50-MG100.pdf
PDF 635 KB Posted
- Attached to
- Y1DA--Expand and Renovate Emergency Department B50 Minor Construction - Tucson VAMC (VA-24-00001448)
- Solicitation number
- 36c77623r0191
About this file
This document appears to be a medical gas first floor plan for the expansion and renovation of the Emergency Department B50 at the Tucson VA Medical Center. The key details are:
The project involves connecting new 1-inch oxygen, 1-inch medical air, and 2-inch medical vacuum piping to the existing building #38 lines. It also includes furnishing and installing new medical gas outlets and medical vacuum inlets with back boxes, face plates, and associated piping into the headwall. Existing 1/2-inch oxygen, 1/2-inch medical air, and 3/4-inch medical vacuum piping up to the 2nd and 3rd floors will remain. Coordination with the VA Contracting Officer's Representative for any medical gas service outages is required. The contractor is responsible for all modifications to the existing piping necessary to permit the installation of new work.
The related federal contract opportunity is Solicitation Number 36c77623r0191 for the Expand and Renovate Emergency Department B50 Minor Construction project at the Tucson VAMC (VA-24-00001448). The Department of Veterans Affairs Technology Acquisition Center Austin is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 8.3
B B
C C
D D
E E
E.4 E.4
E.2 E.2
K K
G G
H H
G.7 G.7
J J
3.8 4.6 5.5 6.3
(E ) V
(E ) A
(E ) O
(E) A
(E) V
(E) O
MG0-3
MG0-3
1/2"
3/4"
1/2"
3/4"
MG0-1
MG0-1
ZVB-1
O
AV
AAP-1
AAP-2
(E
) O (E
) V (E
) A
MG0-2
MG0-2
3/4"
1/2"
3/4"
1/2"
MG0-2
MG0-1
MG0-1
MG0-1
MG0-2
MG0-2
3/4"
1/2"1/2"
3/4"MG0-2
1/2"
3/4"MG0-2
3/4"
1/2"
MG0-2
3/4"
1/2"MG0-2
1/2" 3/4"
MG0-2
3/4"
1/2"
MG0-2
3/4"
1/2"
MG0-2
1/2"
3/4"
MG0-2
1/2"
3/4"
MG0-2
MG0-2
1/2"
3/4"
O A
V
MG0-1
ZVB-2MG0-1
O A
V
O A
V
MG0-1
1-1/2"
MG0-1
MG0-1
MG0-1
1"
3/4"
MG0-2
MG0-2
MG0-2
MG0-2
3/4" 1/2"
3/4" 1/2"
1-1/2"
MG0-2
MG0-2
MG0-2
MG0-2
MG0-2
MG0-2
O A
V
MG0-1
MG0-2 3
O A
V
O A
V
O A
V
O A
V
CLEAN
SUPPLY
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
(FAST
TRACK)
EXAM/
TREATMENT
(FAST
TRACK)
HAC
SECURITY
STATION
RECEPTION
WAITING
1001AOD
SUPPORT
TRIAGE
TRIAGE
TOILET
(STAFF)
STORAGE-
AOD
PIT
CONSULT
SOILED
UTILITY
EXAM/
TREATMENT
(LOW
ACUITY)
1026D
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
(ISOLATION)
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
OIT COMM
CLOSET
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
(MENTAL
HEALTH)
EXAM/
TREATMENT
(MENTAL
HEALTH)
STORAGE
TOILET
(MENTAL
HEALTH)
1054EXAM/
TREATMENT
(MENTAL
HEALTH)
EXAM/
TREATMENT
(MENTAL
HEALTH)
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
(WOMENS
HEALTH)
TOILET
(PATIENT)
1047 ALCOVE-
IMAGING
C5A
RADIOLOGY
SOILED
UTILITY
CT
CT
CONTROL
PROCEDURE
PROCEDURE
MECHANICAL
(E)
ELECTRICAL
(E)
BIOMED
COMM
CLOSET
(E)
113B
EMS
SUPPORT
EXAM/
TREATMENT
(ISOLATION)
ANTEROOM
ALCOVE-
OMNICELL
MEDS
NURSE
STATION-
NORTH
COLLABORATION
NURSE
STATION-
SOUTH
STORAGE-
EMS
DECONTAMINATION
TOILET
(STAFF)
TOILET
(ISOLATION
PATIENT)
1032A
TOILET
(ISOLATION
PATIENT)
1036A
TOILET
(PATIENT/CHILD)
CLEAN
LINEN
MEDS
EXAM/
TREATMENT
(LOW
ACUITY)
1026A
EXAM/
TREATMENT
(LOW
ACUITY)
1026B
EXAM/
TREATMENT
(LOW
ACUITY)
1026C
EXAM/
TREATMENT
(LOW
ACUITY)
1026E
EXAM/
TREATMENT
(LOW
ACUITY)
1026F
EXAM/
TREATMENT
(LOW
ACUITY)
1026G
ELECTRICAL
CORRIDOR
C2
CORRIDOR
C11
NOURISHMENT
AMBULANCE
VESTIBULE
1V2
STORAGE-
OXYGEN
CORRIDOR
C1
STAIR
SH2-50
CORRIDOR
C9
RADIOLOGY
CONTROL
1046A
WOMENS
RESTROOM
MENS
RESTROOM
VESTIBULE
1V4
OFFICE
153OFFICE
TRI-CARE/CHAMPS
OFFICE
SUPPORT
WAITING
ROOM
MEANS
TESTING
CORRIDOR
1C2
CORRIDOR
1C3
VESTIBULE
1V3
STAIR
SH1-50
ELEVATOR
50P2
ELEVATOR
50P1
SEATING
AREA
WAITING
AREA
COFFEE
SHOP
1511 NURSE
STATION-
EAST
ALCOVE
C7A
CORRIDOR
C12
CORRIDOR
C13
CORRIDOR
C14
CORRIDOR
C3
CORRIDOR
C4
CORRIDOR
C5
CORRIDOR
C6
CORRIDOR
C10
CORRIDOR
C7
CORRIDOR
C8
A1
DD
EE
II
AA
BB
CC
2"
1"
2" 1"
2"
1"
3/4"
1-1/2"3/4"
3/4"
2"
1"
1"
3/4"
O A
V
O A
V
O A
V
O A
V
O A
V
O A
V
1"
1"
2"
2"
1"
2"1"
2"
2"
1"
1" 3/4"
O A
V
O A
V
O A
V
O
AV
O A
V
3/4"
1"
3/4" 1"
3/4" 1"
V
O A
1/2"
3/4"
V
O A
V
O A
3/4"
1"
O A
V
O A
V
1"3/4"1"3/4"
O A
V
O A
V
O A
V
3/4"
1/2"
O A
V
3/4" 1/2"
1"
3/4"
1/2"
3/4" o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
REVIEW ONLY - NOT FOR CONSTRUCTION
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
4/30/2024MEDICAL GAS - FIRST FLOOR
PLAN
EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 JPK MB
50-MG100
678-331
19-103
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
A
D D
E N
D U
M
N 1/8" = 1'-0"
MEDICAL GAS - FIRST FLOOR PLAN
GENERAL NOTES
A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL MEDICAL GAS SERVICE OUTAGES.
B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY
CONFLICTS BEFORE PROCEEDING.
C. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY
TO PERMIT THE INSTALLATION OF NEW WORK.
D. REFER TO MEDICAL GAS ROUGH-IN SCHEDULE FOR BRANCH CONNECTION TO FIXTURE.
E. INSTALL LOCKABLE ISOLATION VALVES AS SHOWN ON THE DRAWINGS AND REQUIRED BY CODE.
F. ACCESS SHALL BE PROVIDED SUCH THAT MEDICAL GAS COMPONENTS SHALL BE READILY
SERVICEABLE, FOR ALL COMPONENTS THAT REQUIRE OPERATING, CLEANING, SERVICING,
MAINTENANCE, AND CALIBRATION. SUCH COMPONENTS INCLUDES, BUT ARE NOT LIMITED TO
MANUAL VALVES, PRESSURE/VACUUM SWITCHES, AND ALARM PANELS.
G. ALL MEDICAL GAS PIPING TO BE 3/4” MINIMUM UNLESS OTHERWISE NOTED.
H. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
I. COORDINATE CONCRETE FLOOR SLAB AND REPLACEMENT WORK WITH ARCHITECTURAL AND
STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS
EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW THE PROPER CURING TIME
REQUIRED FOR THE NEW FLOOR FINISHES.
J. COORDINATE THE LOCATION OF ALL ZONE VALVE BOXES, ALARM PANELS, AND MEDICAL GAS
INLET/OUTLET PANELS WITH THE ARCHITECTURAL DRAWINGS.
K. PATCH AND FILL CONCRETE SLAB AND WALLS WHERE MEDICAL GAS/VACUUM PIPING HAVE BEEN
REMOVED OR PLUGGED.
L. FINISHED FLOOR EL. 59'-8 3/8"'
1. EXISTING 1" OXYGEN, 1" MEDICAL AIR, AND 2" MEDICAL VACUUM FROM SOURCE - TO REMAIN.
FOR SOURCE, SEE SHEET MG-101.
2. EXISTING 3/4" OXYGEN, 1/2" MEDICAL AIR, AND 1-1/4" MEDICAL VACUUM PIPING FROM BELOW - TO REMAIN, SERVING 2ND AND 3RD FLOOR ON EAST SIDE OF BUILDING. FOR SOURCE, SEE SHEET
MG-101.
3. MG0-2 FURNISH AND INSTALL NEW MEDICAL GAS OUTLETS AND MEDICAL VACUUM INLETS WITH
BACK BOXES, FACE PLATES AND ASSOCIATED PIPING INTO HEADWALL. INSTALL PER
MANUFACTURER'S INSTALLATION INSTRUCTIONS. SEE ARCHITECTURAL DRAWING ELEVATIONS
FOR HEADWALL AND MOUNTING HEIGHTS.
4. CONNECT NEW 1" OXYGEN, 1" MEDICAL AIR, AND 2" MEDICAL VACUUM TO EXISTING LINES FROM
BUILDING #38.
5. EXISTING 1/2" OXYGEN, 1/2" MEDICAL AIR, AND 3/4" MEDICAL VACUUM UP TO 2ND AND 3RD
FLOOR - TO REMAIN.
6. DISCONNET AND LOCK CLOSED FLOOR CONTROL VALVES SERVING EXISTING ZONE VALVE BOX
SERVING EXISTING TO BE REMODELED SIDE OF EMERGENCY DEPARTMENT DURING FINAL
PHASES OF WORK
7. MG0-1 FURNISH AND INSTALL NEW MEDICAL GAS OUTLETS AND MEDICAL VACUUM INLETS WITH
BACK BOXES, FACE PLATES AND ASSOCIATED PIPING INTO HEADWALL. INSTALL PER
MANUFACTURER'S INSTALLATION INSTRUCTIONS. SEE ARCHITECTURAL DRAWING ELEVATIONS
FOR HEADWALL AND MOUNTING HEIGHTS.
8. MG0-3 FURNISH AND INSTALL NEW MEDICAL GAS OUTLETS AND MEDICAL VACUUM INLETS WITH
BACK BOXES, FACE PLATES AND ASSOCIATED PIPING INTO HEADWALL. INSTALL PER
MANUFACTURER'S INSTALLATION INSTRUCTIONS. SEE ARCHITECTURAL DRAWING ELEVATIONS
FOR HEADWALL AND MOUNTING HEIGHTS.
KEY NOTESX
Revisions: Date:
BID SET 05/01/2023