This document provides specifications for a federal construction project to expand and renovate an emergency department at the Southern Arizona VA Healthcare System in Tucson, Arizona. The project involves expanding and renovating Building 50 to upgrade the emergency department facilities. Specifications are provided for various construction divisions and sections involving site work, concrete, masonry, metals, woods and plastics, thermal and moisture protections, doors and windows, finishes, equipment, furnishing fixtures and special construction. Details include requirements for structural steel, metal decking, cold-formed metal framing, metal fabrications, rough carpentry, roofing, exterior insulation, membrane roofing, flashing, roof accessories, fireproofing, firestopping, sealants, demolition, cast-in-place concrete, unit masonry, structural steel framing, steel decking, composite metal decking, metal fabrications, rough carpentry, exterior insulation, roofing, flashing, roof accessories, fireproofing, firestopping, sealants, hollow metal doors and frames, wood doors, integrated door assemblies, access doors, sliding glass doors, coiling doors, aluminum storefronts, blast resistant facades, door hardware, automatic door operators, glazing, gypsum board, ceramic tile, resilient base, resilient flooring, epoxy flooring, carpeting, painting, cubicle curtain tracks, patient bed service walls, wall and door protection, toilet accessories, fire extinguisher cabinets, ceiling mounted patient lifts, casework, and countertops.

View the file

Other files

File Type Posted
50-EP601.pdf PDF
50-M703.pdf PDF
50-A701.pdf PDF
50-A102.pdf PDF
50-M601.pdf PDF
50-EP101.pdf PDF
50-M704.pdf PDF
50-A504.pdf PDF
50-A104.pdf PDF
50-GC102.pdf PDF
50-CU101.pdf PDF
Addendum 1.pdf PDF
50-M505.pdf PDF
50-A502.pdf PDF
50-MG702.pdf PDF
50-AC101.1.pdf PDF
50-MH101.1.pdf PDF
50-EP102.pdf PDF
11 73 00 Ceiling Mounted Patient Lift_Rev.pdf PDF
08 80 00 Glazing_Rev.pdf PDF
50-A401.pdf PDF
50-AC101.4.pdf PDF
50-A303.pdf PDF
50-GC101.pdf PDF
50-MH104.pdf PDF
50-M602.pdf PDF
50-M702.pdf PDF
50-EP602.pdf PDF
01 00 00 Gen Reqs_Rev.pdf PDF
50-MG100.pdf PDF
Technical Questions Spreadsheet - Tucson - Final.pdf PDF
50-A602.pdf PDF
50-M503.pdf PDF
50-CD101.pdf PDF
50-S450.pdf PDF
50-MG701.pdf PDF
50-S310.pdf PDF
50-M701.pdf PDF
36C77623R0191 0003.pdf PDF
36C77623R0191 0002.pdf PDF
36C77623R0191 0001.pdf PDF
Site Visit Sign in Sheet Pg 1 and 2 - Tucson.pdf PDF
Attachment 8 - Architectural Drawings 2 of 2.pdf PDF
Attachment 14 - Mechanical Drawings.pdf PDF
Attachment 6 - Structural Drawings.pdf PDF
36C77623R0191 - 02-22-24.pdf PDF
Attachment 5 - Civil Drawings.pdf PDF
Attachment 20 - Site Visit Instructions.pdf PDF
Attachment 17 - PTube Drawings.pdf PDF
Attachment 7 - Architectural Drawings 1 of 2.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications

Southern Arizona VA Healthcare System

3601 S 6

TH

Avenue | Tucson, Arizona 85723

Expand and Renovate Emergency Department

Building 50

Contract No. 36C25819D0037

Station Project No. 678-331

Bancroft AE Project No. 19-103

BID SET

Volume II

Division 10 - 23

MAY 1, 2023

678-331

EXPAND AND RENOVATE

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

TABLE OF CONTENTS

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 10 Table of Contents

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 01-21

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20

01 33 00 Submittal Procedures 05-17

01 35 26 Safety Requirements 07-20

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 03-19

01 57 19 Temporary Environmental Controls 01-21

01 74 19 Construction Waste Management 01-21

01 78 00 Closeout Submittals

01 78 23 Operation and Maintenance Data

01 90 00 Geotechnical Report

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17

04 05 16 Masonry Grouting 01-21

04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

05 31 00 Steel Decking 01-21

05 36 00 Composite Metal Decking 01-21

05 40 00 Cold-Formed Metal Framing 01-21

05 50 00 Metal Fabrications 08-18

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

TABLE OF CONTENTS

00 01 10-2

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

06 20 00 Finish Carpentry 01-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 01-21

07 22 00 Roof and Deck Insulation 01-21

07 24 00 Exterior Insulation and Finish Systems 01-21

07 52 16.11 Cold Adhesive Styrene-Butadiene-Styrene Modified

Bituminous Membrane Roofing

01-21

07 60 00 Flashing and Sheet Metal 01-21

07 71 00 Roof Specialties 01-21

07 72 00 Roof Accessories 01-21

07 81 00 Applied Fireproofing 10-17

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 10-17

07 95 13 Expansion Joint Cover Assemblies 01-21

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 01-21

08 17 10 Integrated Door Assemblies 01-21

08 31 13 Access Doors and Frames 01-21

08 32 13 ICU Sliding Glass Doors 01-21

08 33 13 Coiling Doors 01-21

08 41 13 Aluminum-Framed Entrances and Storefronts 01-21

08 56 53 Blast Resistant Façade Systems 01-21

08 71 00 Door Hardware 01-21

08 71 13 Automatic Door Operators 01-21

08 80 00 Glazing 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 30 13 Ceramic/Porcelain Tiling 01-21

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 01-21

09 65 16 Resilient Sheet Flooring 05-18

09 65 19 Resilient Tile Flooring 05-18

09 67 23.20 Resinous Epoxy Base With Broadcast (RES 2) 01-21

09 68 00 Carpeting 01-21

09 91 00 Painting 01-21

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

TABLE OF CONTENTS

00 01 10-3

DIVISION 10 – SPECIALTIES

10 21 23 Cubicle Curtain Tracks 01-21

10 25 13 Patient Bed Service Walls 01-20

10 26 00 Wall and Door Protection 01-21

10 28 00 Toilet, Bath, and Laundry Accessories 01-21

10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT

11 73 00 Ceiling Mounted Patient Lift System 08-20

DIVISION 12 – FURNISHINGS

12 32 00 Manufactured Wood Casework 09-15

12 36 00 Countertops 12-18

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-14

13 49 00 Radiation Protection 02-16

DIVISION 14– CONVEYING EQUIPEMENT

14 92 00 Pneumatic Tube System

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-20

22 05 19 Meters and Gages for Plumbing Piping 09-20

22 05 23 General-Duty Valves for Plumbing Piping 09-20

22 07 11 Plumbing Insulation 09-19

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 05-21

22 13 00 Facility Sanitary and Vent Piping 09-20

22 14 00 Facility Storm Drainage 09-15

22 40 00 Plumbing Fixtures 09-15

22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15

22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-20

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

TABLE OF CONTENTS

00 01 10-4

SECTION NO. DIVISION AND SECTION TITLES DATE

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

02-20

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 08 00 Commissioning of HVAC Systems 02-20

23 09 23 Direct-Digital Control System for HVAC 09-11

23 21 13 Hydronic Piping 02-20 23 21 23 Hydronic Pumps 02-20

23 22 13 Steam and Condensate Heating Piping 02-20

23 23 00 Refrigerant Piping 02-20

23 31 00 HVAC Ducts and Casings 02-20

23 34 00 HVAC Fans 02-20

23 36 00 Air Terminal Units 02-20

23 37 00 Air Outlets and Inlets 02-20

23 40 00 HVAC Air Cleaning Devices 03-20

23 72 00 Air-to-Air Energy Recovery Equipment 03-20

23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 03-20

23 81 00 Decentralized Unitary HVAC Equipment 03-20

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 05 36 Wireways for Radiology Equipment 01-18

26 05 41 Underground Electrical Construction 01-17

26 05 73 Overcurrent Protective Device Coordination Study 01-18

26 08 00 Commissioning of Electrical Systems 11-16

26 09 23 Lighting Controls 01-18

26 22 00 Low-Voltage Transformers 01-18

26 24 16 Panelboards 01-18

26 26 00 Power Distribution Units for Static Uninterruptible

Power Systems

01-18

26 27 26 Wiring Devices 01-18

26 29 21 Enclosed Switches and Circuit Breakers 01-17

26 36 23 Automatic Transfer Switches 01-17

26 41 00 Facility Lightning Protection 01-17

26 43 13 Surge Protective Devices 01-17

26 51 00 Interior Lighting 01-18

26 56 00 Exterior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 10-18

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

TABLE OF CONTENTS

00 01 10-5

SECTION NO. DIVISION AND SECTION TITLES DATE

27 08 00 Commissioning of Communications Systems 11-16

27 10 00 Control, Communication and Signal Wiring 06-15

27 11 00 Communications Equipment Room Fittings 06-15

27 15 00 Communications Structured Cabling 01-16

27 31 31 Voice Communications Switching and Routing Equipment -

Extension

06-15

27 41 31 MASTER ANTENNA TELEVISION EQUIPMENT AND SYSTEMS 06-15

27 51 16 Public Address and Mass Notification Systems 10-18

27 52 23 Nurse Call and Code Blue Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16

28 13 00 Physical Access Control System 10-11

28 23 00 Video Surveillance 09-11

28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 07-16

31 63 26 Drilled Caissons 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 12 16 Asphalt Paving 09-15

32 17 23 Pavement Markings 08-16

32 31 40 High Security Fences and Gates 08-16

DIVISION 33 – UTILITIES

33 08 00 Commissioning of Site Utility Systems 11-16

33 30 00 Sanitary Sewer Utilities 06-13

33 40 00 Storm Sewer Utilities 12-17

DIVISION 34 – TRANSPORTATION

34 71 13 Passive Vehicle Barriers 04-18

DIVISION 10

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

CUBICLE CURTAIN TRACKS

10 21 23-1

SECTION 10 21 23

CUBICLE CURTAIN TRACKS

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies cubicle curtain track (C.C.T.), intravenous support assembly (I.V.) and shower curtain tracks.

1.2 RELATED WORK

A. Section 05 50 00, METAL FABRICATIONS: Steel shapes for suspending track assembly.

B. Section 09 51 00, ACOUSTICAL CEILINGS: Acoustical ceiling tile and suspension systems.

1.3 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES.

B. Samples:

1. 305 mm (12 inch) long piece of cubicle curtain track with carrier access and end stop.

2. Clip anchor for fastening track to grid system of acoustical ceilings.

3. One intravenous support assembly consisting of 305 mm (12 inch) long pieces of track, carrier assembly, and bottle pendant.

4. Curtain carrier for attaching curtain to track.

C. Shop Drawings: Showing layout of tracks and method of anchorage.

D. Manufacturer's Literature and Data:

1. Cubicle curtain track.

2. Intravenous support assembly.

1.4 DELIVERY, STORAGE AND HANDLING

A. Deliver material in original package marked to identify the contents, brand name, and the name of the manufacturer or supplier.

B. Store in dry and protected location. Store so as to not bend or warp the tracks.

C. Do not open packages until contents are needed for installation, unless verification inspection is required.

1.5 WARRANTY

A. Construction Warranty: Cubicle curtain tracks are subject to the terms of the Article “Warranty of Construction,” FAR clause 52.246-21.

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

CUBICLE CURTAIN TRACKS

10 21 23-2

1.6 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. ASTM International (ASTM):

B221-14.................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

B221M-13................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)

B456-17.................Electrodeposited Coatings for Copper Plus

Nickel Plus Chromium and Nickel Plus Chromium

C. Aluminum Association (AA):

DAF 45-09...............Designation System for Aluminum Finishes

D. American Architectural Manufacturers Association (AAMA):

2603-20.................Voluntary Specification, Performance

Requirements and Test Procedures for Pigmented

Organic Coatings on Aluminum Extrusions and

Panels (with Coil Coating Appendix)

E. The National Association of Architectural Metal Manufacturers (NAAMM):

AMP 500-06 Series.......Metal Finishes Manual

PART 2 - PRODUCTS

2.1 CUBICLE CURTAIN TRACKS

A. Channel Tracks (Surface Mounted Type): Extruded aluminum, ASTM B221M (B221), alloy 6063, temper T5 or T6, channel shaped, with smooth inside raceway for curtain carriers.

B. Tubular Track (Suspended Type): Seamless drawn aluminum tubing, ASTM B221M (B221), alloy 6061 temper T6, 25 mm (1 inch) outside diameter, not less than 1.5 mm (0.060 inch) wall thickness, slotted for interior carriers.

C. Surface mounted hookless curtain track.

D. Curtain Carriers: Nylon carriers, with nylon wheels on metal or nylon axles.

1. Equip each carrier with either stainless steel, chromium plated brass or steel hooks with swivel, or nickel chromium plated brass or stainless steel bead chain

2. Hook for bead chain may be the same material and finish as the bead chain or may be chromium plated steel.

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

CUBICLE CURTAIN TRACKS

10 21 23-3

3. Provide 2.2 carriers for every 305 mm (1 foot) of each section of each track length, plus one (1) additional carrier.

E. End Stop Connectors, Ceiling Flanges and Other Accessories: Fabricate from the same material with the same finish as the tracks or from nylon.

F. Hangers and Fittings: Fabricate from the same material with the same finish as the tracks. Hangers may be round or square for channel tracks and round for tubular tracks. Design fittings to be compatible with design of tracks and to safely transmit the track load to the hangers.

G. At end of each section of track, make provision for insertion and removal of carriers. Design to prevent accidental removal of carrier.

Provide operating mechanism shall be removable with common tools.

2.2 SHOWER CURTAIN TRACK (NOT USED)

2.3 INTRAVENOUS SUPPORT ASSEMBLY (NOT USED)

2.4 FASTENERS

A. Exposed Fasteners, Screws and Bolts: Stainless steel or chromium/nickel plated brass.

B. Concealed Fasteners, Screws and Bolts: Stainless steel.

C. Metal Clips: Anchor curtain tracks to exposed grid of lay-in acoustical tile ceilings, with concealed metal (butterfly) type or two piece snap locking type ceiling clip of high strength spring steel.

1. When it is not possible to install the metal ceiling clip, the cubicle curtain track may be screwed to the ceiling grid.

2.5 FINISHES

A. Aluminum: Finish numbers for aluminum specified are in accordance with

AA DAF 45. AA-C22A31 finish, chemically etched medium matte with clear anodic coating, Class II Architectural, .01 mm (0.4 mils) thick.

B. Chrome/Nickel Plating: Satin or polished finish, ASTM B546, minimum thickness of chromium plate as follows:

1. 0.005 mm (0.2 mil) on copper alloys.

2. 0.01 mm (0.4 mil) on steel.

C. Stainless Steel: No. 4 in accordance with NAAMM AMP 500.

D. Baked Enamel or Powder Coat Finish: AAMA 2603.

2.6 FABRICATION

A. Weld and grind smooth joints of fabricated components.

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

CUBICLE CURTAIN TRACKS

10 21 23-4

B. Form tracks and bends of lengths that will produce the minimum number of joints. Make track sections up to 4877 mm (16 feet) without joints.

Form corner bend on a 305 mm (12 inch) radius.

C. Provide steel anchor plates, supports, and anchors for securing components to building construction.

D. Form flat surface without distortion.

E. Shop assemble components and package complete with anchors and fittings.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install tracks after finish painting and ceiling finishing operations are complete.

B. Install track level and hangers plumb and securely anchor to the ceiling or suspend from above to form a rigid installation.

C. Anchor surface mounted curtain tracks directly to exposed grid of lay-in acoustical tile ceilings with suitable fasteners, spaced approximately 610 mm (24 inches) on center.

D. Anchor surface mounted curtain tracks to concrete, plaster and gypsum board ceilings with a minimum of 3 mm (1/8-inch) diameter fastenings or concealed clips spaced not more than 914 mm (3 feet) on center.

E. Install suspended track 2210 mm (87 inches) above the finished floor, with hangers spaced no more than 1219 mm (4 feet) on center. At ceiling line, provide flange fittings secured to hangers with set screws.

Secure track to walls with flanged fittings and to hangers with special fittings.

F. Fasten end stop caps to prevent them from being forced out by the striking weight of carriers.

G. Anchor surface mounted intravenous track directly to support system above ceiling.

H. Remove damaged or defective components and replace with new components or repair to the original condition.

I. Install track rigid, plumb, level and true, and securely anchored to the overhead construction.

J. Verify that carrier units operate smoothly and easily over the full range of travel.

- - - E N D - - -

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-20

PATIENT BED SERVICE WALLS

10 25 13-1

SECTION 10 25 13

PART 1 – GENERAL

A. This section specifies the furnishing, installation and connection of the Patient Bed Service Wall (PBSW).

1.2 RELATED WORK

A. SCHEDULE FOR FINISHES: Color and finishes of the PBSW units. Refer to

Contract Drawings Architectural Finish Legend 50-AF602.

B. Section 22 62 00, VACUUM SYSTEMS FOR LABORATORY AND HEALTHCARE

FACILITIES.

C. Section 22 63 00, GAS SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES:

Requirements for air, oxygen and vacuum outlets in the PBSW.

D. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: Minimum requirements, test standards, qualifications products and services, manufactured products, and materials/equipment protection for electrical installations.

E. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES:

Cables and wiring.

F. Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS:

Requirements for personnel safety and to provide a low impedance path to ground for possible ground currents.

G. Section 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS: Raceways and outlet boxes for wiring.

H. Section 26 27 26, WIRING DEVICES: Wiring devices to be installed in the

PBSW units.

I. Section 26 51 00, INTERIOR LIGHTING: Lighting fixture requirements when installed in or connected to the PBSW units.

J. Section 27 52 23, NURSE CALL/CODE BLUE SYSTEMS: Nurse Call and Code One requirements for installation in the PBSW units.

1.3 SUBMITTALS

A. Obtain Government approval for all materials and equipment before delivery to the job site. Delivery, storage or installation of materials and equipment which has not had prior approval is not permitted.

B. Sustainable Design Submittals as described below:

EMERGENCY DEPARTMENT, B50

10 25 13-2

1. Volatile organic compounds per volume as specified in PART 2 -

PRODUCTS.

1. Adhesive: Maximum VOC content: 250 g/L or less.

C. In accordance with Section 26 05 11, REQUIREMENTS FOR ELECTRICAL

INSTALLATIONS and Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND

SAMPLES, submit the following:

1. Shop Drawings:

a. Include sufficient information, clearly presented, to determine compliance with construction documents.

b. Include electrical ratings, dimensions, mounting details, front view, side view, equipment and device arrangement, wiring diagrams, material, and connection diagrams.

c. Submit configuration drawings showing devices, including nurse call, medical gases, electrical receptacles and switches. The

Contracting Officer Representative (COR) will convey by return of submittal the desired configuration of each style of PBSW system.

Limit the quantity and types of devices allowed for each style of unit to the quantity and types of devices specified for that style.

2. Manufacturer’s Literature and Product Data: Submit descriptive literature, catalog cuts, test reports, certifications, samples, and other data necessary for the COR to ascertain that the proposed materials and equipment comply with construction documentation requirements. Catalog cuts submitted for approval are to be legible and clearly identify specific materials and equipment being submitted.

3. Manufacturer’s qualifications.

4. Product qualifications.

5. Service qualifications.

6. Operation and Maintenance Manuals: Two (2) weeks prior to the final inspection, deliver four (4) copies of the following to the COR.

a. Complete maintenance and operating manuals including wiring diagrams, technical data sheets, and information for ordering replacement parts:

1) Include complete "As installed" diagrams which indicate all items of equipment, their interconnecting wiring and interconnecting piping.

EMERGENCY DEPARTMENT, B50

10 25 13-3

2) Include complete diagrams of the internal wiring for each of the items of equipment, including "As installed" revisions of the diagrams.

3) Identify terminals on the wiring diagrams to facilitate installation, maintenance and operation.

7. Certifications: Two (2) weeks prior to the final inspection, deliver four (4) copies of the following certifications to the COR:

a. Certification by the manufacturer that the equipment conforms to the requirements of the construction documents.

b. Certification by the Contractor that the equipment has been properly installed, adjusted, and tested in accordance with the manufacturer’s recommendations.

1.4 WARRANTY

A. Construction Warranty: Comply with FAR clause 52.246-21 “Warranty of

Construction”.

1.5 APPLICABLE PUBLICATIONS

A. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification to the extent referenced. Publications are referenced in text by the basic designation only.

B. Code of Federal Regulation (CFR):

40 CFR 59...............Determination of Volatile Matter Content, Water

Content, Density Volume Solids, and Weight

Solids of Surface Coating

C. National Fire Protection Association (NFPA):

70-20...................National Electrical Code (NEC)

99-21...................Health Care Facilities

D. National Electrical Manufacturer’s Association (NEMA):

WD-6-16.................Wiring Devices - Dimensional

E. Underwriters Laboratories, Inc. (UL): Certification Directory Listing for Prefabricated Medical Headwalls

PART 2 - PRODUCTS

2.1 PBSW SYSTEMS

A. Provide PBSW’s that are UL certification directory listed.

B. Basis of Design: Modular Services Company: 7500 Series and 7200-S

Series

EMERGENCY DEPARTMENT, B50

10 25 13-4

C. Provide units consisting of a structural framework, removable panels and removable equipment console units which are factory assembled to house all permanent bedside services. Services include but are not limited to lighting fixtures, grounding jacks, power outlets, telephone outlets, nurses call patient station, medical gas outlet(s), television remote control unit, and other fittings or devices.

D. Conform to the following:

1. Applicable requirements in NFPA 70 and NFPA 99.

2. Assembly and all components are to be UL listed or labeled.

3. Adhesives where used are to have a VOC content of 250 g/L or less when calculated according to 40 CFR 59, (EPA Method 24).

E. Coordinate the mounting space provisions for the nurse call equipment with Section 27 52 23, NURSE CALL/CODE BLUE SYSTEMS.

F. Compressed Air, Oxygen and Vacuum System Equipment: Furnish, install and test the equipment in accordance with the construction documents and Section 22 62 00, VACUUM SYSTEMS FOR LABORATORY AND HEALTHCARE

FACILITIES and Section 22 63 00, GAS SYSTEMS FOR LABORATORY AND

HEALTHCARE FACILITIES.

1. Provide fixed medical gas outlets that are permanently installed in one (1) location and cannot move without special tools and shutting off the medical gas involved.

G. Electrical receptacles and switches to comply with the requirements in

Section 26 27 26, WIRING DEVICES; grounding in Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS; and internal wiring in

Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES.

H. Styles:

1. Style A1: A single bed PBSW unit consisting of a vertical unit.

a. Provide vertical units that are wall mounted.

1) Wire electrical devices in accordance with the schematic diagram shown on the construction documents.

b. Provide oxygen gas outlet(s): Two (2) each fixed.

c. Provide air outlet (s): Two (2) each fixed.

d. Provide vacuum outlet(s): Two (2) each fixed.

e. Provide emergency power outlets: a minimum of two (2) NEMA 20R red duplex-receptacles or as shown on the drawings, self-illuminated red. Provide stainless steel or anodized aluminum cover plate.

EMERGENCY DEPARTMENT, B50

10 25 13-5

f. Provide normal power outlets: a minimum of three (3) NEMA 20R duplex receptacles or as shown on the drawings; one (1) of which is for the bed motor. Provide stainless steel or anodized aluminum cover plates.

g. Provide Nurses Call audio-visual single bed station.

h. Provide tele-cart jack.

i. Provide auxiliary light in vertical unit, with hood and switch.

Mount both on a stainless steel or an anodized aluminum face plate installed in a single gang box.

j. Provide a switch for the overhead/exam light.

k. Provide a PBSW mounted bed light fixture. Refer to

Section 26 51 00, INTERIOR LIGHTING. Power bed light through the

PBSW unit.

2. Custom Style: A single bed PBSW unit consisting of a vertical unit, wall mounted in accordance with the diagram shown on the construction documents.

I. PBSW: Provide with the following features:

1. Construct basic structural framework of heavy gauge extruded aluminum or minimum 1.72 mm (0.067 inch; 14 gauge) cold-rolled steel.

2. Construct unit to be self-supporting for above-the-floor, close wall mounting or a freestanding installation.

3. Drill and tap the side frame members to permit the installation of front panel devices at modular intervals at any elevation between the top and bottom.

4. Provide removable front panels:

a. Construct panel of the following materials:

1) Fire retarding core material surfaced with a high pressure plastic laminated facing sheet.

2) Vinyl material heat and pressure applied over a minimum of

1.52 mm (0.060 inch) sheet aluminum back braced for rigidity and sound control.

3) Vinyl material heat and pressure applied over sheet steel minimum 1.52 mm (0.060 inch).

4) Vinyl material heat and pressure applied over sheet aluminum minimum 2.03 mm (0.080 inch).

EMERGENCY DEPARTMENT, B50

10 25 13-6

b. Provide color and texture as specified in the Section 09 06 00, SCHEDULE FOR FINISHES.

c. Bond the panel edges with an aluminum extrusion or cold-rolled steel trim designed for mounting directly to the structural framework, thus allowing the panels to be easily removed for access to internal components and for servicing of utility connections or future modifications. Secure panels with hidden screws or other means to offer an overall finished appearance.

All exposed metal surfaces or trims greater than 3.17 mm

(1/8 inch) wide to be of anodized aluminum or stainless steel finished to resist abrasion and affects from hospital cleaning compounds.

5. Back Panels: Styles are not have back panels, provided they are edge gasketed to the wall or totally and inconspicuously edge sealed to the wall with a resilient caulking material. Attach side and back panel made of a minimum 1.52 mm (0.060 inch) sheet steel, or equivalent strength aluminum side and back panels, with flush screws to permit close wall mounting. Finish side panels to match or compliment the front panels. Match back panel for free-standing units with the finish of the front and side panels.

6. Mount patient service components in an equipment console made up of a backbox and finish fascia.

a. Provide galvanized steel backbox with outlet gang openings on minimum 61 mm (2.4 inches) uniform centers to provide mounting supports of front panel devices. Provide removable metal barriers to separate voltage sources and to facilitate wiring between segregated devices within the same horizontal module.

b. Match finish, either anodized aluminum or stainless steel of all fascia and device face plates.

c. Fascia or face plates may be omitted for power and grounding receptacles in the consoles if the receptacles are mounted flush in the PBSW cover panel and facilities, including support members, tapped holes, and spacing are provided behind the panel for future addition or relocation of receptacles.

d. Provide smooth external surfaces having a finished appearance.

Maintain adequate spacing of device plates and similar items to eliminate crevices and facilitate cleaning.

EMERGENCY DEPARTMENT, B50

10 25 13-7

7. Provide patient services as indicated in paragraphs Styles above, the schematic wiring diagram shown on construction documents, and as follows:

a. Electrical components: Factory assembled and prewired to a sectionalized junction box at the top of the unit in accordance with circuiting and switching arrangements shown on the construction documents. Factory assembled prewiring may be stranded in sizes AWG #10 and #12. Provide an equipotential ground bus with lugs suitable for connecting AWG #14 to AWG #6 conductors with a minimum of 48 screw-type terminals, unless otherwise shown.

b. Receptacles and cover plates: Receptacles shall be Hospital Grade

NEMA 5-20R. Each cover plate for emergency receptacles shall be engraved with the word “EMERGENCY” and panel/circuit feeding the receptacle in 6 mm (1/4 inch) red letters. Each cover plate for normal receptacle shall be engraved with the panel/circuit feeding the receptacle in 6 mm (1/4 inch) black letters.

c. Provide medical gas components compatible with those installed elsewhere in the facility, factory assembled, manifolded and pre-piped, with medical grade copper pipe, to single point connections of each service at the top of the units.

d. Provide nurse call services consisting of provisions for adequate space and matching face plates for the equipment and empty conduit to the sectionalized junction box at the top of the unit.

e. Provide internal power and signal wiring in separate EMT, flexible metal conduits or approved raceway. Normal power circuits and emergency power circuits shall be run in separate raceways.

f. Provide adequate supports for conduits and piping within the structural frame.

g. Telephone Outlets/Jacks: Plug-in type as approved by the COR.

h. Except for anodized aluminum and galvanized or stainless steel surfaces, clean and factory paint metal surfaces with primer and not less than two (2) coats of baked enamel.

EMERGENCY DEPARTMENT, B50

10 25 13-8

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install equipment in accordance with NFPA 70, NFPA 99, and as shown on the construction documents.

B. Compressed Air, Oxygen and Vacuum System Equipment:

1. Install and test the equipment and piping system in accordance with the construction documents and Section 22 62 00, VACUUM SYSTEMS FOR

LABORATORY AND HEALTHCARE FACILITIES, and Section 22 63 00, GAS

SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES.

2. Install and make connections as required by PBSW manufacturer for a complete and operational PBSW system for each unit.

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

WALL AND DOOR PROTECTION

10 26 00-1

SECTION 10 26 00

WALL AND DOOR PROTECTION

A. This section specifies wall guards, handrail/wall guard combinations, corner guards and high impact wall covering.

1.2 RELATED WORK

A. Section 05 50 00, METAL FABRICATIONS: Structural Steel Corner Guards.

B. Section 08 71 00, DOOR HARDWARE: Armor plates and kick plates not specified in this section.

C. SCHEDULE FOR FINISHES: Color and texture of resilient material. Refer to Contract Drawings 50-AF602 Architectural Finish Legend.

1.3 QUALITY ASSURANCE

A. Manufacturer’s Qualifications: Manufacturer with a minimum of three (3) years’ experience in providing items of type specified.

1. Obtain wall and door protection from single manufacturer.

B. Installer’s Qualifications: Installers are to have a minimum of three

(3) years’ experience in the installation of units required for this project.

1.4 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES.

B. Sustainable Design Submittals, as described below:

1. Volatile organic compounds per volume as specified in PART 2 -

PRODUCTS.

2. For composite wood products, submit documentation indicating product contains no added urea formaldehyde.

C. Shop Drawings: show design and installation details.

D. Manufacturer's Literature and Data:

1. Handrail/Wall Guard Combinations.

2. Wall Guards.

3. Corner Guards.

4. High Impact Wall covering.

E. Test Report: Showing that resilient material complies with specified fire and safety code requirements.

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

WALL AND DOOR PROTECTION

10 26 00-2

F. Manufacturer’s qualifications.

G. Installer’s qualifications.

H. Manufacturer’s warranty.

1.5 DELIVERY AND STORAGE

A. Deliver materials to the site in original sealed packages or containers marked with the name and brand, or trademark of the manufacturer.

B. Protect from damage from handling and construction operations before, during and after installation.

C. Store in a dry environment of approximately 21 degrees C (70 degrees F) for at least 48 hours prior to installation.

1.6 WARRANTY

A. Construction Warranty: Comply with FAR clause 52.246-21 “Warranty of

Construction”.

B. Manufacturer Warranty: Manufacturer shall warranty their wall and door protection for a minimum of five (5) years from date of installation and final acceptance by the Government. Submit manufacturer warranty.

1.7 APPLICABLE PUBLICATIONS

A. publications listed below form a part of this specification to extent referenced. publications are referenced in text by basic designation only.

B. ASTM International (ASTM):

A240/A240M-20...........Chromium and Chromium-Nickel Stainless Steel

Plate, Sheet, and Strip for Pressure Vessels and For General Applications

B221-14.................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

B221M-13................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)

D256-10(2018)...........Determining the Izod Pendulum Impact Resistance of Plastics

D635-18.................Rate of Burning and/or Extent and Time of

Burning of Plastics in a Horizontal Position

E84-20..................Surface Burning Characteristics of Building

Materials

C. Aluminum Association (AA):

DAF 45-09...............Designation System for Aluminum Finishes

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

WALL AND DOOR PROTECTION

10 26 00-3

D. American Architectural Manufacturers Association (AAMA):

611-14..................Voluntary Specification for Anodized

Architectural Aluminum

E. Code of Federal Regulation (CFR):

40 CFR 59(2020) Subpart D National Volatile Organic Compound

Emission Standards for Architectural Coatings

F. The National Association of Architectural Metal Manufacturers (NAAMM):

AMP 500-06..............Metal Finishes Manual

G. National Fire Protection Association (NFPA):

80-2019.................Standard for Fire Doors and Other Opening

Protectives

H. SAE International (SAE):

J 1545-2014-10..........Instrumental Color Difference Measurement for

Exterior Finishes, Textiles and Colored Trim.

I. Underwriters Laboratories Inc. (UL):

Annual Issue............Building Materials Directory

PART 2 - PRODUCTS

2.1 MATERIALS

A. Stainless Steel: A240/A240M, Type 304.

B. Aluminum Extruded: ASTM B221M (B221), Alloy 6063, Temper T5 or T6.

Provide aluminum alloy used for colored anodizing coating as required to produce specified color.

C. Resilient Material:

1. Provide resilient material consisting of high impact resistant extruded acrylic vinyl, polyvinyl chloride, or injection molded thermal plastic conforming to the following:

a. Minimum impact resistance of 960.8 N-m/m (18 feet-pounds/square inch) when tested in accordance with ASTM D256 (Izod impact, feet-pounds per inch notched).

b. Class 1 fire rating when tested in accordance with ASTM E84, having a maximum flame spread of 25 and a smoke developed rating of 450 or less.

c. Rated self-extinguishing when tested in accordance with

ASTM D635.

d. Provide material labeled and tested by Underwriters Laboratories or other approved independent testing laboratory.

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

WALL AND DOOR PROTECTION

10 26 00-4

e. Provide resilient material for protection on fire rated doors and frames assemblies that is listed by the testing laboratory performing the tests.

f. Provide resilient material installed on fire rated wood/steel door and frame assemblies that have been tested on similar type assemblies. Test results of material tested on any other combination of door and frame assembly are not acceptable.

g. Provide integral color with colored components matched in accordance with SAE J 1545 to within plus or minus 1.0 on the

CIE-LCH scales.

2.2 CORNER GUARDS

A. Resilient, Shock-Absorbing Corner Guards: Surface mounted type.

1. Snap-on corner guard formed from resilient material, minimum 1.98 mm

(0.078-inch) thick, free floating on a continuous 1.52 mm

(0.060-inch) thick extruded aluminum retainer. Provide appropriate mounting hardware, cushions and base plates as required.

2. Profile: Minimum 50 mm (2 inch) long leg and 6 mm (1/4 inch) corner radius.

3. Height: 2.43 m (8 feet).

4. Retainer Clips: Provide manufacturer’s standard impact-absorbing clips.

5. Provide factory fabricated end closure caps at top and bottom of surface mounted corner guards.

6. Flush mounted corner guards installed on any fire rated wall to be installed in a manner that maintains the fire rating of the wall.

Provide fire test of proposed corner guard system to verify compliance.

a. Where insulating materials are an integral part of the corner guard system, provide insulating materials furnished by the manufacturer of the corner guard system.

2.3 WALL GUARDS AND HANDRAILS

A. Resilient Wall Guards and Handrails:

1. Handrail/Wall Guard Combination:

a. Snap-on covers of resilient material, minimum 2 mm (0.078-inch) thick.

b. Free-floating on a continuous, extruded aluminum retainer, minimum 1.82 mm (0.072-inch) thick.

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

WALL AND DOOR PROTECTION

10 26 00-5

c. Anchor to wall at maximum 762 mm (30 inches) on center.

2. Wall Guards:

a. Snap-on covers of resilient material, minimum 2.54 mm (0.100-inch) thick. Free-floated over a continuous extruded aluminum retainer, minimum 2.03 mm (0.080-inch) thick anchored to wall at maximum 610 mm (24 inches) on center.

3. Provide handrails and wall guards with prefabricated end closure caps, inside and outside corners, concealed splices, cushions, mounting hardware and other accessories as required. End caps and corners to be field adjustable to assure close alignment with handrails and wall guards. Screw or bolt closure caps to aluminum retainer in a concealed manner.

2.4 DOOR AND DOOR FRAME PROTECTION (NOT USED)

2.5 HIGH IMPACT WALL COVERING

A. Provide wall covering/panels consisting of high impact rigid acrylic vinyl or polyvinyl chloride resilient material.

B. Panel sizes to be 0.61 x 1.21 meter (2 x 4 feet).

C. Submit fire rating and extinguishing test results for resilient material.

D. Submit statements attesting that the items comply with specified fire and safety code requirements.

E. Rigid Vinyl Acrylic Wall Covering: Wall covering thickness to be 0.56 mm (0.022 inch).

F. High Impact Wall Panels: Wall panel face and edge thickness to be 0.56 mm (0.022 inch). Panel face to be factory banded to a 9.53 mm (0.375 inch) thick fiberboard core. The backside of the panel is to be laminated with a moisture resistant vapor barrier.

G. Provide adhesive as recommended by the wall covering manufacturer.

Provide adhesive with VOC content of 250 g/L or less when calculated according to 40 CFR 59, (EPA Method 24).

2.6 FASTENERS AND ANCHORS

A. Provide fasteners and anchors as required for each specific type of installation.

B. Where type, size, spacing or method of fastening is not shown or specified in construction documents, submit shop drawings showing proposed installation details.

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

WALL AND DOOR PROTECTION

10 26 00-6

2.7 FINISH

A. Resilient Material: Embossed textures and color in accordance with

SAE J1545.

PART 3 - INSTALLATION

3.1 RESILIENT CORNER GUARDS

A. Install corner guards on walls in accordance with manufacturer's instructions.

3.2 STAINLESS STEEL CORNER GUARDS (NOT USED)

3.3 RESILIENT WALL GUARDS, HANDRAILS, WALL GUARD HANDRAIL COMBINATION

A. Secure guards to walls with mounting cushions, brackets and fasteners in accordance with manufacturer's details and instructions.

3.4 ALUMINUM WALL GUARDS (NOT USED)

3.5 STAINLESS STEEL WALL GUARDS (NOT USED)

3.6 HIGH IMPACT WALL COVERING

A. Surfaces to receive protection to be clean, smooth and free of obstructions.

B. Install protectors after frames are in place but preceding installation of doors in accordance with approved shop drawings and manufacturer’s specific instructions.

C. Apply with adhesive in controlled environment according to manufacturer’s recommendations.

D. Protection installed on fire rated doors and frames to be installed according to NFPA 80 and installation procedures listed in UL Building

Materials Directory; or, equal listing by other approved independent testing laboratory establishing the procedures.

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

TOILET, BATH AND LAUNDRY ACCESSORIES

10 28 00-1

SECTION 10 28 00

TOILET, BATH, AND LAUNDRY ACCESSORIES

A. SUMMARY:

1. Section Includes: Toilet and bath accessories at toilets, baths and other areas indicated on drawings.

1.2 RELATED WORK

A. Section 09 30 13, CERAMIC/PORCELAIN TILING: Ceramic Toilet and Bath

Accessories.

B. Section 10 21 23, CUBICLE CURTAIN TRACKS: Shower Curtain Break Away

Pendant Chain Hooks.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. American Society of Mechanical Engineers (ASME):

1. B18.6.4-98(R2005) Thread Forming and Thread Cutting Tapping

Screws and Metallic Drive Screws inch.

C. American Welding Society (AWS):

D10.4-86(2000)..........Welding Austenitic Chromium-Nickle Stainless

Steel Piping and Tubing.

D. ASTM International (ASTM):

A269/A269M-15a(2019)....Seamless and Welded Austenitic Stainless Steel

Tubing for General Service.

A312/A312M-19...........Seamless, Welded, and Heavily Cold Worked

Austenitic Stainless Steel Pipes.

A653/A653M-20...........Steel Sheet, Zinc-Coated (Galvanized) or

Zinc-Iron Alloy-Coated (Galvannealed) by the

Hot-Dip Process.

A666-15.................Annealed or Cold-Worked Austenitic Stainless

Steel Sheet, Strip, Plate, and Flat Bar.

A1011/A1011M-18a........Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved

Formability, and Ultra-High Strength.

B30-20..................Copper Alloys in Ingot Form.

B75/B75M-20.............Seamless Copper Tube.

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

TOILET, BATH AND LAUNDRY ACCESSORIES

10 28 00-2

B221-14.................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes.

B221M-13................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric).

B456-17.................Electrodeposited Coatings of Copper Plus Nickel

Plus Chromium and Nickel Plus Chromium.

B824-17.................General Requirements for Copper Alloy Castings.

C1036-16................Flat Glass.

C1048-18................Heat-Strengthened and Fully Tempered Flat

Glass.

D635-18.................Rate of Burning and/or Extent and Time of

Burning of Plastics in a Horizontal Position.

F446-19.................Grab Bars and Accessories Installed in the

Bathing Area.

E. Federal Specifications (Fed. Spec.):

A-A-3002................Mirror, Glass.

FF-S-107C(2)............Screws, Tapping and Drive.

WW-P-541/8B(1)..........Plumbing Fixtures (Accessories, Land Use).

F. National Architectural Metal Manufacturers(NAAMM):

AMP 500-06..............Metal Finishes Manual.

1.4 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Submittal Drawings:

1. Show size, configuration, and fabrication, anchorage and installation details.

2. Show mounting locations and heights.

C. Manufacturer's Literature and Data:

1. Description of each product.

2. Installation instructions.

D. Samples:

1. Full sized, complete assembly of each product specified.

2. Approved samples may be incorporated into project.

E. Certificates: Certify each product complies with specifications.

1. Soap dispensers: Certify soap dispensers are fabricated of material that will not be affected by liquid soap, aseptic detergents, and hexachlorophene solutions.

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

TOILET, BATH AND LAUNDRY ACCESSORIES

10 28 00-3

F. Qualifications: Substantiate qualifications comply with specifications.

1. Manufacture.

G. Operation and Maintenance Data:

1. Care instructions for each exposed finish product.

1.5 QUALITY ASSURANCE

A. Manufacturer Qualifications:

1. Regularly manufactures specified products.

1.6 DELIVERY

A. Deliver products in manufacturer's original sealed packaging.

B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.

C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

1.7 STORAGE AND HANDLING

A. Store products indoors in dry, weathertight facility.

B. Protect products from damage during handling and construction operations.

1.8 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

PART 2 - PRODUCTS

2.1 MATERIALS

A. Aluminum: ASTM B221M (ASTM B221), Alloy 6063-T5 and Alloy 6463-T5.

B. Stainless Steel:

1. Plate Or Sheet: ASTM A666, Type 304, 0.8 mm (0.031 inch) thick unless otherwise specified.

2. Tubing: ASTM A269/A269M, Grade TP 304, seamless or welded.

3. Pipe: ASTM A312/A312M; Grade TP 304.

C. Steel Sheet: ASTM A653/A653M, zinc-coated (galvanized) coating designation G90.

D. Chrome Plating (Service Condition Number SC 2): ASTM B456.

E. Brass Castings: ASTM B30.

F. Copper:

1. Tubing: ASTM B75/B75M.

2. Castings: ASTM B824.

G. Glass:

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

TOILET, BATH AND LAUNDRY ACCESSORIES

10 28 00-4

1. ASTM C1036, Type 1, Class 1, Quality q2, for mirrors, and for mirror doors in medicine cabinets.

2. ASTM C1036, Type 1 Class 1 Quality q3, for shelves in medicine cabinets.

3. ASTM C1048, Kind FT, Condition A, Type 1, Class 1 for glass and mirrors in Mental Health and Behavior Patient Care Units, and

Security Examination Rooms.

2.2 PRODUCTS - GENERAL

A. Provide each product from one manufacturer.

B. Products Used Within Mental Health and Behavioral Patient Care Units:

1. Provide accessories free of anchor points.

2. Design accessories for attachment with tamper resistant hardware.

2.3 PAPER TOWEL DISPENSERS (NOT USED)

2.4 COMBINATION PAPER TOWEL DISPENSER AND DISPOSAL UNITS (NOT USED)

2.5 WASTE RECEPTACLES (NOT USED)

2.6 TOILET TISSUE DISPENSERS (NOT USED)

2.7 GRAB BARS

A. Fed. Spec. WW-P-541/8B, Type IV, bars, surface mounted, Class 2, grab bars and complying with ASTM F446.

B. Fabricate from stainless steel or nylon coated steel, use one type throughout project:

1. Stainless steel: Grab bars, flanges, mounting plates, supports, screws, bolts, and exposed nuts and washers.

2. Nylon Coated Steel: Grab bars and flanges complete with mounting plates and fasteners.

C. Mounting:

Other Types and Locations: Concealed type.

D. Bars:

1. Fabricate to 38 mm (1-1/2 inch) outside diameter.

a. Stainless steel, minimum 1.2 mm (0.05 inch) thick.

b. Nylon coated bars, minimum 1.5 mm (0.06 inch) thick.

2. Fabricate in one continuous piece with ends turned toward walls.

a. Swing up grab bars and grab bars continuous around three sides of showers may be fabricated in two sections, with concealed slip joint between.

3. Continuously weld intermediate support to grab bar.

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

TOILET, BATH AND LAUNDRY ACCESSORIES

10 28 00-5

4. Swing Up Bars: Manually operated; designed to prevent bar from falling when in raised position.

E. Flange for Concealed Mounting:

1. Minimum 2.65 mm (0.1 inch) thick, maximum 79 mm (3-1/8 inch) diameter by 13 mm (1/2 inch) deep, with minimum three set screws for securing flange to back plate.

2. Insert grab bar through center of flange and continuously weld perimeter of grab bar flush to back side of flange.

3. In lieu of providing flange for concealed mounting, and back plate as specified, grab bar may be welded to back plate covered with flange.

F. Flange for Exposed Mounting:

1. Minimum 5 mm (3/16 inch) thick, maximum 79 mm (3-1/8 inch) diameter.

2. Insert grab bar through flange and continuously weld perimeter of grab bar flush to backside of flange.

G. Back Plates:

1. Minimum 2.65 mm (0.1046 inch) thick metal.

2. Fabricate in one piece, maximum 6 mm (1/4 inch) deep, with diameter sized to fit flange. Provide slotted holes to accommodate anchor bolts.

3. Provide spreaders, through bolt fasteners, and cap nuts, where grab bars are mounted on partitions.

H. Grab bars in Mental Health and Behavioral Patient Care Units: Provide units complying with accessibility standards, but preventing materials from being threaded between bar and wall as possible anchor point.

2.8 SHOWER CURTAIN RODS (NOT USED)

2.9 CLOTHES HOOKS, ROBE OR COAT

A. Fabricate hook units from chromium plated brass with satin finish, or stainless steel, using 6 mm (1/4 inch) minimum thick stock, with edges and corners rounded smooth to thickness of metal, or 3 mm (1/8 inch) minimum radius.

B. Fabricate each unit as a double hook on a single shaft, integral with or permanently fastened to wall flange, provided with concealed fastenings.

C. Clothes Hooks Used In Mental Health And Behavioral Patient Care Units:

Provide units free of anchor points and secured to the wall using tamper resistant hardware.

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

TOILET, BATH AND LAUNDRY ACCESSORIES

10 28 00-6

2.10 TOWEL BARS (NOT USED)

2.11 METAL FRAMED MIRRORS

A. Fed. Spec. A-A-3002 metal frame; chromium finished steel, anodized aluminum, or stainless steel.

B. Mirror Glass:

1. Minimum 6 mm (1/4 inch) thick.

2. Set mirror in a protective vinyl glazing tape.

C. Frames:

1. Channel or angle shaped section with face of frame minimum 9 mm

(3/8 inch) wide. Fabricate with square corners.

2. Metal Thickness 0.9 mm (0.035 inch).

3. Filler:

a. Where mirrors are mounted on walls having ceramic tile wainscots not flush with wall above, provide fillers contoured to conceal void between back of mirror and wall surface.

b. Fabricate fillers from same material and finish as mirror frame.

4. Attached Shelf for Mirrors:

a. Fabricate shelf of same material and finish as mirror frame.

b. Make shelf maximum 150 mm (6 inches) in depth, and extend full width of mirror.

c. Close ends and front edge of shelf to same thickness as mirror frame width.

d. Form shelf for aluminum framed mirror as integral part of bottom frame member.

e. Form stainless steel shelf with concealed brackets to attach to mirror frame.

D. Back Plate:

1. Fabricate backplate for concealed wall hanging from zinc-coated, or cadmium plated 0.9 mm (0.036 inch) thick sheet steel, die cut to fit face of mirror frame.

2. Provide set screw type theft resistant concealed fastening system for mounting mirrors.

E. Mounting Bracket:

1. Designed to support mirror tight to wall.

2. Designed to retain mirror with concealed set screw fastenings.

F. Metal Framed Mirrors used in Mental Health and Behavioral Patient Care

Units: Provide shatter proof glass or polished stainless steel units.

EMERGENCY DEPARTMENT, B50

SAVAHCS

01-01-21

TOILET, BATH AND LAUNDRY ACCESSORIES

10 28 00-7

2.12 MEDICINE CABINETS (NOT USED)

2.13 FOOT OPERATED SOAP DISPENSER (NOT…