Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation is seeking a general contractor to provide infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The scope of work includes electrical panel upgrades and power systems work, building management system integration, HVAC assessments and upgrades, building renovation including demolition, construction and finishes, data center renovation, physical security improvements, fiber infrastructure assessment and upgrades between buildings, installation of a diversified path to the datacenter for the WAN, and hazardous material abatement. The project involves construction and renovation activities in buildings 1, 2, 3, 3T, 18, 23, 24, 25, 51, 51T, 52, 53, 53T, 55, 56, 57, 58, 59, 60, 60T, 61, 75. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
36C77623R0009 0005.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf PDF
36C77623R0009 0003.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
36C77623R0009 0001.pdf PDF
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 38 - Envr. Report - Drawings.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Attachment 1 - Specifications.pdf PDF
Attachment 5 - Drawings Part-4.pdf PDF
Attachment 6 - Drawings Part-5.pdf PDF
Attachment 9 - Drawings Part-8.pdf PDF
Attachment 22 - Drawings Part-21.pdf PDF
Attachment 24 - Drawings Part-23.pdf PDF
Attachment 36 - Envr. Report - Appendix B.pdf PDF
Attachment 41 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 44 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tectonic Copyright 2007

T ectonic Cop yright 2007

Tectonic Copyright 2007

Tectonic Copyright 2007

UP

UP

UP

DN

F E

C F

E C

FEC

F E

C

F E

C

F E

C

F E

C

FEC

FEC

FEC

FEC

F E

C

DATA

SYSTEMS

1C132

DATA

TECH

1C133

CORRIDOR

C1-57

BREAKDOWN,VERIFICATION

INVENTORY

1C135

DATA, SYSTEM

1A130

85 SF

DATA, TECH

1A129

CORE LAB

1A126

S S

SS

Mo

1B104

8.3

TYP

TR

1B104

110 SF

E

8.2

PANEL

TELEPHONE

TERMINAL

BOARD

TELEPHONE

TERMINAL BOARD

8.3

55-1B104A-2 55-1B104A-2

55-1B104A-2

55-1B104B-2

55-1B104B-2 55-1B104B-2

55-1B104B-2

55-1B104A-2

55-1B104A-1,3,5

55-1B104B-1,3,5

TR

1B104

110 SF

55-AC-3-1B104

DATA RACK,

TYP. EP502

E

8.2

PANEL

55-DP-TRA

55-DP-TRB

TELEPHONE

TERMINAL

BOARD

TELEPHONE

TERMINAL BOARD

8.3 8.5

55-1B104A-4

L1 L1

L1 L1

DATA RACK,TYP

TR

1B104

110 SF

E

8.2

PANEL

55-1B104A

55-1B104AB

B

8.3 8.5

TYP

TR

1B104

110 SF

E

8.2

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

- AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

55EP401b

BLDG 55 - FLOOR 1 - ENLARGED

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

1/2" = 1'-0"55EP101b

1 RM 1B104 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"55EP101b

2 RM 1B104 - ELECTRICAL PLAN

1/2" = 1'-0"55EP101a

4 RM 1B104 - LIGHTING PLAN

KEY NOTES

KEY PLAN

0' 2' 4' 8'

0' 2' 4' 8'

0' 2' 4' 8'

0' 2' 4' 8' 1/2" = 1'-0"55EP101a

3 RM 1B104 - DEMOLITION LIGHTING PLAN

SOURCE A POWER PANELBOARD "55-1B104A".

SOURCE B POWER PANELBOARD "55-1B104B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

GENERAL NOTES

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

LRL/WNM LLT/JPS

T ectonic Cop yright 2007

Tectonic Copyright 2007

Tectonic Copyright 2007

UP

UP

UP

DN

S

S

Mo

S S

1C132

TYP

TR

1C132

96 SF

L

TELEPHONE

TERMINAL BOARD

55-1C132B-2

55-1C132B-2

55-1C132A-2

55-1C132A-2

55-1C132A-2

55-1C132A-2

55-1C132B-2

55-1C132B-2

55-1C132A-1,3,5

55-1C132B-1,3,5

DATA RACK

55-AC-2-1C132

TR

1C132

96 SF

EP502

LTELEPHONE TERMINAL

BOARD

55-DP-TRA

55-DP-TRB

TYP

B

TR

1C132

96 SF

L

55-1C132A-4

L1

L1

TR

1C132

96 SF

DATA RACK,

TYP.

L1 L1

L 55-1C132A

55-1C132B

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

- AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

55EP401c

BLDG 55 - FLOOR 1 - ENLARGED

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

1/2" = 1'-0"55EP101b

1 RM 1C132 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"55EP101b

2 RM 1C132 - ELECTRICAL PLAN

1/2" = 1'-0"55EP101a

3 RM 1C132 - DEMOLITION LIGHTING PLAN

1/2" = 1'-0"55EP101a

4 RM 1C132 - LIGHTING PLAN

KEY NOTES

KEY PLAN

0' 2' 4' 8'

0' 2' 4' 8' 0' 2' 4' 8'

0' 2' 4' 8'

SOURCE A POWER PANELBOARD "55-1C132A".

SOURCE B POWER PANELBOARD "55-1C132B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

GENERAL NOTES

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

S S

SS

Mo

2A136

F

TYP

TR

2A136

85 SF

F

TR

2A136

85 SF

3 2

55-2A136A-2 55-2A136A-2

55-2A136A-2

55-2A136B-2 55-2A136B-2

55-2A136A-2

55-2A136B-255-2A136B-2

55-2A136A-1,3,5

55-2A136B-1,3,5 55-AC-3-2A136

DATA RACK,

TYP.EP502

F

55-DP-TRA

55-DP-TRB

B

TR

2A136

85 SF

TYP

F

55-2A136A-4

L1

L1

L1

L1

TR

2A136

85 SFDATA RACK,

TYP.

F

55-2A136A

55-2A136B

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

- AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

55EP402a

BLDG. 55 - FLOOR 2 - ENLARGED

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

1/2" = 1'-0"55EP102a

1 RM 2A136 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"55EP102a

2 RM 2A136 - ELECTRICAL PLAN

1/2" = 1'-0"55EP102a

3 RM 2A136 - DEMOLITION LIGHTING PLAN 1/2" = 1'-0"55EP102a

4 RM 2A136 - LIGHTING PLAN

GENERAL NOTES

KEY PLAN

KEY NOTES

Revisions: Date:

0' 2' 4' 8' 0' 2' 4' 8'

0' 2' 4' 8'

0' 2' 4' 8'

SOURCE A POWER PANELBOARD "55-2A136A".

SOURCE B POWER PANELBOARD "55-2A136B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

GENERAL NOTES

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

UP

DN

UP

DN

UP

DN

DATA

TECH

2C145

DATA

TECH

2A136

CORRIDOR

C2-12

DATA

SYSTEM

2A135

INTAKE/EXIT

2A137

S S

SS

Mo

2C144

TYP

TR

2C144

101 SF

LTELEPHONE

TERMINAL BOARD

TELEPHONE

TERMINAL BOARD

B

TYP

TR

2C144

101 SF

L

TR

2C144

101 SF

55-2C144A-4L1 L1

L1 L1

DATA RACK,

TYP

L

55-2C144A 55-2C144B

1 2

55-2C114A-2 55-2C114A-2

55-2C114A-2

55-2C114A-2

55-2C114B-2 55-2C114B-2

55-2C114B-2 55-2C114B-2

55-2C114A-1,3,5

55-2C114B-1,3,5

TR

2C144

101 SF

DATA RACK,

TYP.

55-AC-3-2C144

EP502

L

55-DP-TRB55-DP-TRA

TELEPHONE

TERMINAL BOARD

TELEPHONE

TERMINAL BOARD

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

- AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

55EP402b

BLDG. 55 - FLOOR 2 - ENLARGED

ELECTRICAL PLANSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

KEY PLAN

KEY NOTES

1/2" = 1'-0"55EP102b

1 RM 2C144 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"55EP102a

3 RM 2C144 - DEMOLITION LIGHTING PLAN

1/2" = 1'-0"55EP102a

4 RM 2C144 - LIGHTING PLAN

1/2" = 1'-0"55EP102b

2 RM 2C144 - ELECTRICAL PLAN

0' 2' 4' 8'

0' 2' 4' 8'0' 2' 4' 8'

0' 2' 4' 8'

SOURCE A POWER PANELBOARD "55-2C144A".

SOURCE B POWER PANELBOARD "55-2C144B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

GENERAL NOTES

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

S S

M o

DN

DN

UP

DN

DN

29' - 4"

4' - 0"

TR

3A120

85 SF

TYP

F

TELEPHONE

TERMINAL

BOARD

F

TR

3A120

85 SF

55-3A120A-2 55-3A120A-2

55-3A120B-2

55-3A120B-2

55-3A120B-2

55-3A120B-2

55-3A120A-1,3,5 55-3A120B-1,3,5

DATA RACK,

TYP.

55-AC-3-3A120

55-3A120B-2

EP502

55-DP-TRB

55-DP-TRA

TELEPHONE

TERMINAL

BOARD

B

TYP

TR

3A120

85 SF

F

TR

3A120

85 SF

L1 L1

L1L1

DATA RACK,

TYP.

55-3A120A-4

F

55-3A120A

55-3A120A

3A120

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

- AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

55EP403a

BLDG. 55 - FLOOR 3 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

1/2" = 1'-0"55EP103a

1 RM 3A120 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"55EP103a

2 RM 3A120 - ELECTRICAL PLAN

1/2" = 1'-0"55EP103a

3 RM 3A120 - DEMOLITION LIGHTING PLAN

1/2" = 1'-0"55EP103a

4 RM 3A120 - LIGHTING PLAN

KEY PLAN

KEY NOTES

Revisions: Date:

0' 2' 4' 8' 0' 2' 4' 8'

0' 2' 4' 8' 0' 2' 4' 8'

SOURCE A POWER PANELBOARD "55-3A120A".

SOURCE B POWER PANELBOARD "55-3A120B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

GENERAL NOTES

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

UP

DN

DN

29' - 4"

4' - 0"

S

S

SS

Mo

3C149

L

TR

3C149

100 SF

TYP

L

PATCH PANEL

ACCESS

DOOR

CONTROLLER

ACCESS POWER

CONTROLLER

PANEL

ACCESS

DOOR

CONTROLLER

ACCESS POWER

CONTROLLER

PANEL

PANEL BOARD

FIRE ALARM

PANEL

L

TR

3C149

100 SF

55-3C149B-2

55-3C149A-2

55-3C149B-2

55-3C149A-1,3,5

55-3C149B-1,3,5

55-AC-3-3C149

55-3C149A-2

55-3C149B-2

DATA

RACK,

TYP.

EP502

L

ACCESS DOOR

CONTROLLER

ACCESS DOOR

CONTROLLER

PANELBOARD

FIRE

ALARM

PANEL

ACCESS POWER

CONTROLLER

PANEL

PATCH PANEL

ACCESS POWER

CONTROLLER

PANEL

55-DP-TRB

55-DP-TRA

L

TR

3C149

100 SF

B

TYP

L

TR

3C149

100 SF

55-3C149A-4

L1

L1

L1 L1

DATA RACK,

TYP.

L

55-3C149A

55-3C149B

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

- AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

55EP403b

BLDG. 55 - FLOOR 3 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

KEY PLAN

KEY NOTES

1/2" = 1'-0"55EP103b

1 RM 3C149 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"55EP103b

2 RM 3C149 - ELECTRICAL PLAN

0' 1' 2' 4'0' 1' 2' 4' 0' 1' 2' 4'

0' 1' 2' 4'0' 1' 2' 4'

1/2" = 1'-0"55EP103a

3 RM 3C149 - DEMOLITION LIGHTING PLAN

1/2" = 1'-0"55EP103a

4 RM 3C149 - LIGHTING PLAN

GENERAL NOTES

SOURCE A POWER PANELBOARD "55-3C149A".

SOURCE B POWER PANELBOARD "55-3C149B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER RECEPTACLE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

55-CU-3-1A129

55-CU-3-2A136

55-CU-3-3A120

55-1A129A-6,8

55-2A136A-6,8

55-3A120A-6,8

EP503

TYP

F

8.3 8.5

55-CU-3-1B104

55-1B104A-6,8

EP503

TYP

F

E

8 8.2

55-CU-2-1C132

55-CU-3-2C144

55-CU-3-3C149

55-1C132A-6,8

55-2C144A-6,8

55-3C149A-6,8

EP503

TYP

L

55-CU-3-1A129

55-CU-3-2A136

55-CU-3-3A120

55-CU-3-1B104

55-CU-3-1C132

55-CU-3-2C144

55-CU-3-3C149

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR

SHALL FIELD VERIFY ALL POWER AND SIGNAL DEVICES AND ASSOCIATED

CIRCUITRY AS REQUIRED. ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH

DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS,

AND RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL

LOCATIONS WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER

INSTALLATION OF MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF

DEVICES SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY

POWER AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT.

POWER TO ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND

SHALL REMAIN ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN

SHALL CONFORM WITH VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL

INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR

ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

- AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

55EP404

BLDG 55 - ENLARGED ROOF

PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM INFRASTRUCTURE

UPGRADES

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

Revisions: Date:

KEY PLAN

GENERAL NOTES

KEY PLAN

KEY NOTES

GENERAL NOTES

- 1/2" = 1'-0"

1 BLDG 55 - ENLARGED ROOF PLAN - VIEW 1

- 1/2" = 1'-0"

3 BLDG 55 - ENLARGED ROOF PLAN - VIEW 3

- 1/2" = 1'-0"

2 BLDG 55 - ENLARGED ROOF PLAN - VIEW 2

0' 1' 2' 4'

0' 1' 2' 4'

0' 1' 2' 4'

1 PROVIDE CONDUIT AND WIRE FROM CONDENSING UNIT TO ASSOCIATED AC UNIT

AS REQUIRED PER MANUFACTURER'S INSTRUCTIONS. COORDINATE WITH

MECHANICAL CONTRACTOR AS REQUIRED.

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

S

Mo

S S

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

BA105

5.5

E

TR

BA 105

76 SF

5.5

COMBINER & SPLITTER

FIBER OPTIC

TELEPHONE

TERMINAL

BOARD

TYP TR

BA 105

76 SF

56-BA105A-2

56-BA105A-2

56-BA105A-2

56-BA105B-2

56-BA105B-2

56-BA105B-2

56-BA105B-2

56-BA105A-1,3,5

56-BA105B-1,3,5

5.5

E

DATA

RACK,

TYP

EP502

56-AC-4BA105

COMBINER & SPLITTER

FIBER OPTIC

TELEPHONE

TERMINAL

BOARD

56-DP-TRB

56-DP-TRA

B

5.5

E

TR

BA 105

76 SF

TYP

DATA

RACK,

TYP

56-BA105A-4

L3

L3

L3

L3

5.5

E

TR

BA 105

76 SF

56-BA105A

56-BA105B

SOURCE A POWER PANELBOARD "56-BA105A".

SOURCE B POWER PANELBOARD "56-BA105B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNTION BOX.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

56EP400

BLDG 56 - FLOOR 0 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM - INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

GENERAL NOTES

KEY PLAN

KEY NOTES

1/2" = 1'-0"56EP100

1 RM BA105 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"56EP100

2 RM BA105 - ELECTRICAL PLAN

1/2" = 1'-0"56EP100

3 RM BA105 - DEMOLITION LIGHTING PLAN

1/2" = 1'-0"56EP100

4 RM BA105 - LIGHTING PLAN

Revisions: Date:

0' 1' 2' 4'

0' 1' 2' 4' 0' 1' 2' 4'

0' 1' 2' 4'

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

Mo

S

S

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

1A 109

TR

1A 109

TR

1A 109

78 SF

5.5

E

TYP

TELEPHONE

TERMINAL

BOARD

TR

1A 109

78 SF

56-1A109A-2

56-1A109A-2

56-1A109B-256-1A109B-2

56-1A109B-256-1A109B-2

DATA

RACK,

TYP.

56-1A109A-1,3,5

56-1A109B-1,3,5

5.5

E

56-1A109A-2

EP502

56-AC-4-1A109

56-1A109A-2

TELEPHONE

TERMINAL

BOARD

56-DP-TRA

56-DP-TRB

5.5

E

TR

1A 109

78 SF

TYP TR

1A 109

78 SF

56-1A109A-4

L2

5.5

E

DATA

RACK,

TYP.

L2

L2

56-1A109A

56-1A109B

SOURCE A POWER PANELBOARD "56-1A109A".

SOURCE B POWER PANELBOARD "56-1A109B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA MANUFACTURER'S

CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNTION BOX.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

56EP401

BLDG 56 - FLOOR 1 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM - INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

GENERAL NOTES

KEY PLAN

KEY NOTES

1/2" = 1'-0"56EP101

1 RM 1A 109 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"56EP101

2 RM 1A 109 - ELECTRICAL PLAN

1/2" = 1'-0"56EP101

3 RM 1A 109 - DEMOLITION LIGHTING PLAN

1/2" = 1'-0"56EP101

4 RM 1A 109 - LIGHTING PLAN

0' 1' 2' 4'

0' 1' 2' 4'

0' 1' 2' 4'

0' 1' 2' 4'

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

J

S

Mo

2A 122

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

TR

2A 122

76 SF

5.5

F

TELEPHONE

TERMINAL

BOARD

TYP

56-2A122A-2

56-2A122A-2

56-2A122B-2

56-2A122B-256-2A122B-2

56-2A122B-1,3,5

56-2A122A-1,3,5

56-AC-42A122

5.5

F

56-2A122A-2

56-2A122B-2

TR

2A 122

76 SF

56-2A122A-2

TELEPHONE

TERMINAL

BOARD

56-DP-TRB 56-DP-TRA

DATA

RACK,

TYP.

EP502

TR

2A 122

76 SF

5.5

F

TYP

TR

2A 122

76 SF

DATA

RACK,

TYP.

56-2A122A-4

L2

5.5

F

L2 L2

56-2A122A56-2A122B

SOURCE A POWER PANELBOARD "56-2A122A".

SOURCE B POWER PANELBOARD "56-2A122B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA MANUFACTURER'S

CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR AS REQUIRED.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNTION BOX.

FURNISH AND INSTALL BOXED POWER SUPPLIES AS INDICATED ABOVE ACCESSIBLE

CEILINGS. VERIFY LOCATIONS WITH ARCHITECT. PROVIDE (1) POWER SUPPLY FOR

EACH DOOR OPENING. PROVIDE 120V POWER TO ADEQUATELY SERVE DOORS WITH

ELECTRIFIED DOOR HARDWARE AND MAKE CONNECTIONS AS REQUIRED. SEE

REQUIREMENTS IN 087100 - DOOR HARDWARE. COORDINATE WITH ARCHITECT AND

DOOR INSTALLER.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

56EP402

BLDG 56 - FLOOR 2 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM - INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

GENERAL NOTES

KEY PLAN

KEY NOTES

1/2" = 1'-0"56EP102

1 RM 2A 122 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"56EP102

2 RM 2A 122 - ELECTRICAL PLAN

1/2" = 1'-0"56EP102

3 RM 2A 122 - DEMOLITION LIGHTING PLAN

1/2" = 1'-0"56EP102

4 RM 2A 122 - LIGHTING PLAN

0' 1' 2' 4'

0' 1' 2' 4'

0' 1' 2' 4'

0' 1' 2' 4'

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

Mo

1. DEMOLITION PLANS/NOTES ARE BASED ON SITE INVESTIGATIONS AND RECORD

DRAWINGS. IF DISCREPANCIES ARE FOUND THAT MAY IMPACT WORK, PROMPTLY

NOTIFY VA AND ENGINEER OF SAID DISCREPANCY.

2. ALL EXISTING EQUIPMENT MAY NOT BE SHOWN FOR CLARITY. CONTRACTOR SHALL

FIELD VERIFY ALL POWER, LIGHTING AND ASSOCIATED CIRCUITRY AS REQUIRED.

ALL RACEWAYS AND CONDUCTORS ASSOCIATED WITH EQUIPMENT TO BE

DEMOLISHED SHALL BE DEMOLISHED BACK TO THEIR SOURCE, UNLESS OTHERWISE

NOTED.

3. CONTRACTOR SHALL DEMOLISH ALL ELECTRICAL EQUIPMENT, CONDUCTORS, AND

RACEWAYS ASSOCIATED WITH WALLS BEING REMOVED AND IN ALL LOCATIONS

WHERE JUNCTION BOXES WILL NOT REMAIN ACCESSIBLE AFTER INSTALLATION OF

MILLWORK, UNLESS OTHERWISE NOTED.

4. CONTRACTOR SHALL DISPOSE OF THE REMOVED DEVICES. DISPOSAL OF DEVICES

SHALL COMPLY WITH ALL APPROPRIATE CODES.

5. PROTECT ALL EXISTING WORK FROM DAMAGE DURING CONSTRUCTION. ANY

DAMAGED MATERIALS, SYSTEMS, COMPONENTS, FINISHES BE LIKE, SHALL BE

REPAIRED OR REPLACED AT THE EXPENSE OF THE CONTRACTOR TO THE

ACCEPTANCE OF THE OWNER.

6. FIELD VERIFY ALL RACEWAY DEMOLITION AND INSTALLATIONS PRIOR TO

PERFORMING WORK.

7. CONTRACTOR TO COORDINATE NORMAL/ESSENTIAL ELECTRICAL SYSTEM

SHUTDOWNS AND PHASING WITH THE VA PRIOR TO PERFORMING REQUIRED

EQUIPMENT UPGRADES. CONTRACTOR TO PROVIDE BACKUP EMERGENCY POWER

AND DETERMINE TIE-IN/CONNECTION PLAN WITH EXISTING EQUIPMENT. POWER TO

ALL EXISTING ESSENTIAL EQUIPMENT CANNOT BE INTERRUPTED AND SHALL REMAIN

ACTIVE DURING CONSTRUCTION. BACKUP POWER AND TIE-IN SHALL CONFORM WITH

VA STANDARDS.

8. SEAL ALL INTERIOR WALL AND CEILING PENETRATIONS TO MATCH EXISTING FIRE

RATING OR NEW FIRE RATING, IF REQUIRED. COORDINATE WITH ARCHITECTURAL

DRAWINGS AS REQUIRED.

9. REFERENCE CORRESPONDING ONE-LINE DIAGRAM FOR ADDITIONAL INFORMATION.

10. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL

PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING FURNITURE, INCLUDING

TRANSPORTATION, FOR ALL WORK TO DESIRED VA STORAGE LOCATION.

COORDINATE WITH VA AS REQUIRED.

3A 122

TR

3A 122

76 SF

5.5

E

TELEPHONE

TERMINAL

BOARD

COMBINER & SPLITTER

FIBER OPTIC

TYP

5.5

E

TR

3A 122

76 SF

56-3A122A-2

56-3A122A-2

56-3A122B-2

56-3A122B-2

56-3A122A-1,3,5

56-3A122B-1,3,5

56-3A122B-256-3A122B-2

56-AC-4-3A122

5.5

DATA

RACK,

TYP.

56-3A122A-2

EP502

TELEPHONE

TERMINAL

BOAD

COMBINER & SPLITTER

FIBER OPTIC

56-DP-TRB

56-DP-TRA

5.5

E

TR

3A 122

76 SF

TYP

5.5

E

56-3A122A-4

DATA RACK, TYP

L2L2

L2

5.5

TR

3A 122

76 SF

56-3A122A

56-3A122B

SOURCE A POWER PANELBOARD "56-3A122A".

SOURCE B POWER PANELBOARD "56-3A122B".

SECONDARY BONDING BUS BAR.

EXISTING EQUIPMENT TO BE DEMOLISHED. ASSOCIATED CONDUIT AND WIRE SHALL

BE DEMOLISHED BACK TO SOURCE.

AC UNIT IS CIRCUITED TO CORRESPONDING CONDENSING UNIT VIA

MANUFACTURER'S CONNECTIONS. COORDINATE WITH MECHANICAL CONTRACTOR

AS REQUIRED.

OVERHEAD TR RACK SOURCE A AND SOURCE B POWER JUNTION BOX.

AREA OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

56EP403

BLDG 56 - FLOOR 3 - ENLARGED

ELECTRICAL PLANSSPEES DESIGN BUILD

625 1ST AVE, STE 301

SEATTLE, WA 98104

(206) 590-2118

RAY SPEES

EHRM - INFRASTRUCTURE

UPGRADES

ST. LOUIS VA MEDICAL CENTER - JEFFERSON BARRACKS, MO

657-21-701JB

03/31/2022 LRL/WNM JPS/LLT

CONSTRUCTION

DOCUMENTS

GENERAL NOTES

KEY PLAN

KEY NOTES

1/2" = 1'-0"56EP103

1 RM 3A 122 - DEMOLITION ELECTRICAL PLAN

1/2" = 1'-0"56EP103

2 RM 3A 122 - ELECTRICAL PLAN

1/2" = 1'-0"56EP103

3 RM 3A 122 - DEMOLITION LIGHTING PLAN

1/2" = 1'-0"56EP103

4 RM 3A 122 - LIGHTING PLAN

0' 1' 2' 4'

0' 1' 2' 4'

0' 2' 4' 8'

0' 1' 2' 4'

Revisions: Date:

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

PROJECT

NORTH

File details come from the government source that posted it. Updated .