This document appears to be a set of electrical drawings for the Expand and Renovate Emergency Department B50 Minor Construction project at the Tucson VA Medical Center. The drawings provide details on the electrical equipment and wiring required, including a 300A fused disconnect, automatic transfer switch, electrical panels, condenser units, exhaust fans, and transformers. Key requirements include installing electrical equipment in the AHU-5 unit, terminating the EF-2A and EF-2B exhaust fans, and providing power to various electrical loads. The drawings reference associated documents such as the Statement of Work, panel schedules, and wiring details. This appears to be part of the technical specifications for the overall construction project, which has the solicitation number 36c77623r0191 and is being procured by the Department of Veterans Affairs Technology Acquisition Center in Austin.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3 5 6 7 8
F
E
I
H
J
G
PANEL: 50-AHU5-EQ, CKT: 7,9,11
HUM-5
35A DISCONNECT
TO VFD EF-2A
ROOM 342A
ACCU-1025
EF-2BEF-2A
15A DISCONNECT
8 TO VFD EF-2B
ROOM 342A
15A DISCONNECT
BOND TO LIGHTNING
GRID
TO OIT ROOM 1025
50-EP102
FIRST FLOOR ROOF
THIRD FLOOR ROOF
SEE 50-EP104 FOR
WIRE AND CONDUIT SIZES
4 # 12 & 1 # 12G, 3/4 IN. C.
P A
N E
L
-A H
U 5-
E Q
ACCU-AHU-5
A. INSTALL ELECTRICAL EQUIPMENT IN AHU-5 IN PHASE 1.
B. TERMINATE EF-2A AND EF-2B IN PHASE 2.
C. EXISTING EMERGENCY DEPARTMENT MUST STAY OPERATIONAL UNTIL NEW SECTION IS
CONSTRUCTED AND MADE OPERATIONAL.
D. CONTRACTOR TO FOLLOW VA SAFETY RULES AND LOCK-OUT-TAG-OUT RULES.
E. COMMUNICATE OUTAGES TO THE VA COR TWO WEEKS PRIOR TO PERFORMING THE
OUTAGE.
F. SEE DRAWING 50-EP100 TO CONTINUE POWER FEEDS FROM FLOOR BELOW (FEEDER
FROM 80-BUS-EHAA AND FEEDER FROM SES-2) INTO FUSED DISCONNECTS LOCATED
INSIDE AHU-5 VESTIBULE.
G. SEE DRAWINGS 50-E501, 2 FOR INSTALLATION DETAILS.
H. SEE DRAWING SERIES 50-E600 FOR ELECTRICAL PANEL SCHEDULES.
I. ELECTRICAL CONTRACTOR TO COORDINATE WITH MECHANICAL CONTRACTOR WHEN
INSTALLING ELECTRICAL EQUIPMENT IN VESTIBULE OF AHU-5, TO PREVENT
INTERFERENCE BETWEEN ELECTRICAL EQUIPMENT AND MAINTENANCE OF AHU-5
COMPONENTS.
1. INSTALL TWO 300A FUSED DISCONNECTS. TERMINATE FEEDERS FROM 80-BUS-EHAA
AND FEEDER FROM SES-2 INTO THE DISCONNECTS LOCATED IN AHU-5 VESTIBULE.
2. INSTALL ATS 50-ATS-AHU-5, AND LAND FEEDERS INTO ATS.
3. INSTALL PANEL 50-AHU-5EQ:
a. TERMINATE TO OUTPUT OF 50-ATS-AHU-5.
b. TERMINATE 480V POWER TO AHU-5 EXHAUST FAN AND SUPPLY FAN PER AHU-5
WIRING INSTRUCTIONS.
c. TERMINATE 480V POWER TO HUM-5 PER HUM-5 WIRING INSTRUCTIONS.
4. NOT USED.
5. SEE DRAWING 50-EP104 FOR WIRE AND CONDUIT SIZES. ROUTE POWER TO CONDENSER
ACCU-1025, FROM OIT ROOM 1025 EVAPORATOR TERMINATIONS IN CEILING BELOW. SEE
BLOCK LOGIC AND WIRING DETAILS ON DRAWING 50-EP104.
6. NOT USED.
7. IN ROOM 342A, INSTALL 15A BREAKER ON PANEL 50-EDB1, CKTS 2, 4, 6 , INSTALL 15A
480/277V DISCONNECT ON FAN. RUN POWER TO VFD EF-2A THEN RUN POWER FROM VFD
TO EF-2A ON ROOF. SEE DETAIL ON 50-EP401.
8. IN ROOM 342A, INSTALL 15A BREAKER ON PANEL 50-EDB1, CKTS 7, 9, 11. INSTALL 15A
480/277V DISCONNECT ON FAN. RUN POWER TO VFD EF-2B THEN RUN POWER FROM VFD
TO EF-2B ON ROOF. SEE DETAIL ON 50-EP401.
9. BOND FAN HOUSING TO LIGHTNING GRID AROUND ROOF. TERMINATE WITH 26,240 KCML
Cu STRANDED BARE CONDUCTOR.
10. INSTALL 15KVA 480/277V – 208/120V TRANSFORMER.
11. INSTALL PANEL 50-AHU5-ELEQ.
12. INSTALL DUCT SMOKE DETECTOR TEST STATION. REFER TO DRAWING 50-EF101 FOR
DETAILS.
13. INSTALL (10) 4 FT STRIP LIGHTS.
14. PROVIDE POWER TO SPLIT COOLING UNIT, DFSS-AHU-5 AND ACCU-AHU-5 FROM 35A 1-
PHASE, 208V BREAKER IN PANEL AHU5-ELEQ. FIELD RUN ¾ IN CONDUIT FROM PANEL TO
DFSS-AHU-5, AND FROM DFSS-AHU-5 TO ACCU-AHU-5 FOR ALL WIRES.
8' - 1"
44' - 7"
12' - 0"
9,000 LBS 15,100 LBS 13,400 LBS 9,500 LBS 8,900 LBS
11' - 8" 6' - 11" 5' - 11"
MERV 8 & 11
PRE-FILTERS
SERVICE VESTIBULE
RELIEF DAMPER
CHILLED
WATER
COOLING
COIL
MERV 8
FILTERS
EXHAUST
DAMPER
8x78
RETURN
DAMPER
18x100
AUTOMATIC TRANSFER
SWITCH
480Y/277V PANELTRANSFORMER
50-AHU-5 EQ
SERVICE VESTIBULE
SUPPLY DAMPER
HUM-5
270 LBS/HR
SA
3x2 SUPPLY
FAN ARRAY
MERV 14
FINAL FILTERS
SUPPLY
DISCHARGE
24"X80"
OA INLET
24x140
MERV 8 & 11
FILTERS
OA BYPASS
DAMPER
34x50
PLATE TO
PLATE HEAT
EXCHANGER
OA
EA
SHIPPING SPLIT (TYP.)
REFER TO STRUCTURAL DRAWINGS FOR
INTERMEDIATE SUPPORTS AT EACH
SHIPPING SPLIT.
INTEGRAL
MOTORIZED
DAMPER
(TYP.)
STEAM
HUMIDIFER
MANIFOLD
AHU5-ELEQ
120/208V
DUCT DETECTOR
TEST UNIT (RTSI) 300A DISCONNECTS
50-ATS
AHU5
3 2
AHU5-EQ
101112
AHU5-ELEQ-CKT2
AHU5-ELEQ-CKT3
AHU5-ELEQ-CKT1
(6) SUPPLY FAN VFD's (6) EXHAUST FAN VFD's
TWO ROWS
DFSS-AHU5
ACCU-AHU5
AHU5-ELEQ-CKT4, 6
o n e e ig h th i n c h o n e fo o t th re e i n c h e s o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t o n e i n c h o n e fo o t th r e e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a r te r i n c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
BID SET
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
04/30/2024ELECTRICAL - ROOF POWER PLAN EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 WG BX
50-EP102
678-331
19-103
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
A
D D
E N
D U
M
GENERAL NOTES
KEY NOTES
0 4' 8' 16'N 1/8" = 1'-0"
ELECTRICAL - ROOF POWER PLAN
NOT TO
SCALE
AIR HANDLING UNIT ELECTRICAL DETAILS
T
3/4" C
PANEL 50-AHU5-ELEQ DFSS-AHU-5 AND ACCU-AHU-5 2#10&1#10G, 3/4 IN C
TR 50-AHU5-EQ PANEL 50-AHU5-ELEQ 4#6&1#10G, 1 IN C
PANEL 50-AHU5-EQ AHU5 4#350&1#4G, 3 IN C
PANEL 50-AHU5-EQ TR 50-AHU5-EQ 4#10&1#10G, 3/4 IN C
50-ATS-AHU5 PANEL 50-AHU5-0EQ
(2) 3#3/0&1#3/0 G, 2-
1/2 C
80-BUS-EHAA, DISCONNECT
IN AHU-5 ENCLOSURE
50-ATS-AHU5 4#500&1#3G, 4 IN C
SES-2, DISCONNECT IN
AHU-5 ENCLOSURE
50-ATS-AHU5 4#350&1#4G, 3 IN C
80-BUS-EHAA
DISCONNECT IN AHU-5
ENCLOSURE
4#500&1#3G, 4 IN C
SES-2
DISCONNECT IN AHU-5
ENCLOSURE
4#350&1#4G, 3 IN C
FROM TO WIRING & CONDUIT
AHU-5 WIRING SCHEDULE
N
Revisions: Date:
BID SET 05/01/2023
ADDENDUM 1 04/30/2024
File details come from the government source that posted it. Updated .