Attachment 10 - Plumbing Drawings 1 of 3.pdf
PDF 15 MB Posted
- Attached to
- Y1DA--Expand and Renovate Emergency Department B50 Minor Construction - Tucson VAMC (VA-24-00001448)
- Solicitation number
- 36c77623r0191
About this file
This document provides details on a federal solicitation opportunity and related technical drawings. The solicitation number is 36c77623r0191 for the project "Y1DA--Expand and Renovate Emergency Department B50 Minor Construction - Tucson VAMC (VA-24-00001448)" to expand and renovate the emergency department located in Tucson, Arizona. The opportunity type is a solicitation issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The file attached is titled "Attachment 10 - Plumbing Drawings 1 of 3.pdf" and provides technical drawings for plumbing but no other content details.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PL105
PLUMBING FIXTURE SCHEDULE
PLUMBING GENERAL NOTES PLUMBING MATERIALS AND PROCEDURES NOTES PLUMBING SYMBOL LIST
SYMBOL
AP ACCESS PANEL
PROCEDURES: DESCRIPTION
1. THE PLUMBING FIXTURE AND EQUIPMENT SCHEDULE, IN GENERAL, SPECIFIES THE PLUMBING
FIXTURES, EQUIPMENT AND DEVICES: HOWEVER, UNLESS NOTED OTHERWISE, ALL FIXTURES SHALL
BE PROVIDED WITH APPLICABLE ACCESSORIES (SUCH AS SUPPLY STOPS, WASTE TRAPS, FIXTURE
MOUNTING SUPPORTS, BOLT CAPS, WATER CLOSET SEATS, ETC., AS REQ'D TO COMPLETE THE
INSTALLATION.)
2. ALL ITEMS SPECIFIED HEREAFTER SHALL BE NEW, CLEANED AND ADJUSTED FOR THE SPECIFIED
DESIGN PURPOSE (UNLESS OTHERWISE SPECIFIED).
3. ALL EQUIPMENT AND DEVICES SHALL BEAR A.G.A., N.S.F., ASME, C.S.A. OR U.L. APPROVED LABELS
AND CERTIFICATIONS FOR THE SPECIFIED DESIGN PURPOSE.
4. PLUMBING CONTRACTOR SHALL VERIFY IN FIELD WITH VA/COR ALL FINAL FIXTURE AND EQUIPMENT
LOCATIONS AND MOUNTING HEIGHTS REQUIRED FOR THE DESIGN PURPOSE.
5. SUBMIT, AS PER THE SPECIFICATIONS, THE NUMBER OF COPIES OF EACH CATALOG CUT, FOR EACH
ITEM, TO BE APPROVED BY THE VA/COR (PRIOR TO THE BEGINNING OF CONSTRUCTION) FOR ALL
NEW ITEMS SPECIFIED HEREAFTER.
6. THE CONTRACTOR SHALL SUBMIT EQUIPMENT PRODUCT DATA FOR EACH PIECE OF EQUIPMENT
PRIOR TO ORDERING. SUBMIT, AS PER THE SPECIFICATIONS, THE NUMBER OF COPIES FOR APPROVAL
BY THE VA/COR THIS CONTRACTOR SHALL ALSO ASSEMBLE PRINTED INSTRUCTIONS FOR THE
OPERATION AND MAINTENANCE OF EACH ITEM INSTALLED AND BIND TOGETHER WITH EQUIPMENT
CUTS AND CONTROL WIRING DIAGRAMS. DO NOT SUBMIT EQUIPMENT DATA FOR B.O.D. EQUIVALENCY
SUBSTITUTION ITEMS UNTIL SUCH TIME AS THE B.O.D. PROTOCOLS PROCESS HAS BEEN COMPLETED
AND THE SUBSTITUTION HAS BEEN APPROVED BY BOTH THE CO AND COR.
7. SOME FIXTURES FURNISHED BY VA SHALL BE INSTALLED BY PLUMBING CONTRACTOR, ALL OTHER
FIXTURES SHALL BE FURNISHED & INSTALLED BY PLUMBING CONTRACTOR.
1. ALL MATERIALS SHALL BE NEW OF FIRST QUALITY AND UL LISTED FOR THE SPECIFIC DESIGN PURPOSE.
2. SANITARY, VENT, AND STORM LINES SHALL BE SCHEDULE 40 CAST IRON OR COPPER PIPE.
3. DOMESTIC WATER SUPPLY PIPING LOCATED BELOW THE SLAB-ON-GRADE LESS THAN 2" SHALL BE TYPE "K" COPPER LINES
6" AND LARGER SHALL BE STAINLESS STEEL (ASTM 312)
4. THREADED FITTINGS ON GALVANIZED STEEL PIPING SHALL BE 150# CLASS GALVANIZED MALLEABLE IRON FITTING
CONFORMING TO ASTM A-197 SPECIFICATION.
5. FURNISH AND INSTALL UNIONS WHERE INDICATED OR AS DEEMED NECESSARY FOR REPAIR OR SERVICE. UNIONS 2" AND
SMALLER SHALL BE STANDARD GROUND JOINT BRASS TO IRON SEAT, MALLEABLE IRON, SCREWED. UNIONS 2-1/2" AND
LARGER SHALL BE STANDARD CAST IRON FLANGED UNIONS 125# CLASS.
6. DOMESTIC HOT WATER SUPPLY AND RETURN PIPING SHALL BE INSULATED WITH ONE OF THE FOLLOWING:
A. 1" THICK PREFORMED FIBERGLASS WITH "K" FACTOR OF 0.23 MAXIMUM AT 75°F. MEAN TEMPERATURE. JACKET TO
BE FACTORY APPLIED KRAFT PAPER WITH VAPOR BARRIER.
B. 1" THICK MOLDED RIGID PHENOLIC FOAM WITH "K" FACTOR OF 0.23 MAXIMUM AT 78°F MEAN TEMPERATURE WITH
FACTORY APPLIED LAMINATED ALUMINUM FOILAND WHITE KRAFT PAPER VAPOR BARRIER JACKET.
9. DOMESTIC COLD WATER PIPING SHALL BE INSULATED WITH:
A. 1/2" THICK INSULATION FOR PIPING UP TO 1-1/4" DIAMETER.
B. 1" THICK INSULATION FOR PIPING LARGER THAN 1-1/2" DIAMETER.
10. HANGERS SHALL BE OF STANDARD WEIGHT STEEL OR IRON ROD AND RING OR CLEVIS TYPE. SEE DETAIL.
1. DISINFECTION OF POTABLE WATER SYSTEM SHALL BE AT THE VERY MINIMUM AS DESCRIBED BELOW IN ITEMS A THRU
D, OR THE MOST AGRESSIVE SYSTEM REQUIRED BY THE FOLLOWING FOR CITED AUTHORITIES:
NEW POTABLE WATER SYSTEMS SHALL BE PURGED OF DELETERIOUS MATTER AND DISINFECTED PRIOR TO UTILIZATION. THE
METHOD TO BE FOLLOWED SHALL BE THAT PRESCRIBED BY THE HEALTH AUTHORITY HAVING JURISDICTION OR, IN
THE ABSENCE OF A PRESCRIBED METHOD, THE PROCEDURE DESCRIBED IN EITHER AWWA C651 OR AWWA C652
LISTED IN CHAPTER 19, AND AS DESCRIBED IN THE VA SPECIFICATION SECTION. THIS REQUIREMENT SHALL APPLY TO
"ONSITE" OR "IN-PLANT" FABRICATION OF A SYSTEM OR TO A MODULAR PORTION OF A SYSTEM.
A. THE PIPE SYSTEM SHALL BE FLUSHED WITH CLEAN, POTABLE WATER UNTIL DIRTY WATER DOES NOT APPEAR
AT THE POINTS OF OUTLET.
B. THE SYSTEM OR PART THEREOF SHALL BE FILLED WITH A WATER/CHLORINE SOLUTION AT LEAST 50 PARTS
PER MILLION (50 mg/l) OF CHLORINE, AND THE SYSTEM OR PART THEREOF SHALL BE VALVED OFF AND
ALLOWED TO STAND FOR 24 HOURS; OR THE
SYSTEM OR PART THEREOF SHALL BE FILLED WITH A WATER CHLORINE SOLUTION AT LEAST 200 PARTS PER MILLION (200mg/l)
OF CHLORINE AND ALLOWED TO STAND FOR 3 HOURS. FOLLOWING THE REQUIRED STANDING TIME, THE
SYSTEM SHALL BE FLUSHED.
C. THE SYSTEM SHALL BE FLUSHED WITH CLEAN POTABLE WATER UNTIL THE CHLORINE IS PURGED FROM THE
SYSTEM.
D. THE PROCEDURE SHALL BE REPEATED WHERE SHOWN BY A BACTERIOLOGICAL EXAMINATION THAT
CONTAMINATION REMAINS PRESENT IN THE SYSTEM.
2. PIPING SERVICE MARKING:
VINYL CLOTH PRESSURE SENSITIVE MARKERS BLACK LETTER ON WHITE BACKGROUND
A. PIPES 3" AND LARGER SPACING 30'-0" O.C. PIPES 2 1/2" AND SMALLER SPACING 20'-0" O.C.
B. INSTALL DIRECTIONAL ARROWS ON ALL PIPING AT SAME SPACING.
3. CONTRACTOR TO VERIFY IN FIELD AND PROVIDE EXTENSIONS REQUIRED TO ADJUST ALL FIXTURES TO GRADE LEVEL
TO MAINTAIN INVERTS AS DETERMINED BY ALL FIXTURES RELATED (GREASE TRAPS, MAN HOLES, ETC.).
4. PROVIDE EXTERIOR ACCESS TO ISOLATION VALVES FOR HOT AND COLD WATER SUPPLY CUTOF F.
A.F.F. ABOVE FINISH FLOOR
1. ALL SUSPENDED HORIZONTAL PIPING SHALL BE SUPPORTED BY HANGERS SPACED NO FURTHER
THAN 8'-0" APART. NO PIPING SHALL BE SELF-SUPPORTING NOR BE SUPPORTED FROM EQUIPMENT
CONNECTIONS.
2. ALL PARALLEL PIPES (TWO(2) OR MORE) SHALL BE SUPPORTED ON A CHANNEL TYPE TRAPEZE
HANGER.
3. SUPPORTS AND HANGERS SHALL BE INSTALLED TO PERMIT FREE EXPANSION AND CONTRACTION IN
PIPING SYSTEMS UNLESS PIPE REQUIRES FIRM ANCHOR CONTROL.
4. HORIZONTAL SOIL OR WASTE LINES SHALL BE AT A SLOPE OF NOT LESS THAN 1/8" PER FOOT AND
SHALL BE HELD CLOSE TO THE CONSTRUCTION TO MAINTAIN A MAXIMUM OF HEAD ROOM. ALL
CHANGES OF DIRECTION AND JUNCTIONS SHALL BE MADE WITH "Y" FITTINGS AND 1/8" BENDS. NO
LINES OF ANY KIND SHALL BE LOCATED BELOW FREEZERS. ALL DRAIN LINES SHALL BE PROTECTED
FROM FREEZING.
5. HOT AND COLD WATER PIPING SHALL BE PROPERLY PITCHED TO LOW POINTS IN THE SYSTEM
WHERE DRAINS SHALL BE INSTALLED.
6. CLEANOUTS SHALL BE PLACED AT ALL DEAD ENDS, AT CHANGES OF DIRECTION, AT 50'-0" INTERVALS
ON HORIZONTAL RUNS, OUT OF HIGH TRAFFIC AREAS, (NOT UNDER CASES) ETC. WHERE
CLEANOUTS OCCUR IN CONCEALED SPACES, THEY SHALL BE PROVIDED WITH EXTENSIONS TO
FLOOR ABOVE OR TO WALLS. A HAND-HOLE TEST TEE SHALL BE PLACED AT THE BASE OF EACH
STACK.
7. VENT STACKS EXTENDING UP THROUGH THE ROOF SHALL BE FLASHED WITH SIX POUND SHEET
LEAD. FLASHING SHALL EXTEND 12" IN ALL DIRECTIONS FROM THE VENT, CARRIED OVER AND
TURNED DOWN THE INSIDE OF THE VENT. ALL SEAMS AND JOINTS OF FLASHING SHALL BE
SOLDERED AND PROVEN WEATHERTIGHT. EXTEND VENTS A MIN. OF 12" ABOVE ROOF, AND 30" AWAY
FROM PARAPET.
8. ALL SUPPLY PIPING TO BE RUN OVERHEAD, UNLESS NOTED OTHERWISE.
9. ALL SUPPLY PIPING TO BE A MINIMUM OF 3/4" DIA.
10. EACH FIXTURE WILL HAVE A 1/2" X 12" AIR CHAMBER.
11. PROVIDE SERVICE VALVE AT BRANCHES AND AT ALL APPLIANCES.
12. ALL FIXTURES WILL BE FURNISHED WITH INTEGRAL STOPS.
13. ALL FLOOR DRAINS AND FIXTURES TO BE VENTED IN ACCORDANCE WITH ALL LOCAL, STATE AND
FEDERAL CODES AND REGULATIONS.
14. ALL HORIZONTAL VENT PIPING SHALL BE RUN ABOVE FINISHED CEILINGS AND SLOPED UP TOWARD
MAIN STACK.
15. THE PLUMBING CONTRACTOR WILL NOT INSTALL COMBUSTIBLE PIPING MATERIAL IN OR THROUGH
FIRE RATED ASSEMBLIES.
16. HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THAN 1/4" PER FOOT FOR PIPING 3"
DIA. AND UNDER.
17. HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THEN 1/8" PER FOOT FOR PIPING 4"
DIA. AND OVER.
18. ALL EQUIPMENT DEVICES SHALL BE INSTALLED WITH UNIONS IN SUCH A MANNER TO FACILITATE
EASY REMOVAL AND MAINTENANCE OF EQUIPMENT WITHOUT DISRUPTING SERVICE AND CAUSING
MAJOR PIPING REVISIONS.
DISCIPLINE SPECIFIC
MATERIALS
SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL
REQUIREMENTS LOCATED WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A
DIRECT PART OF THIS SECTION AND AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED BELOW.
EQUIVALENCY SUBSTITUTIONS: THE “BASIS OF DESIGN (BOD) PROTOCOLS” ARE TO BE FOLLOWED FOR ALL EQUIPMENT, MATERIALS AND ASSEMBLIES SPECIFIED AND DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE BOD DESIGNATE IS SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL DRAWINGS SECTION
FOR THE FULL BOD EQUIVALENCY SUBSTITUTION REQUIREMENTS AND PROTOCOLS TO BE FOLLOWED.
1. THIS CONTRACTOR SHALL REVIEW ENTIRE SET OF CONTRACT DOCUMENTS: INCLUDING BUT NOT NECESSARILY
LIMITED TO ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL
DRAWINGS AND ENTIRE PROJECT SPECIFICATIONS. THIS CONTRACTOR SHALL ACKNOWLEDGE AND INCLUDE IN THE
SCOPE OF WORK (CONTRACT) ALL CONDITIONS PERTINENT TO THE COMPLETION OF HIS WORK. THIS CONTRACTOR
SHALL FULLY COORDINATE HIS/HER WORK WITH THE INSTALLATION OF WORK BY OTHER TRADES AND MAKE
NECESSARY FIELD ADJUSTMENTS AS REQUIRED TO ACCOMMODATE THE INSTALLATION. ALL OF THE ABOVE SHALL
BE INCLUDED IN THE SCOPE OF WORK.
2. THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS, VISIT THE SITE OF THE
WORK AND FULLY INFORM THEMSELVES AS TO ALL CONDITIONS AND MATTERS THAT CAN, IN ANY WAY, AFFECT
THE WORK OR THE COST THEREOF. SHOULD THIS CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM
THE DRAWINGS, SPECIFICATIONS OR OTHER DOCUMENTS, OR BE IN DOUBT AS TO THEIR MEANING, NOTIFY THE
VA/CO AT ONCE, IN WRITING, OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND NEW WORK, OR
BETWEEN THEIR WORK AND THE WORK OF OTHER TRADES AND OBTAIN CLARIFICATION PRIOR TO SUBMITTING ANY
BID. LACK OF SUCH NOTIFICATION SHALL BE CONSTRUED AS TO INDICATE NO DISCREPANCIES OR CONFLICTS
EXIST.
3. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE INTENT, GENERAL CHARACTER, REQUIREMENTS AND LOCATION
OF THE WORK SHOWN AND INCLUDED. THE WORK INDICATED, BUT HAVING MINOR DETAILS OBVIOUSLY OMITTED, SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE VA/GOVERNMENT.
4. THE CONTRACTOR IS REQUIRED TO BID, AS SPECIFIED, THE WORK SHOWN ON THE DRAWINGS AND PROVIDED IN
THE SPECIFICATIONS WITHOUT DEVIATION, WITH THE EXCEPTION OF ANY BASIS OF DESIGN (BOD) EQUIVALENCY
SUBSTITUTIONS. THESE REQUESTED SUBSTITUTIONS WILL NEED TO BE IDENTIFIED, SUBMITTED AND APPROVED
BY THE VA/CO AND SHALL BE IN FULL COMPLIANCE WITH THE BASIS OF DESIGN COMPLIANCE PROTOCOLS. SEE
GI001.
5. THIS CONTRACTOR IS RESPONSIBLE TO FURNISH AND INSTALL ALL LABOR AND MATERIALS NECESSARY FOR A
COMPLETE SYSTEM. WHERE THERE IS NO MENTION OF THE RESPONSIBLE PARTY FOR A SPECIFIC ITEM TO BE
FURNISHED OR INSTALLED ON THE DRAWINGS, THE DRAWING'S TRADE CONTRACTOR SHALL BE COMPLETELY
RESPONSIBLE FOR ALL RELATED PURCHASES AND LABOR FOR PROVIDING A COMPLETE OPERATING SYSTEM FOR
THIS ITEM.
6. WHEN PERFORMING ANY CUTTING OR PATCHING (RESTORE TO ORIGINAL STATE) ALL BUILDING MATERIALS AND
FINISHES AS REQUIRED TO PROVIDE A FINISHED PRODUCT THAT IS LIKE NEW AND DOESN'T STAND OUT AS BEING
DIFFERENT OR DISTINGUISHABLE AS A PATCH OR REPAIR.
7. THIS CONTRACTOR SHALL VERIFY AND COORDINATE ALL MOUNTING, ARRANGEMENTS, HEIGHTS AND LOCATIONS
PRIOR TO ROUGH-IN AS REQUIRED BY THE VA DESIGN GUIDES/MANUALS ALONG WITH THE EXPRESSED DESIGN
INTENT PRESENTED WITHIN THESE DOCUMENTS.
8. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL SLEEVES THRU WALLS AND THROUGH FLOORS, INCLUDING
CORING IF REQUIRED.
9. PLUMBING CONTRACTOR SHALL VERIFY EXACT LOCATION OF ALL EXISTING SANITARY, STORM AND WATER SUPPLY
ON THE SITE PRIOR TO THE PERFORMANCE OF ANY WORK.
10. PROVIDE SERVICE VALVES AT ALL BRANCH SUPPLY PIPING. SUCH SERVICE VALVES SHALL BE AS PER THE
SPECIFICATIONS AND IN KEEPING WITH THE VA STANDARDS AND REQUIREMENTS.
11. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL CURRENT GOVERNING LOCAL, COUNTY, STATE, AND
FEDERAL BUILDING CODE REQUIREMENTS AND REGULATIONS PLUS COMPLIANCE WITH LOCAL UTILITY COMPANY
AND VA REQUIREMENTS.
12. THIS CONTRACTOR SHALL BE LICENSED, BONDED, INSURED AND CAPABLE OF PERFORMING QUALITY
WORKMANSHIP.
13. THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE PROTECTION OF ALL PERSONNEL
THRU ALL PHASES OF WORK, COMPLYING WITH ALL APPLICABLE PROVISIONS OF CITY, STATE, AND FEDERAL
SAFETY LAWS (OSHA) AND AS RECOMMENDED IN THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" AS
ISSUED BY THE ASSOCIATION OF GENERAL CONTRACTORS OF AMERICA, INC., 20TH AND E. STREETS, N.W.
WASHINGTON, D.C.
14. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE PURCHASE, DELIVERY, RECEIVING, UNLOADING, UNCRATING, STORING, SETTING IN PLACE, AND PROTECTING OF ALL NEW EQUIPMENT AND MATERIALS FURNISHED
BY THIS CONTRACTOR ALONG WITH EQUIPMENT FURNISHED BY THE VA AND INSTALLED BY THIS CONTRACTOR.
PROVIDE PROTECTION FROM DAMAGE BY THE CONSTRUCTION, HANDLING, VANDALISM AND WEATHER DURING ALL
PHASES OF CONSTRUCTION UNTIL COMPLETION OF THE WORK.
15. THIS CONTRACTOR SHALL SUBMIT SHOP DRAWINGS IN THE NUMBERS REQUIRED BY THE SPECIFICATIONS PRIOR
TO THE START OF INSTALLATION FOR VA/COR APPROVAL AND A SUCCESSFUL REVIEW BY THE
ARCHITECT/ENGINEER.
16. THIS CONTRACTOR SHALL FURNISH AS-BUILT CONTRACT DOCUMENTS TO THE VA/COR BEFORE FINAL PROJECT
CLOSE-OUT CAN OCCUR. THE CONTRACT RECORD AS-BUILT DOCUMENTS SHALL BE PROVIDED IN ELECTRONIC
REPRODUCIBLE FORM.
17. BEFORE PLACING WATER SYSTEM IN OPERATION, CHLORINATE ENTIRE SYSTEM IN ACCORDANCE WITH THE
REQUIREMENTS OF THE SPECIFICATIONS AND IN CONJUNCTION WITH ALL LOCAL, STATE AND FEDERAL PLUMBING
CODES ALONG WITH ALL REQUIREMENTS OF THE VA, BOTH FEDERAL AND LOCAL. WHEN PROPERLY COMPLETED
AND APPROVED BY THE VA/COR PROVIDE THE SPECIFIED CERTIFICATION(S).
18. ALL NEW SANITARY PIPING SHALL BE GIVEN A FULL STATIC PRESSURE TEST. METHOD OF TEST AND
REQUIREMENTS TO BE MET SHALL BE AS PER THE SPECIFICATIONS AND IN CONJUNCTION WITH ALL LOCAL, STATE AND FEDERAL CODE REQUIREMENTS ALONG WITH ALL REQUIREMENTS OF THE VA, BOTH FEDERAL AND
LOCAL.
19. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE PUMPING AND DRAINING OF TRENCHES OR PITS
NECESSARY FOR THE INSTALLATION OF THEIR WORK.
20. UPON COMPLETION OF THE WORK, THIS CONTRACTOR SHALL REVIEW AND CHECK THE ENTIRE PORTION OF
THEIR WORK, CLEAN EQUIPMENT AND DEVICES, REMOVE SURPLUS MATERIALS AND RUBBISH FROM THE
PROPERTY, LEAVE THE WORK IN NEAT AND CLEAN ORDER, AND PROVIDE A COMPLETED SYSTEM(S) THAT HAS
BEEN FULLY TESTED AND IS IN GOOD WORKING CONDITION. EACH RESPECTIVE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE REMOVAL OF ANY CARTONS, DEBRIS, EQUIPMENT, ETC., INSTALLED BY THIS
CONTRACTOR INCLUDING EQUIPMENT FURNISHED BY OTHERS
BFP BACKFLOW PREVENTER
CI CAST IRON (PIPE)
CO CLEANOUT
CW COLD WATER
105HW 105° HOT WATER
DN DOWN
EL ELEVATION
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
SAN SANITARY
LAV LAVATORY
W.C. WATER CLOSET
MB MOP BASIN
WHA WATER HAMMER ARRESTER
WCO WALL CLEANOUT
TYP. TYPICAL
V VENT
COLD WATER PIPING
HOT WATER PIPING
VENT
RISER DOWN
RISER UP
POINT OF CONNECTION (TO EXISTING)
DIELECTRIC UNION
SHUT-OFF VALVE
BUTTERFLY VALVE
BALL VALVE
CHECK VALVE (DIRECTION OF FLOW)
PLUMBING EQUIPMENT TAG
HOT WATER RETURN PIPING
POINT OF DEMOLITION (OF EXISTING)
TEMPERATURE/PRESSURE
BALANCING MIXING VALVE
EXISTING PIPING TO BE DEMOLISHED
SH SHOWER
TD TRENCH DRAIN
SK SINK
21. ALL EQUIPMENT/DEVICES SHALL BE AND OF FIRST RATE QUALITY (UNLESS OTHERWISE SPECIFIED) AND IS TO BEAR
THE APPROPRIATE NSF, AGA, CSA OR UL APPROVED LABELS, LISTINGS, AND CERTIFICATIONS FOR THE SPECIFIC
DESIGN PURPOSE.
22. THE DRAWINGS, SCHEDULES AND SPECIFICATIONS HAVE BEEN PREPARED USING ONE MANUFACTURER FOR EACH
PIECE OF EQUIPMENT AS THE BASIS OF DESIGN. BEFORE THE CONTRACTOR PURCHASES EQUIPMENT FROM A
SPECIFIED ACCEPTABLE MANUFACTURER, BUT NOT THE SCHEDULED MANUFACTURER USED FOR THE BASE DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE FOR FULL COMPLIANCE WITH THE PROTOCOLS REQUEST FOR
EQUIVALENCY SUBMISSION AND APPROVAL PROCESS THAT NEEDS TO BE COMPLETED SUCCESSFULLY BEFORE
SUCH A SUBSTITUTION WILL BE ALLOWED TO OCCUR AND BE SUBMITTED VIA THE SHOP DRAWING PROCESS. AS
PART OF THAT PROCESS THE REQUESTING CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING ALL THE
DIMENSIONS OF THE EQUIPMENT TO VERIFY THAT IT WILL FIT IN THE SPACE SHOWN ON THE DRAWINGS. MINOR
DEVIATIONS IN DIMENSIONS WILL BE PERMITTED, PROVIDED THE RATINGS MEET THOSE SHOWN ON THE DRAWINGS
AND EQUIPMENT WILL PHYSICALLY FIT INTO THE SPACE ALLOCATED WITH SUITABLE ACCESS AROUND EQUIPMENT
FOR OPERATION AND MAINTENANCE OF THE EQUIPMENT. WHEN EQUIPMENT SUBMITTED FOR REVIEW DOES NOT
MEET THE PHYSICAL SIZE OR ARRANGEMENT OF THAT SCHEDULED AND SPECIFIED, CONTRACTOR SHALL BE
RESPOSIBLE FOR ANY AND ALL ALTERATIONS REQUIRED TO ACCOMMODATE SUCH EQUIPMENT AT NO ADDITIONAL
COST TO THE V.A. CONTRACTOR WILL ALSO BE RESPONSIBLE FOR ALL ADDITIONAL WORK REQUIRED BY OTHER
CONTRACTORS TO MAKE CHANGES WHICH WOULD ALLOW THE EQUIPMENT TO FIT IN THE SPACE AND FUNCTION AS
INTENDED. SEE FULL BASIS OF DESIGN COMPLIANCE PROTOCOLS ON GI001.
23. GENERAL CONTRACTOR MUST FIELD VERIFY SIZES, CAPACITIES, WEIGHTS, ETC. ON ALL EQUIPMENT.
DISCREPANCIES FROM THE ORIGINAL BASIS OF DESIGN ON THE DRAWINGS WILL NOT CONSTITUTE A BASIS FOR
CHANGE ORDERS. VERIFY WITH VA/COR FOR ANY AND ALL DISCREPANCIES IF THEY EXIST.
24. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER
QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY AND QUALITY OF WORK, AS DETERMIONED BY
THE GOVERNMENT/CO/COR, SHALL BE PROVIDED.
A.O.R. ARCHITECT OF RECORD
E.O.R. ENGINEER OF RECORD
DRAWING SYMBOLS
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
REDUCER OR INCREASER
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
CAPPED OUTLET
STRAINER
FCO FLOOR CLEAN OUT
THERMOSTATIC VALVE (HOT WATER RETURN)
HWR HOT WATER RETURN
S SOIL
HB HOSE BIBB
WALL CLEAN OUT
CRP CHEMICAL RESISTANT PIPE
(E) EXISTING
B.F.F. BELOW FINISHED FLOOR
A/E ARCHITECT / ENGINEER
GW GREASE WASTE PIPE
105TWC TEMPERED WATER CIRCULATION RETURN
105R 105° HOT WATER RETURN
130R 130° HOT WATER RETURN
130HW 130° HOT WATER
HW HOT WATER
G NATURAL GAS
GS GLYCOL SUPPLY
GR GLYCOL RETURN
GV NATURAL GAS VENT
PRESSURE REDUCING VALVE
DSO DOWNSPOUT OUTLET
EPDM ETHYLENE PROPYLENE DIENE MONOMER
SPM SINGLE-PLY MEMBRANE
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
REVIEW ONLY - NOT FOR CONSTRUCTION
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
05/01/2023PLUMBING - GENERAL NOTES,
SYMBOLS AND ABBREVIATIONS
EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 JPK MB
50-P001
678-331
19-103
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
B
ID
S
E T
Revisions: Date:
35% SCHEMATIC DESIGN DEVELOPMENT 08/10/2021
65% DESIGN DEVELOPMENT SUBMISSION 11/29/2021
95% CONSTRUCTION DOCUMENTS SUBMISSION 06/30/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 10/07/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/7/2022
BID SET 05/01/2023
BID SET
VA FORM 08-6231
Revisions: Date:
BID SET 05/01/2023
1 2 3 4 5 6 7 8 8.3
B B
C C
D D
E E
E.4 E.4
E.2 E.2
G
G
H H
G.7 G.7
F F
3.8 4.6 5.5 6.3
V
HW
CW
HW
3 2
1 1
3 2
HWR
CW
CW
HWR
HW
V
HWR
F.P.
F.P.
F.
P.
HWR
CW
3 3
3 1
A1
DD
EE
21 214
3" C
W
2" H
W
3"V UP
3"V UP
2"V UP
2"V UP
3"V UP
TREATMENT
TREATMENT
TREATMENT
TREATMENT
TREATMENT
TREATMENT
HAC
ORTHOTREATMENT
TREATMENT
TREATMENT
PSYCH
TREATMENT
PSYCH
TREATMENT
OXYGYN
STORAGE
ISOLATION
TREATMENT
CLEAN
LINEN
PSYCH
TREATMENT
ISOLATION
TREATMENT
135 PSYCH
TRIAGE
TRIAGE
TREATMENT
TREATMENT
TRAUMA
ROOM
CORRIDOR
113A
HEICS
STORAGE
ELECTRICAL
ROOM
BIOMED
COMM
CLOSET
(E)
113B
STAFF
TLT/SHWR
PHYSICIANS
AREA
MECHANICAL
ROOM
SOILED
UTILITY
ELEC
SIGNAL
WAITING
CHECK-IN
105A
AOD
STORAGE
TRIAGE
PHYSICIANS
AREA
TREATMENT
MED
ROOM
RADIO
ROOM
AMBULANCE
VESTIBULE
1V2 o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
REVIEW ONLY - NOT FOR CONSTRUCTION
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
05/01/2023PLUMBING - FIRST FLOOR
DEMOLITION PLAN
EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 JPK MB
50-PD100
678-331
19-103
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
B
ID
S
E T
N 1/8" = 1'-0"
PLUMBING - FIRST FLOOR DEMOLITION PLAN
0 4' 8' 16'
DEMOLITION GENERAL NOTES
A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY
CONFLICTS BEFORE PROCEEDING.
C. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEEET
OR EXCEED FORMER CONDITIONS.
D. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING,
CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS.
ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED, AND REINSTALLED IN SAME
LOCATION. COORDINATE WITH OTHER TRADES.
E. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN SERVICE TO _______ FLOOR FIXTURES
DURING CONSTRUCTION.
F. ABANDONED AND/OR DEAD LEG DOMESTIC WATER PIPING WILL NOT BE ALLOWED AND SHALL BE
REMOVED EVEN IF NOT SHOWN ON DRAWINGS.
G. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
H. ALL DOMESTIC PIPING BEING DEMOLISHED TO MAIN SHALL BE CAPPED AT 1.5X THE DIAMETER OF BRANCH PIPING. NO DEAD END OR STUBS ARE ALLOWED IN DOMESTIC WATER PIPING. ALL DEAD
END PIPING MUST BE CAPPED.
I. REMOVE ALL ASSOCIATED VALVING, CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH
PIPING REMOVAL.
J. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY
TO PERMIT THE INSTALLATION OF NEW WORK.
K. ALL ASSOCIATED PIPING SHALL INCLUDE BUT NOT BE LIMITED TO CW, HW, HWC, SANITARY, AND
VENT PIPING.
L. PATCH AND FILL CONCRETE SLAB WHERE DOMESTIC WATER, SANITARY AND VENT PIPING HAVE
BEEN REMOVED OR PLUGGED.
M. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH
ARCHITECTURAL AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL
BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE
PROPER CURING TIME REQUIRED TO RECIEVE THE NEW FLOOR FINISHES.
N. FOR EXISTING FIRE/SMOKE WALLS SEE ARCHITECTURAL DRAWING.
1. DISCONNECT AND REMOVE EXISTING PLUMBING FIXTURE AND PIPING BACK TO SOURCE. CAP
AND LEAVE NO "DEAD ENDS."
2. DISCONNECT AND REMOVE EXISTING PIPING RUNS.
3. PROVIDE CAP OR PLUG ON EXISTING PIPING TO REMAIN. LEAVE NO "DEAD ENDS."
4. EXISTING FIXTURE TO BE RELOCATED.
5. NEW CONNECTION TO BE MADE AT THIS LOCATION. DISCONNECT AND REMOVE EXISTING PIPING
RUNS AS SHOWN DASHED.
DEMOLITION KEY NOTESX
Revisions: Date:
35% SCHEMATIC DESIGN DEVELOPMENT 08/10/2021
65% DESIGN DEVELOPMENT SUBMISSION 11/29/2021
95% CONSTRUCTION DOCUMENTS SUBMISSION 06/30/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 10/07/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/7/2022
BID SET 05/01/2023
BID SET
VA FORM 08-6231
1 2 3 4 5 6 7 8 8.3
B B
C C
D D
E E
E.4 E.4
E.2 E.2
G
G
H H
G.7 G.7
F F
3.8 4.6 5.5 6.3
EXISTING 4"
EXISTING 6"
BUILDING
SANITARY SEWER
FS-1
3 2
2 2
2 3
21FS-1
FD-1
2 3
FD-1
(E) 6" CW. TO
REMAIN UG.
1 2
1 2
A1
DD
EE
TREATMENT
TREATMENT
TREATMENT
TREATMENT
TREATMENT
123 TREATMENT
HAC
ORTHOTREATMENT
TREATMENT
TREATMENT
PSYCH
TREATMENT
PSYCH
TREATMENT
OXYGYN
STORAGE
ISOLATION
TREATMENT
CLEAN
LINEN
PSYCH
TREATMENT
ISOLATION
TREATMENT
PSYCH
TRIAGE
TRIAGE
TREATMENT
TREATMENT
TRAUMA
ROOM
CORRIDOR
113A
HEICS
STORAGE
ELECTRICAL
ROOM
BIOMED
COMM
CLOSET
(E)
113B
STAFF
TLT/SHWR
PHYSICIANS
AREA
MECHANICAL
ROOM
SOILED
UTILITY
ELEC
SIGNAL
WAITING
CHECK-IN
105A
AOD
STORAGE
TRIAGE
PHYSICIANS
AREA
TREATMENT
MED
ROOM
RADIO
ROOM
AMBULANCE
VESTIBULE
1V2 o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
REVIEW ONLY - NOT FOR CONSTRUCTION
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
05/01/2023PLUMBING - OVERALL
DEMOLITION PLAN,
UNDERGROUND
EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 JPK MB
50-PD100U
678-331
19-103
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
B
ID
S
E T
N 1/8" = 1'-0"
PLUMBING - UNDERGROUND DEMOLITION PLAN
UNDERGROUND DEMOLITION
GENERAL NOTES
A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEEET
OR EXCEED FORMER CONDITIONS
C. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY
CONFLICTS BEFORE PROCEEDING.
D. REMOVE ALL ASSOCIATED VALVING, CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH
PIPING REMOVAL.
E. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY
TO PERMIT THE INSTALLATION OF NEW WORK.
F. PATCH AND FILL CONCRETE SLAB WHERE SANITARY AND VENT PIPING HAVE BEEN REMOVED OR
PLUGGED.
G. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH
ARCHITECTURAL AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL
BE PERFORMED AS EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE
PROPER CURING TIME REQUIRED TO RECIEVE THE NEW FLOOR FINISHES.
H. FINISHED FLOOR EL. XXX'
I. FOR EXISTING FIRE/SMOKE WALLS SEE ARCHITECTURAL DRAWING.
UNDERGROUND DEMOLITION
KEY NOTES
1. DISCONNECT AND REMOVE EXISTING PLUMBING FIXTURE AND PIPING BACK TO SOURCE. CAP
AND LEAVE NO "DEAD ENDS".
2. REMOVE EXISTING PIPING.
3. CAP EXISTING PIPING TO REMAIN. TERMINATE PIPING TO BE REMOVED SO AS TO LEAVE NO
"DEAD ENDS"
4. EXISTING FIXTURE TO BE RELOCATED
X
0 4' 8' 16'
Revisions: Date:
35% SCHEMATIC DESIGN DEVELOPMENT 08/10/2021
65% DESIGN DEVELOPMENT SUBMISSION 11/29/2021
95% CONSTRUCTION DOCUMENTS SUBMISSION 06/30/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 10/07/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/7/2022
BID SET 05/01/2023
BID SET
VA FORM 08-6231
Tectonic Copyright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007 o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
REVIEW ONLY - NOT FOR CONSTRUCTION
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
05/01/2023PLUMBING - PHASING PLANS EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 JPK TH
50-P002
678-331
19-103
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
B
ID
S
E T
N 1/16" = 1'-0"
PLUMBING - UNDERGROUND - PHASE 1
N 1/16" = 1'-0"
PLUMBING - UNDERGROUND - PHASE 2 DEMOLITION
N 1/16" = 1'-0"
PLUMBING - UNDERGROUND - PHASE 2 NEW CONSTRUCTION
SANITARY & STORM SYSTEM – PHASE 1 DEMOLITION AND INSTALLATION
1. EXISTING SANITARY SYSTEM IN EXISTING BUILDING TO REMAIN.
2. INSTALL NEW SANITARY AND VENT PIPING TO SERVE NEW
SYSTEM IN NEW ADDITION.
3. CONNECT NEW BUILDING SANITARY AND STORM SEWERS
(DRAINS WITHIN 5’-0” OF BUILDING WALL).
4. INSTALL A NEW 4” SANITARY STUB RUNNING SOUTH TO LOCATION
OF PHASE 2 WORK. THIS STUB SHALL BE USED FOR THE
DISCHARGE FROM PHASE 2.
5. CONNECTION FOR SANITARY AND STORM BEYOND 5'-0"
EXTERIOR TO THE CITY SEWAGE. SEE CIVIL DRAWINGS.
6. TEST AND ACTIVATE NEW ADDITION SANITARY, STORM, AND VENT
SYSTEMS.
SANITARY & STORM SYSTEM – PHASE 2 DEMOLITION
1. DISCONNECT AND REMOVE EXISTING SANITARY AND VENT
SYSTEMS IN PHASE 2 AREA.
2. CONNECT NEW 4” LINE SERVING NEW SANITARY SYSTEM IN
PHASE 2 TO EXISTING 4” SANITARY STUB TO NEW ADDITION
BUILDING SYSTEM.
3. TEST AND ACTIVATE NEW ADDITION SANITARY, STORM, AND VENT
SYSTEMS.
SANITARY & STORM SYSTEM – PHASE 2 NEW INSTALLATION
1. CONNECT NEW 4” LINE SERVING NEW SANITARY SYSTEM IN
PHASE 2 TO EXISTING 4” SANITARY STUB TO NEW ADDITION
BUILDING SYSTEM CONSTRUCTED IN PHASE 1.
2. TEST AND ACTIVATE NEW ADDITION SANITARY, STORM, AND VENT
SYSTEMS.
Revisions: Date:
95% CONSTRUCTION DOCUMENTS SUBMISSION 06/30/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 10/07/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/7/2022
BID SET 05/01/2023
BID SET
VA FORM 08-6231
T ectonic Cop yright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007 o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
REVIEW ONLY - NOT FOR CONSTRUCTION
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
05/01/2023PLUMBING - PHASING PLANS EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 JPK TH
50-P003
678-331
19-103
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
B
ID
S
E T
N 1/16" = 1'-0"
PLUMBING - UNDERGROUND - PHASE 3 DEMOLITION
N 1/16" = 1'-0"
PLUMBING - UNDERGROUND - PHASE 3 NEW CONSTRUCTION
N 1/16" = 1'-0"
PLUMBING - UNDERGROUND - PHASE 4 DEMOLITION
N 1/16" = 1'-0"
PLUMBING - UNDERGROUND - PHASE 4 NEW CONSTRUCTION
SANITARY & STORM SYSTEM – PHASE 3 DEMOLITION
1. DISCONNECT AND REMOVE EXISTING SANITARY AND VENT
SYSTEMS IN PHASE 3 AREA.
SANITARY & STORM SYSTEM – PHASE 3 NEW INSTALLATION
1. INSTALL AND CONNECT NEW SANITARY AND VENT SYSTEM
SHOWN IN PHASE 3.
2. TEST AND ACTIVATE NEW ADDITION SANITARY, STORM, AND VENT
SYSTEMS.
SANITARY & STORM SYSTEM – PHASE 4 DEMOLITION
1. DISCONNECT AND REMOVE EXISTING SANITARY AND VENT
SYSTEMS IN PHASE 4 AREA.
SANITARY & STORM SYSTEM – PHASE 4 NEW INSTALLATION
1. INSTALL AND CONNECT NEW SANITARY AND VENT SYSTEM
SHOWN IN PHASE 4.
2. TEST AND ACTIVATE NEW ADDITION SANITARY, STORM, AND VENT
SYSTEMS.
Revisions: Date:
95% CONSTRUCTION DOCUMENTS SUBMISSION 06/30/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 10/07/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/7/2022
BID SET 05/01/2023
BID SET
VA FORM 08-6231
T ectonic Cop yright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007 o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
VA FORM 08-6231
Office of Facilities Management
U.S. Department of Veterans Affairs
STAMP
Date
Location
Building Number Checked Drawn Drawing Number
Project Number
REVIEW ONLY - NOT FOR CONSTRUCTION
Approved: Director
Approved: Associate Director
Approved: Assistant Director
Approved: Assoc. Director for Patient Care Service/Nurse Executive
Approved: Deputy Assoc. Director of Patient Care Services
Approved: Chief of Staff
Approved: Deputy Chief of Staff
Approved: Chief of Engineering
Approved:
Approved:
ARCHITECT/ENGINEER/CONSULTANTS:
Bancroft Project No.
SAVAHCS, TUCSON, AZ 85723
3300 Dundee Road
Northbrook, IL 60062
T: 847.952.9362
05/01/2023PLUMBING - PHASING PLANS EXPAND AND RENOVATE
EMERGENCY DEPARTMENT B50
50 JPK TH
50-P004
678-331
19-103
8-
E X
P A
N D
A N
D R
E N
O V
A T
E E
M E
R G
E N
C Y
D E
P A
R T
M E
N T
B
B
ID
S
E T
N 1/16" = 1'-0"
PLUMBING - UNDERGROUND - PHASE 5 DEMOLITION
N 1/16" = 1'-0"
PLUMBING - UNDERGROUND - PHASE 5 NEW CONSTRUCTION
SANITARY & STORM SYSTEM – PHASE 5 DEMOLITION
1. DISCONNECT AND REMOVE EXISTING SANITARY AND VENT
SYSTEMS IN PHASE 5, NORTH AREA.
2. UPON COMPLETION OF NORTH AREA, DISCONNECT AND REMOVE
EXISTING SANITARY AND VENT SYSTEMS IN PHASE 5, SOUTH
AREA.
SANITARY & STORM SYSTEM – PHASE 5 NEW INSTALLATION
1. INSTALL AND CONNECT NEW SANITARY AND VENT SYSTEM
SHOWN IN PHASE 5, NORTH AREA.
2. UPON COMPLETION OF PHASE 5, NORTH AREA INSTALLATION,
AND DEMOLITION OF PHASE 5, SOUTH AREA, INSTALL AND
CONNECT NEW SANITARY AND VENT SYSTEM SHOWN IN PHASE 5,
SOUTH AREA.
3. TEST AND ACTIVATE NEW ADDITION SANITARY, STORM, AND VENT
SYSTEMS.
Revisions: Date:
95% CONSTRUCTION DOCUMENTS SUBMISSION 06/30/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 10/07/2022
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/7/2022
BID SET 05/01/2023
BID SET
VA FORM 08-6231
| 122 50-P001 |
| 123 50-PD100 |
| 124 50-PD100U |
| 125 50-P002 |
| 126 50-P003 |
| 127 50-P004 |
| 128 50-P005 |
| 129 50-P006 |
| 130 50-P007 |
| 131 50-P100 |
| 132 50-P100U |
| 133 50-P101 |
| 134 50-P401 |
| 135 50-P501 |
| 136 50-P502 |
| 137 50-P503 |
| 138 50-P601 |
| 139 50-P602 |
| 140 50-P701 |
| 141 50-P702 |
| 142 50-P703 |
| 143 50-P704 |
| 144 50-P705 |
File details come from the government source that posted it. Updated .