL BE ROUTED IN EXISTING PATHWAY VACATED BY EXISTING CABLING.

PROVIDE RACEWAYS TO EXTEND TO ASSOCIATED TR.

6. A TELECOMMUNICATIONS OUTLET UPGRADE SHALL INCLUDE, BUT IS NOT LIMITED TO REMOVING AND DISPOSING EXISTING DEVICES AND CABLES; PROVIDING ALL LABOR, MATERIALS, TOOLS, TEST INSTRUMENTS, AND CONSUMABLES REQUIRED FOR THE INSTALLATION, TERMINATION, TESTING, LABELING, AND CERTIFICATION OF A

FULLY FUNCTIONAL CATEGORY 6A OUTLET WITH THE PORT QUANTITY INDICATED.

7. CONTRACTOR SHALL PROVIDE, INSTALL, AND TERMINATE HORIZONTAL CAT 6A CABLING FROM EACH WAO (WORK

AREA OUTLET) TO ITS RESPECTIVE TR.

8. PROVIDE PULL BOXES SIZED PER ANSI/TIA-569 AT 100-FT INTERVALS IN STRAIGHT CONDUIT RUNS, OR CONDUIT

CONTAINING BENDS TOTALING MORE THAN 180 DEGREES.

9. PROVIDE CONDUITS AND SLEEVES AS REQUIRED FOR ROUTING AND INSTALLATION OF HORIZONTAL AND BACKBONE CABLING. PROVIDE FIRE-STOP MATERIALS TO SEAL IN AND AROUND CONDUIT PER CODE. REFER TO

ARCHITECTURAL DRAWINGS FOR PARTITION TYPES AND WALL HEIGHTS.

10. OUTLET LOCATIONS ARE APPROXIMATE. DETERMINE EXACT LOCATIONS IN FIELD; DOCUMENT VARIANCES ON AS-

BUILT DRAWINGS.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING TRANSPORTATION, FOR ALL

WORK TO DESIRED VA STORAGE LOCATION. COORDINATE WITH VA AS REQUIRED.

12. ALL DATA CABLING SHALL BE SEGREGATED FROM OTHER SPECIAL SYSTEMS INCLUDING, BUT NOT LIMITED TO, SECURITY, FIRE ALARM, AND NURSE CALL SYSTEMS. WHEN ROUTED THROUGH CONDUIT, DATA CABLING SHALL HAVE ITS OWN RACEWAY. WHEN DATA CABLING IS ROUTED THROUGH A COMMON SPECIAL SYSTEMS CABLE TRAY, CABLING SHALL BE BUNDLED WITH LIKE SYSTEMS; ADDITIONALLY, CABLE TRAYS SHALL BE PROVIDED WITH TRAY

DIVIDERS AS REQUIRED TO SEGREGATE SYSTEMS FROM ONE ANOTHER.

13. FIBER-OPTIC CABLING ROUTES AND ASSOCIATED RACEWAYS/ CABLE TRAY ARE DIAGRAMMATICAL. COORDINATE EXACT ROUTING WITH EXISTING CONDITIONS, ARCHITECTURAL FEATURES, MECHANICAL DUCTWORK, PIPING, EQUIPMENT, AND ANY OTHER OBSTRUCTIONS PRIOR TO INSTALLATION

AREA OF WORK

PROJECT

NORTH

- 1" = 20'-0"

1 BLDG 52 - FLOOR 1 - TELECOMMUNICATIONS PLAN

GENERAL NOTES

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

EHRM INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

SPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES 52ET101

BLDG 52 - FLOOR 1 -

TELECOMMUNICATIONS PLAN 52

LRL/WNM JGE/JBB

CONSTRUCTION

DOCUMENTS

03/31/2022

Revisions: Date:

KEY NOTES

0' 10' 20' 40'

PROJECT

NORTH

PROVIDE TELECOMMUNICATIONS OUTLET WITH PORT QUANTITY SHOWN TO REPLACE EXISTING

TELECOMMUNICATIONS OUTLET; EXISTING OUTLET CONDUIT SHALL REMAIN AND BE UTILIZED TO FEED NEW CABLING; REFERENCE SHEET DETAIL '1' ON SHEET ET503 AND THE GENERAL NOTES ON THIS SHEET FOR

ADDITIONAL INFORMATION. COORDINATE WITH VA FOR EXACT OUTLET PLACEMENT.

EXISTING WIRELESS ACCESS POINT RE-FED WITH CAT6A CABLING.

REMOVE AND REPLACE EXISTING CABLE TRAY IN THE AREAS SHOWN AS REQUIRED; IF CABLE TRAY IS NON- EXISTENT, PROVIDE CABLE TRAY AS INDICATED. REFERENCE DETAIL ‘6’ ON SHEET ET503 AND TELECOMMUNICATIONS WAO AND CABLE TRAY SCHEDULE ON SHEET ET701. WHERE WALL EXTENDS TO CEILING, CABLE TRAY SHALL STOP AND TRANSITION TO CONDUIT SLEEVES [(2) 4”, MINIMUM] WITH APPROPRIATE FIRE- PROOFING AND CAULKING TO PASS THROUGH WALL WHERE EXISTING CABLE TRAY AND/OR SLEEVES ARE DISCOVERED, EVALUATE CONDITION AND RACEWAY CAPACITY; IF CABLE TRAY AND/OR SLEEVES APPEAR TO BE

REUSABLE, NOTIFY COR FOR POSSIBLE REUSE.

FIBER-OPTIC CABLE VERTICAL ROUTING; COORDINATE EXACT LOCATIONS PRIOR TO INSTALLATION. UTILIZE RIGID CONDUIT SLEEVES WITH FIRE PROOFING AND ALL REQUIRED APPURTENANCES AS REQUIRED. REFERENCE DETAIL

2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.

FIBER-OPTIC CABLE HORIZONTAL ROUTING SHALL BE CONCEALED ABOVE DROP CEILING WHEREVER POSSIBLE.

UTILZE CABLE TRAY AS APPLICABLE. PROVIDE CONDUIT SLEEVE WITH FIREPROOFING AS REQUIRED WHERE WALL PENETRATIONS ARE REQUIRED. REFERENCE DETAIL 2 ON SHEET ET503 FOR ADDITIONAL INFORMATION.

2 2

2 2

2 2

2 2

2 2

2 2

2 2

4160 VO

LTS

DUST CO

LLECTO

R

LIQ UEFIED PETRO LEUM G AS

FLAM M ABLE G AS 2

TRASH COM

PACTO

R

P

SILVERBUILDING 1 23

VA PO

LICE

E

LECTRIC ACCESS

TRANSFO

RM

ER

TRANSFO

RM

ER

TRANSFO

RM

ER

HVAC UNIT

E

LECTRIC PANEL

HVAC UNIT

S&C PAD M

O

UNTED G

EAR

CATALO

G

# 55152-C3DGIG

2P1V M

O

DEL# PM

H-9

EE13299 SG

-52

13278

BUILDING

UPDN

DN DN

ROOF BELOW

ROOF BELOW

ROOF BELOW ROOF BELOW

ROOF BELOW

ROOF BELOW

ROOF

BELOW

52ET402b

52ET402a

52ET402b

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1 WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1

WAP 1 WAP 4

WAP 1

WAP 1

WAP 1

WAP 1WAP 1

WAP 1 WAP 1

WAP 1

OFFICE

2S20A

OFFICE

2N80

OFFICE

2N79

OFFICE

2N77

TOILET, MALE

2N78

OFFICE

2N76

TOILET, MALE

2N88

F.E. CLOSET

2N90

OFFICE

2N89

TR

2N91

OFFICE

2N92

OFFICE

2N93

STAIR 3

S203

CLEAN LINEN

2N94

STORAGE

2N109

STORAGE

2N108

STORAGE

2N107

CONFERENCE RM.

2N72A

CHAPEL

2N72

CHAPEL

2N73

TOILET, FEMALE

2N75

TOILET, STAFF

2N74 KITCHEN

2N71

OFFICE, OPEN

2N69

CORRIDOR

H206

TOILET, STAFF

2N70

LIBRARY

2N68

OFFICE

2N66

TOILET, MALE

2N67

OFFICE

2N65

HAC

2N64

OFFICE

2N63

OFFICE

2N60

OFFICE

2N59

OFFICE

2N59A

CLOSET

2N59B

OFFICE

2N112

WHEELCHAIR STORAGE

2N110

EXAM RM.

2S08

EXAM

2N118

EXAM

2S01

TREAT. RM.

2S05

CONTROL RM.

2S06

VEST.

2S06A

EXAM

2S04

SCI SERVICE PAIN REHAB. CENTER

2N117A

TOILET

2N113A

TOILET, STAFF

2N115

ELEV 1

E1

SCI SERVICE PAIN REHAB. CENTER

2N117

TOILET

2N116

STAIR 2

S202

ELEVATOR LOBBY

2S57

PAIN REHAB. CENTER

2S56A

P.T. / O.T.

2N58

CORRIDOR

H205

HALLWAY

2N113

WAITING RM.

2N112A

CORRIDOR

H204

OFFICE

2S51

TR

2S53

CONFERENCE RM.

2S56

CORRIDOR

H208

HAC

2S10

ELEC. CLOSET

2S9

OFFICE

2S11

OFFICE

2S11A

EXAM

2S12B

HALLWAY

2S13

BATH / SHOWER

2S12

EXAM

2S12A

EXAM

2S13A

STORAGE

2S16

STORAGE

2S17

STORAGE

2S14

TOILET, FEMALE

2S43A

TOILET, MALE

2S41

HALLWAY

2S45

CONFERENCE RM.

2S44

OFFICE

2S46

TOILET

2S47

OFFICE

2S48

OFFICE

2S49

TOILET

2S50

CRAFTS RM.

2S21

OFFICE

2S22B

HALLWAY

2S20

HALLWAY

2S22

OFFICE

2S22A

TOILET, FEMALE

2S23

OFFICE

2S20B

PIPE CHASE

2S24A

OFFICE

2S24

OFFICE

2S19B

OFFICE

2S18

STORAGE

2S26

OFFICE

2S25

STORAGE

2S28

STAIR 1

S201

VA CONSULT

2S29

OFFICE

2S30 HAC

2S31

OFFICE

2S32 OFFICE

2S33

OFFICE

2S36

OFFICE

2S38 OFFICE

2S37

CLOSET

2S37A

TOILET

2S39

ADMIN.

2S34

CORRIDOR

H202

CORRIDOR

H201

CORRIDOR

H203

OFFICE

2S35

OFFICE

2S45A

PIPE CHASE

2N77A

PIPE CHASE

2N76A

PIPE CHASE

2N90A

OFFICE

2S33A

F.E. CLOSET

2S40

F.E. CLOSET

2S27

STORAGE

2S15

WORK RM.

2N81

TELECOM

2N86A

CORRIDOR

H207

ELEV 3

E3

STORAGE

2S43

PIPE CHASE

2S41A

PIPE CHASE

2S38A

STORAGE

2S…