This document is a set of mechanical ventilation plans and specifications for the Expand and Renovate Emergency Department B50 project at the Tucson VAMC.

The plans detail the installation of new mechanical equipment including an air handling unit (AHU-5), two exhaust fans (EF-2A and EF-2B), a ductless split system (DFSS-AHU-5), and associated piping and ductwork. Key requirements include installing the HEPA filter housing per the detail provided, maintaining manufacturer's clearance requirements for the DFSS and ACCU units, and extending the exhaust ductwork 15 feet from the outside air intake. The plans also specify labeling the exhaust ductwork for the isolation suites as "communicable disease contaminated air". The mechanical systems are to be installed during two construction phases as indicated on the phasing plan.

This project is part of the VA's solicitation 36c77623r0191 for the "Y1DA--Expand and Renovate Emergency Department B50 Minor Construction" at the Tucson VAMC.

View the file

Other files

File Type Posted
50-EP601.pdf PDF
50-M703.pdf PDF
50-A701.pdf PDF
50-A102.pdf PDF
50-M601.pdf PDF
50-EP101.pdf PDF
50-M704.pdf PDF
50-A504.pdf PDF
50-A104.pdf PDF
50-GC102.pdf PDF
50-CU101.pdf PDF
Addendum 1.pdf PDF
50-M505.pdf PDF
50-A502.pdf PDF
50-MG702.pdf PDF
50-AC101.1.pdf PDF
50-MH101.1.pdf PDF
50-EP102.pdf PDF
11 73 00 Ceiling Mounted Patient Lift_Rev.pdf PDF
08 80 00 Glazing_Rev.pdf PDF
50-A401.pdf PDF
50-AC101.4.pdf PDF
50-A303.pdf PDF
50-GC101.pdf PDF
50-M602.pdf PDF
50-M702.pdf PDF
50-EP602.pdf PDF
01 00 00 Gen Reqs_Rev.pdf PDF
50-MG100.pdf PDF
Technical Questions Spreadsheet - Tucson - Final.pdf PDF
50-A602.pdf PDF
50-M503.pdf PDF
50-CD101.pdf PDF
50-S450.pdf PDF
50-MG701.pdf PDF
50-S310.pdf PDF
50-M701.pdf PDF
36C77623R0191 0003.pdf PDF
36C77623R0191 0002.pdf PDF
36C77623R0191 0001.pdf PDF
Site Visit Sign in Sheet Pg 1 and 2 - Tucson.pdf PDF
Attachment 8 - Architectural Drawings 2 of 2.pdf PDF
Attachment 14 - Mechanical Drawings.pdf PDF
Attachment 6 - Structural Drawings.pdf PDF
36C77623R0191 - 02-22-24.pdf PDF
Attachment 2 - Specifications - 2 of 3.pdf PDF
Attachment 5 - Civil Drawings.pdf PDF
Attachment 20 - Site Visit Instructions.pdf PDF
Attachment 17 - PTube Drawings.pdf PDF
Attachment 7 - Architectural Drawings 1 of 2.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FF

EE

DD

CC

BB

2 3.5 4.5 5.5 6.5 7.5

II

HH

JJ

GG

8.58.3

(E) 12"∅ EA DN

27x24x60

PLENUM

F-2A/2BF-2A/2B

EF-2AEF-2A

900 CFM

EF-2BEF-2B

900 CFM

13ø

13ø

100x18 RA DN 80x24 SA DN

SERVICE

VESTIBULE

HUM-5

78x8 EA DN

(E) 13"∅ EA DN

ELECTRICAL EQUIPMENT

(REFER TO ELECTRICAL

DRAWINGS)

AHU-5AHU-5

20170 CFM

CAPPED

x3

EA

4" CHWS /

CHWR DN

CHILLED

WATER COIL

PULL SPACE

3 4

UP

UP

EXISTING ROOF TOP

EQUIPMENT

(TYPICAL)

EXISTING 3-STORY ROOF

NEW 1-STORY ROOF

NEW CANOPY

ACCU-1025

2 TONS

1" D

ACCU-AHU-5

2 TON

DFSS-AHU-5

2 TON

A. COORDINATE ALL MECHANICAL SERVICE OUTAGES WITH VA/COR.

B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY CONFLICTS BEFORE PROCEEDING.

C. DURING CONSTRUCTION, PROVIDE TEMPORARY CLOSURES ON ALL EXHAUST AIR DUCT OPENINGS BY SEALING WITH A DISPOSABLE POLYETHYLENE SHEETING TO PREVENT CONSTRUCTION DUST FROM ENTERING DUCTWORK SYSTEM.

D. EXHAUST AIR DISCHARGE SHALL BE A MINIMUM OF 25 FEET FROM ANY OUTSIDE AIR INTAKE.

E. ALL EXHAUST DUCTWORK SERVING THE ISOLATION SUITES SHALL BE CLEARLY LABELED AS "COMMUNICABLE DISEASE

CONTAMINED AIR" EVERY 50 FEET.

F. AHU-5 IS A CUSTOM UNIT, COORDINATE ALL DUCT OPENINGS WITH STRUCTURAL DRAWINGS.

GENERAL MECHANICAL VENTILATION NOTES

MECHANICAL KEY NOTES

1. BAG-IN / BAG-OUT HEPA FILTER. PROVIDE ALL MAINTENANCE AND SERVICE ACCESS PER MANUFACTURER'S INSTRUCTIONS. REFER TO DETAIL #1 ON SHEET 50-M505 FOR HEPA FILTER HOUSING DETAIL.

2. REFRIGERANT LIQUID / SUCTION PIPING DN TO DFSS-1025. SIZE PER MANUFACTURER'S RECOMMENDATIONS.

REFER TO DETAIL #10 ON SHEET 50-M501 FOR ROOF SLEEVE DETAIL.

3. MAINTAIN MANUFACTURER'S RECOMMENDED CLEARANCE REQUIREMENTS.

4. INSTALL DFSS AND ACCU PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. REFER TO DETAIL #5 ON SHEET 50-M505 FOR MORE INFORMATION ON DFSS. REFER TO DETAIL #8 ON SHEET 50-M502 FOR ROOF MOUNTED

EQUIPMENT RAIL. INSTALL DFSS 7'-0" ABOVE FINISHED FLOOR.

5. INSTALL AHU-5 PER MANUFACTURER'S INSTALLATION INSTRUCTIONS DURING PHASE 1, REFER TO PHASING PLAN ON SHEET 50-MC101. MOUNT AHU-5 ON CONCRETE CURB, REFER TO STRUCTURAL DRAWINGS FOR CURB DETAILS.

REFER TO DETAIL #3 ON SHEET 50-M505 FOR MORE INFORMATION ON AHU-5.

6. INSTALL EF-2A & 2B PER MANUFACTURER'S INSTALLATION INSTRUCTIONS DURING PHASE 2, REFER TO PHASING PLAN ON SHEET 50-MC101. MOUNT EF-2A & 2B ON NEW ROOF CURBS. REFER TO DETAIL #9 ON SHEET 50-M503 FOR

UP-BLAST EXHAUST FAN.

7. EXHAUST FAN VFD LOCATED IN ELECTRICAL ROOM 342A, REFER TO SHEET 50-MP103.

8. INSTALL EXPANSION JOINT PIPING, REFER TO ARCHITECTURAL DRAWINGS FOR EXPANSION JOINT LOCATION.

9. EXTEND EXHAUST AIR DUCTWORK 15 FEET AWAY FROM OUTSIDE AIR INTAKE.

10. MAKE FULL SIZE DUCT CONNECTIONS TO AHU.

11. 45 DEGREE CUT.

12. TERMINATE DUCT WITH 45 DEGREE CUT FACING AND WIRE MESH SCREEN.

13. 1" DRAIN TO SPILL TO NEAREST ROOF DRAIN.

14. DUCT SUPPORTS. REFER TO DETAIL #4 ON SHEET 50-M505.

15. REVERSE OSMOSIS WATER DN, SEE PLUMBING DRAWINGS FOR MORE INFORMATION.

16. TERMINATE 3/4" CONDENSATE DRAIN OUT THROUGH AHU WALL WITH DOWN TURNED TYPE "K" COPPER ELBOW.

INSTALL INSECT SCREEN. INSTALL WATER-TIGHT PENETRATION SEAL.

17. REFRIGERANT LIQUID / SUCTION PIPING FROM DFSS-AHU-5 TO ACCU-AHU-5. SIZE PER MANUFACTURER'S

RECOMMENDATIONS. INSTALL WATER-TIGHT PENETRATION SEAL AT AHU WALL.

18. AHU STAIRS, REFER TO ARCHITECTURAL DRAWINGS FOR MORE INFORMATION.

X

N o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

VA FORM 08-6231

Office of Facilities Management

U.S. Department of Veterans Affairs

STAMP

Date

Location

Building Number Checked Drawn Drawing Number

Project Number

BID SET

Approved: Director

Approved: Associate Director

Approved: Assistant Director

Approved: Assoc. Director for Patient Care Service/Nurse Executive

Approved: Deputy Assoc. Director of Patient Care Services

Approved: Chief of Staff

Approved: Deputy Chief of Staff

Approved: Chief of Engineering

Approved:

Approved:

ARCHITECT/ENGINEER/CONSULTANTS:

Bancroft Project No.

SAVAHCS, TUCSON, AZ 85723

3300 Dundee Road

Northbrook, IL 60062

T: 847.952.9362

KEY PLAN

04/30/2024MECHANICAL - VENTILATION

OVERALL PLAN, ROOF

EXPAND AND RENOVATE

EMERGENCY DEPARTMENT B50

50 DGG TE

50-MH104

678-331

8-

E X

P A

N D

A N

D R

E N

O V

A T

E E

M E

R G

E N

C Y

D E

P A

R T

M E

N T

B

A

D D

E N

D U

M

N 1/8" = 1'-0"

MECHANICAL - VENTILATION OVERALL PLAN, ROOF

0 4' 8' 16'

Revisions: Date:

BID SET 05/01/2023

ADDENDUM 1 04/30/2024

Sheets
50-M505 - MECHANICAL - DETAILS
50-MH104 - MECHANICAL - VENTILATION OVERALL PLAN, ROOF

File details come from the government source that posted it. Updated .