50-EP101.pdf
PDF 2 MB Posted
- Attached to
- Y1DA--Expand and Renovate Emergency Department B50 Minor Construction - Tucson VAMC (VA-24-00001448)
- Solicitation number
- 36c77623r0191
About this file
This document appears to be the electrical drawings and specifications for the Expand and Renovate Emergency Department B50 project at the Tucson VA Medical Center. The drawings provide detailed information on the electrical system design, including power distribution, lighting, HVAC controls, medical gas alarms, and other electrical requirements for the renovation and expansion of the emergency department.
Key details include the phasing plan for the project, requirements for maintaining the existing emergency department operations during construction, electrical panel and feeder information, GFCI receptacle locations, power and lighting for exam rooms and medical equipment, coordination with other trades, and various notes and specifications for the electrical work. The document also references related drawings and documents, such as the statement of work, door schedules, and mechanical/plumbing plans. Overall, this set of electrical plans and specifications provides comprehensive technical guidance for the electrical construction aspects of this VA facility renovation project.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T V
MN
MNMN
MN
MN
MN
MN
MN
MN
MN
TVTVTVTV
T V
T V
T V
T V
TV TV TV TV TV TV TV
TV
T V
TV
TV
TV
TV TV
TVTV
TV
TV
1 3 4
6 7 82
CLEAN
SUPPLY
EXAM/
TREATMENT
EXAM/
TREATMENT
(FAST
TRACK)
HAC
SECURITY
STATION
RECEPTION
WAITING
AOD
SUPPORT
TRIAGE
TRIAGE
TOILET
(STAFF)
1005 STORAGE-
AOD
PIT
CONSULT
SOILED
UTILITY
EXAM/
TREATMENT
(LOW
ACUITY)
1026D
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
(ISOLATION)
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
OIT COMM
CLOSET
EXAM/
TREATMENT
EXAM/
TREATMENT
1058EXAM/
TREATMENT
(MENTAL
HEALTH)
EXAM/
TREATMENT
(MENTAL
HEALTH)
STORAGE
TOILET
(MENTAL
HEALTH)
EXAM/
TREATMENT
(MENTAL
HEALTH)
EXAM/
TREATMENT
(MENTAL
HEALTH)
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
(WOMENS
HEALTH)
TOILET
(PATIENT)
ALCOVE-
IMAGING
C5A
RADIOLOGY
SOILED
UTILITY
CT
CT
CONTROL
PROCEDURE
PROCEDURE
MECHANICAL
(E)
ELECTRICAL
(E)
BIOMED
COMM
CLOSET
(E)
113B
EMS
SUPPORT
EXAM/
TREATMENT
(ISOLATION)
ANTEROOM
ALCOVE-
OMNICELL
MEDS
NURSE
STATION-
NORTH
COLLABORATION
NURSE
STATION-
SOUTH
STORAGE-
EMS
DECONTAMINATION
TOILET
(STAFF)
TOILET
(ISOLATION
PATIENT)
1032A
TOILET
(ISOLATION
PATIENT)
1036A
TOILET
(PATIENT/CHILD)
CLEAN
LINEN
MEDS
VESTIBULE
1V1
EXAM/
TREATMENT
(LOW
ACUITY)
1026A
EXAM/
TREATMENT
(LOW
ACUITY)
1026B
EXAM/
TREATMENT
(LOW
ACUITY)
1026C
EXAM/
TREATMENT
(LOW
ACUITY)
1026E
EXAM/
TREATMENT
(LOW
ACUITY)
1026F
EXAM/
TREATMENT
(LOW
ACUITY)
1026G
E L
E C
T R
IC
A
L
CORRIDOR
C2
CORRIDOR
C11
NOURISHMENT
G
FC
I
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
EXAM/
TREATMENT
(FAST
TRACK)
AMBULANCE
VESTIBULE
1V2
STORAGE-
OXYGEN
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
G
FC
I G
FC
I
GFCI
GFCI GFCI
GFCI GFCI
GFCI
GFCI
GFCI
GFCI
GFCI GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
G
FC
I
GFCI GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI GFCI
GFCI GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
G
FC
I
G
FC
I
G
FC
I
G
FC
I
G
FC
I
G
FC
I
NL1AIG
NL1BIG
NL2AIG
NL1A
EL1EB
EL1B
EL1A
EL1AIG
EH1LS
NL1B
NEW TAP
BOX
50-EP105
50-EP105
4 50-EP105
50-EP105
1 50-EP103
50-EP105
SPLIT A/C UNIT
DFSS-1025
G
FC
I
GFCI
GFCI
G
FC
I G
FC
I
XRAY, CT
N
LD
B
E T
ID
N
LD
B
PNL-EHDB-LS
PNL-EHDB-EQ
F
E
D
C
I
H
J
G
CORRIDOR
C9
CORRIDOR
C4
CORRIDOR
C8
CORRIDOR
C6
CORRIDOR
C3
STAIR
SH2-50
C O
R R
ID
O
R C
C O
R R
ID
O
R C
CORRIDOR
C13
CORRIDOR
C12
NURSE
STATION-
EAST
TOILET
(PUBLIC)
1001B
TOILET
(PUBLIC)
1001A
C O
R R
ID
O
R C
CORRIDOR
C14
CORRIDOR
C1
NORTH AREA CONDUITS
SOUTH AREA CONDUITS
SOUTH AREANORTH AREA
PNL: EL1B, CKT-1
PNL: EL1B, CKT-1
PNL: EL1B, CKT-1
PNL: EL1B, CKT-1
PNL: EL1B, CKT-2
PNL: EL1B, CKT-2
PNL: EL1B, CKT-2
PNL: EL1B, CKT-2
CORRIDOR
C7
PNL: EL1B, CKT-3
PNL: EL1B, CKT-3
PNL: EL1B, CKT-2
PNL: EL1B, CKT-1
PNL: EL1B, CKT-1
VAV-5-1021
VAV-5-1018
VAV-5-1015
VAV-5-1014
VAV-5-1002
VAV-5-1009
VAV-5-1008
VAV-5-1033
VAV-5-1032
VAV-5-1034
VAV-5-1036
VAV-5-1031
VAV-5-1029
VAV-5-1038
VAV-5-1065
VAV-5-1041VAV-5-1042
VAV-5-1045
VAV-5-1044
VAV-5-1064
VAV-5-1060
VAV-5-1048
VAV-5-1050
VAV-5-1046
VAV-5-1053
VAV-5-1056
VAV-5-1059
VAV-5-1023
VAV-5-1026
VAV-5-1001C
VAV-5-1001A
VAV-5-1001B
PNL: EL1B, CKT-34
PNL: EL1B, CKT-35
PNL: EL1B, CKT-41
PNL: EL1B, CKT-42
PNL: EL1B, CKT-43
PNL: EL1B, CKT-47
PNL: EL1B, CKT-48
PNL: EL1B, CKT-49
PNL: NL2AIG, CKT-1
PNL: NL2AIG, CKT-3
PNL: NL2AIG, CKT-4
PNL: NL2AIG, CKT-5
PNL: NL2AIG, CKT-6 PNL: NL2AIG, CKT-7
PNL: NL2AIG, CKT-8
PNL: NL2AIG, CKT-9
PNL: NL2AIG, CKT-10
PNL: NL2AIG, CKT-12
PNL: NL2AIG, CKT-11
PNL: NL2AIG, CKT-13
PNL: NL2AIG, CKT-14
PNL: EL1B, CKT-51
PNL: EL1B, CKT-53
PNL: NL1A, CKT-23
PNL: NL1A, CKT-24
PNL: NL1A, CKT-25 PNL: NL1A, CKT-26
PNL: NL1A, CKT-28
PNL: NL1A, CKT-27
AHU-19
VF
D
VF
D
RELOCATED OUTDOOR LIGHT DISCONNECT
VAV-5-1061
VAV-5-1035
VAV-5-1027
PNL: EL1B, CKT-3
50-EP104
PNL: NL1A, CKT-29
1V 1B
1V 1A
1V 2A
1V
B
C
B
C14
PNL: EL1EB, CKT-41
PNL: EL1EB, CKT-40
PNL: EL1EB, CKT-43
PNL: EL1EB, CKT-42
PNL: EL1EB, CKT-45
PNL: EL1EB, CKT-44
PNL: EL1EB, CKT-46
PNL: NL1B, CKT-19
PNL: EL1EB, CKT-37
PNL: EL1B, CKT-2
PNL: EL1B, CKT-3
PNL: EL1B, CKT-3
PNL: EL1B, CKT-3
PNL: EL1B, CKT-4
PNL: EL1B, CKT-4
PNL: EL1B, CKT-4
PNL: EL1B, CKT-4
PNL: EL1B, CKT-4
PNL: EL1B, CKT-4
PNL: EL1B, CKT-5
PNL: EL1B, CKT-5
PNL: EL1B, CKT-5
PNL: EL1B, CKT-5
PNL: EL1B, CKT-5
PNL: EL1B, CKT-5
PNL: EL1B, CKT-6
PNL: EL1B, CKT-6
PNL: EL1B, CKT-6
PNL: EL1B, CKT-6
PNL: EL1B, CKT-6
PNL: EL1B, CKT-6
PNL: NL2AIG, CKT-30
PNL: NL2AIG, CKT-31
PNL: NL2AIG, CKT-32
PNL: NL2AIG, CKT-33
GFCI
PNL: NL2AIG, CKT-34
PNL: EL1B, CKT-37
PNL: EL1B, CKT-38
PNL: EL1B, CKT-40
PNL: EL1B, CKT-44
PNL: EL1B, CKT-46
GFCI
PNL: NL1A, CKT-34
PNL: EL1B, CKT-7
PNL: NL2AIG, CKT-2
M
M
PNL: EL1EB, CKT-30, 32
RELOCATED
POWER
SUPPLY
SF-1-1
SF-1-2
4 # 12 & 1 # 12G, 3/4 IN. C.
(2) CONDUITS
(1) 4 # 2 & 1 # 8G, 1-1/4 IN. C., ROOM 1046 X-RAY
(1) 4 # 3/0 & 1 # 6G, 2 IN. C., ROOM 1044 CT
EAV-1032
EAV-1036
PNL: EL1EB, CKT-47
PNL: NL2AIG, CKT-35
PNL: NL2AIG, CKT-36
GFCI
PNL: EL1B, CKT-8
PNL: EL1B, CKT-57
PNL: EL1B, CKT-9
PNL: EL1B, CKT-10
VAV-5-1006
20 20
PNL: EL1EB, CKT-49
PNL: EL1EB, CKT-48
PNL: EL1EB, CKT-51
PNL: EL1EB, CKT-50
1035A
C1C
1006A
1008A
1003A
1002B
B80
PNL: EL1EB, CKT-52
A. FOLLOW PHASING PLAN FOR SEQUENCING THE PROJECT WORK.
B. EXISTING EMERGENCY DEPARTMENT MUST STAY OPERATIONAL UNTIL NEW SECTION IS
CONSTRUCTED AND MADE OPERATIONAL.
C. CONTRACTOR TO FOLLOW VA SAFETY RULES AND LOCK-OUT-TAG-OUT RULES.
D. COMMUNICATE OUTAGES TO THE VA COR TWO WEEKS PRIOR TO PERFORMING THE OUTAGE.
E. PERFORM WORK INDICATED ON 50-EP103 PRIOR TO PERFORMING ANY DEMOLITION WORK IN
THE EMERGENCY DEPARTMENT. NOTE THAT THE WORK ON 50-EP103 WILL INSTALL NEW
BRANCH PANELS TO INITIALLY FEED THE NEW BUILDOUT, THEN WHEN THE NEW BUILDOUT IS
OPERATIONAL, THESE SAME NEW BRANCH PANELS WILL FEED THE REMODELED AREA IN THE
EXISTING AREA.
F. THE NEW BRANCH PANELS WILL BE FEED FROM EXISTING FEEDER PANELS IN ELECTRICAL
CLOSET 114. WHEN PLANNING TO FEED THE NEW BRANCH PANELS, SEE SINGLE LINE
DRAWINGS TO DETERMINE WHICH FEEDER PANEL FEEDS THE BRANCH PANELS, AND EXTENT
OF OUTAGE WHEN THE FEEDER PANEL IS DE-ENERGIZED.
a. DISTRIBUTION PANEL SES-1 POWERS BRANCH PANEL NH1A: DRAWING 50-E500-718.
b. FEEDER PANEL NLDB1 POWERS BRANCH PANELS NL1A AND NL1B: DRAWING 50-E500-718.
c. FEEDER PANEL EHDBEQ POWERS BRANCH PANEL EL1EB.
d. FEEDER PANEL EHDB-LS POWERS BRANCH PANELS EL1A, EL1B, EL1AIG AND EH1LS.
e. FEEDER PANEL NLDB2 POWERS BRANCH PANELS NL1AIG, NL1BIG, NL2AIG AND NL2BIG.
G. CONTRACTOR TO FOLLOW NEC 110.26 EXCLUSION SPACE REQUIREMENTS FOR ELECTRICAL
EQUIPMENT.
H. CONTRACTOR TO PROVIDE COMMON GROUND TO ALL BRANCH PANELS THAT PROVIDE POWER
TO HEADWALLS. SEE DRAWING 50-EP103 FOR DETAILS.
I. VA PROCURED FURNITURE WILL BE INSTALLED AROUND THE PERIMETER OF THE NURSE
STATIONS. CONDUITS NEED TO BE ROUTED DOWN COLUMNS, OR INSTALLED ON A POWER
POLE, TO REACH THE FURNITURE BELOW. SEE ARCHITECTURAL DRAWINGS 50-A101.1 AND 50-
A101.3, AND KEY NOTES 4, 5 AND 6 FOR CLARITY. ALSO PROVIDE 4X4 JUNCTION BOXES AT
BOTTOM OF THESE LOCATIONS, AT HEIGHT TO FEED THE VA PURCHASED FURNITURE.
J. CONTRACTOR TO SELECT A POWER POLE THAT ACCOMMODATES BOTH POWER AND DATA
REQUIREMENTS. COLOR SHOULD BE “POWDER COATED” AND CLOSELY MATCH THE VA
PROVIDED FURNITURE FINISH.
K. REFER TO FOLLOWING FOR EXAM ROOMS’ WIRING:
a. SEE DRAWING 50-E600 FOR EXAM ROOM WIRING SCHEDULES (INCLUDES PATIENT
HEADWALLS).
b. SEE DRAWING 50-E404 FOR HEADWALL POWER DETAILS.
c. SEE DRAWING 50-E501 FOR WIRING PRIVACY GLASS IN THE EXAM ROOM DOORS.
L. PROVIDE LEVITON DECORA HOSPITAL GRADE RECEPTACLES.
M. SEE DRAWING E002 FOR SYMBOL LEGENDS.
N. SEE DRAWING SERIES 50-E600 FOR PANEL SCHEDULES.
O. SEE DRAWING SERIES 50-E600 FOR WIRE MOLD SPECIFICATIONS.
P. SEE DRAWING 50-A601 FOR DOOR SCHEDULES.
Q. SEE DRAWING 50-ET501 FOR TYPICAL DOOR DETAILS.
R. PROVIDE 4x4 JUNCTION BOX WITH 120V EMERGENCY POWER FOR POWER SUPPLY ABOVE
DOORS. SEE HARDWARE SCHEDULE ON DRAWING 50-A601.
S. SEE DETAIL 1 ON DRAWING 50-EP104 FOR POWER AND LIGHTING CIRCUITS IN OIT COMM
CLOSET 1025. NOTE THAT CIRCUIT NUMBERS ARE LISTED ON THAT DETAIL. SEE DETAIL 2, 3 ON
DRAWING EP104 FOR WIRING DFS-1025 EVAPORATOR AND CONDENSER TO ONE POWER
SOURCE.
T. SEE ET DRAWINGS 50-ET101 FOR “QUAD WALL PLATE” FOR POWERING TV MONITORS.
U. INSTALL GFCI RECEPTACLES AT END OF BRANCH CIRCUIT TO PREVENT OTHER RECEPTACLES
FROM BEING ON GFCI. INSTALL GFCI’S WITHIN 6 FT OF SINKS. NO GFCI’s ON HEADWALLS.
V. ALL EXAM ROOMS WIRING IS SHOWN ON SCHEDULE DRAWING 50-EP600, DUE TO THE DENSITY
OF DETAILS. ALL OTHER WIRING IS SHOWN ON INDIVIDUAL DRAWINGS.
W. COORDINATE WITH MECHANICAL MEDICAL GAS CONTRACTOR TO RUN THREE 24V SIGNAL
WIRES/CONDUITS FROM MEDICAL GAS PRESSURE TRANSMITTERS ZVB-1 (CL. F – 3) AND ZVB-2 (CL. H – 6.3) TO TWO MONITOR PANELS AT NURSING STATION SOUTH RM 1065 (BETWEEN D – E &
5 – 6). COORDINATE WITH NURSE STAFF FOR EXACT LOCATION ON HARD WALL BETWEEN
ROOMS 1064 AND 1065. SEE DRAWING 50-MG100 FOR PRESSURE TRANSMITTER LOCATIONS.
X. COORDINATE WITH SWISSLOG CONTRACTOR TO ROUTE POWER TO THE RECESSED STATIONS
AND TRANSFER UNIT. SEE DRAWINGS PT-300 – 302, AND KEY NOTES 7 AND 8 BELOW FOR
DETAILS.
Y. NOTE THAT VAV’S ARE 120V EACH WITH FUSED DISCONNECTS, AND THAT ONE CIRCUIT FEEDS
MULTIPLE VAV’S. THE COMMON CIRCUIT IS SHOWN, BUT THE “JUMPERS” BETWEEN COMMON
VAV’S ARE NOT SHOWN.
Z. NOTE THAT NORTH AREA AND SOUTH AREA CONDUITS WILL NEED TO BE INSTALLED IN PHASE 1.
1. SOUTH AREA CONDUITS WILL HAVE ABOUT 200 INDIVIDUAL CONDUCTORS. EMERGENCY AND
NORMAL POWER MUST BE IN SEPARATE CONDUITS. BASED ON FIELD CONDITIONS AND NEC
CODE, CONTRACTOR TO DETERMINE QUANTITY OF CONDUITS FOR THIS RUN. INSTALL PULL
BOXES AT ENDS OF EACH CONDUIT TO DISTRIBUTE CIRCUITS TO THEIR END POINTS.
CONTRACTOR TO DETERMINE SIZE OF PULL BOXES BASED ON FIELD CONDITIONS.
2. NORTH AREA CONDUITS WILL HAVE ABOUT 700 INDIVIDUAL CONDUCTORS. EMERGENCY AND
NORMAL POWER MUST BE IN SEPARATE CONDUITS. BASED ON FIELD CONDITIONS AND NEC
CODE, CONTRACTOR TO DETERMINE QUANTITY OF CONDUITS FOR THIS RUN. INSTALL PULL
BOXES AT ENDS OF EACH CONDUIT TO DISTRIBUTE CIRCUITS TO THEIR END POINTS.
CONTRACTOR TO DETERMINE SIZE OF PULL BOXES BASED ON FIELD CONDITIONS.
3. ELECTRICAL CONDUITS DROP FROM ABOVE, INSIDE WALL.
4. ADD 4X4 JUNCTION BOX IN WALL, LEVEL WITH FURNITURE TO FEED FURNITURE IN MIDDLE OF
ROOM.
5. INSTALL PRIVACY GLASS POWER PACK AND 15A GFCI AT END OF OVERHEAD CIRCUIT, ABOVE
HINGED SIDE OF DOOR TO POWER PRIVACY GLASS. INSTALL ON / OFF SWITCH ON OPPOSITE
SIDE OF DOOR INSIDE ROOM. (THIS IS A NORMAL SWITCH NOT ELECTRONIC).
6. INSTALL “POWER POLE” TO CONTAIN THE CONDUIT TO FEED RECEPTACLES BELOW.
7. INSTALL (2) INDIVIDUAL CIRCUITS IN CEILING WITH 15A DISCONNECTS TO POWER SWISSLOG
RECESSED STATIONS #108 AND #118. FEED EACH CKT FROM 15A BREAKERS ON PANEL EL1B.
8. INSTALL INDIVIDUAL CIRCUIT WITH 15A DISCONNECT TO POWER SWISSLOG TRANSFER UNIT #
107. FEED CKT THROUGH 15A BREAKER ON PANEL EL1B.
9. RUN NEW CONDUIT AND WIRING TO TWO NEW SUPPLY FANS IN AHU-1 (SF-1-1 AND SF-1-2)
FROM NEW VFD’S ON WALL.
10. REUSE CONDUIT (SEE DRAWING 50-EPD101) RUN TWO NEW 20A CIRCUITS TO VFD’S-SF-1-1 AND
SF-1-2 FOR AHU-1.
11. INSTALL NEW PANEL X-RAY, CT (SEE DRAWING 50-EP103 FOR MORE DETAIL).
12. RUN ¾” C, 120V TO DOOR OPERATORS AND POWER SUPPLIES ON DOORS: 1V1A, 1V1B, 1V2A, 1V2B, 1000 GATE, 1003, 1008A, C7B AND C14. SEE DETAIL 1 ON DRAWING 50-ET503.
13. INSTALL TWO MED GAS ALARM PANELS ON HARD WALL IN NURSE STSTION SOUTH RM 1065.
MED GAS CONTRACTOR WILL PROVIDE ALARM PANELS. SEE GENERAL NOTE “X” FOR MORE
DETAIL.
14. INSTALL DEDICATED 20A DUPLEX GFCI RECEPTACLE FOR UNDERCOUNTER ICE MAKER AND
REFRIGERATOR.
15. INSTALL DEDICATED 20A DUPLEX GFCI RECEPTACLE FOR UNDERCOUNTER ICE MAKER AND
REFRIGERATOR.
16. INSTALL ABOVE CEILING J-BOX AND POWER POLE TO BRING POWER DOWN TO FURNITURE
BELOW.
17. RECEPTACLE LOCATED 44 INCH ABOVE FFL.
18. INSTALL 24V POWER SUPPLY TO POWER EAV-1032 AND EAV-1036 FOR ISOLATION ROOMS.
19. CONTRACTOR TO INSTALL X-RAY ROOM AND CT ROOM CONDUITS TO “NEAR” FINAL LOCATION
IN ROOMS 1044 AND 1046. FINAL LOCATIONS IN EACH ROOM WILL BE DETERMINED AFTER VA
SELECTS THE EQUIPMENT MANUFACTURER’S. EACH CONDUIT SHALL BE SEPARATE FROM
XRAY / CT PANEL TO JUNCTION BOXES.
20. RUN ¾” C, 120V TO POWER SUPPLIES ON DOORS/ROOMS: 1061, 1043, 1035, 1035A, C1A, C1C, 1027, 1025, 1006A, 1003A, 1011, 1002A AND 1002B. SEE DETAIL 1 ON DRAWING 50-ET503.
21. RUN ¾” C, 120V TO POWER SUPPLIES TO DOOR B80. RUN 2#8 & 1#10G, FOR THIS 304 FT RUN.
SUGGEST CORRIDORS C4, C7 AND 1C2.
o n e e ig h th i n c h o n e fo o t th re e i n c h e s o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t o n e i n c h o n e fo o t th r e e q u a rt e rs i n c h o n e fo o t o n e h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t o n e q u a r te r i n c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
BID SET
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
04/30/2024ELECTRICAL - FIRST FLOOR
POWER PLAN NEW
EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 WG BX
50-EP101
678-331
19-103
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
A
D D
E N
D U
M
N 1/8" = 1'-0"
ELECTRICAL - FIRST FLOOR POWER PLAN NEW
GENERAL NOTES
KEY NOTES
0 4' 8' 16'
Revisions: Date:
BID SET 05/01/2023
ADDENDUM 1 04/30/2024
File details come from the government source that posted it. Updated .