About this file

This document appears to be a medical gas first floor plan for the expansion and renovation of the Emergency Department B50 at the Tucson VA Medical Center. The key details are:

The project involves connecting new 1-inch oxygen, 1-inch medical air, and 2-inch medical vacuum piping to the existing building #38 lines. It also includes furnishing and installing new medical gas outlets and medical vacuum inlets with back boxes, face plates, and associated piping into the headwall. Existing 1/2-inch oxygen, 1/2-inch medical air, and 3/4-inch medical vacuum piping up to the 2nd and 3rd floors will remain. Coordination with the VA Contracting Officer's Representative for any medical gas service outages is required. The contractor is responsible for all modifications to the existing piping necessary to permit the installation of new work.

The related federal contract opportunity is Solicitation Number 36c77623r0191 for the Expand and Renovate Emergency Department B50 Minor Construction project at the Tucson VAMC (VA-24-00001448). The Department of Veterans Affairs Technology Acquisition Center Austin is the contracting agency.

View the file

Other files

File Type Posted
50-EP601.pdf PDF
50-M703.pdf PDF
50-A701.pdf PDF
50-A102.pdf PDF
50-M601.pdf PDF
50-EP101.pdf PDF
50-M704.pdf PDF
50-A504.pdf PDF
50-A104.pdf PDF
50-GC102.pdf PDF
50-CU101.pdf PDF
Addendum 1.pdf PDF
50-M505.pdf PDF
50-A502.pdf PDF
50-MG702.pdf PDF
50-AC101.1.pdf PDF
50-MH101.1.pdf PDF
50-EP102.pdf PDF
11 73 00 Ceiling Mounted Patient Lift_Rev.pdf PDF
08 80 00 Glazing_Rev.pdf PDF
50-A401.pdf PDF
50-AC101.4.pdf PDF
50-A303.pdf PDF
50-GC101.pdf PDF
50-MH104.pdf PDF
50-M602.pdf PDF
50-M702.pdf PDF
50-EP602.pdf PDF
01 00 00 Gen Reqs_Rev.pdf PDF
Technical Questions Spreadsheet - Tucson - Final.pdf PDF
50-A602.pdf PDF
50-M503.pdf PDF
50-CD101.pdf PDF
50-S450.pdf PDF
50-MG701.pdf PDF
50-S310.pdf PDF
50-M701.pdf PDF
36C77623R0191 0003.pdf PDF
36C77623R0191 0002.pdf PDF
36C77623R0191 0001.pdf PDF
Site Visit Sign in Sheet Pg 1 and 2 - Tucson.pdf PDF
Attachment 8 - Architectural Drawings 2 of 2.pdf PDF
Attachment 14 - Mechanical Drawings.pdf PDF
Attachment 6 - Structural Drawings.pdf PDF
36C77623R0191 - 02-22-24.pdf PDF
Attachment 2 - Specifications - 2 of 3.pdf PDF
Attachment 5 - Civil Drawings.pdf PDF
Attachment 20 - Site Visit Instructions.pdf PDF
Attachment 17 - PTube Drawings.pdf PDF
Attachment 7 - Architectural Drawings 1 of 2.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 8.3

B B

C C

D D

E E

E.4 E.4

E.2 E.2

K K

G G

H H

G.7 G.7

J J

3.8 4.6 5.5 6.3

(E ) V

(E ) A

(E ) O

(E) A

(E) V

(E) O

MG0-3

MG0-3

1/2"

3/4"

1/2"

3/4"

MG0-1

MG0-1

ZVB-1

O

AV

AAP-1

AAP-2

(E

) O (E

) V (E

) A

MG0-2

MG0-2

3/4"

1/2"

3/4"

1/2"

MG0-2

MG0-1

MG0-1

MG0-1

MG0-2

MG0-2

3/4"

1/2"1/2"

3/4"MG0-2

1/2"

3/4"MG0-2

3/4"

1/2"

MG0-2

3/4"

1/2"MG0-2

1/2" 3/4"

MG0-2

3/4"

1/2"

MG0-2

3/4"

1/2"

MG0-2

1/2"

3/4"

MG0-2

1/2"

3/4"

MG0-2

MG0-2

1/2"

3/4"

O A

V

MG0-1

ZVB-2MG0-1

O A

V

O A

V

MG0-1

1-1/2"

MG0-1

MG0-1

MG0-1

1"

3/4"

MG0-2

MG0-2

MG0-2

MG0-2

3/4" 1/2"

3/4" 1/2"

1-1/2"

MG0-2

MG0-2

MG0-2

MG0-2

MG0-2

MG0-2

O A

V

MG0-1

MG0-2 3

O A

V

O A

V

O A

V

O A

V

CLEAN

SUPPLY

EXAM/

TREATMENT

EXAM/

TREATMENT

EXAM/

TREATMENT

EXAM/

TREATMENT

EXAM/

TREATMENT

(FAST

TRACK)

EXAM/

TREATMENT

(FAST

TRACK)

HAC

SECURITY

STATION

RECEPTION

WAITING

1001AOD

SUPPORT

TRIAGE

TRIAGE

TOILET

(STAFF)

STORAGE-

AOD

PIT

CONSULT

SOILED

UTILITY

EXAM/

TREATMENT

(LOW

ACUITY)

1026D

EXAM/

TREATMENT

EXAM/

TREATMENT

EXAM/

TREATMENT

EXAM/

TREATMENT

EXAM/

TREATMENT

(ISOLATION)

EXAM/

TREATMENT

EXAM/

TREATMENT

EXAM/

TREATMENT

EXAM/

TREATMENT

OIT COMM

CLOSET

EXAM/

TREATMENT

EXAM/

TREATMENT

EXAM/

TREATMENT

(MENTAL

HEALTH)

EXAM/

TREATMENT

(MENTAL

HEALTH)

STORAGE

TOILET

(MENTAL

HEALTH)

1054EXAM/

TREATMENT

(MENTAL

HEALTH)

EXAM/

TREATMENT

(MENTAL

HEALTH)

EXAM/

TREATMENT

EXAM/

TREATMENT

EXAM/

TREATMENT

EXAM/

TREATMENT

(WOMENS

HEALTH)

TOILET

(PATIENT)

1047 ALCOVE-

IMAGING

C5A

RADIOLOGY

SOILED

UTILITY

CT

CT

CONTROL

PROCEDURE

PROCEDURE

MECHANICAL

(E)

ELECTRICAL

(E)

BIOMED

COMM

CLOSET

(E)

113B

EMS

SUPPORT

EXAM/

TREATMENT

(ISOLATION)

ANTEROOM

ALCOVE-

OMNICELL

MEDS

NURSE

STATION-

NORTH

COLLABORATION

NURSE

STATION-

SOUTH

STORAGE-

EMS

DECONTAMINATION

TOILET

(STAFF)

TOILET

(ISOLATION

PATIENT)

1032A

TOILET

(ISOLATION

PATIENT)

1036A

TOILET

(PATIENT/CHILD)

CLEAN

LINEN

MEDS

EXAM/

TREATMENT

(LOW

ACUITY)

1026A

EXAM/

TREATMENT

(LOW

ACUITY)

1026B

EXAM/

TREATMENT

(LOW

ACUITY)

1026C

EXAM/

TREATMENT

(LOW

ACUITY)

1026E

EXAM/

TREATMENT

(LOW

ACUITY)

1026F

EXAM/

TREATMENT

(LOW

ACUITY)

1026G

ELECTRICAL

CORRIDOR

C2

CORRIDOR

C11

NOURISHMENT

AMBULANCE

VESTIBULE

1V2

STORAGE-

OXYGEN

CORRIDOR

C1

STAIR

SH2-50

CORRIDOR

C9

RADIOLOGY

CONTROL

1046A

WOMENS

RESTROOM

MENS

RESTROOM

VESTIBULE

1V4

OFFICE

153OFFICE

TRI-CARE/CHAMPS

OFFICE

SUPPORT

WAITING

ROOM

MEANS

TESTING

CORRIDOR

1C2

CORRIDOR

1C3

VESTIBULE

1V3

STAIR

SH1-50

ELEVATOR

50P2

ELEVATOR

50P1

SEATING

AREA

WAITING

AREA

COFFEE

SHOP

1511 NURSE

STATION-

EAST

ALCOVE

C7A

CORRIDOR

C12

CORRIDOR

C13

CORRIDOR

C14

CORRIDOR

C3

CORRIDOR

C4

CORRIDOR

C5

CORRIDOR

C6

CORRIDOR

C10

CORRIDOR

C7

CORRIDOR

C8

A1

DD

EE

II

AA

BB

CC

2"

1"

2" 1"

2"

1"

3/4"

1-1/2"3/4"

3/4"

2"

1"

1"

3/4"

O A

V

O A

V

O A

V

O A

V

O A

V

O A

V

1"

1"

2"

2"

1"

2"1"

2"

2"

1"

1" 3/4"

O A

V

O A

V

O A

V

O

AV

O A

V

3/4"

1"

3/4" 1"

3/4" 1"

V

O A

1/2"

3/4"

V

O A

V

O A

3/4"

1"

O A

V

O A

V

1"3/4"1"3/4"

O A

V

O A

V

O A

V

3/4"

1/2"

O A

V

3/4" 1/2"

1"

3/4"

1/2"

3/4" o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

VA FORM 08-6231

Office of Facilities Management

U.S. Department of Veterans Affairs

STAMP

Date

Location

Building Number Checked Drawn Drawing Number

Project Number

REVIEW ONLY - NOT FOR CONSTRUCTION

Approved: Director

Approved: Associate Director

Approved: Assistant Director

Approved: Assoc. Director for Patient Care Service/Nurse Executive

Approved: Deputy Assoc. Director of Patient Care Services

Approved: Chief of Staff

Approved: Deputy Chief of Staff

Approved: Chief of Engineering

Approved:

Approved:

ARCHITECT/ENGINEER/CONSULTANTS:

Bancroft Project No.

SAVAHCS, TUCSON, AZ 85723

3300 Dundee Road

Northbrook, IL 60062

T: 847.952.9362

4/30/2024MEDICAL GAS - FIRST FLOOR

PLAN

EXPAND AND RENOVATE

EMERGENCY DEPARTMENT B50

50 JPK MB

50-MG100

678-331

19-103

8-

E X

P A

N D

A N

D R

E N

O V

A T

E E

M E

R G

E N

C Y

D E

P A

R T

M E

N T

B

A

D D

E N

D U

M

N 1/8" = 1'-0"

MEDICAL GAS - FIRST FLOOR PLAN

GENERAL NOTES

A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL MEDICAL GAS SERVICE OUTAGES.

B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY

CONFLICTS BEFORE PROCEEDING.

C. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY

TO PERMIT THE INSTALLATION OF NEW WORK.

D. REFER TO MEDICAL GAS ROUGH-IN SCHEDULE FOR BRANCH CONNECTION TO FIXTURE.

E. INSTALL LOCKABLE ISOLATION VALVES AS SHOWN ON THE DRAWINGS AND REQUIRED BY CODE.

F. ACCESS SHALL BE PROVIDED SUCH THAT MEDICAL GAS COMPONENTS SHALL BE READILY

SERVICEABLE, FOR ALL COMPONENTS THAT REQUIRE OPERATING, CLEANING, SERVICING,

MAINTENANCE, AND CALIBRATION. SUCH COMPONENTS INCLUDES, BUT ARE NOT LIMITED TO

MANUAL VALVES, PRESSURE/VACUUM SWITCHES, AND ALARM PANELS.

G. ALL MEDICAL GAS PIPING TO BE 3/4” MINIMUM UNLESS OTHERWISE NOTED.

H. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.

I. COORDINATE CONCRETE FLOOR SLAB AND REPLACEMENT WORK WITH ARCHITECTURAL AND

STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS

EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW THE PROPER CURING TIME

REQUIRED FOR THE NEW FLOOR FINISHES.

J. COORDINATE THE LOCATION OF ALL ZONE VALVE BOXES, ALARM PANELS, AND MEDICAL GAS

INLET/OUTLET PANELS WITH THE ARCHITECTURAL DRAWINGS.

K. PATCH AND FILL CONCRETE SLAB AND WALLS WHERE MEDICAL GAS/VACUUM PIPING HAVE BEEN

REMOVED OR PLUGGED.

L. FINISHED FLOOR EL. 59'-8 3/8"'

1. EXISTING 1" OXYGEN, 1" MEDICAL AIR, AND 2" MEDICAL VACUUM FROM SOURCE - TO REMAIN.

FOR SOURCE, SEE SHEET MG-101.

2. EXISTING 3/4" OXYGEN, 1/2" MEDICAL AIR, AND 1-1/4" MEDICAL VACUUM PIPING FROM BELOW - TO REMAIN, SERVING 2ND AND 3RD FLOOR ON EAST SIDE OF BUILDING. FOR SOURCE, SEE SHEET

MG-101.

3. MG0-2 FURNISH AND INSTALL NEW MEDICAL GAS OUTLETS AND MEDICAL VACUUM INLETS WITH

BACK BOXES, FACE PLATES AND ASSOCIATED PIPING INTO HEADWALL. INSTALL PER

MANUFACTURER'S INSTALLATION INSTRUCTIONS. SEE ARCHITECTURAL DRAWING ELEVATIONS

FOR HEADWALL AND MOUNTING HEIGHTS.

4. CONNECT NEW 1" OXYGEN, 1" MEDICAL AIR, AND 2" MEDICAL VACUUM TO EXISTING LINES FROM

BUILDING #38.

5. EXISTING 1/2" OXYGEN, 1/2" MEDICAL AIR, AND 3/4" MEDICAL VACUUM UP TO 2ND AND 3RD

FLOOR - TO REMAIN.

6. DISCONNET AND LOCK CLOSED FLOOR CONTROL VALVES SERVING EXISTING ZONE VALVE BOX

SERVING EXISTING TO BE REMODELED SIDE OF EMERGENCY DEPARTMENT DURING FINAL

PHASES OF WORK

7. MG0-1 FURNISH AND INSTALL NEW MEDICAL GAS OUTLETS AND MEDICAL VACUUM INLETS WITH

BACK BOXES, FACE PLATES AND ASSOCIATED PIPING INTO HEADWALL. INSTALL PER

MANUFACTURER'S INSTALLATION INSTRUCTIONS. SEE ARCHITECTURAL DRAWING ELEVATIONS

FOR HEADWALL AND MOUNTING HEIGHTS.

8. MG0-3 FURNISH AND INSTALL NEW MEDICAL GAS OUTLETS AND MEDICAL VACUUM INLETS WITH

BACK BOXES, FACE PLATES AND ASSOCIATED PIPING INTO HEADWALL. INSTALL PER

MANUFACTURER'S INSTALLATION INSTRUCTIONS. SEE ARCHITECTURAL DRAWING ELEVATIONS

FOR HEADWALL AND MOUNTING HEIGHTS.

KEY NOTESX

Revisions: Date:

BID SET 05/01/2023

ADDENDUM 1 4/30/2024

File details come from the government source that posted it. Updated .