Attachment 14 - Mechanical Drawings.pdf
PDF 16 MB Posted
- Attached to
- Y1DA--Expand and Renovate Emergency Department B50 Minor Construction - Tucson VAMC (VA-24-00001448)
- Solicitation number
- 36c77623r0191
About this file
This document provides details on a federal contract opportunity for expanding and renovating an emergency department at the Tucson VA Medical Center. The solicitation number is 36c77623r0191 and seeks to expand and renovate the emergency department located at 3601 South 6th Avenue in Tucson, Arizona 85723. The contracting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The related file is mechanical drawings for the emergency department renovation and expansion project. Key details provided include the name and location of the medical facility project, along with the soliciting agency.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DSD
12x24
R
D
H
VOLUME DAMPERVD
FLEXIBLE DUCT CONNECTION
MANUAL SINGLE BLADE OR OPPOSED BLADE DAMPER
MOTOR OPERATED DAMPER
VERTICAL FIRE DAMPER WITH ACCESS DOOR
AIR FLOW
DUCT SIZE FREE AREA
CROSS-SECTION OF SUPPLY OR
CROSS-SECTION OF RETURN DUCT
INCLINED RISE (R) OR DROP (D)
90° ELBOW WITH TURNING VANES
90° BRANCH TAKE-OFF W/45 DEGREE ENTRY
EQUIPMENT TAG
ROUND FLEXIBLE DUCT
SQUARE OR RECTANGLE DUCT TRANSITION
SQUARE OR RECTANGLE TO ROUND
WALL THERMOSTAT OR TEMPERATURE SENSOR
ROUND
CHILLED WATER SUPPLY
CHILLED WATER RETURN
DUCT UP TO ROOF MOUNTED EXHAUST FAN
THERMOMETER (WITH PIPE WELL)
FLOW SWITCH (WITH THREAD OR WELD-O-LET)
PRESSURE GAUGE AND NEEDLE VALVE
PRESSURE SWITCH (WITH THREAD OR WELD-O-LET)
CONCENTRIC PIPE REDUCER OR INCREASER
PIPE UNION (OR FLANGES IF 2 1/2" OR LARGER PIPE)
DRAIN VALVE WITH HOSE THREADED OUTLET
CIRCUIT BALANCING VALVE W/BALANCING PORTS
2 WAY CONTROL VALVE
3 WAY CONTROL VALVE
BALL VALVE (2" & SMALLER)
CHECK VALVE
GATE VALVE
GLOBE VALVE
LOW PRESSURE STEAM (UP TO 15 PSIG)
LOW PRESSURE CONDENSATE RETURN
DRAIN LINE
DIRECTION OF FLOW
PITCH OF PIPE (DOWN)
PIPE ELBOW (TURNED UP)
PIPE ELBOW (TURNED DOWN)
PIPE TEE DOWN (DROP)
PIPE TEE UP
PIPE TEE UP OR ANGLE
PIPE TEE DOWN OR ANGLE
NEW CONNECTION
SOLENOID VALVE
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE (PIPE TO FLOOR DRAIN)
AUTOMATIC BALL OR BUTTERFLY VALVE
STEAM TRAP ASSEMBLY
THERMOMETER WELL
REFRIGERANT EXPANSION VALVE
AD
BHP
BOP
BTU
BTUH
CC
CFM
DB
DN.
EAT
EF
ESP
EWT
FPF
FPM
FT
HP
HWR
HWS
LAT
LWT
ODP
PD
PHC
PSI
RPM
RO
SF
SP
TSP
WB
W.C.
WG
ACCESS DOOR
BRAKE HORSEPOWER
BOTTOM OF PIPE
BRITISH THERMAL UNIT
BRITISH THERMAL UNIT PER HOUR
COOLING COIL
CUBIC FEET PER MINUTE
DRAIN LINE
DRY BULB
DOWN
ENTERING AIR TEMPERATURE
EXHAUST FAN
ENTERING WATER TEMPERATURE
FAHRENHEIT
FINS PER FOOT
FEET PER MINUTE
FLASH TANK
HORSEPOWER
HOT WATER RETURN
HOT WATER SUPPLY
LEAVING AIR TEMPERATURE
LEAVING WATER TEMPERATURE
OPEN DRIP PROOF
PRESSURE DROP
PREHEAT COIL
POUNDS PER SQUARE INCH
REVOLUTIONS PER MINUTE
REVERSE OSMOSIS
SUPPLY FAN
STATIC PRESSURE
TOTAL STATIC PRESSURE
WET BULB
WATER COLUMN
WATER GAUGE
PLUG VALVE (GAS COCK)
GALLONS PER MINUTEGPM
HOT WATER SUPPLY
HOT WATER RETURN
CUH CABINET UNIT HEATER
EXTERNAL STATIC PRESSURE
WALL HUMIDISTAT
WALL THERMOSTAT OR TEMPERATURE
BUTTERFLY VALVE (2 1/2" & LARGER)
(8" AND UNDER) CIRCUIT FLOW INDICATOR W/BALANCING
PORTS AND MEMORY STOP BUTTERFLY VALVE FOR
GENERAL CONTRACTORGC
TEMPERATURE CONTROLTC
MAXIMUM OVERCURRENT PROTECTIONMOCP
MINIMUM CIRCUIT AMPSMCA
TYPICALTYP.
HOT WATER COILHWC
TEMPERATURE WELL WITH DDC SENSOR
STRAINER
PRESSURE WELL WITH DDC SENSOR
PRESSURE/TEMPERATURE PLUG WITH CAP
STRAINER WITH BLOWDOWN VALVE
PIPING, DUCTWORK, OR EQUIPMENT TO BE REMOVED
DUCT SMOKE DETECTOR
BAS BUILDING AUTOMATION SYSTEM
D
PUMPED CONDENSATE RETURN
VACUUM CONDENSATE
VARIABLE FREQUENCY DRIVEVFD
F
CROSS-SECTION OF EXHAUST DUCT
(E) EXISTING TO REMAIN
PCR PUMPED CONDENSATE RETURN
MEDIUM PRESSURE STEAM SUPPLY (16 TO 60 PSIG)
MEDIUM PRESSURE CONDENSATE RETURN
BUTTERFLY VALVE
CONNECT TO EXISTING
BALANCING (10" AND ABOVE)
(1ST FIGURE, SIDE OF DUCT SHOWN)
OUTSIDE AIR INTAKE DUCT
DUCT TRANSITION
OR VENTILATOR
SENSOR WITH GUARD
CO CONTRACTING OFFICER
COR CONTRACTING OFFICER'S REPRESENTATIVE
CHILLED GLYCOL WATER SUPPLY
CHILLED GLYCOL WATER RETURN
CONDENSATE RETURN
PRV PRESSURE REDUCING VALVE
HX HEAT EXCHANGER
PP PRESSURE PUMP
DH DOOR HEATER
NK NECK
ANCHOR
DAMPER
EXISTING TERMINAL UNIT TO BE DEMOLISHED AND
REMOVED. RETURN UNIT TO VA.
EXISTING RETURN GRILLE TO BE DEMOLISHED AND
REMOVED. RETURN TO VA.
EXISTING SUPPLY DIFFUSER TO BE DEMOLISHED
AND REMOVED. RETURN TO VA.
DEMOLISH AND REMOVE(D)
MAKE-UP WATERMU
GLYCOLGLY
LPCS LOW PRESSURE CLEAN STEAM
BOD BASIS OF DESIGN
SOW SCOPE OF WORK
OUTSIDE AIROA
ACH AIR CHANGES PER HOUR
NATURAL GASG
NATURAL GAS
CHWS
CHWR
FS
PS
D
LPS
LPR
D
NC
PITCH
S
HWS
HWR
T
PCR
VC
MPS
MPR
GCS
GCR
CR
G
FID
MECHANICAL SYMBOLS AND ABBREVIATIONSMECHANICAL GENERAL NOTES:
MECHANICAL EQUIPMENT NOTES:
XXX-1
SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL REQUIREMENTS LOCATED WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT PART OF THIS SECTION AND AS IF THEY WERE
DIRECTLY INCLUDED AND PROVIDED BELOW.
EQUIVALENCY SUBSTITUTIONS: THE “BASIS OF DESIGN (BOD) PROTOCOLS” IS TO BE FOLLOWED FOR
ALL EQUIPMENT, MATERIALS AND ASSEMBLIES SPECIFIED AND DETAILED THROUGHOUT ALL
DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE BOD DESIGNATE IS SPECIFICALLY
REFERENCED THEREIN OR NOT. SEE THE GENERAL DRAWINGS SECTION FOR THE FULL BOD
EQUIVALENCY SUBSTITUTION REQUIREMENTS AND PROTOCOLS TO BE FOLLOWED.
1. CONTRACTOR SHALL FULLY REVIEW ENTIRE SET OF CONTRACT DOCUMENTS, THE DRAWINGS AND SPECIFICATIONS, INCLUDING BUT NOT NECESSARILY LIMITED TO ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION, LIFE SAFETY, MEDICAL GAS, ETC. AND SHALL
ACKNOWLEDGE AND INCLUDE IN THEIR SCOPE OF WORK ALL CONDITIONS PERTINENT TO THE
COMPLETION OF THE WORK.
2. CONTRACTOR SHALL FULLY COORDINATE THEIR WORK WITH THE GENERAL/PRIME CONTRACTOR AND
THE INSTALLATION WORK OF OTHER TRADES, AND FULLY PROVIDE ALL NECESSARY FIELD
ADJUSTMENTS AS REQUIRED TO ACCOMMODATE THE FINAL FULLY COORDINATED SOW
INSTALLATION(S).
3. THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS, VISIT THE SITE OF THE WORK AND FULLY INFORM THEMSELVES AS TO ALL CONDITIONS AND MATTERS THAT
CAN, IN ANY WAY, AFFECT THE WORK OR THE COST THEREOF.
4. SHOULD THE CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM THE DRAWINGS,
SPECIFICATIONS OR OTHER DOCUMENTS, OR BE IN DOUBT AS TO THEIR MEANING, NOTIFY THE VA/CO
AT ONCE IN WRITING OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND WORK, OR
BETWEEN THEIR WORK AND THE WORK OF OTHER TRADES AND OBTAIN CLARIFICATION FROM THE VA/CO PRIOR TO SUBMITTING ANY BID. LACK OF SUCH NOTIFICATION DURING THE BIDDING PHASE SHALL BE CONSTRUED AS TO INDICATE NO DISCREPANCIES OR CONFLICTING CONDITIONS EXIST.
5. DRAWINGS ARE INTENDED TO BE GENERALLY DIAGRAMMATIC AND ARE NOT TO BE SCALED FOR LOCATING THE WORK. USE THE GIVEN DIMENSIONS AND SIZES AS INDICATED AND COORDINATE ALL
LOCATION, HEIGHT, ELEVATION AND CLEARANCE REQUIREMENTS WITH ALL CONTRACTORS, THE
EXISTING CONDITIONS AND ALL ELEMENTS OF WORK YET TO BE INSTALLED.
6. ROUTING OF PIPING, DUCTWORK, CONDUITS, RACEWAYS, ETC., AS SHOWN ON DRAWINGS, IS NOT INTEND TO SHOW EVERY RISE, DROP, OFFSET, FITTING OR EVERY STRUCTURAL ELEMENT THAT MAY BE ENCOUNTERED DURING THE INSTALLATION OF THE WORK. EACH CONTRACTOR SHALL MAKE THE
REQUIRED MODIFICATIONS FROM THE GENERAL ROUTING SHOWN ON THESE DRAWINGS, SUCH AS
OFFSETS, BENDS OR CHANGES IN ELEVATION DUE TO COORDINATION WITH THE WORK OF OTHER
TRADES AND THE REMAINING EXISTING CONSTRUCTION.
7. IT IS THE INTENT OF THESE DOCUMENTS THAT THE MECHANICAL CONTRACTOR PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND TOOLS FOR THE COMPLETE INSTALLATION OF ALL WORK SHOWN ON THE PLANS, INCLUDED IN THE SPECIFICATIONS, AND/OR DESCRIBED HEREIN, INCLUDING ALL DEVICES, CONTROLS, AND APPURTENANCES REQUIRED TO TEST AND PROVIDE COMPLETED SYSTEMS IN FULL
FUNCTIONAL OPERATION.
8. SHOULD CONDITIONS NECESSITATE ANY REARRANGEMENTS OR IF ANY SYSTEMS LAYOUT CAN BE
RUN TO BETTER ADVANTAGE, PREPARE AND SUBMIT SHOP DRAWINGS SHOWING THE REQUESTED
CHANGES BEFORE PROCEEDING WITH THE WORK. IF SUCH CHANGES ARE APPROVED BY THE VA/COR AND SUCCESSFULLY REVIEWED BY THE A/E, THEY WILL BECOME A PART OF THE CONTRACT SOW.
9. CONTRACTOR SHALL FIELD VERIFY ALL MOUNTING REQUIREMENTS, ARRANGEMENTS, HEIGHTS, LOCATIONS, AND SUPPORTS PRIOR TO PERFORMING ANY ROUGH-IN WORK. NO ROUGH-IN WORK WILL BE ALLOWED TO BEGIN UNTIL THE CONTRACTOR OBTAINS BOTH GENERAL/PRIME CONTRACTOR AND
VA/COR APPROVAL. ANY MENTION OF SPECIFIC MOUNTING ARRANGEMENT(S), WEIGHT OR
LOCATION(S) IN THE CONSTRUCTION DOCUMENTS SHALL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO VERIFY AND COORDINATE THE SPECIFIC REQUIREMENTS FURNISHED OR THE REQUIREMENTS OF OTHER TRADES WORKING IN THE SAME AREA. NO ADDITIONS TO THE CONTRACT SUM WILL BE CONSIDERED FOR THE CORRECTION OF ITEMS INSTALLED IMPROPERLY, IN WRONG
LOCATIONS, IN CONFLICT WITH OTHER WORK, ETC.
10. CONTRACTOR SHALL FURNISH AND INSTALL A COMPLETE TEMPERATURE CONTROL SYSTEM AS SPECIFIED AND AS REQUIRED TO FULLY INTEGRATE WITH ALL EXISTING AND NEW EQUIPMENT AND
SYSTEMS AS WELL AS WITH THE EXISTING BAS.
11. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL APPROPRIATE VA DESIGN GUIDES/MANUALS, CURRENT FEDERAL BUILDING CODES, REGULATIONS, AND REQUIREMENTS, LOCAL UTILITY COMPANY
REQUIREMENTS, AND ASHRAE STANDARDS.
12. CONTRACTOR SHALL PAY ALL PERMIT FEES, PLAN REVIEW FEES, LICENSE FEES, INSPECTIONS, AND ALL RELATED EXPENSES APPLICABLE TO THEIR DIVISION/WORK IF REQUIRED ON THIS PROJECT. ALL SUCH COSTS/EXPENSES SHALL BE INCLUDED IN THEIR BASE BID CONTRACT AMOUNT AS IDENTIFIED
AND COORDINATED WITH THE GENERAL/PRIME CONTRACTOR.
13. CONTRACTOR SHALL BE LICENSED, BONDED, INSURED AND CAPABLE OF PERFORMING QUALITY WORKMANSHIP AND GUARANTEES HIS WORK AND MATERIALS FOR THE PERIOD(S) AS REQUIRED IN
THE SPECIFICATIONS IN ORDER TO RECEIVE FINAL ACCEPTANCE BY THE VA/COR.
14. CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE PROTECTION OF THEIR
PERSONNEL AND ALL OTHERS THROUGHOUT ALL PHASES OF THEIR WORK. THEY SHALL COMPLY
WITH ALL VA REQUIREMENTS AND THE APPLICABLE PROVISIONS OF ALL LOCAL, STATE, FEDERAL
SAFETY LAWS (OSHA) AND AS RECOMMENDED IN THE "MANUAL OF ACCIDENT PREVENTION IN
CONSTRUCTION" AS ISSUED BY THE ASSOCIATION OF GENERAL CONTRACTORS OF AMERICA, 20TH
AND E. STREETS, N.W. WASHINGTON, D.C., LATEST EDITION.
15. CONTRACTOR SHALL CHECK DRAWINGS OF OTHER TRADES TO VERIFY THAT SPACES IN WHICH THEIR WORK WILL BE INSTALLED ARE CLEAR OF ANY OBSTRUCTIONS. WORK SHALL BE INSTALLED
TO MAINTAIN MAXIMUM HEADROOM AND SPACE CONDITIONS AT ALL POINTS IN THE BUILDING.
WHERE HEADROOM OR SPACE CONDITIONS APPEAR INADEQUATE, CONTRACTOR SHALL NOTIFY
THE GENERAL/PRIME CONTRACTOR AND THE VA/COR TO OBTAIN DIRECTION AND APPROVALS
BEFORE PROCEEDING WITH THE PREPARATION AND INSTALLATION OF THEIR WORK.
16. THE SEQUENCE FOR THE INSTALLATION OF ALL WORK SHALL BE FULLY COORDINATED WITH THE GENERAL/PRIME CONTRACTOR FIRST AND IN TURN WITH ALL CONTRACTORS AND THE VA/COR. THE
SCHEDULING, SEQUENCING AND PERFORMANCE OF ALL WORK SHALL BE IN STRICT ACCORDANCE
WITH SCHEDULE AS APPROVED, STIPULATED AND MODIFIED BY THE VA/COR.
17. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CORING, CUTTING, PATCHING, REPAIRING, REFINISHING, REMOVAL, REWORK AND REPLACEMENT OF ALL NEW OR EXISTING BUILDING
CONSTRUCTION REQUIRED FOR THE INSTALLATION AND/OR REMOVAL OF THEIR WORK.
18. CONTRACTOR SHALL BE RESPONSIBLE TO X-RAY ALL CONCRETE SLABS AND MASONRY
CONSTRUCTION IN PLACE PRIOR TO ANY CORING IF REQUIRED.
19. ALL PATCHING, REPAIRING AND REFINISHING WORK SHALL BE PERFORMED BY THOSE REGULARLY
INVOLVED IN THAT TRADE AND SHALL MATCH THE ADJACENT CONSTRUCTION AS CLOSELY AS
POSSIBLE TO PROVIDE A LIKE NEW CONDITION THAT IS NOT DISTINGUISHABLE AS A PATCH/REPAIR.
CARE SHALL BE TAKEN SO AS NOT TO DAMAGE ANY EXISTING BUILDING CONSTRUCTION OR ITEMS THAT ARE TO REMAIN. ANY EXISTING FINISHES THAT ARE DAMAGED DURING THE INSTALLATION OF NEW WORK OR REMOVAL OF EXISTING WORK, IF REQUIRED, SHALL BE REPAIRED AND REPLACED TO
THE SATISFACTION OF THE VA/COR. REFER TO ARCHITECTURAL DRAWINGS AND SEQUENCE OF
CONSTRUCTION FOR BUILDING CONSTRUCTION THAT IS SUBJECT TO PATCHING, REPAIRING,
REFINISHING, AND REMOVAL/REPLACEMENT AT THE TIME THAT WORK IS TO BE PERFORMED.
20. WHERE THERE IS EVIDENCE THAT WORK OF ONE TRADE WILL INTERFERE WITH WORK OF OTHER TRADES, ALL TRADES SHALL COORDINATE WITH THE GENERAL/PRIME CONTRACTOR AND MEET ON
THE JOB SITE TO WORK OUT SPACE CONDITIONS AND MAKE SATISFACTORY ADJUSTMENTS TO
INSTALLATION OF THE NEW WORK. CONTRACTORS SHALL VERIFY EXACT LOCATIONS OF ALL
DEVICES AND EQUIPMENT WITH FIELD CONDITIONS, SHOP DRAWINGS, AND WORK OF OTHER
TRADES PRIOR TO PERFORMING ANY ROUGH-IN WORK. EACH CONTRACTOR SHALL BE
RESPONSIBLE, AT THEIR OWN EXPENSE, FOR THE REMOVAL AND REINSTALLATION OF ANY PART OF
THEIR WORK THAT WAS INSTALLED WITHOUT CONSULTING AND COORDINATING WITH OTHER
TRADES AS WELL AS OBTAINING THE GENERAL/PRIME CONTRACTORS APPROVAL BEFORE
INSTALLING THEIR WORK.
21. CONTRACTOR SHALL STORE ALL MATERIALS AND EQUIPMENT SHIPPED TO THE SITE IN A
PROTECTED AREA APPROVED BY THE VA/COR. IF MATERIAL IS ALLOWED TO BE STORED OUTSIDE OF THE BUILDING, IT MUST BE STORED OFF THE GROUND A MINIMUM OF SIX INCHES (6"), SET ON 6 X
6 PLANKS OR WOOD PALLETS, AND BE COMPLETELY COVERED WITH WATERPROOF TARPS OR
HEAVY DUTY VISQUEEN THAT IS PROPERLY TIED DOWN AND SECURED. ALL PIPING AND DUCTWORK
WILL HAVE THE ENDS CLOSED/SEALED TO KEEP OUT DIRT AND OTHER DEBRIS.
22. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE VA/COR FOR APPROVAL, AS REQUIRED IN THE PROJECT SPECIFICATIONS, PRIOR TO THE START OF INSTALLATION OF ANY WORK REQUIRING AN APPROVED SUBMITTAL. AN APPROVED SUBMITTAL REQUIRES THE VA/COR APPROVAL AND THE
SUCCESSFUL REVIEW OF THE A/E, BOTH PROPERLY DOCUMENTED ON THE FINAL SHOP DRAWING
TO BE ISSUED FOR ASSEMBLY AND/OR CONSTRUCTION.
23. CONTRACTOR SHALL FURNISH AS-BUILT DRAWINGS TO THE VA/COR BEFORE THE CLOSE-OUT OF
THE PROJECT AS PER THE CONTRACT REQUIREMENTS. THE AS-BUILT DRAWINGS SHALL BE
SUBMITTED IN THE VA APPROVED ELECTRONIC REPRODUCIBLE FORMAT.
24. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE STARTUP, TESTING, ADJUSTMENTS AND MODIFICATIONS REQUIRED OF ALL EQUIPMENT AND SYSTEMS THAT ARE A PART OF THEIR WORK.
25. THIS CONTRACTOR SHALL PROVIDE A COMPETENT OPERATING TECHNICIAN TO INSTRUCT THE VA
PERSONNEL IN THE OPERATION AND MAINTENANCE OF THE EQUIPMENT ALONG WITH THE
OPERATION OF THE EQUIPMENT CONTROLS.
26. UPON COMPLETION OF THE WORK, THIS CONTRACTOR SHALL REVIEW AND CHECK THEIR ENTIRE PORTION OF WORK, CLEAN EQUIPMENT AND DEVICES. REMOVE SURPLUS MATERIALS AND RUBBISH
FROM THE PROPERTY AND LEAVE THE WORK IN NEAT AND CLEAN ORDER AND IN COMPLETE
WORKING CONDITION. EACH RESPECTIVE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
REMOVAL OF ANY CARTONS, DEBRIS, EQUIPMENT, ETC., INSTALLED BY THEM INCLUDING
EQUIPMENT FURNISHED BY OTHERS AND UNPACKED OR REMOVED FROM CARTONS BY THEM.
27. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING,
MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS
STANDING AT FLOOR LEVEL OR BY STANDING ON PERMANENT PLATFORMS WITHOUT THE USE OF
PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO ALL TYPES
OF VALVES, FILTERS AND STRAINERS, TRANSMITTERS AND CONTROL DEVICES. PRIOR TO
COMMENCING INSTALLATION WORK, REFER CONFLICTS BETWEEN THIS REQUIREMENT AND
CONTRACT DRAWINGS TO THE VA/COR FOR RESOLUTION. FAILURE OF THE CONTRACTOR TO
NOTIFY THE VA/COR AND RESOLVE ANY SUCH ISSUES WILL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY FOR CORRECTING ANY SUCH CONDITIONS AT NO ADDITIONAL COST TO THE VA.
28. UNLESS INDICATED OTHERWISE, THE ARCHITECT/ENGINEER MAKES NO REPRESENTATION AS TO WHETHER OR NOT ANY HAZARDOUS OR CONTAMINATED MATERIALS (INCLUDING BUT NOT LIMITED TO ASBESTOS, PCB'S, LEAD, CONTAMINATED SOILS, ETC.) ARE PRESENT WITHIN THE BUILDING OR ON THE SITE. WORK SHOWN ON THE DRAWINGS AND/OR INDICATED IN THE SPECIFICATIONS SHALL NOT BE CONSTRUED TO CALL FOR CONTACT WITH ANY OF THESE MATERIALS. IF THESE MATERIALS
ARE ENCOUNTERED OR SUSPECTED, THE CONTRACTOR SHALL NOT DISTURB THEM AND SHALL
CONTACT THE GENERAL/PRIME CONTRACTOR AND THE VA/COR IMMEDIATELY.
29. ALL EQUIPMENT DEVICES REQUIRING PIPING CONNECTIONS SHALL BE INSTALLED WITH UNIONS IN
SUCH A MANNER TO FACILITATE EASY REMOVAL AND MAINTENANCE OF EQUIPMENT WITHOUT
DISRUPTING SERVICE AND CAUSING MAJOR PIPING REVISIONS.
30. ALL PIPING CONNECTIONS BETWEEN DISSIMILAR METALS SHALL BE MADE WITH THE APPROPRIATE
DIELECTRIC UNIONS, COUPLINGS OF FITTINGS.
31. IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE
BETTER QUALITY, MORE STRINGENT REQUIREMENTS, OR GREATER QUANTITY OF WORK, AS
DETERMINED BY THE VA/CO DURING BIDDING AND/OR DURING THE CONSTRUCTION PHASES, SHALL
BE PROVIDED.
32. MEP CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE PRESENCE OF EXISTING REINFORCING BARS AND CONDUIT AS WELL AS DETERMINE ITS EXACT LOCATION IN THE EXISTING FLOOR SLAB
PRIOR TO ANY CORING AND/OR DRILLING WORK TAKING PLACE.
33. THE DRAWINGS, SCHEDULES AND SPECIFICATIONS HAVE BEEN PREPARED USING ONE
MANUFACTURER FOR EACH PIECE OF EQUIPMENT AS THE BASIS OF DESIGN FOR PERFORMANCE AS WELL AS THE BASIS FOR DIMENSIONAL DESIGN. SEE THE "BASIS OF DESIGN (BOD)- PROTOCOLS"
ESTABLISHED IN THE GENERAL DRAWINGS THAT ARE TO BE ADHERED TO FOR ALL EQUIPMENT,
MATERIAL OR ASSEMBLY EQUIVALENT SUBSTITUTIONS BEING REQUESTED FOR CONSIDERATION. IF
THE CONTRACTOR PURCHASES EQUIPMENT OR MATERIAL FROM A SPECIFIED ACCEPTABLE
MANUFACTURER, BUT NOT THE SCHEDULED MANUFACTURER USED FOR THE BASIS OF DESIGN, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING ALL DIMENSIONS OF THE EQUIPMENT TO
VERIFY THAT IT WILL FIT IN THE SPACE SHOWN ON THE DRAWINGS. MINOR DEVIATIONS IN
DIMENSIONS WILL BE PERMITTED PROVIDED THE RATINGS MEET THOSE SHOWN ON THE DRAWINGS AND THE EQUIPMENT WILL PHYSICALLY FIT INTO THE SPACE ALLOCATED WITH SUITABLE ACCESS
AROUND EQUIPMENT FOR OPERATION AND MAINTENANCE OF THE EQUIPMENT. WHEN EQUIPMENT
SUBMITTED FOR REVIEW DOES NOT MEET THE PHYSICAL SIZE OR ARRANGEMENT OF THAT
SCHEDULED AND SPECIFIED, CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ALL ALTERATIONS
REQUIRED TO ACCOMMODATE SUCH EQUIPMENT AT NO ADDITIONAL COST TO THE VA.
CONTRACTOR WILL ALSO BE FULLY RESPONSIBLE FOR ALL COSTS OF ANY ADDITIONAL WORK
REQUIRED BY OTHER CONTRACTORS, AND THE VA IN ORDER TO MAKE CHANGES WHICH WOULD
ALLOW THE EQUIPMENT TO FIT IN THE SPACE AND FUNCTION AS INTENDED.
1. ALL EQUIPMENT/DEVICES SHALL BE AND OF FIRST RATE QUALITY AND IS TO BEAR THE APPROPRIATE AGA, CSA OR UL APPROVED LABELS, LISTINGS, AND CERTIFICATIONS FOR THE SPECIFIC DESIGN PURPOSE.
2. ALL EQUIPMENT SOUND LEVELS SHALL NOT EXCEED 50 DB AT PROPERTY LINE.
3. ALL INTERCONNECTING WIRING AT UNIT SHALL BE FACTORY PRE-WIRED AND REQUIRE ONLY ONE (1) POWER
CONNECTION TO THE UNIT BY THE ELECTRICAL CONTRACTOR.
4. SUBMIT THE REQUIRED NUMBER OF COPIES OF EACH CATALOG CUT, FOR THE EQUIPMENT SPECIFIED, TO THE VA/COR FOR APPROVAL AND TO THE A/E FOR HIS/HER SUCCESSFUL REVIEW PRIOR TO THE BEGINNING OF CONSTRUCTION. THIS CONTRACTOR SHALL ALSO ASSEMBLE PRINTED INSTRUCTIONS FOR THE OPERATION AND MAINTENANCE OF EACH ITEM INSTALLED AND BIND TOGETHER WITH EQUIPMENT CUTS AND CONTROL WIRING DIAGRAMS. SUBMIT THE REQUIRED NUMBER OF COPIES TO THE VA/COR AND TO THE A/E FOR HIS/HER
SUCCESSFUL REVIEW.
5. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL STRUCTURAL STEEL MEMBERS, SLEEVES, AND SHIMS
REQUIRED TO LEVEL AND SUPPORT EQUIPMENT.
6. CONTRACTOR AND/OR MANUFACTURER SHALL VERIFY AND CERTIFY THAT THE CHARACTERISTICS OF THE EQUIPMENT BEING SUBMITTED FOR REVIEW MEETS THE CAPACITY AND DUTY SPECIFIED. WHEN EQUIPMENT SUBMITTED FOR REVIEW REQUIRES MODIFICATIONS TO THE WORK OF OTHER CONTRACTORS, SUBMITTING CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ALL COSTS AND FOR ADDITIONAL WORK REQUIRED BY OTHER CONTRACTORS, AND/OR THE VA TO MAKE CHANGES WHICH WOULD ALLOW THE EQUIPMENT TO
FUNCTION SAFELY AND PROPERLY.
XX
S-SUPPLY
R-RETURN
E-EXHAUST
DIFFUSER/GRILLE
IDENTIFICATION
DIFFUSER/GRILLE SIZE
CFMDIFFUSER/GRILLE
AIRFLOW RATE
HIGH PRESSURE STEAM SUPPLY (61 PSIG AND ABOVE)HPS
HIGH PRESSURE CONDENSATE RETURNHPR
IFB INTEGRAL FACE AND BYPASS
WATER FLOW METER
RA RETURN AIR
SEA SPECIALTY EXHAUST AIR
SA SUPPLY AIR
EA EXHAUST AIR
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
REVIEW ONLY - NOT FOR CONSTRUCTION
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
05/01/2023MECHANICAL - GENERAL NOTES,
SYMBOLS AND ABBREVIATIONS
EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 DGG TE
50-M001
678-331
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
B
ID
S
E T
Revisions: Date:
35% SCHEMATIC DESIGN SUBMISSION 8/10/2021
65% DESIGN DEVELOPMENT 11/29/2021
65% DESIGN DEVELOPMENT RESUBMISSION 02/28/2022
95% CONSTRUCTION DOCUMENTS SUBMISSION 06/30/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 10/7/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/7/2022
BID SET 05/01/2023
BID SET
VA FORM 08-6231
Revisions: Date:
BID SET 05/01/2023
1 HOUR FIRE & SMOKE SEPARATION
2 HOUR FIRE & SMOKE SEPARATION
FIRE BARRIER LEGEND
A. COORDINATE ALL MECHANICAL SERVICE OUTAGES WITH VA/COR.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT SCHEDULED FOR DEMOLITION.
DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR EXCEED FORMER CONDITIONS.
C. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS, CEILING TILES AND CEILING GRIDS
ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS.
D. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY CONFLICTS BEFORE PROCEEDING.
E. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEM IN SERVICE DURING CONSTRUCTION.
F. ALL ABANDONED OPENINGS TO BE SEALED, REFER TO ARCHITECTURAL AND STRUCTRUAL DRAWINGS. CONTRACTOR SHALL
VERIFY AND BE RESPONSIBLE FOR EXACT NUMBER OF OPENINGS REQUIRING SEALING.
G. ANY DUCTWORK THAT IS EXISTING TO REMAIN, WHETHER OR NOT SHOWN ON THESE DRAWINGS, THAT IS CRUSHED OR DAMAGED IN ITS CURRENT CONDITIONS OR AS A RESULT OF CONSTRUCTION, SHALL BE REPLACED WITH NEW.
H. REMOVE ALL DUCTWORK, DIFFUSERS, GRILLES, INCLUDING ASSOCIATED INSULATION, HANGERS, SUPPORTS, ETC. SHOWN
DASHED UNLESS NOTES OTHERWISE.
I. CLEAN, SANITIZE AND SEAL ALL EXISTING DUCTWORK THAT WILL BE REUSED.
J. COORDINATE ALL DEMOLITION WORK WITH DEMOLITION PHASING PLAN ON SHEET 50-MCD101.
GENERAL MECHANICAL DEMOLITION NOTES
FF
EE
DD
CC
BB
18ø x2
20ø
14ø
12ø
9ø
5ø
6ø
8x14
6x12
8x14
8x14
8x14
6x14
6x14
6x12
12ø
10ø
16x148x14
8x14
8x14
16x12
16x12
8x12
20ø
10x10
10x14 12x14
12x14
8x14
8x14
14x18
18x18
22x18 28x24
20ø
10x12
10x12 6x10
8x10
8x16
14x16
14x16
6x10
28x24
50x24
8x14
8x18
8x18 x2
8x10
14x16
18x16
18x16
20x18
14ø
6x10 8x108x14
14x14
14x1412ø 12ø
16x14
10x12
6x12 6x8
8x8 14ø
8x8
18ø ø
6ø6ø6ø 6ø
6x12
6x12
10x10
10x10
8x12
10x10
8x8
8x8
6x10
8ø
8x14
12x12
6ø
6x12
6x12
8x8
6ø 7ø 6ø
12ø
16x14
6ø
8x14
10x6
14x8
6x10
12x14
14x8
14x8
12x14
12x6
16x20
16x18
16ø 16ø
24x8
10ø
12ø 8ø
6ø 8ø
8ø
8x12
12x14
12x14
8ø
6x10
6x106x12
6ø 6ø 6ø
16ø
20ø
6ø
8x8
10ø
10x8
12x6 12x614x14
12x10
8x12
6ø
10x6
10x8
10x6 10x6
10x8
8x8
14ø
14X14 EA UP
12"∅ EA UP
3.5 4.5 5.5 6.5 7.5
HH
GG
10x8
50x24
28X28 OA DUCT UP
THRU 2ND FLOOR
AHU-1
8ø
9ø
12ø
6x14
6x14
6x14
6x14
14x8
12x8
6x8
8.3
(E)14x12 EA
RISER UP
TO EF-4
SUPPORT
WAITING
ROOM
OFFICE
CORRIDOR
1C3
VESTIBULE
1V3
CORRIDOR
1C2
ELEVATOR
50P2
ELEVATOR
50P1
MENS
RESTROOM
WOMENS
RESTROOM
TRI-CARE/CHAMPS
OFFICE
MEANS
TESTING
OFFICE
10x6
VFD
1. REMOVE ALL DUCTWORK, DIFFUSERS, GRILLES, INSULATION, HANGERS, SUPPORTS, ETC. SHOWN DASHED.
2. REMOVE EXISTING VAV BOX AND ASSOCIATED DUCTWORK, PIPING, VALVING, CONTROLS, ETC.
3. REMOVE ALL DUCTWORK, DIFFUSERS, GRILLES, INSULATION, HANGERS, SUPPORTS, ETC. SHOWN DASHED BEYOND THIS POINT. CAP AND SEAL RISER ABOVE THE FIRST FLOOR CEILING. DUCTWORK PASSING THRU TO
THE SECOND AND THIRD FLOOR TO BE ABANDONED IN PLACE.
4. REMOVE ALL DUCTWORK, DIFFUSERS, GRILLES, INSULATION, HANGERS, SUPPORTS, ETC. SHOWN DASHED AND
CAP AT MAIN.
5. EXISTING TO REMAIN.
6. REMOVE SUPPLY FAN FROM EXISTING AIR HANDLING UNIT (AHU-1) AND ALL ASSOCIATED VFDS AND CONTROLS
FIELD LOCATE STATIC PRESSURE SENSOR AND REMOVE.
X MECHANICAL DEMOLITION KEY NOTES
M
(E) CONDENSATE
PUMPS
PSYCH
TREATMENT
TREATMENT
TREATMENT
TREATMENT
TREATMENT
TREATMENT
TREATMENT
MED
ROOM
RADIO
ROOM
CLEAN
LINEN
PSYCH
TREATMENT
ISOLATION
TREATMENT
PSYCH
TRIAGE
TRIAGE
CHECK-IN
105A
STORAGE
AOD
TRIAGE
CORRIDOR
113A
ELECTRICAL
ROOM
HEICS
STORAGE
BIOMED
COMM
CLOSET
(E)
113B
STAFF
TLT/SHWR
TRAUMA
ROOM
115TREATMENT
116PHYSICIANS
AREA
MECHANICAL
ROOM
PHYSICIANS
AREA
TREATMENT
TREATMENT
SOILED
UTILITY
SIGNAL
ELEC
ORTHOTREATMENT
HAC
TREATMENT
TREATMENT
ISOLATION
TREATMENT
OXYGYN
STORAGE
PSYCH
TREATMENT
0 4' 8' 16'
N 1/8" = 1'-0"
MECHANICAL - VENTILATION OVERALL DEMOLITION PLAN, FIRST FLOOR
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
REVIEW ONLY - NOT FOR CONSTRUCTION
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
05/01/2023MECHANICAL - VENTILATION
OVERALL DEMOLITION PLAN,
FIRST FLOOR
EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 DGG TE
50-MHD101
678-331
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
B
ID
S
E T
Revisions: Date:
35% SCHEMATIC DESIGN SUBMISSION 8/10/2021
65% DESIGN DEVELOPMENT 11/29/2021
65% DESIGN DEVELOPMENT RESUBMISSION 02/28/2022
95% CONSTRUCTION DOCUMENTS SUBMISSION 06/30/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 10/7/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/7/2022
BID SET 05/01/2023
BID SET
VA FORM 08-6231
A. COORDINATE ALL MECHANICAL SERVICE OUTAGES WITH VA/COR.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT SCHEDULED FOR DEMOLITION.
DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR EXCEED FORMER CONDITIONS.
C. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS, CEILING TILES AND CEILING GRIDS
ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS.
D. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY CONFLICTS BEFORE PROCEEDING.
E. PIPING MAY BE SHOWN OFFSET FROM ITS ACTUAL LOCATION FOR CLARITY. FIELD VERIFY EXACT LOCATIONS.
F. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO PERMIT THE INSTALLATION
OF NEW WORK.
G. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEM IN SERVICE DURING CONSTRUCTION.
H. ALL ABANDONED OPENINGS TO BE SEALED, REFER TO ARCHITECTURAL AND STRUCTRUAL DRAWINGS. CONTRACTOR SHALL
VERIFY AND BE RESPONSIBLE FOR EXACT NUMBER OF OPENINGS REQUIRING SEALING.
I. REMOVE ALL ASSOCIATED CLAMPS, HANGERS, SUPPORTS, ETC. ASSOCIATED WITH PIPING REMOVAL.
J. COORDINATE ALL DEMOLITION WORK WITH DEMOLITION PHASING PLAN ON SHEET 50-MCD102.
GENERAL MECHANICAL DEMOLITION NOTES
1 HOUR FIRE & SMOKE SEPARATION
2 HOUR FIRE & SMOKE SEPARATION
FIRE BARRIER LEGEND
FF
EE
DD
CC
BB
1" HWS
1" HWR
1" H
W S
1" H
W R
1" HWS
1" HWR
1" HWS
1" HWR
1" HWS
1" HWR
1" H
W S
1" H
W R
1" H
W R
1" H
W S
1" HWR
1" HWS
1/
2" H
W S
1/
2" H
W R
T
T
3.5 4.5 5.5 6.5 7.5
HH
GG
TT
T
T
T T
T
T
T
T
TT
T
T
T
TT
T
T
T
T
T
T
T
T
T T
T
T
T
T
T
2 2
2 2
3 3 3 4
8.3
VAV-1-15
VAV-1-14
VAV-1-12
VAV-1-10
VAV-1-8
VAV-1-7
VAV-1-5
VAV-1-4 VAV-1-3
VAV-1-2
VAV-1-27
CAV-1-24
VAV-1-23
CAV-1-22
CAV-1-21CAV-1-20
CAV-1-19
CAV-1-17
VAV-1-16
VAV-1-35
CAV-1-30
CAV-1-31
VAV-1-34
VAV-1-33
CAV-1-41
CAV-1-40
VAV-1-37
VAV-1-36
VAV-1-11
VAV-1-9
VAV-1-38
VAV-1-6
VAV-1-39
VAV-1-26
VAV-1-24A
VAV-1-25
VAV-1-32
VAV-1-13
VAV-1-28
VAV-1-18
VAV-1-19A
VAV-1-1
SUPPORT
WAITING
ROOM
OFFICE
CORRIDOR
1C3
VESTIBULE
1V3
CORRIDOR
1C2
ELEVATOR
50P2
ELEVATOR
50P1
MENS
RESTROOM
WOMENS
RESTROOM
TRI-CARE/CHAMPS
OFFICE
MEANS
TESTING
OFFICE
VESTIBULE
1V4
VESTIBULE
1V4
CORRIDOR
1C2
1. REMOVE ALL PIPING, VALVING, INSULATION, HANGERS, SUPPORTS, ETC. SHOWN DASHED.
2. REMOVE EXISTING VAV BOX AND ALL ASSOCIATED BRANCH PIPING, VALVING, CONTROLS, ETC.
3. REMOVE ALL PIPING, VALVING, INSULATION, HANGERS, SUPPORTS, ETC. SHOWN DASHED AND CAP AT MAIN.
4. NEW CONNECTION TO BE MADE AT THIS LOCATION. REMOVE ALL PIPING, VALVING, INSULATION, HANGERS, SUPPORTS, ETC.
SHOWN DASHED.
5. REMOVE EXISTING THERMOSTAT INCLUDING ALL ASSOCIATED CONDUIT, WIRING, ETC. LOCATED BETWEEN THERMOSTAT
AND THE UNIT IT CONTROLS.
6. NEW CONNECTION TO BE MADE AT THIS LOCATION. REMOVE ALL PIPING, INSULATION, HANGERS, SUPPORTS, ETC SHOWN
DASHED BEYOND THIS POINT.
MECHANICAL DEMOLITION KEY NOTESX
H W
R H
W S
HWR
HWS (E)AHU 50-1
2" HWS & HWR UP
TO 2ND FLOOR6"
C H
W R
6" C
H W
S
3" CHWR
3" CHWS
3" CHWR
3" CHWS
PSYCH
TREATMENT
TREATMENT
TREATMENT
TREATMENT
TREATMENT
TREATMENT
TREATMENT
PSYCH
TREATMENT
MED
ROOM
RADIO
ROOM
CLEAN
LINEN
PSYCH
TREATMENT
ISOLATION
TREATMENT
PSYCH
TRIAGE
TRIAGE
CHECK-IN
105A
STORAGE
AOD
AMBULANCE
VESTIBULE
1V2
TRIAGE
CORRIDOR
113A
ELECTRICAL
ROOM
HEICS
STORAGE
BIOMED
COMM
CLOSET
(E)
113B
STAFF
TLT/SHWR
TRAUMA
ROOM
TREATMENT
PHYSICIANS
AREA
MECHANICAL
ROOM
PHYSICIANS
AREA
TREATMENT
TREATMENT
SOILED
UTILITY
SIGNAL
ELEC
ORTHOTREATMENT
HAC
TREATMENT
TREATMENT
ISOLATION
TREATMENT
OXYGYN
STORAGE
0 4' 8' 16' o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
REVIEW ONLY - NOT FOR CONSTRUCTION
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
05/01/2023MECHANICAL - PIPING
DEMOLITION PLAN, FIRST FLOOR
EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 DGG TE
50-MPD101
678-331
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
B
ID
S
E T
N 1/8" = 1'-0"
MECHANICAL - PIPING OVERALL DEMOLITION PLAN, FIRST FLOOR
Revisions: Date:
35% SCHEMATIC DESIGN SUBMISSION 8/10/2021
65% DESIGN DEVELOPMENT 11/29/2021
65% DESIGN DEVELOPMENT RESUBMISSION 02/28/2022
95% CONSTRUCTION DOCUMENTS SUBMISSION 06/30/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 10/7/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/7/2022
BID SET 05/01/2023
BID SET
VA FORM 08-6231
FF
EE
DD
CC
BB
2 3.5 4.5 5.5 6.5 7.5
HH
GG
8.3 9
UP
UP
13"∅ EA DN
12"∅ EA DN
EXISTING ROOF-TOP
EQUIPMENT
(TYPICAL)
EXISTING 3-STORY ROOF
1. REMOVE EXISTING EXHAUST FANS EF-1A & 1B AND ALL ASSOCIATED DUCTWORK, FILTER BOX, CONTROLS, SUPPORTS AND ROOF CURB DURING PHASE 4, REFER TO DEMOLITION PHASING PLAN ON SHEET 50-MCD101.
2. CAP EXISTING 13"∅ EXHAUST DUCT AT THIS LOCATION.
3. REMOVE EXISTING EXHAUST FAN EF-2 AND ALL ASSOCIATED DUCTWORK, CONTROLS, SUPPORTS AND ROOF
CURB DURING PHASE 2, REFER TO DEMOLITION PHASING PLAN ON SHEET 50-MCD101.
4. EXISTING 12"∅ EXHAUST DUCT TO REMAIN, NEW CONNECTION TO BE MADE AT THIS LOCATION TO SERVE THE
NEW EF-2A & 2B FANS, REFER TO NEW ROOF PLAN ON SHEET 50-MH104.
5. REMOVE EXHAUST FAN VFD / CONTROLLER, CONTROL PANEL AND ALL ASSOCIATED MOUNTING / SUPPORTS.
6. REMOVE HEPA FILTER BOX AND ASSOCIATED SUPPORTS AND ROOF CURB.
X MECHANICAL DEMOLITION KEY NOTES
A. COORDINATE ALL MECHANICAL SERVICE OUTAGES WITH VA/COR.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT SCHEDULED FOR DEMOLITION.
DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR EXCEED FORMER CONDITIONS.
C. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY CONFLICTS BEFORE PROCEEDING.
D. REMOVE ALL DUCTWORK, INCLUDING ASSOCIATED INSULATION, HANGERS, SUPPORTS, ETC. SHOWN DASHED UNLESS NOTED
OTHERWISE.
GENERAL MECHANICAL DEMOLITION NOTES
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
REVIEW ONLY - NOT FOR CONSTRUCTION
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
05/01/2023MECHANICAL - VENTILATION
DEMOLITION ROOF PLAN
EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 DGG TE
50-MHD104
678-331
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
B
ID
S
E T
N 1/8" = 1'-0"
MECHANICAL - VENTILATION DEMOLITION ROOF PLAN
0 4' 8' 16'
Revisions: Date:
35% SCHEMATIC DESIGN SUBMISSION 8/10/2021
65% DESIGN DEVELOPMENT 11/29/2021
65% DESIGN DEVELOPMENT RESUBMISSION 02/28/2022
95% CONSTRUCTION DOCUMENTS SUBMISSION 06/30/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 10/7/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/7/2022
BID SET 05/01/2023
BID SET
VA FORM 08-6231
FF
EE
DD
CC
BB
2 3.5 4.5 5.5 6.5 7.5
HH
GG
8.3
SUPPORT
WAITING
ROOM
OFFICE
CORRIDOR
1C3
VESTIBULE
1V3
CORRIDOR
1C2
ELEVATOR
50P2
ELEVATOR
50P1
MENS
RESTROOM
WOMENS
RESTROOM
TRI-CARE/CHAMPS
OFFICE
MEANS
TESTING
OFFICE
12"∅ EA UP
3 3
14x14 EA UP
28x28 OA DUCT UP
THRU 2ND FLOOR
(E)14x12 EA
RISER UP
TO EF-4
6 9
PSYCH
TREATMENT
TREATMENT
TREATMENT
TREATMENT
TREATMENT
TREATMENT
TREATMENT
PSYCH
TREATMENT
MED
ROOM
RADIO
ROOM
CLEAN
LINEN
PSYCH
TREATMENT
ISOLATION
TREATMENT
PSYCH
TRIAGE
TRIAGE
CHECK-IN
105A
STORAGE
AOD
STORAGE
TRIAGE
CORRIDOR
113A
ELECTRICAL
ROOM
HEICS
STORAGE
BIOMED
COMM
CLOSET
(E)
113B
STAFF
TLT/SHWR
TRAUMA
ROOM
115TREATMENT
PHYSICIANS
AREA
MECHANICAL
ROOM
PHYSICIANS
AREA
TREATMENT
TREATMENT
SOILED
UTILITY
SIGNAL
ELEC
ORTHOTREATMENT
HAC
TREATMENT
TREATMENT
ISOLATION
TREATMENT
OXYGYN
STORAGE
PHASING LEGEND
AREA NOT IN CONTRACT
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 5
1. REMOVE PHASE 2 DEMOLITION DUCTWORK UP TO THIS LOCATION AND CAP.
2. REMOVE 12"∅ EXHAUST DUCT SECTION TO 12"∅ RISER, NEW CONNECTION TO BE
MADE DURING THIS PHASE, REFER TO PHASING PLAN ON SHEET 50-MC101.
PHASE 2 DEMOLITION NOTES
3. REMOVE PHASE 3 DEMOLITION DUCTWORK UP TO THIS LOCATION AND CAP.
4. REMOVE PHASE 3 DEMOLITION DUCTWORK UP TO THIS LOCATION, NEW CONNECTION
TO BE MADE DURING THIS PHASE, REFER TO PHASING PLAN ON SHEET 50-MC101.
5. REMOVE ELBOW WITH TURNING VANES, NEW CONNECTION TO RETURN MAIN TO MADE
AT THIS LOCATION, REFER TO PHASING PLAN ON SHEET 50-MC101.
6. TEMPORARILY RECONNECT RETURN BRANCH TO NEW MAIN AT THIS LOCATION UNTIL
PHASE 5 IS COMPLETED, REFER TO PHASING PLAN ON SHEET 50-MC101.
PHASE 3 DEMOLITION NOTES
7. REMOVE PHASE 4 DEMOLITION DUCTWORK UP TO THIS LOCATION AND CAP.
8. REMOVE EXHAUST DUCTWORK TO 14x14 RISER , CAP RISER ABOVE THE CEILING.
PHASE 4 DEMOLITION NOTES
9. REMOVE PHASE 5 DEMOLITION DUCTWORK UP TO THIS LOCATION AND CAP.
10. REMOVE PHASE 5 DEMOLITION DUCTWORK UP TO THIS LOCATION, NEW CONNECTION
TO BE MADE DURING THIS PHASE, REFER TO PHASING PLAN ON SHEET 50-MC101.
11. REMOVE SUPPLY FAN FROM EXISTING AIR HANDLING UNIT (AHU-1) AND ASSOCIATED
VFD.
PHASE 5 DEMOLITION NOTES
A. REVIEW THIS DRAWING IN CONJUNCTION WITH SHEETS 50-GC101 & 50-GC102 AND
CORRESPONDING ARCHITECTURAL, FIRE PROTECTION, PLUMBING, MEDICAL GAS AND
ELECTRICAL DEMOLITION AND NEW WORK DRAWINGS FOR A FULL SCOPE OF PROJECT
CONSTRUCTION PHASING. THIS INFORMATION IS SUGGESTED, CONTRACTOR IS
ULTIMATELY RESPONSIBLE FOR ALL PHASED CONSTRUCTION PLANNING, SEQUENCING,
MEANS, METHODS, PROCEDURES, COORDINATION AND PERFORMANCE OF THE WORK.
B. REBALANCE AHU-1 AND AHU-5 AT THE END OF EACH PHASE IN ACCORDANCE WITH THE
UPDATED AIR FLOWS.
GENERAL PHASING DEMOLITION NOTES
X
X
X
X
M o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
REVIEW ONLY - NOT FOR CONSTRUCTION
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
05/01/2023MECHANICAL - VENTILATION
DEMOLITION PHASING PLAN
EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 DGG TE
50-MCD101
678-331
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
B
ID
S
E T
N 1/8" = 1'-0"
MECHANICAL - VENTILATION DEMOLITION PHASING PLAN
0 4' 8' 16'
AHU-1 AIR FLOW BALANCE
PHASE AIR FLOW
18700 CFM
15300 CFM
12000 CFM
7675 CFM
5225 CFM
EXISTING
Revisions: Date:
65% DESIGN DEVELOPMENT RESUBMISSION 02/28/2022
95% CONSTRUCTION DOCUMENTS SUBMISSION 06/30/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 10/7/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/7/2022
BID SET 05/01/2023
BID SET
VA FORM 08-6231
FF
EE
DD
CC
BB
2 3.5 4.5 5.5 6.5 7.5
HH
GG
8.3 9
PHASE 3
PHASE 3
PHASE 3
PHASE 4
PHASE 3
PHASE 3
PHASE 3
PHASE 4 PHASE 2
PHASE 2
PHASE 5
PHASE 5
5 6
7 8
PHASE 1
PHASE 1
PHASE 5
3 9
PHASING LEGEND
AREA NOT IN CONTRACT
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 5
PSYCH
TREATMENT
TREATMENT
TREATMENT
TREATMENT
TREATMENT
TREATMENT
TREATMENT
PSYCH
TREATMENT
MED
ROOM
RADIO
ROOM
CLEAN
LINEN
PSYCH
TREATMENT
ISOLATION
TREATMENT
PSYCH
TRIAGE
TRIAGE
CHECK-IN
105A
STORAGE
AOD
AMBULANCE
VESTIBULE
1V2
TRIAGE
CORRIDOR
113A
ELECTRICAL
ROOM
HEICS
STORAGE
BIOMED
COMM
CLOSET
(E)
113B
STAFF
TLT/SHWR
TRAUMA
ROOM
TREATMENT
PHYSICIANS
AREA
PHYSICIANS
AREA
TREATMENT
TREATMENT
SOILED
UTILITY
SIGNAL
ELEC
ORTHOTREATMENT
HAC
TREATMENT
121TREATMENT
ISOLATION
TREATMENT
OXYGYN
STORAGE
MECHANICAL
ROOM
4. REMOVE PHASE 2 DEMOLITION PIPING UP TO THIS LOCATION AND CAP.
PHASE 2 DEMOLITION NOTES
5. REMOVE PHASE 3 DEMOLITION PIPING UP TO THIS LOCATION AND CAP.
PHASE 3 DEMOLITION NOTES
6. REMOVE PHASE 4 DEMOLITION PIPING UP TO THIS LOCATION AND CAP.
PHASE 4 DEMOLITION NOTES
7. REMOVE PHASE 5 DEMOLITION PIPING UP TO THIS LOCATION AND CAP.
8. REMOVE PHASE 5 DEMOLITION PIPING TO THE RISER LOCATED IN THE MECHANICAL
ROOM.
9. CAP 1-1/2" HWS / HWR PIPING AT NEW 2" MAIN. REFER TO SHEET 50-MC102 FOR MORE
CLARITY.
PHASE 5 DEMOLITION NOTES
A. REVIEW THIS DRAWING IN CONJUNCTION WITH SHEETS 50-GC101 & 50-GC102 AND
CORRESPONDING ARCHITECTURAL, FIRE PROTECTION, PLUMBING, MEDICAL GAS AND
ELECTRICAL DEMOLITION AND NEW WORK DRAWINGS FOR A FULL SCOPE OF PROJECT
CONSTRUCTION PHASING. THIS INFORMATION IS SUGGESTED, CONTRACTOR IS
ULTIMATELY RESPONSIBLE FOR ALL PHASED CONSTRUCTION PLANNING, SEQUENCING,
MEANS, METHODS, PROCEDURES, COORDINATION AND PERFORMANCE OF THE WORK.
B. BALANCE HEATING WATER PUMP VFDS AT THE END OF EACH PHASE IN ACCORDANCE
WITH THE UPDATED FLOW RATES TO KEEP THE SPACE FUNCTIONAL.
C. PROVIDE A FINAL TEST AND BALANCE ON THE HEATING WATER PUMPS AND VFDS TO
MEET CONSTRUCTION DRAWINGS.
GENERAL PHASING DEMOLITION NOTES
1. UPSIZE EXISTING 3" CHWS / CHWR PIPING SHOWN DASHED. REFER TO SHEET 50-MC102
FOR NEW WORK.
2. UPSIZE EXISTING 1-1/2" HWS / HWR PIPING SHOWN DASHED TO 2" RISERS. REFER TO
SHEET 50-MC102 FOR NEW WORK.
3. RECONNECT EXISTING 1-1/2" HWS / HWR PIPING SERVING EXISTING SPACES INTO NEW
2" MAIN TEMPORARILY UNTIL WORK IN PHASE 5 IS COMPLETE.
PHASE 1 DEMOLITION NOTESX
X
X
X
X
H W
R H
W S
AHU-1
2" HWS & HWR UP
TO 2ND FLOOR6"
C H
W R
6" C
H W
S
3" CHWR
3" CHWS
3" CHWR
3" CHWS
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
REVIEW ONLY - NOT FOR CONSTRUCTION
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
05/01/2023MECHANICAL - PIPING
DEMOLITION PHASING PLAN
EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 DGG TE
50-MCD102
678-331
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
B
ID
S
E T
Revisions: Date:
95% CONSTRUCTION DOCUMENTS SUBMISSION 06/30/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 10/7/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/7/2022
BID SET 05/01/2023
N 1/8" = 1'-0"
MECHANICAL - PIPING DEMOLITION PHASING PLAN
0 4' 8' 16'
HW FLOW RATE BALANCE
PHASE FLOW RATE
32.4 GPM
45.4 GPM
EXISTING
41.2 GPM2
36.5 GPM3
35.7 GPM4
32.6 GPM5
BID SET
VA FORM 08-6231
FF
EE
DD
CC
BB
2 3.5 4.5 5.5 6.5 7.5
II
HH
JJ
GG
CLEAN
SUPPLY
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
(FAST
TRACK)
EXAM/
TREATMENT
(FAST
TRACK)
SECURITY
STATION
AOD
SUPPORT
HAC
RECEPTION
TOILET
(PATIENT/CHILD)
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
MEDS
CONSULT
PIT
TRIAGE
TRIAGE
STORAGE-
AOD
TOILET
(STAFF)
WAITING
WAITING
EXAM/
TREATMENT
(ISOLATION)
STORAGE-
EMS
TOILET
(ISOLATION
PATIENT)
1032A
ANTEROOM
EXAM/
TREATMENT
(ISOLATION)
CLEAN
LINEN
DECONTAMINATION
COLLABORATION
NURSE
STATION-
SOUTH
NURSE
STATION-
NORTH
ALCOVE-
OMNICELL
MEDS
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
(MENTAL
HEALTH)
EXAM/
TREATMENT
(MENTAL
HEALTH)
STORAGE
TOILET
(MENTAL
HEALTH)
EXAM/
TREATMENT
(MENTAL
HEALTH)
EXAM/
TREATMENT
(MENTAL
HEALTH)
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
(WOMENS
HEALTH)
ALCOVE-
IMAGING
C5A
TOILET
(PATIENT)
RADIOLOGY
CT
CONTROL
MECHANICAL
(E)
ELECTRICAL
(E)
BIOMED
COMM
CLOSET
(E)
113B
EMS
SUPPORT
PROCEDURE
PROCEDURE
CT
SOILED
UTILITY
ELECTRICAL
TOILET
(STAFF)
TOILET
(ISOLATION
PATIENT)
1036A
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
SOILED
UTILITY
STORAGE-
OXYGEN
TOILET
(PUBLIC)
1001B
TOILET
(PUBLIC)
1001A
8.58.3
/1 50-MH101.1
/1 50-MH101.2
/1 50-MH101.1
/1 50-MH101.2
VESTIBULE
1V1
OIT COMM
CLOSET
12"∅ EA UP
(E)14x14 EA UP
(E)14x12 EA
RISER UP
NURSE
STATION-
EAST
CORRIDOR
C12
CORRIDOR
C11
CORRIDOR
C1
CORRIDOR
C13
CORRIDOR
C2
CORRIDOR
C9
CORRIDOR
C7
CORRIDOR
C7
CORRIDOR
C4
AMBULANCE
VESTIBULE
1V2
28x28 OA DUCT UP
THRU 2ND FLOOR
100x18 RA
UP TO
AHU-5
80x24 SA UP
TO AHU-5
78x8 EA UP
TO AHU-5
1 HOUR FIRE & SMOKE SEPARATION
2 HOUR FIRE & SMOKE SEPARATION
FIRE BARRIER LEGEND
A. THIS OVERALL PLAN IS INTENDED TO GIVE AN OVERVIEW OF THE WORK. REFER TO SHEET 50-MH101.1 AND 50-MH101.2 FOR
DETAILED INFORMATION.
GENERAL MECHANICAL VENTILATION NOTES
M
M
N o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
REVIEW ONLY - NOT FOR CONSTRUCTION
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
KEY PLAN
05/01/2023MECHANICAL - VENTILATION
OVERALL PLAN, FIRST FLOOR
EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 DGG TE
50-MH101
678-331
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
B
ID
S
E T
N 1/8" = 1'-0"
MECHANICAL - VENTILATION OVERALL PLAN, FIRST FLOOR
0 4' 8' 16'
Revisions: Date:
35% SCHEMATIC DESIGN SUBMISSION 8/10/2021
65% DESIGN DEVELOPMENT 11/29/2021
65% DESIGN DEVELOPMENT RESUBMISSION 02/28/2022
95% CONSTRUCTION DOCUMENTS SUBMISSION 06/30/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 10/7/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/7/2022
BID SET 05/01/2023
BID SET
VA FORM 08-6231
B. PROVIDE BALANCING DAMPER AT ALL SUPPLY DIFFUSERS, COORDINATE LOCATION OF DIFFUSERS / GRILLES WITH SPRINKLER HEADS, LIGHTING FIXTURES AND ALL CEILING MOUNTED DEVICES. REFER TO ARCHITECTURAL CEILING GRID DRAWINGS FOR
LOCATIONS.
C. CEILING ACCESS SHALL BE PROVIDED FOR ALL HVAC EQUIPMENT AND COMPONENTS LOCATED ABOVE THE CEILING THAT
REQUIRE OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION.
D. DURING CONSTRUCTION, PROVIDE TEMPORARY CLOSURES ON ALL SUPPLY AND RETURN AIR DUCT OPENINGS BY SEALING WITH A DISPOSABLE POLYETHYLENE SHEETING TO PREVENT CONSTRUCTION DUST FROM ENTERING DUCTWORK SYSTEM OR
AIR TERMINAL UNITS.
E. VAV TERMINAL UNIT LOCATIONS SHALL BE MARKED ON THE CEILING GRID WHERE THE VAV IS LOCATED.
F. COORDINATE ALL NEW WORK WITH NEW PHASING PLAN 50-MC101.
G. MOUNT DUCTWORK AT ELEVATION SO IT DOESN'T INTERFERE WITH VAV BOX SERVICE CLEARANCE REQUIREMENTS.
GENERAL MECHANICAL VENTILATION NOTES
1 HOUR FIRE & SMOKE SEPARATION
2 HOUR FIRE & SMOKE SEPARATION
FIRE BARRIER LEGEND
4 5 6
FF
3.5
3.5
4.5
4.5
5.5
5.5
6.5
6.5
7.5
7.5
II
HH
JJ
G G
CLEAN
SUPPLY
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
(FAST
TRACK)
EXAM/
TREATMENT
(FAST
TRACK)
SECURITY
STATION
AOD
SUPPORT
HAC
RECEPTION
VESTIBULE
1V1
TOILET
(PATIENT/CHILD)
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
MEDS
EXAM/
TREATMENT
(LOW
ACUITY)
1026G EXAM/
TREATMENT
(LOW
ACUITY)
1026F
EXAM/
TREATMENT
(LOW
ACUITY)
1026E
EXAM/
TREATMENT
(LOW
ACUITY)
1026D
CONSULT
PIT
TRIAGE
TRIAGE
STORAGE-
AOD
TOILET
(STAFF)
WAITING
WAITING
SOILED
UTILITY
8ø NK
SA
145 CFM
8ø NK
SA
195 CFM
8ø NK
SA
195 CFM
8ø NK
SA
195 CFM
8ø NK
SA
195 CFM
8ø NK
SA
195 CFM
8ø NK
SA
195 CFM
8ø NK
SA
180 CFM
8ø NK
SA
180 CFM
8ø NK
SA
180 CFM
8ø NK
SA
180 CFM
12ø NK
SA
405 CFM
10ø NK
SA
350 CFM
10ø NK
SA
350 CFM
10ø NK
SA
350 CFM
10ø NK
SA
350 CFM
8ø NK
SA
155 CFM
RE
180 CFM
22x10
RE
180 CFM
22x10
RE
180 CFM
22x10
8.5
8.5
8.3
8.3
/1 50-MH101.2/1 50-MH101.2
EE
100 CFM
10x10
EE
75 CFM
10x10
EE
1075 CFM
22x22
EE
105 CFM
10x10
EE
105 CFM
10x10
EE
1075 CFM
22x22
EE
1070 CFM
22x22
EE
1075 CFM
22x22
EE
100 CFM
10x10
EE
75 CFM
10x10
16x14 EA
20x14 EA
20x18 EA
VAV-5-1018
740 CFM
RE
120 CFM
22x10
12x12 SA
RE
195 CFM
22x10
RE
195 CFM
22x10
RE
195 CFM
22x10
RE
195 CFM
22x10
RE
195 CFM
22x10
RE
195 CFM
22x10
VAV-5-1014
595 CFM
10x12 SA
8ø NK
SA
205 CFM
VAV-5-1002
535 CFM
8ø NK
SA
205 CFM
36x16 RA 32x16 RA 32x16 RA x1
R
A
RE
405 CFM
22x10
12ø SA
22x14 SA
34x12 SA
16x14 SA
12ø SA
12ø SA
8ø NK
SA
150 CFM
12ø SA
22x14 SA
VAV-5-1001A
1615 CFM
VAV-5-1001B
1265 CFM
10ø NK
SA
350 CFM
10ø NK
SA
355 CFM
10ø NK
SA
350 CFM
10ø NK
SA
350 CFM
10ø NK
SA
350 CFM
10ø NK
SA
350 CFM
14x14 SA
RE
130 CFM
22x10
8ø NK
SA
130 CFM
8ø NK
SA
130 CFM
RE
130 CFM
22x10
VAV-5-1008
130 CFM
8ø NK
SA
110 CFM
VAV-5-1001C
1050 CFM
8ø NK
SA
130 CFM
RE
130 CFM
22x10
34x12 SA x1
SA
30x22 SA x2
SA
24x14 SA x1
SA
x1
SA
VAV-5-1023
420 CFM
10x10 SA
RE
425 CFM
22x10
12ø NK
SA
425 CFM
RE
430 CFM
22x10
12ø NK
SA
430 CFM
8ø NK
SA
130 CFM
10ø NK
SA
230 CFM
10ø NK
SA
230 CFM
VAV-5-1009
445 CFM
12x10 SA
8ø NK
SA
115 CFM
8ø NK
SA
110 CFM
RE
115 CFM
22x10
RE
110 CFM
22x10
8ø SA
6ø NK
SA
60 CFM
8ø NK
SA
110 CFM
x1
R
A x1
R
A
26x12 RA x1
R
A
8ø NK
SA
200 CFM
100x18 RA UP
TO AHU-5
80x24 SA UP
TO AHU-5
12x10 SA
VAV-5-1033
515 CFM
10x10 SA
8ø NK
SA
130 CFM
8ø NK
SA
130 CFM
OIT COMM
CLOSET
50x26 RA
DFSS-1025
2 TONS
CORRIDOR
C11
CORRIDOR
C1
6ø NK
SA
60 CFM
6ø NK
SA
60 CFM
6ø NK
SA
50 CFM
RE
180 CFM
22x10
RE
60 CFM
22x10
RE
110 CFM
10x10
RE
550 CFM
22x22
RE
185 CFM
22x10
16x6 RA
6ø EA
14x14 EA
16x12 EA
12x12 SA 16x16 SA
12ø RA
14x12 SA
10ø SA x1
R
A
CORRIDOR
C11
NURSE
STATION-
EAST
TOILET
(PUBLIC)
1001B
TOILET
(PUBLIC)
1001A
VAV-5-1026
1315 CFM
16x16 NK
SC
60 CFM
16x6 RA
VAV-5-1015
390 CFM
16ø SA
VAV-5-1021
410 CFM
78x8 EA UP
TO AHU-5
48x14 EA
14ø SA
48x14 EA 36x18 EA
24x18 EA
8ø EA
8ø EA
16x12 EA
20x12 SA
8ø RA
6ø EA
12x8 SA
6ø EA
8ø RA
36x22 SA x2
SA
CORRIDOR
C12
CORRIDOR
C13
10ø SA
8ø RA
10x10 RA
10ø RA
8ø RA
6ø RA
6ø EA
8ø RA 6ø SA x1
R
A
DSD
62x20 RA
40x16 RA
VAV-5-1027
330 CFM
12x8 SA
6ø EA
48x16 EA48x16 EA
10ø SA
16x14 EA
16x12 EA 8x8 EA
8x8 EA x1
SA
x1
EA
12ø RA
8ø RA x1
R
A x1
R A
10ø SA
12ø SA
8ø RA8ø RA8ø RA8ø RA8ø RA8ø RA
8ø RA
8ø RA
12ø RA
12ø RA
8ø RA
8ø RA
14ø EA
14ø EA
14ø EA
12ø EA
8ø RA
VAV-5-1006
190 CFM
333 33
8ø RA
X MECHANICAL KEY NOTES
1. DUCT SMOKE DETECTOR TO BE PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR. COORDINATE WITH ELECTRICAL
DRAWINGS. SHOWN HERE FOR REFERENCE PURPOSES ONLY.
2. PROVIDE DUCT REINFORCEMENT FOR DUCTWORK WITH AN ASPECT RATIO LARGER THAN 4:1. REFER TO DETAIL #6 ON
SHEET 50-M501.
3. PROVIDE BALANCING DAMPER.
N o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
REVIEW ONLY - NOT FOR CONSTRUCTION
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
KEY PLAN
05/01/2023M…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .