Attachment 16 - Drawings Part-15.pdf
PDF 15 MB Posted
- Attached to
- Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
- Solicitation number
- 36C77623R0009
About this file
This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, building renovation including demolition, construction and finishes, data center renovation, physical security improvements, fiber infrastructure assessment and upgrades between buildings, installation of a diversified path to the datacenter for the WAN, and hazardous material abatement. The project involves construction and renovation activities in buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 50
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tectonic Copyright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
UP
UP
UP
DN
F E
C F
E C
FEC
F E
C
F E
C
F E
C
F E
C
FEC
FEC
FEC
FEC
F E
C
DATA
SYSTEMS
1C132
DATA
TECH
1C133
CORRIDOR
C1-57
BREAKDOWN,VERIFICATION
INVENTORY
1C135
DATA, SYSTEM
1A130
85 SF
DATA, TECH
1A129
CORE LAB
1A126
S S
SS
Mo
1B104
8.3
TYP
TR
1B104
110 SF
E
8.2
PANEL
TELEPHONE
TERMINAL
BOARD
TELEPHONE
TERMINAL BOARD
8.3
55-1B104A-2 55-1B104A-2
55-1B104A-2
55-1B104B-2
55-1B104B-2 55-1B104B-2
55-1B104B-2
55-1B104A-2
55-1B104A-1,3,5
55-1B104B-1,3,5
TR
1B104
110 SF
55-AC-3-1B104
DATA RACK,
TYP. EP502
E
8.2
PANEL
55-DP-TRA
55-DP-TRB
TELEPHONE
TERMINAL
BOARD
TELEPHONE
TERMINAL BOARD
8.3 8.5
55-1B104A-4
L1 L1
L1 L1
DATA RACK,TYP
TR
1B104
110 SF
E
8.2
PANEL
55-1B104A
55-1B104AB
B
8.3 8.5
TYP
TR
1B104
110 SF
E
8.2
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR
ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
- AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
55EP401b
BLDG 55 - FLOOR 1 - ENLARGED
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
1/2" = 1'-0"55EP101b
1 RM 1B104 - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"55EP101b
2 RM 1B104 - ELECTRICAL PLAN
1/2" = 1'-0"55EP101a
4 RM 1B104 - LIGHTING PLAN
KEY NOTES
KEY PLAN
0' 2' 4' 8'
0' 2' 4' 8'
0' 2' 4' 8'
0' 2' 4' 8' 1/2" = 1'-0"55EP101a
3 RM 1B104 - DEMOLITION LIGHTING PLAN
SOURCE A POWER PANELBOARD "55-1B104A".
SOURCE B POWER PANELBOARD "55-1B104B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
GENERAL NOTES
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
LRL/WNM LLT/JPS
T ectonic Cop yright 2007
Tectonic Copyright 2007
Tectonic Copyright 2007
UP
UP
UP
DN
S
S
Mo
S S
1C132
TYP
TR
1C132
96 SF
L
TELEPHONE
TERMINAL BOARD
55-1C132B-2
55-1C132B-2
55-1C132A-2
55-1C132A-2
55-1C132A-2
55-1C132A-2
55-1C132B-2
55-1C132B-2
55-1C132A-1,3,5
55-1C132B-1,3,5
DATA RACK
55-AC-2-1C132
TR
1C132
96 SF
EP502
LTELEPHONE TERMINAL
BOARD
55-DP-TRA
55-DP-TRB
TYP
B
TR
1C132
96 SF
L
55-1C132A-4
L1
L1
TR
1C132
96 SF
DATA RACK,
TYP.
L1 L1
L 55-1C132A
55-1C132B
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR
ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
- AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
55EP401c
BLDG 55 - FLOOR 1 - ENLARGED
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
1/2" = 1'-0"55EP101b
1 RM 1C132 - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"55EP101b
2 RM 1C132 - ELECTRICAL PLAN
1/2" = 1'-0"55EP101a
3 RM 1C132 - DEMOLITION LIGHTING PLAN
1/2" = 1'-0"55EP101a
4 RM 1C132 - LIGHTING PLAN
KEY NOTES
KEY PLAN
0' 2' 4' 8'
0' 2' 4' 8' 0' 2' 4' 8'
0' 2' 4' 8'
SOURCE A POWER PANELBOARD "55-1C132A".
SOURCE B POWER PANELBOARD "55-1C132B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
GENERAL NOTES
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
S S
SS
Mo
2A136
F
TYP
TR
2A136
85 SF
F
TR
2A136
85 SF
3 2
55-2A136A-2 55-2A136A-2
55-2A136A-2
55-2A136B-2 55-2A136B-2
55-2A136A-2
55-2A136B-255-2A136B-2
55-2A136A-1,3,5
55-2A136B-1,3,5 55-AC-3-2A136
DATA RACK,
TYP.EP502
F
55-DP-TRA
55-DP-TRB
B
TR
2A136
85 SF
TYP
F
55-2A136A-4
L1
L1
L1
L1
TR
2A136
85 SFDATA RACK,
TYP.
F
55-2A136A
55-2A136B
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR
ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
- AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
55EP402a
BLDG. 55 - FLOOR 2 - ENLARGED
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
1/2" = 1'-0"55EP102a
1 RM 2A136 - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"55EP102a
2 RM 2A136 - ELECTRICAL PLAN
1/2" = 1'-0"55EP102a
3 RM 2A136 - DEMOLITION LIGHTING PLAN 1/2" = 1'-0"55EP102a
4 RM 2A136 - LIGHTING PLAN
GENERAL NOTES
KEY PLAN
KEY NOTES
Revisions: Date:
0' 2' 4' 8' 0' 2' 4' 8'
0' 2' 4' 8'
0' 2' 4' 8'
SOURCE A POWER PANELBOARD "55-2A136A".
SOURCE B POWER PANELBOARD "55-2A136B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
GENERAL NOTES
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
UP
DN
UP
DN
UP
DN
DATA
TECH
2C145
DATA
TECH
2A136
CORRIDOR
C2-12
DATA
SYSTEM
2A135
INTAKE/EXIT
2A137
S S
SS
Mo
2C144
TYP
TR
2C144
101 SF
LTELEPHONE
TERMINAL BOARD
TELEPHONE
TERMINAL BOARD
B
TYP
TR
2C144
101 SF
L
TR
2C144
101 SF
55-2C144A-4L1 L1
L1 L1
DATA RACK,
TYP
L
55-2C144A 55-2C144B
1 2
55-2C114A-2 55-2C114A-2
55-2C114A-2
55-2C114A-2
55-2C114B-2 55-2C114B-2
55-2C114B-2 55-2C114B-2
55-2C114A-1,3,5
55-2C114B-1,3,5
TR
2C144
101 SF
DATA RACK,
TYP.
55-AC-3-2C144
EP502
L
55-DP-TRB55-DP-TRA
TELEPHONE
TERMINAL BOARD
TELEPHONE
TERMINAL BOARD
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR
ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
- AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
55EP402b
BLDG. 55 - FLOOR 2 - ENLARGED
ELECTRICAL PLANSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
KEY PLAN
KEY NOTES
1/2" = 1'-0"55EP102b
1 RM 2C144 - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"55EP102a
3 RM 2C144 - DEMOLITION LIGHTING PLAN
1/2" = 1'-0"55EP102a
4 RM 2C144 - LIGHTING PLAN
1/2" = 1'-0"55EP102b
2 RM 2C144 - ELECTRICAL PLAN
0' 2' 4' 8'
0' 2' 4' 8'0' 2' 4' 8'
0' 2' 4' 8'
SOURCE A POWER PANELBOARD "55-2C144A".
SOURCE B POWER PANELBOARD "55-2C144B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
GENERAL NOTES
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
S S
M o
DN
DN
UP
DN
DN
29' - 4"
4' - 0"
TR
3A120
85 SF
TYP
F
TELEPHONE
TERMINAL
BOARD
F
TR
3A120
85 SF
55-3A120A-2 55-3A120A-2
55-3A120B-2
55-3A120B-2
55-3A120B-2
55-3A120B-2
55-3A120A-1,3,5 55-3A120B-1,3,5
DATA RACK,
TYP.
55-AC-3-3A120
55-3A120B-2
EP502
55-DP-TRB
55-DP-TRA
TELEPHONE
TERMINAL
BOARD
B
TYP
TR
3A120
85 SF
F
TR
3A120
85 SF
L1 L1
L1L1
DATA RACK,
TYP.
55-3A120A-4
F
55-3A120A
55-3A120A
3A120
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR
ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
- AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
55EP403a
BLDG. 55 - FLOOR 3 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
1/2" = 1'-0"55EP103a
1 RM 3A120 - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"55EP103a
2 RM 3A120 - ELECTRICAL PLAN
1/2" = 1'-0"55EP103a
3 RM 3A120 - DEMOLITION LIGHTING PLAN
1/2" = 1'-0"55EP103a
4 RM 3A120 - LIGHTING PLAN
KEY PLAN
KEY NOTES
Revisions: Date:
0' 2' 4' 8' 0' 2' 4' 8'
0' 2' 4' 8' 0' 2' 4' 8'
SOURCE A POWER PANELBOARD "55-3A120A".
SOURCE B POWER PANELBOARD "55-3A120B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
GENERAL NOTES
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
UP
DN
DN
29' - 4"
4' - 0"
S
S
SS
Mo
3C149
L
TR
3C149
100 SF
TYP
L
PATCH PANEL
ACCESS
DOOR
CONTROLLER
ACCESS POWER
CONTROLLER
PANEL
ACCESS
DOOR
CONTROLLER
ACCESS POWER
CONTROLLER
PANEL
PANEL BOARD
FIRE ALARM
PANEL
L
TR
3C149
100 SF
55-3C149B-2
55-3C149A-2
55-3C149B-2
55-3C149A-1,3,5
55-3C149B-1,3,5
55-AC-3-3C149
55-3C149A-2
55-3C149B-2
DATA
RACK,
TYP.
EP502
L
ACCESS DOOR
CONTROLLER
ACCESS DOOR
CONTROLLER
PANELBOARD
FIRE
ALARM
PANEL
ACCESS POWER
CONTROLLER
PANEL
PATCH PANEL
ACCESS POWER
CONTROLLER
PANEL
55-DP-TRB
55-DP-TRA
L
TR
3C149
100 SF
B
TYP
L
TR
3C149
100 SF
55-3C149A-4
L1
L1
L1 L1
DATA RACK,
TYP.
L
55-3C149A
55-3C149B
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR
ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
- AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
55EP403b
BLDG. 55 - FLOOR 3 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
KEY PLAN
KEY NOTES
1/2" = 1'-0"55EP103b
1 RM 3C149 - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"55EP103b
2 RM 3C149 - ELECTRICAL PLAN
0' 1' 2' 4'0' 1' 2' 4' 0' 1' 2' 4'
0' 1' 2' 4'0' 1' 2' 4'
1/2" = 1'-0"55EP103a
3 RM 3C149 - DEMOLITION LIGHTING PLAN
1/2" = 1'-0"55EP103a
4 RM 3C149 - LIGHTING PLAN
GENERAL NOTES
SOURCE A POWER PANELBOARD "55-3C149A".
SOURCE B POWER PANELBOARD "55-3C149B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
55-CU-3-1A129
55-CU-3-2A136
55-CU-3-3A120
55-1A129A-6,8
55-2A136A-6,8
55-3A120A-6,8
EP503
TYP
F
8.3 8.5
55-CU-3-1B104
55-1B104A-6,8
EP503
TYP
F
E
8 8.2
55-CU-2-1C132
55-CU-3-2C144
55-CU-3-3C149
55-1C132A-6,8
55-2C144A-6,8
55-3C149A-6,8
EP503
TYP
L
55-CU-3-1A129
55-CU-3-2A136
55-CU-3-3A120
55-CU-3-1B104
55-CU-3-1C132
55-CU-3-2C144
55-CU-3-3C149
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR
SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED
CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH
DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,
AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL
LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER
INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF
DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY
POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.
POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND
SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN
SHALL CONFORM WITH VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR
ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
- AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
55EP404
BLDG 55 - ENLARGED ROOF
PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM INFRASTRUCTURE
UPGRADES
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
Revisions: Date:
KEY PLAN
GENERAL NOTES
KEY PLAN
KEY NOTES
GENERAL NOTES
- 1/2" = 1'-0"
1 BLDG 55 - ENLARGED ROOF PLAN - VIEW 1
- 1/2" = 1'-0"
3 BLDG 55 - ENLARGED ROOF PLAN - VIEW 3
- 1/2" = 1'-0"
2 BLDG 55 - ENLARGED ROOF PLAN - VIEW 2
0' 1' 2' 4'
0' 1' 2' 4'
0' 1' 2' 4'
1 PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT
AS REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH
MECHANICAL CONTRACTOR AS REQUIRED.
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
S
Mo
S S
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
BA105
5.5
E
TR
BA 105
76 SF
5.5
COMBINER & SPLITTER
FIBER OPTIC
TELEPHONE
TERMINAL
BOARD
TYP TR
BA 105
76 SF
56-BA105A-2
56-BA105A-2
56-BA105A-2
56-BA105B-2
56-BA105B-2
56-BA105B-2
56-BA105B-2
56-BA105A-1,3,5
56-BA105B-1,3,5
5.5
E
DATA
RACK,
TYP
EP502
56-AC-4BA105
COMBINER & SPLITTER
FIBER OPTIC
TELEPHONE
TERMINAL
BOARD
56-DP-TRB
56-DP-TRA
B
5.5
E
TR
BA 105
76 SF
TYP
DATA
RACK,
TYP
56-BA105A-4
L3
L3
L3
L3
5.5
E
TR
BA 105
76 SF
56-BA105A
56-BA105B
SOURCE A POWER PANELBOARD "56-BA105A".
SOURCE B POWER PANELBOARD "56-BA105B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNTION BOX.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
56EP400
BLDG 56 - FLOOR 0 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM - INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
GENERAL NOTES
KEY PLAN
KEY NOTES
1/2" = 1'-0"56EP100
1 RM BA105 - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"56EP100
2 RM BA105 - ELECTRICAL PLAN
1/2" = 1'-0"56EP100
3 RM BA105 - DEMOLITION LIGHTING PLAN
1/2" = 1'-0"56EP100
4 RM BA105 - LIGHTING PLAN
Revisions: Date:
0' 1' 2' 4'
0' 1' 2' 4' 0' 1' 2' 4'
0' 1' 2' 4'
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Mo
S
S
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
1A 109
TR
1A 109
TR
1A 109
78 SF
5.5
E
TYP
TELEPHONE
TERMINAL
BOARD
TR
1A 109
78 SF
56-1A109A-2
56-1A109A-2
56-1A109B-256-1A109B-2
56-1A109B-256-1A109B-2
DATA
RACK,
TYP.
56-1A109A-1,3,5
56-1A109B-1,3,5
5.5
E
56-1A109A-2
EP502
56-AC-4-1A109
56-1A109A-2
TELEPHONE
TERMINAL
BOARD
56-DP-TRA
56-DP-TRB
5.5
E
TR
1A 109
78 SF
TYP TR
1A 109
78 SF
56-1A109A-4
L2
5.5
E
DATA
RACK,
TYP.
L2
L2
56-1A109A
56-1A109B
SOURCE A POWER PANELBOARD "56-1A109A".
SOURCE B POWER PANELBOARD "56-1A109B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA MANUFACTURER'S
CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNTION BOX.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
56EP401
BLDG 56 - FLOOR 1 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM - INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
GENERAL NOTES
KEY PLAN
KEY NOTES
1/2" = 1'-0"56EP101
1 RM 1A 109 - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"56EP101
2 RM 1A 109 - ELECTRICAL PLAN
1/2" = 1'-0"56EP101
3 RM 1A 109 - DEMOLITION LIGHTING PLAN
1/2" = 1'-0"56EP101
4 RM 1A 109 - LIGHTING PLAN
0' 1' 2' 4'
0' 1' 2' 4'
0' 1' 2' 4'
0' 1' 2' 4'
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
J
S
Mo
2A 122
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
TR
2A 122
76 SF
5.5
F
TELEPHONE
TERMINAL
BOARD
TYP
56-2A122A-2
56-2A122A-2
56-2A122B-2
56-2A122B-256-2A122B-2
56-2A122B-1,3,5
56-2A122A-1,3,5
56-AC-42A122
5.5
F
56-2A122A-2
56-2A122B-2
TR
2A 122
76 SF
56-2A122A-2
TELEPHONE
TERMINAL
BOARD
56-DP-TRB 56-DP-TRA
DATA
RACK,
TYP.
EP502
TR
2A 122
76 SF
5.5
F
TYP
TR
2A 122
76 SF
DATA
RACK,
TYP.
56-2A122A-4
L2
5.5
F
L2 L2
56-2A122A56-2A122B
SOURCE A POWER PANELBOARD "56-2A122A".
SOURCE B POWER PANELBOARD "56-2A122B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA MANUFACTURER'S
CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNTION BOX.
FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE
CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR
EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH
ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE
REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND
DOOR INSTALLER.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
56EP402
BLDG 56 - FLOOR 2 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM - INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
GENERAL NOTES
KEY PLAN
KEY NOTES
1/2" = 1'-0"56EP102
1 RM 2A 122 - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"56EP102
2 RM 2A 122 - ELECTRICAL PLAN
1/2" = 1'-0"56EP102
3 RM 2A 122 - DEMOLITION LIGHTING PLAN
1/2" = 1'-0"56EP102
4 RM 2A 122 - LIGHTING PLAN
0' 1' 2' 4'
0' 1' 2' 4'
0' 1' 2' 4'
0' 1' 2' 4'
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
Mo
1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD
DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY
NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.
2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL
FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.
ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE
DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE
NOTED.
3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND
RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS
WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF
MILLWORK, UNLESS OTHERWISE NOTED.
4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES
SHALL COMPLY WITH ALL APPROPRIATE CODES.
5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY
DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE
REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE
ACCEPTANCE OF THE OWNER.
6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO
PERFORMING WORK.
7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM
SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED
EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER
AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO
ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN
ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH
VA STANDARDS.
8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE
RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL
DRAWINGS AS REQUIRED.
9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.
10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING
TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.
COORDINATE WITH VA AS REQUIRED.
3A 122
TR
3A 122
76 SF
5.5
E
TELEPHONE
TERMINAL
BOARD
COMBINER & SPLITTER
FIBER OPTIC
TYP
5.5
E
TR
3A 122
76 SF
56-3A122A-2
56-3A122A-2
56-3A122B-2
56-3A122B-2
56-3A122A-1,3,5
56-3A122B-1,3,5
56-3A122B-256-3A122B-2
56-AC-4-3A122
5.5
DATA
RACK,
TYP.
56-3A122A-2
EP502
TELEPHONE
TERMINAL
BOAD
COMBINER & SPLITTER
FIBER OPTIC
56-DP-TRB
56-DP-TRA
5.5
E
TR
3A 122
76 SF
TYP
5.5
E
56-3A122A-4
DATA RACK, TYP
L2L2
L2
5.5
TR
3A 122
76 SF
56-3A122A
56-3A122B
SOURCE A POWER PANELBOARD "56-3A122A".
SOURCE B POWER PANELBOARD "56-3A122B".
SECONDARY BONDING BUS BAR.
EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL
BE DEMOLISHED BACK TO SOURCE.
AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA
MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR
AS REQUIRED.
OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNTION BOX.
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
56EP403
BLDG 56 - FLOOR 3 - ENLARGED
ELECTRICAL PLANSSPEES DESIGN BUILD
625 1ST AVE, STE 301
SEATTLE, WA 98104
(206) 590-2118
RAY SPEES
EHRM - INFRASTRUCTURE
UPGRADES
ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO
657-21-701JB
03/31/2022 LRL/WNM JPS/LLT
CONSTRUCTION
DOCUMENTS
GENERAL NOTES
KEY PLAN
KEY NOTES
1/2" = 1'-0"56EP103
1 RM 3A 122 - DEMOLITION ELECTRICAL PLAN
1/2" = 1'-0"56EP103
2 RM 3A 122 - ELECTRICAL PLAN
1/2" = 1'-0"56EP103
3 RM 3A 122 - DEMOLITION LIGHTING PLAN
1/2" = 1'-0"56EP103
4 RM 3A 122 - LIGHTING PLAN
0' 1' 2' 4'
0' 1' 2' 4'
0' 2' 4' 8'
0' 1' 2' 4'
Revisions: Date:
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
PROJECT
NORTH
File details come from the government source that posted it. Updated .