This document is a set of phasing plans for the expansion and renovation of the Emergency Department (ED) in Building 50 at the Southern Arizona VA Health Care System (SAVAHCS) in Tucson, Arizona.
The phasing plan outlines a pre-phase and two subsequent construction phases. The pre-phase involves modifications to the existing entry/waiting room to provide temporary access during Phase 1 construction. Phase 1 aims to construct a new entry drive, entrance registration, waiting area, triage rooms, security, exam rooms, and low acuity patient bays to create an operational ED. Phase 2 will add two isolation rooms, EMS storage, and a new ambulance entry. The phasing is subject to the contractor's means and methods, scheduling, and existing conditions. Strict infection control, interim life safety, and coordination with the VA's schedule must be maintained throughout the construction. Additional details are provided in the phasing plan and across various discipline-specific drawings.
This phasing plan supports the federal contract opportunity with Solicitation Number 36c77623r0191 to "Expand And Renovate Emergency Department - Tucson, Arizona 85723" for the Department of Veterans Affairs Technology Acquisition Center Austin.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WAITING
STAIR
SH2-50
CORRIDOR
1C1
TRAVEL DISTANCE TO EXIT = 130'-2"
TRAVEL DISTANCE
TO EXIT = 150-4"
STAIR
SH2-50
CORRIDOR
1C1
TRAVEL DISTANCE
TO EXIT = 150'-4"
PHASE 1 WALK-IN ENTRANCE
AMBULANCE ENTRANCE
TR
AV
EL
D
IS
TA
N C
E
TO
E
XI
T
LF
CURRENT PHASE
NOT INCLUDED IN
AREA OF WORK
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
BID SET
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
04/30/2024GENERAL - PHASING PLANS EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 CZ DTB
50-GC101
678-331
19-103
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
A
D D
E N
D U
M
N 1/16" = 1'-0"
PHASE 1
N 1/16" = 1'-0"
PHASE 2
PRE-PHASE 1 NOTES
PHASE 1 NOTES
PHASE 2 NOTES
A. A PRE-PHASE WILL BE REQUIRED PRIOR TO COMENCING PHASE 1 WORK.
B. PRE-PHASE 1 WILL REQUIRE MODIFICATIONS OF THE EXISTING ENTRY/WAITING ROOM TO
PROVIDE TEMPORARY ACCESS DURING PHASE 1 CONSTRUCTION.
C. REMOVAL OF EXISTING STOREFRONT WILL BE REQUIRED FOR A NEW TEMPORARY ENTRY DOOR
TO BE CONSTRUCTED ON THE SOUTH ELEVATION OF THE EXISTING WAITING ROOM # 105.
D. WITH ENTRY DOOR IN PLACE, CONSTRUCT AN INTERIOR BARRIER TO SEPARATE PHASE 1
DEMOLITION WHICH INCLUDES THE EXISTING ED VESTIBULE AND WAITING ROOM EAST WALL,
FROM THE EXISTING WAITING ROOM.
E. RELOCATE EXISTING WAITING ROOM DESK TO SOUTH FACE FOR TEMPORARY WALK-IN ENTRY TO
THE WAITING ROOM.
GENERAL PHASING NOTES
1. SAVAHCS WILL REQUIRE A MAXIMUM OF 28 CALENDAR DAYS BETWEEN PHASES TO MOVE INTO A
NEW SPACE AND OUT OF AN EXISTING SPACE FOR THE NEXT PHASE.
2. MAINTAIN EMERGENCY DEPARTMENT LOCK DOWN FEATURE DURING EACH PHASE.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR SEQUENCING AND COORDINATION OF
CONSTRUCTION PHASING WITH THE VA'S SCHEDULE, INFECTION CONTROL, AND INTERIM LIFE
SAFETY REQUIREMENTS. REFER TO SPECIFICATIONS FOR PROJECT GENERAL CONDITIONS,
INFECTION CONTROL, SPECIAL NOTES, PROJECT SCHEDULE, ETC. FOR ALL PROJECT
REQUIREMENTS.
4. CONTRACTOR SHALL PROVIDE ALL SUB-PHASING ACTIVITIES AS REQUIRED FOR WORK
OCCURRING BETWEEN VARIOUS PHASES.
5. THE PHASING PLAN IS NOT TO BE TAKEN AS AN ALL INCLUSIVE LIST OF ALL ITEMS TO BE
COMPLETED WITHIN A SPECIFIC OUTLINED PHASE. PLEASE REFER TO ALL DISCIPLINES AND
CONTRACT DOCUMENTS FOR ALL WORK ASSOCIATED IN THESE AREAS
6. THE PHASING PLAN IS SUBJECT TO THE CONTRACTORS MEANS AND METHODS, SCHEDULING
AND TO EXISTING CONDITIONS AND TIME RESTRAINTS.
7. CONTRACTOR SHALL REFER TO ALL DEMOLITION AND CONSTRUCTION DRAWINGS FOR A
COMPLETE UNDERSTANDING OF THE SPECIFIED SCOPE OF WORK.
8. CONTRACTOR SHALL MAINTAIN EGRESS PASSAGE WAYS MAIN CORRIDOR, ELEVATOR LOBBY
AND STAIR EXITS DURING COMPLETE PROJECT DURATION. ALSO MAINTAIN ALL EGRESS/EXIT
DOORS OF THE FACILITY.
9. CONTRACTOR SHALL REFER TO INFECTION CONTROL DRAWINGS AND SUGGESTED LOCATION OF
CONSTRUCTION BARRIERS AND ENTRANCES.
10. CONTRACTOR SHALL NOTE ALL EXISTING PLUMBING, MECHANICAL AND ELECTRICAL SERVICES
AND SYSTEMS THAT ARE SCHEDULED TO REMAIN FULLY OPERATIONAL AND FUNCTIONAL FOR
DURATION OF SPECIFIC PHASES.
11. CONTRACTOR SHALL NOTE THAT BUILDING 50 SHALL BE OCCUPIED DURING CONSTRUCTION.
12. HOURS OF OPERATION FOR NOISE AND VIBRATION OPERATIONS ARE DURING OFF NORMAL
HOSPITAL OPERATION HOURS (6:00PM TO 6:00AM). SERVICE INTERRUPTIONS DURING OFF
NORMAL WORK HOURS AND SCHEDULED MINIMUM (2) WEEK ADVANCED NOTICE.
13. WHERE TWO OR MORE SEQUENCES MEET IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
COORDINATE THE TRANSITION WORK BETWEEN SEQUENCES.
14. CONTRACTOR TO HAVE ALL MATERIALS AND EQUIPMENT ON SITE FOR THE COMPLETION OF ANY
WORK THAT IS DESIGNATED FOR OFF HOURS PRIOR TO THE START OF OFF HOURS WORK
15. PHASES TO BE PERFORMED IN SEQUENCE.
16. THE INTENT OF THE PHASING PLANS IS TO PROVIDE A MEANS BY WHICH THE EMERGENCY
DEPARTMENT REMAINS AVAILABLE AND FUNCTIONAL IN A LIMITED MANNER TO THE VETERANS.
17. PHASING IS SUBJECT TO THE CONTRACTORS MEANS AND METHODS, SCHEDULING AND TO
EXISTING CONDITIONS AND TIME RESTRAINTS.
18. PLEASE REFER TO EACH DISCIPLINES PHASING SHEETS FOR DISCIPLINE SPECIFIC NOTES AND
CONDITIONS WITHIN EACH PHASE. THERE ARE INSTANCES WHEN WORK WILL NEED TO BE
PERFORMED IN ACTIVE PARTS OF THE HOSPITAL TO ACCOMPLISH THE DESIRED INTENT WITHIN
THE PHASE. THIS WORK IS TO BE COMPLETED AFTER HOURS AND TO BE COORDINATED WITH
THE COR.
19. ADDITIONAL SHEETS ARE : 50-MC101, 50-MC102, 50-FX002, 50-FX003, 50-FX004, 50-P003, 50-P004, 50-P005, 50-P006, 50-P007, 50-P008, 50-MG-002 AND 50-MG004.
A. THE INTENT AT THE END OF PHASE 1 IS TO HAVE IN PLACE AN OPERATIONAL ED TO INCLUDE A NEW ENTRY DRIVE, ENTRANCE REGISTRATION, WAITING, 2 TRIAGE ROOMS, SECURITY, 10 EXAM
ROOMS AND 7 LOW ACUITY PATIENT BAYS.
B. PEDESTRIAN ACCESS TO THE EMERGENCY DEPARTMENT WILL BE FROM THE ALTERNATE ENTRY
CONSTRUCTED IN THE PRE-PHASE.
C. CANOPY WILL BE CONSTRUCTED WITHIN LIMITS OF PHASE 1
D. DURING PHASE 1 THE EXISTING AMBULANCE ENTRY WILL REMAIN.
E. DURING PHASE 1 A NEW VEHICULAR MANAGEMENT PLAN WILL BE IN PLACE DEDICATING A
TEMPORARY PARKING AND DROP OFF FOR WALK-INS IN THE EXISTING PARKING LOT SOUTH OF
BUILDING 50. A NEW PROTECTED SIDEWALK ACCESS WILL BE PROVIDED TO THE TEMPORARY ED
ENTRANCE.
F. DURING PHASE 1 CONSTRUCTION ONLY EMERGENCY VEHICLES WILL BE ALLOWED ACCESS TO
BUILDING 50.
G. DURING PHASE 1, PEDESTRIAN ACCESS WILL BE RESTRICTED TO THE EXTERIOR COURTYARD
FROM THE COFFEE SHOP AND THE BUILDING 80 CORRIDOR. DOORS SHOULD BE SECURED TO
LIMIT ACCESS.
A. PRIOR TO PHASE 2 CONSTRUCTION COMMENCING THE CONNECTION BETWEEN PHASE 1 AND THE EXISTING EMERGENCY DEPARTMENT WILL BE MADE SOUTH OF THE EXISTING STAIR SH2-50. THE
NEW ENTRANCE CONSTRUCTED IN PHASE 1 WILL BE OPENED FOR BOTH AMBULANCE AND WALK-
IN PATIENTS.
B. AMBULANCE VEHICLES TO UTILIZE THE NEW DROP OFF AND WALK INS ENTERING THE NEW
ENTRANCE FROM THE TEMPORARY ED PARKING SOUTH OF BUILDING 50.
C. PHASE 2 DEMOLITION OF SITE WORK AND EXISTING CANOPY
D. DURING PHASE 2 CONSTRUCTION EGRESS FROM EXISTING STAIR WILL BE REDIRECTED NORTH
VIA CORRIDOR 1C1
E. PHASE 2 SITE WORK AND PHASE 2 NEW CANOPY WILL BE CONSTRUCTED.
F. THE INTENT OF PHASE 2 IS TO HAVE CONSTRUCT 2 NEW ISOLATION ROOMS, EMS STORAGE AND
NEW AMBULANCE ENTRY. CONNECTION BETWEEN PHASE 1 AND PHASE 2 RENOVATION WILL BE
IN PLACE VIA CORRIDOR SOUTH OF EXISTING STAIR.
PHASING LEGEND
Revisions: Date:
BID SET 05/01/2023
ADDENDUM 1 04/30/2024
-RFI #12
| Sheets |
| 50-GC101 - GENERAL - PHASING PLANS |
File details come from the government source that posted it. Updated .