Attachment 1 - Specifications.pdf

PDF 11 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks Federal contract opportunity
Solicitation number
36C77623R0009
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document contains details of a federal contract solicitation for infrastructure upgrades at the St. Louis Jefferson Barracks VA Medical Center. The solicitation seeks a general contractor to provide electrical panel upgrades, power systems work, bonding and grounding, UPS installations, building management system integration, HVAC assessments and upgrades, building space reconfigurations, renovations and finishes work, data center renovations, communication infrastructure upgrades including network cabling and fiber backbone work, physical security improvements, hazardous material abatement across multiple buildings. The work locations include Buildings 1 through 3, 3T, 18, 23 through 25, 51 through 53, 53T, 55 through 61, 75. The issuing agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks, newest first.
File Type Posted
36C77623R0009 0005.pdf PDF
36C77623R0009 0004.pdf PDF
657-21-701JB - 100 PC - Basis of Design.pdf PDF
329000-05-R1 Sod Certificate.pdf PDF
32 32 23 01R1 - Mechanically Stabilized Earth Wall System RESPONSE.pdf PDF
Attachment 43 - Construction Wage Rates - St. Louis 3-3-23.pdf PDF
36C77623R0009 0003.pdf PDF
36C77623R0009 0002.pdf PDF
Site Visit Sign-in Sheet - St. Louis 2-28-23.pdf PDF
36C77623R0009 0001.pdf PDF
36C77623R0009 - 2-16-23.pdf PDF
Attachment 7 - Drawings Part-6.pdf PDF
Attachment 11 - Drawings Part-10.pdf PDF
Attachment 12 - Drawings Part-11.pdf PDF
Attachment 13 - Drawings Part-12.pdf PDF
Attachment 18 - Drawings Part-17.pdf PDF
Attachment 31 - Drawings Part-30.pdf PDF
Attachment 35 - Envr. Report - Appendix A.pdf PDF
Attachment 38 - Envr. Report - Drawings.pdf PDF
Attachment 42 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 45 - Site Visit Instructions.pdf PDF
Attachment 4 - Drawings Part-3.pdf PDF
Attachment 10 - Drawings Part-9.pdf PDF
Attachment 14 - Drawings Part-13.pdf PDF
Attachment 20 - Drawings Part-19.pdf PDF
Attachment 21 - Drawings Part-20.pdf PDF
Attachment 25 - Drawings Part-24.pdf PDF
Attachment 26 - Drawings Part-25.pdf PDF
Attachment 28 - Drawings Part-27.pdf PDF
Attachment 29 - Drawings Part-28.pdf PDF
Attachment 32 - Drawings Part-31.pdf PDF
Attachment 39 - ICRA ILSM Tool - MCM 001S-03 Att B.zip ZIP file
Attachment 5 - Drawings Part-4.pdf PDF
Attachment 6 - Drawings Part-5.pdf PDF
Attachment 9 - Drawings Part-8.pdf PDF
Attachment 16 - Drawings Part-15.pdf PDF
Attachment 22 - Drawings Part-21.pdf PDF
Attachment 24 - Drawings Part-23.pdf PDF
Attachment 36 - Envr. Report - Appendix B.pdf PDF
Attachment 41 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Attachment 44 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 2 - Drawings Part-1.pdf PDF
Attachment 3 - Drawings Part-2.pdf PDF
Attachment 8 - Drawings Part-7.pdf PDF
Attachment 15 - Drawings Part-14.pdf PDF
Attachment 17 - Drawings Part-16.pdf PDF
Attachment 19 - Drawings Part-18.pdf PDF
Attachment 23 - Drawings Part-22.pdf PDF
Attachment 27 - Drawings Part-26.pdf PDF
Attachment 30 - Drawings Part-29.pdf PDF
Show all 50

Y1DA--EHRM Infrastructure Upgrades Construction Jefferson Barracks has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

March 31, 2022

EHRM IT Infrastructure

Upgrade

657-21-701JB

VA St. Louis Health Care System Jefferson Barracks VA Medical Center St. Louis, MO

SPECIFICATIONS

100% Submittal

CONSTRUCTION DOCUMENTS

EHRM INFRASTRUCTURE UPGRADES PROJECT #: 657-21-701JB

JEFFERSON BARRACKS VA MEDICAL CENTER – ST. LOUIS, MO

SEALS PAGE 00 01 07-1

SECTION 00 01 07

SEALS PAGE

CERTIFICATION

The technical material and data contained in these Contract Documents were prepared under the supervision and direction of the undersigned, whose seal, as a licensed professional to practice as such, is affixed below.

James M. King, Registered Architect Division 0-4 & 7-10

Dante Valdez, S.E., Structural Engineering Division 5, 13

Michael Hubbard, P.E.

Mechanical Engineer Division 21-23

Ryan Litzko, P.E.

Electrical Engineer Division 26-28

Justin R. Rhyneer, CIH Division 02

TABLE OF CONTENTS 00 01 10 - 01

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 07 Seals Page 00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 11-21 01 33 23 Shop Drawings, Product Data, and Samples 06-21 01 35 26 Safety Requirements 11-21 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 57 19 Temporary Environmental Controls 01-21 01 74 19 Construction Waste Management 11-21 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 01-21 02 82 13.13 Glovebag Asbestos Abatement 01-21 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21 02 82 13.21 Asbestos Roofing Abatement 01-21 02 82 13.31 Asbestos Transite Abatement 01-21 02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE

03 45 00 Precast Architectural Concrete 01-21

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 01-21 04 20 00 Unit Masonry 08-17

TABLE OF CONTENTS 00 01 10 - 02

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 51 00 Built-Up Bituminous Roofing 12-21 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 01-21

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 71 00 Door Hardware 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 06 00 Schedule for Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 65 19 Resilient Tile Flooring 05-18 09 66 00 Static Dissipative Sealer for Concrete Substrates 09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 26 00 Wall and Door Protection 01-21 10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural Components 01-21

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16 21 13 13 Wet-Pipe Sprinkler Systems 06-15

TABLE OF CONTENTS 00 01 10 - 03

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-20 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 05-21 22 13 00 Facility Sanitary and Vent Piping 09-20

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-20 23 05 12 General Motor Requirements for HVAC Equipment 02-20 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 02-20 23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 07 11 HVAC Insulation 02-20 23 08 00 Commissioning of HVAC Systems 02-20 23 09 23 Direct-Digital Control System for HVAC 08-20 23 21 13 Hydronic Piping 02-20 23 23 00 Refrigerant Piping 02-20 23 34 00 HVAC fans 02-20 23 37 00 Air Outlets and Inlets 02-20 23 81 00 Decentralized Unitary HVAC Equipment 03-20

DIVISION 25 – INTEGRATED AUTOMATION

25 10 10 Advanced Utility Metering System 02-10

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 41 Underground Electrical Construction 01-17 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 22 00 Low-Voltage Transformers 01-18 26 24 16 Panelboards 01-18 26 26 00 Power Distribution Units for Static Uninterruptible Power Systems 01-18 26 27 26 Wiring Devices 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 33 53 Static Uninterruptible Power Supply 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18

TABLE OF CONTENTS 00 01 10 - 04

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 05 53 Identification for Communications Systems 02-22 27 10 00 Structured Cabling 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 11 19 Communications Termination Blocks and Patch Panels 11-21 27 13 23 Communications Optical Fiber Backbone Cabling 11-21 27 15 13.13 Communications Optical Fiber Splicing and Terminations 02-22 27 16 19 Communications Patch Cords, Station Cords, and Cross Connect Wire 11-21

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and Security 10-18 28 05 26 Grounding and Bonding for Electronic Safety and Security 09-11 28 13 00 Physical Access Control System 10-11 28 23 00 Video Surveillance 09-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork (Short Form) 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15

LIST OF DRAWING SHEETS 00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

G-001 COVER

G-002 DRAWING INDEX

G-003 DRAWING INDEX

CIVIL

C-001 SHEET INDEX AND GENERAL NOTES

C-100 SITE COMMUNICATIONS PLAN - OVERALL

C-101 SITE COMMUNICATIONS PLAN

C-102 SITE COMMUNICATIONS PLAN

C-103 SITE COMMUNICATIONS PLAN

C-104 SITE COMMUNICATIONS PLAN

C-105 SITE COMMUNICATIONS PLAN

C-200 LOGICAL FIBER DIAGRAM SIDE A

C-201 LOGICAL FIBER DIAGRAM SIDE B

C-500 COMMUNICATIONS DETAILS

C-501 COMMUNICATIONS DETAILS

C-502 COMMUNICATIONS DETAILS

C-503 COMMUNICATIONS DETAILS

C-504 COMMUNICATIONS DETAILS

C-505 COMMUNICATIONS DETAILS

C-506 COMMUNICATIONS DETAILS

C-600 FIBER DISTRIBUTION SCHEDULE SIDE A

C-601 TUBE CABLE AND FIBER DISTRIBUTION SCHEDULES SIDE B

C-700 FIBER TOPOLOGIES

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS & ABBREVIATIONS

AS101 ICRA DETAILS

01A-101a BLDG 01 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS 01A-101b BLDG 01 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

01A-102 BLDG 01 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

01A-103 BLDG 01 – FLOOR 3 – DEMO, FLOOR PLANS & RCPS

02A-100 BLDG 02 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

LIST OF DRAWING SHEETS 00 01 15 - 2

02A-101 BLDG 02 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

02A-102 BLDG 02 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

02A-103 BLDG 02 – FLOOR 3 – DEMO, FLOOR PLANS & RCPS

03A-100 BLDG 03 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

03A-101 BLDG 03 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

03A-102 BLDG 03 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

18A-100 BLDG 18 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

18A-101 BLDG 18 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

18A-102 BLDG 18 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

18A-103 BLDG 18 – FLOOR 3 – DEMO, FLOOR PLANS & RCPS

23A-100 BLDG 23 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

23A-101 BLDG 23 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

24A-100 BLDG 24 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

24A-101 BLDG 24 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

24A-102 BLDG 24 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

25A-101 BLDG 25 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

25A-102 BLDG 25 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

25A-103 BLDG 25 – FLOOR 3 – DEMO, FLOOR PLANS & RCPS

51A-100 BLDG 51 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

51A-101a BLDG 51 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS 51A-101b BLDG 51 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

52A-100 BLDG 52 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

52A-101a BLDG 52 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS 52A-101b BLDG 52 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

52A-102 BLDG 52 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

53A-100 BLDG 53 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

53A-101 BLDG 53 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

53A-102 BLDG 53 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

55A-101 BLDG 55 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

55A-102 BLDG 55 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

55A-103 BLDG 55 – FLOOR 3 – DEMO, FLOOR PLANS & RCPS

56A-100 BLDG 56 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

56A-101 BLDG 56 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

56A-102 BLDG 56 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

56A-103 BLDG 56 – FLOOR 3 – DEMO, FLOOR PLANS & RCPS

57A-101 BLDG 57 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

58A-101 BLDG 58 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

60A-101 BLDG 60 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

75A-101 BLDG 75 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

AE421 INTERIOR ELEVATIONS & TR PLAN VIEW

A-601 INTERIOR FINISH & DOOR SCHEDULE

LIST OF DRAWING SHEETS 00 01 15 - 3

A-602 DOOR DETAILS, TYPES, WALL TYPES

A-603 DETAILS

MECHANICAL

M-001 SYMBOLS & ABBREVIATIONS

01M-101 BLDG 01 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

01M-102 BLDG 01 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

01M-103 BLDG 01 – FLOOR 3 – DEMO, FLOOR PLANS & RCPS

01M-110 BLDG 01 – ROOF PLAN

02M-100 BLDG 02 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

02M-101 BLDG 02 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

02M-102 BLDG 02 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

02M-103 BLDG 02 – FLOOR 3 – DEMO, FLOOR PLANS & RCPS

03M-100 BLDG 03 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

03M-101 BLDG 03 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

03M-102 BLDG 03 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

03TM-101 BLDG 03T – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

18M-100 BLDG 18 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

18M-101 BLDG 18 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

18M-102 BLDG 18 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

18M-103 BLDG 18 – FLOOR 3 – DEMO, FLOOR PLANS & RCPS

23M-100 BLDG 23 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

23M-101 BLDG 23 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

23M-110 BLDG 23 – ROOF PLAN

24M-100 BLDG 24 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

24M-101 BLDG 24 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

24M-102 BLDG 24 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

25M-101 BLDG 25 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

25M-102 BLDG 25 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

25M-103 BLDG 25 – FLOOR 3 – DEMO, FLOOR PLANS & RCPS

51M-100 BLDG 51 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

51M-101a BLDG 51 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS 51M-101b BLDG 51 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

51M-110 BLDG 51 – ROOF PLAN

51TM-101 BLDG 51T – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

52M-100 BLDG 52 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

52M-101a BLDG 52 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS 52M-101b BLDG 52 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

52M-102 BLDG 52 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

52M-110 BLDG52 – ROOF PLAN

53M-100 BLDG 53 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

LIST OF DRAWING SHEETS 00 01 15 - 4

53M-101 BLDG 53 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

53M-102 BLDG 53 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

53M-110 BLDG 53 – ROOF PLAN

53TM-101 BLDG 53T – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

55M-101 BLDG 55 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

55M-102 BLDG 55 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

55M-103 BLDG 55 – FLOOR 3 – DEMO, FLOOR PLANS & RCPS

55M-110 BLDG 55 – ROOF PLAN

56M-100 BLDG 56 – FLOOR 0 – DEMO, FLOOR PLANS & RCPS

56M-101 BLDG 56 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

56M-102 BLDG 56 – FLOOR 2 – DEMO, FLOOR PLANS & RCPS

56M-103 BLDG 56 – FLOOR 3 – DEMO, FLOOR PLANS & RCPS

56M-110 BLDG 56 – ROOF PLAN

57M-101 BLDG 57 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

58M-101 BLDG 58 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

60M-101 BLDG 60 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

60TM-101 BLDG 60T – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

75M-101 BLDG 75 – FLOOR 1 – DEMO, FLOOR PLANS & RCPS

M-501 MECHANICAL DETAILS AND CONTROLS

M-502 MECHANICAL DETAILS AND SCHEDULES

ELECTRICAL

EPG001 ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS

01EP100 BLDG 01 - FLOOR 0 - ELECTRICAL PLAN

01EP101 BLDG 01 - FLOOR 1 - ELECTRICAL PLAN

01EP102 BLDG 01 - FLOOR 2 - ELECTRICAL PLAN

01EP103 BLDG 01 - FLOOR 3 - ELECTRICAL PLAN

02EP100 BLDG 02 - FLOOR 0 - ELECTRICAL PLAN

02EP101 BLDG 02 - FLOOR 1 - ELECTRICAL PLAN

02EP102 BLDG 02 - FLOOR 2 - ELECTRICAL PLAN

02EP103 BLDG 02 - FLOOR 3 - ELECTRICAL PLAN

03EP100 BLDG 03 - FLOOR 0 - ELECTRICAL PLAN

03EP101 BLDG 03 - FLOOR 1 - ELECTRICAL PLAN

03EP102 BLDG 03 - FLOOR 2 - ELECTRICAL PLAN

03TEP101 BLDG 03T - FLOOR 1 - ELECTRICAL PLAN

18EP100 BLDG 18 - FLOOR 0 - ELECTRICAL PLAN

18EP101 BLDG 18 - FLOOR 1 - ELECTRICAL PLAN

18EP102 BLDG 18 - FLOOR 2 - ELECTRICAL PLAN

18EP103 BLDG 18 - FLOOR 3 - ELECTRICAL PLAN

23EP100 BLDG 23 - FLOOR 0 - ELECTRICAL PLAN

LIST OF DRAWING SHEETS 00 01 15 - 5

23EP101 BLDG 23 - FLOOR 1 - ELECTRICAL PLAN

24EP100 BLDG 24 - FLOOR 0 - ELECTRICAL PLAN

24EP101 BLDG 24 - FLOOR 1 - ELECTRICAL PLAN

24EP102 BLDG 24 - FLOOR 2 - ELECTRICAL PLAN

25EP100 BLDG 25 - FLOOR 0 - ELECTRICAL PLAN

25EP101 BLDG 25 - FLOOR 1 - ELECTRICAL PLAN

25EP102 BLDG 25 - FLOOR 2 - ELECTRICAL PLAN

25EP103 BLDG 25 - FLOOR 3 - ELECTRICAL PLAN

51EP100a BLDG 51 - FLOOR 0 - AREA A & C - ELECTRICAL PLAN 51EP100b BLDG 51 - FLOOR 0 - AREA E - ELECTRICAL PLAN 51EP101a BLDG 51 - FLOOR 1 - AREA A - ELECTRICAL PLAN 51EP101b BLDG 51 - FLOOR 1 - AREA B - ELECTRICAL PLAN 51EP101c BLDG 51 - FLOOR 1 - AREA C - ELECTRICAL PLAN 51EP101d BLDG 51 - FLOOR 1 - AREA D - ELECTRICAL PLAN 51EP101e BLDG 51 - FLOOR 1 - AREA E - ELECTRICAL PLAN

51TEP101 BLDG 51T - FLOOR 1 - ELECTRICAL PLAN

52EP100 BLDG 52 - FLOOR 0 - ELECTRICAL PLAN

52EP101 BLDG 52 - FLOOR 1 - ELECTRICAL PLAN

52EP102 BLDG 52 - FLOOR 2 - ELECTRICAL PLAN

53EP100 BLDG 53 - FLOOR 0 - ELECTRICAL PLAN

53EP101 BLDG 53 - FLOOR 1 - ELECTRICAL PLAN

53EP102 BLDG 53 - FLOOR 2 - ELECTRICAL PLAN

53TEP101 BLDG 53T - FLOOR 1 - ELECTRICAL PLAN

55EP101a BLDG 55 - FLOOR 1 - AREA A - ELECTRICAL PLAN 55EP101b BLDG 55 - FLOOR 1 - AREA B - ELECTRICAL PLAN 55EP102a BLDG 55 - FLOOR 2 - AREA A - ELECTRICAL PLAN 55EP102b BLDG 55 - FLOOR 2 - AREA B - ELECTRICAL PLAN 55EP103a BLDG 55 - FLOOR 3 - AREA A - ELECTRICAL PLAN 55EP103b BLDG 55 - FLOOR 3 - AREA B - ELECTRICAL PLAN

56EP100 BLDG 56 - FLOOR 0 - ELECTRICAL PLAN

56EP101 BLDG 56 - FLOOR 1 - ELECTRICAL PLAN

56EP102 BLDG 56 - FLOOR 2 - ELECTRICAL PLAN

56EP103 BLDG 56 - FLOOR 3 - ELECTRICAL PLAN

57EP101 BLDG 57 - FLOOR 1 - ELECTRICAL PLAN

58EP101 BLDG 58 - FLOOR 1 - ELECTRICAL PLAN

60EP101 BLDG 60 - FLOOR 1 - ELECTRICAL PLAN

60TEP101 BLDG 60T - FLOOR 1 - ELECTRICAL PLAN

75EP101 BLDG 75 - FLOOR 01 - ELECTRICAL PLAN

01EP400a BLDG 01 - FLOOR 0 - ENLARGED ELECTRICAL PLANS 01EP400b BLDG 01 - FLOOR 0 - ENLARGED ELECTRICAL PLANS 01EP401a BLDG 01 - FLOOR 1 - ENLARGED ELECTRICAL PLANS

LIST OF DRAWING SHEETS 00 01 15 - 6

01EP401b BLDG 01 - FLOOR 1 - ENLARGED ELECTRICAL PLANS

01EP402 BLDG 01 - FLOOR 2 - ENLARGED ELECTRICAL PLANS

01EP403a BLDG 01 - FLOOR 3 - ENLARGED ELECTRICAL PLANS 01EP403b BLDG 01 - FLOOR 3 - ENLARGED ELECTRICAL PLANS

01EP404 BLDG 01 - ENLARGED ROOF PLANS

02EP400 BLDG 02 - FLOOR 0 - ENLARGED ELECTRICAL PLANS

02EP401 BLDG 02 - FLOOR 1 - ENLARGED ELECTRICAL PLANS

02EP402 BLDG 02 - FLOOR 2 - ENLARGED ELECTRICAL PLANS

02EP403 BLDG 02 - FLOOR 3 - ENLARGED ELECTRICAL PLANS

03EP400 BLDG 03 - FLOOR 0 - ENLARGED ELECTRICAL PLANS

03EP401 BLDG 03 - FLOOR 1 - ENLARGED ELECTRICAL PLANS

03EP402 BLDG 03 - FLOOR 2 - ENLARGED ELECTRICAL PLANS

03TEP401 BLDG 03T - FLOOR 1 - ENLARGED ELECTRICAL PLANS

18EP400 BLDG 18 - FLOOR 0 - ENLARGED ELECTRICAL PLANS

18EP401 BLDG 18 - FLOOR 1 - ENLARGED ELECTRICAL PLANS

18EP402 BLDG 18 - FLOOR 2 - ENLARGED ELECTRICAL PLANS

18EP403 BLDG 18 - FLOOR 3 - ENLARGED ELECTRICAL PLANS

23EP400 BLDG 23 - FLOOR 0 - ENLARGED ELECTRICAL PLANS

23EP401 BLDG 23 - FLOOR 1 - ENLARGED ELECTRICAL PLANS

23EP402 BLDG 23 - ENLARGED ROOF PLANS

24EP400a BLDG 24 - FLOOR 0 - ENLARGED ELECTRICAL PLANS 24EP400b BLDG 24 - FLOOR 0 - ENLARGED ELECTRICAL PLANS

24EP401 BLDG 24 - FLOOR 1 - ENLARGED ELECTRICAL PLANS

24EP402 BLDG 24 - FLOOR 2 - ENLARGED ELECTRICAL PLANS

25EP401 BLDG 25 - FLOOR 1 - ENLARGED ELECTRICAL PLANS

25EP402 BLDG 25 - FLOOR 2 - ENLARGED ELECTRICAL PLANS

25EP403 BLDG 25 - FLOOR 3 - ENLARGED ELECTRICAL PLANS

51EP400 BLDG 51 - FLOOR 0 - ENLARGED ELECTRICAL PLANS

51EP401a BLDG 51 - FLOOR 1 - ENLARGED ELECTRICAL PLANS 51EP401b BLDG 51 - FLOOR 1 - ENLARGED ELECTRICAL PLANS 51EP401c BLDG 51 - FLOOR 1 - ENLARGED ELECTRICAL PLANS

51EP402 ENLARGED ROOF PLANS

51TEP401 BLDG 51T - FLOOR 1 - ENLARGED ELECTRICAL PLANS

52EP400 BLDG 52 - FLOOR 0 - ENLARGED ELECTRICAL PLANS

52EP401a BLDG 52 - FLOOR 1 - ENLARGED ELECTRICAL PLANS 52EP401b BLDG 52 - FLOOR 1 - ENLARGED ELECTRICAL PLANS 52EP402a BLDG 52 - FLOOR 2 - ENLARGED ELECTRICAL PLANS 52EP402b BLDG 52 - FLOOR 2 - ENLARGED ELECTRICAL PLANS

52EP403 BLDG 52 - ENLARGED ROOF PLANS

53EP400a BLDG 53 - FLOOR 0 - ENLARGED ELECTRICAL PLANS 53EP400b BLDG 53 - FLOOR 0 - ENLARGED ELECTRICAL PLANS

LIST OF DRAWING SHEETS 00 01 15 - 7

53EP401a BLDG 53 - FLOOR 1 - ENLARGED ELECTRICAL PLANS 53EP401b BLDG 53 - FLOOR 1 - ENLARGED ELECTRICAL PLANS

53EP402 BLDG 53 - FLOOR 2 - ENLARGED ELECTRICAL PLANS

53EP403 BLDG 53 - ENLARGED ROOF PLANS

53TEP401 BLDG 53T - FLOOR 1 - ENLARGED ELECTRICAL PLANS

55EP401a BLDG 55 - FLOOR 1 - ENLARGED ELECTRICAL PLANS 55EP401b BLDG 55 - FLOOR 1 - ENLARGED ELECTRICAL PLANS 55EP401c BLDG 55 - FLOOR 1 - ENLARGED ELECTRICAL PLANS 55EP402a BLDG 55 - FLOOR 2 - ENLARGED ELECTRICAL PLANS 55EP402b BLDG 55 - FLOOR 2 - ENLARGED ELECTRICAL PLANS 55EP403a BLDG 55 - FLOOR 3 - ENLARGED ELECTRICAL PLANS 55EP403b BLDG 55 - FLOOR 3 - ENLARGED ELECTRICAL PLANS

55EP404 BLDG 55 - ENLARGED ROOF PLANS

56EP400 BLDG 56 - FLOOR 0 - ENLARGED ELECTRICAL PLANS

56EP401 BLDG 56 - FLOOR 1 - ENLARGED ELECTRICAL PLANS

56EP402 BLDG 56 - FLOOR 2 - ENLARGED ELECTRICAL PLANS

56EP403 BLDG 56 - FLOOR 3 - ENLARGED ELECTRICAL PLANS

56EP404 BLDG 56 - ENLARGED ROOF PLANS

57EP401a BLDG 57 - FLOOR 1 - ENLARGED ELECTRICAL PLANS 57EP401b BLDG 57 - FLOOR 1 - ENLARGED ELECTRICAL PLANS

57EP402 BLDG 57 - ENLARGED ROOF PLANS

58EP401 BLDG 58 - FLOOR 1 - ENLARGED ELECTRICAL PLANS

58EP402 BLDG 58 - ENLARGED ROOF PLANS

60EP401 BLDG 60 - FLOOR 1 - ENLARGED ELECTRICAL PLANS

60EP402 BLDG 60 - ENLARGED ROOF PLANS

60TEP401 BLDG 60T - FLOOR 1 - ENLARGED ELECTRICAL PLANS

75EP401 BLDG 75 - FLOOR 1 - ENLARGED ELECTRICAL PLANS

75EP402 BLDG 75 - ENLARGED ROOF PLANS

EP501 ELECTRICAL DETAILS

EP502 ELECTRICAL DETAILS

EP503 ELECTRICAL DETAILS

01EP601 BLDG 1 - ONE-LINE DIAGRAM

01EP602 BLDG 1 - ONE-LINE DIAGRAM (CONTINUED)

02EP601 BLDG 02 - ONE-LINE DIAGRAM

03EP601 BLDG 03 - ONE-LINE DIAGRAM

18EP601 BLDG 18 AND 3T - ONE-LINE DIAGRAM

23EP601 BLDG 23 - ONE-LINE DIAGRAM

24EP601 BLDG 24 - ONE-LINE DIAGRAM

25EP601 BLDG 25 - ONE-LINE DIAGRAM

51EP601 BLDG 51, 51A, AND 51T - PARTIAL ONE-LINE DIAGRAM

51EP602 BLDG 51M, 51A, AND 51T - PARTIAL ONE-LINE DIAGRAM

LIST OF DRAWING SHEETS 00 01 15 - 8

(CONTINUED)

52EP601 BLDG 52 - ONE-LINE DIAGRAM

53EP601 BLDG 53 AND 53T - ONE-LINE DIAGRAM

55EP601 BLDG 55 - ONE-LINE DIAGRAM

56EP601 BLDG 56 - ONE-LINE DIAGRAM

57EP601 BLDG 57 - ONE-LINE DIAGRAM

58EP601 BLDG 58 - ONE-LINE DIAGRAM

60EP601 BLDG 60 AND 60T - ONE-LINE DIAGRAM

75EP601 BLDG 75 - ONE-LINE DIAGRAM

01EP701 BLDG 01 - ELECTRICAL SCHEDULES

01EP702 BLDG 01 - ELECTRICAL SCHEDULES

02EP701 BLDG 02 - ELECTRICAL SCHEDULES

03EP701 BLDG 03 - ELECTRICAL SCHEDULES

18EP701 BLDG 18 AND 3T- ELECTRICAL SCHEDULES

23EP701 BLDG 23 - ELECTRICAL SCHEDULES

24EP701 BLDG 24 - ELECTRICAL SCHEDULES

25EP701 BLDG 25 - ELECTRICAL SCHEDULES

51EP701 BLDG 51, 51A, AND 51T - ELECTRICAL SCHEDULES

51EP702 BLDG 51, 51A, AND 51T - ELECTRICAL SCHEDULES

52EP701 BLDG 52 = ELECTRICAL SCHEDULES

53EP701 BLDG 53 AND 53T - ELECTRICAL SCHEDULES

55EP701 BLDG 55 - ELECTRICAL SCHEDULES

56EP701 BLDG 56 - ELECTRICAL SCHEDULES

57EP701 BLDG 57 - ELECTRICAL SCHEDULES

58EP701 BLDG 58 - ELECTRICAL SCHEDULES

60EP701 BLDG 60 AND 60T - ELECTRICAL SCHEDULES

75EP701 BLDG 75 - ELECTRICAL SCHEDULES

EP701 TYPICAL ELECTRICAL SCHEDULES

EP702 TYPICAL ELECTRICAL SCHEDULES

EP703 ELECTRICAL SCHEDULES

EP704 ELECTRICAL SCHEDULES

TELECOM

ETG001

TELECOMMUNICATIONS LEGEND, GENERAL NOTES,

AND ABBREVIATIONS

01ET100 BLDG 01 - FLOOR 0 - TELECOMMUNICATIONS PLAN

01ET101 BLDG 01 - FLOOR 1 - TELECOMMUNICATIONS PLAN

01ET102 BLDG 01 - FLOOR 2 - TELECOMMUNICATIONS PLAN

01ET103 BLDG 01 - FLOOR 3 - TELECOMMUNICATIONS PLAN

02ET100 BLDG 02 - FLOOR 0 - TELECOMMUNICATIONS PLAN

LIST OF DRAWING SHEETS 00 01 15 - 9

02ET101 BLDG 02 - FLOOR 1 - TELECOMMUNICATIONS PLAN

02ET102 BLDG 02 - FLOOR 2 - TELECOMMUNICATIONS PLAN

02ET103 BLDG 02 - FLOOR 3 - TELECOMMUNICATIONS PLAN

03ET100 BLDG 03 - FLOOR 0 - TELECOMMUNICATIONS PLAN

03ET101 BLDG 03 - FLOOR 1 - TELECOMMUNICATIONS PLAN

03ET102 BLDG 03 - FLOOR 2 - TELECOMMUNICATIONS PLAN

03TET101 BLDG 03T - FLOOR 1 - TELECOMMUNICATIONS PLAN

18ET100 BLDG 18 - FLOOR 0 - TELECOMMUNICATIONS PLAN

18ET101 BLDG 18 - FLOOR 1 - TELECOMMUNICATIONS PLAN

18ET102 BLDG 18 - FLOOR 2 - TELECOMMUNICATIONS PLAN

18ET103 BLDG 18 - FLOOR 3 - TELECOMMUNICATIONS PLAN

23ET100 BLDG 23 - FLOOR 0 - TELECOMMUNICATIONS PLAN

23ET101 BLDG 23 - FLOOR 1 - TELECOMMUNICATIONS PLAN

24ET100 BLDG 24 - FLOOR 0 - TELECOMMUNICATIONS PLAN

24ET101 BLDG 24 - FLOOR 1 - TELECOMMUNICATIONS PLAN

24ET102 BLDG 24 - FLOOR 2 - TELECOMMUNICATIONS PLAN

25ET100 BLDG 25 - FLOOR 0 - TELECOMMUNICATIONS PLAN

25ET101 BLDG 25 - FLOOR 1 - TELECOMMUNICATIONS PLAN

25ET102 BLDG 25 - FLOOR 2 - TELECOMMUNICATIONS PLAN

25ET103 BLDG 25 - FLOOR 3 - TELECOMMUNICATIONS PLAN

25ET104 BLDG 25 - PENTHOUSE - TELECOMMUNICATIONS PLAN

51ET100a BLDG 51 - FLOOR 0 - AREA A & C - TELECOMMUNICATIONS PLAN 51ET100b BLDG 51 - FLOOR 0 - AREA E - TELECOMMUNICATIONS PLAN 51ET101a BLDG 51 - FLOOR 1 - AREA A - TELECOMMUNICATIONS PLAN 51ET101b BLDG 51 - FLOOR 1 - AREA B TELECOMMUNICATIONS PLAN 51ET101c BLDG 51 - FLOOR 1 - AREA C TELECOMMUNICATIONS PLAN 51ET101d BLDG 51 - FLOOR 1 - AREA D TELECOMMUNICATIONS PLAN 51ET101e BLDG 51 - FLOOR 1 - AREA E TELECOMMUNICATIONS PLAN

51TET101 BLDG 51T - FLOOR 1 - TELECOMMUNICATIONS PLAN

52ET100 BLDG 52 - FLOOR 0 - TELECOMMUNICATIONS PLAN

52ET101 BLDG 52 - FLOOR 1 - TELECOMMUNICATIONS PLAN

52ET102 BLDG 52 - FLOOR 2 - TELECOMMUNICATIONS PLAN

53ET100 BLDG 53 - FLOOR 0 - TELECOMMUNICATIONS PLAN

53ET101 BLDG 53 - FLOOR 1 - TELECOMMUNICATIONS PLAN

53ET102 BLDG 53 - FLOOR 2 - TELECOMMUNICATIONS PLAN

53ET103 BLDG 53 - PENTHOUSE - TELECOMMUNICATIONS PLAN

53TET101 BLDG 53T - FLOOR 1 - TELECOMMUNICATIONS PLAN

54ET100 BLDG 54 - FLOOR 0 - TELECOMMUNICATIONS PLAN

54ET101 BLDG 54 - FLOOR 1 - TELECOMMUNICATIONS PLAN

54ET102 BLDG 54 - FLOOR 2 - TELECOMMUNICATIONS PLAN

55ET101a BLDG 55 - FLOOR 1 - AREA A - TELECOMMUNICATIONS PLAN

LIST OF DRAWING SHEETS 00 01 15 - 10

55ET101b BLDG 55 - FLOOR 1 - AREA B - TELECOMMUNICATIONS PLAN 55ET102a BLDG 55 - FLOOR 2 - AREA A - TELECOMMUNICATIONS PLAN 55ET102b BLDG 55 - FLOOR 2 - AREA B - TELECOMMUNICATIONS PLAN 55ET103a BLDG 55 - FLOOR 3 - AREA A - TELECOMMUNICATIONS PLAN 55ET103b BLDG 55 - FLOOR 3 - AREA B - TELECOMMUNICATIONS PLAN

56ET100 BLDG 56 - FLOOR 0 - TELECOMMUNICATIONS PLAN

56ET101 BLDG 56 - FLOOR 1 - TELECOMMUNICATIONS PLAN

56ET102 BLDG 56 - FLOOR 2 - TELECOMMUNICATIONS PLAN

56ET103 BLDG 56 - FLOOR 3 - TELECOMMUNICATIONS PLAN

57ET101 BLDG 57 - FLOOR 1 - TELECOMMUNICATIONS PLAN

58ET101 BLDG 58 - FLOOR 1 - TELECOMMUNICATIONS PLAN

60ET101 BLDG 60 - FLOOR 1 - TELECOMMUNICATIONS PLAN

60TET101 BLDG 60T - FLOOR 1 - TELECOMMUNICATIONS PLAN

75ET101 BLDG 75 - FLOOR 1 - TELECOMMUNICATIONS PLAN

75ET102 BLDG 75 - MEZZANINE - TELECOMMUNICATIONS PLAN

CET101

BLDG 1-24 - FLOOR 0 - CORRIDOR WIRELESS ACCESS POINT

TELECOMMUNICATIONS PLAN

CET102

BLDG 1-24 - FLOOR 1 - CORRIDOR WIRELESS ACCESS POINT

TELECOMMUNICATIONS PLAN

CET103

BLDG 23-51-65 - FLOOR 1 - CORRIDOR WIRELESS ACCESS POINT

TELECOMMUNICATIONS PLAN

CET104

BLDG 51-52-53-60-61 - FLOOR 1 - CORRIDOR WIRELESS ACCESS POINT

TELECOMMUNICATIONS PLAN

01ET400a BLDG 01 - FLOOR 0 - ENLARGED TELECOMMUNICATIONS PLANS 01ET400b BLDG 01 - FLOOR 0 - ENLARGED TELECOMMUNICATIONS PLANS 01ET401a BLDG 01 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS 01ET401b BLDG 01 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

01ET402 BLDG 01 - FLOOR 2 - ENLARGED TELECOMMUNICATIONS PLANS

01ET403a BLDG 01 - FLOOR 3 - ENLARGED TELECOMMUNICATIONS PLANS 01ET403b BLDG 01 - FLOOR 3 - ENLARGED TELECOMMUNICATIONS PLANS

02ET400 BLDG 02 - FLOOR 0 - ENLARGED TELECOMMUNICATIONS PLANS

02ET401 BLDG 02 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

02ET402 BLDG 02 - FLOOR 2 - ENLARGED TELECOMMUNICATIONS PLANS

02ET403 BLDG 02 - FLOOR 3 - ENLARGED TELECOMMUNICATIONS PLANS

03ET400 BLDG 03 - FLOOR 0 - ENLARGED TELECOMMUNICATIONS PLANS

03ET401 BLDG 03 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

03ET402 BLDG 03 - FLOOR 2 - ENLARGED TELECOMMUNICATIONS PLANS

03TET401 BLDG 03T - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

18ET400 BLDG 18 - FLOOR 0 - ENLARGED TELECOMMUNICATIONS PLANS

18ET401 BLDG 18 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

18ET402 BLDG 18 - FLOOR 2 - ENLARGED TELECOMMUNICATIONS PLANS

LIST OF DRAWING SHEETS 00 01 15 - 11

18ET403 BLDG 18 - FLOOR 3 - ENLARGED TELECOMMUNICATIONS PLANS

23ET400 BLDG 23 - FLOOR 0 - ENLARGED TELECOMMUNICATIONS PLANS

23ET401 BLDG 23 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

24ET400 BLDG 24 - FLOOR 0 - ENLARGED TELECOMMUNICATIONS PLANS

24ET401 BLDG 24 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

24ET402 BLDG 24 - FLOOR 2 - ENLARGED TELECOMMUNICATIONS PLANS

25ET401 BLDG 25 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

25ET402 BLDG 25 - FLOOR 2 - ENLARGED TELECOMMUNICATIONS PLANS

25ET403 BLDG 25 - FLOOR 3 - ENLARGED TELECOMMUNICATIONS PLANS

51ET400 BLDG 51 - FLOOR 0 - ENLARGED TELECOMMUNICATIONS PLANS

51ET401a BLDG 51 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS 51ET401b BLDG 51 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS 51ET401c BLDG 51 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

51TET401 BLDG 51T - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

52ET400 BLDG 52 - FLOOR 0 - ENLARGED TELECOMMUNICATIONS PLANS

52ET401a BLDG 52 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS 52ET401b BLDG 52 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS 52ET401c BLDG 52 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS 52ET402a BLDG 52 - FLOOR 2 - ENLARGED TELECOMMUNICATIONS PLANS 52ET402b BLDG 52 - FLOOR 2 - ENLARGED TELECOMMUNICATIONS PLANS 53ET400a BLDG 53 - FLOOR 0 - ENLARGED TELECOMMUNICATIONS PLANS 53ET400b BLDG 53 - FLOOR 0 - ENLARGED TELECOMMUNICATIONS PLANS 53ET401a BLDG 53 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS 53ET401b BLDG 53 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

53ET402 BLDG 53 - FLOOR 2 - ENLARGED TELECOMMUNICATIONS PLANS

53TET401 BLDG 53T - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

55ET401a BLDG 55 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS 55ET401b BLDG 55 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS 55ET401c BLDG 55 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS 55ET402a BLDG 55 - FLOOR 2 - ENLARGED TELECOMMUNICATIONS PLANS 55ET402b BLDG 55 - FLOOR 2 - ENLARGED TELECOMMUNICATIONS PLANS 55ET403a BLDG 55 - FLOOR 3 - ENLARGED TELECOMMUNICATIONS PLANS 55ET403b BLDG 55 - FLOOR 3 - ENLARGED TELECOMMUNICATIONS PLANS

56ET400 BLDG 56 - FLOOR 0 - ENLARGED TELECOMMUNICATIONS PLANS

56ET401 BLDG 56 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

56ET402 BLDG 56 - FLOOR 2 - ENLARGED TELECOMMUNICATIONS PLANS

56ET403 BLDG 56 - FLOOR 3 - ENLARGED TELECOMMUNICATIONS PLANS

57ET401a BLDG 57 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS 57ET401b BLDG 57 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS 58ET401a BLDG 58 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS 58ET401b BLDG 58 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

LIST OF DRAWING SHEETS 00 01 15 - 12

60ET401 BLDG 60 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

60TET401 BLDG 60T - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

75ET401 BLDG 75 - FLOOR 1 - ENLARGED TELECOMMUNICATIONS PLANS

ET501 TELECOMMUNICATIONS DETAILS

ET502 TELECOMMUNICATIONS DETAILS

ET503 TELECOMMUNICATIONS DETAILS

ET601 FIBER OPTIC NETWORK DIAGRAM

ET602 FIBER OPTIC NETWORK DIAGRAM

ET603 FIBER OPTIC NETWORK DIAGRAM

ET701 TELECOMMUNICATIONS SCHEDULES

- - - END - - -

EHRM INFRASTRUCTURE UPGRADES

PROJECT #: 657-21-701JB

GENERAL REQUIREMENTS 01 00 00 - 03

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work as required by drawings and specifications.

B. Visits to the site by Bidders shall be made in accordance with what is listed in the solicitation and at the discretion of the Contracting Officer.

C. Offices of Spees Design build, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

E. Normal working hours for this contract will be from 7:00AM to 4:30PM (local time) Monday through Friday except for weekends and established Federal Holidays. Cable running for CAT6A will be performed after hours between 430PM and 1230AM, so not to impede hospital services or patient care.

F. Performing on-site work outside normal working hours will require approval from the

Contracting Officer and the COR. Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.

G. Before placement and installation of work subject to tests by testing laboratories or commissioning authority testing laboratory retained by the Contractor, the Contractor shall notify the COR in sufficient time to enable testing laboratories or commissioning authority personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than (3) workdays unless otherwise designated by the COR.

PROJECT #: 657-21-701JB

GENERAL REQUIREMENTS 01 00 00 - 03

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, Work includes all general, safety and management requirements depicted in the contract documents.

B. ITEM II, GENERAL CONSTRUCTION: Work includes general constructions, alterations, and selective demolition depicted in the contract documents.

C. ITEM III, ELECTRICAL WORK: Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project depicted in the contract documents.

D. ITEM IV, MECHANICAL WORK: Work includes all labor, material, equipment and supervision to perform the required mechanical construction work on this project depicted in the contract documents.

E. ITEM V, TELECOMMUNICATION WORK: Work includes all labor, material, equipment and supervision to perform the required telecommunication construction work on this project depicted in the contract documents.

F. ITEM VI, SITE AND CIVIL WORK: Work includes all labor, material, equipment and supervision to perform the required civil site construction work on this project depicted in the contract documents.

G. ITEM VII, ENVIRONMENTAL WORK: Work includes all labor, material, equipment and supervision to perform the required environmental work on this project depicted in the contract documents

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. Physical security of the construction site and installations will meet requirements depicted in the next paragraph ‘Security Procedures,’ the VA Design Manual ‘Physical Security Design

Manual for VA Life-Safety Protected Facilities,’ and any other applicable VA documentation.

2. The Contractor is responsible for determining the security plan that will define both physical and administrative security procedures. Once approved by the VA, these procedures will remain effective for the entire duration of the project.

GENERAL REQUIREMENTS 01 00 00 - 03

3. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge.

They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting

Officer so that security escort and or arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting

Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Guards:

1. The General Contractor shall provide unarmed guards at the project site after construction hours.

2. The Contractor shall provide the guards and VA police with communication devices as directed.

3. The general Contractor shall install equipment for recording guard rounds to ensure systematic checking of the premises.

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the

Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall install all permanent cores at completion of the work. See

Section 08 71 00, DOOR HARDWARE and coordinate.

E. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

GENERAL REQUIREMENTS 01 00 00 - 04

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law

Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of permits (5) shall be issued for General Contractor and its employees for parking in designated areas only. Contractor to coordinate with the COR for additional parking permits if required.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers, and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

GENERAL REQUIREMENTS 01 00 00 - 05

B. Limited amounts of well-organized and unobtrusive materials and tools may be kept in the construction area during construction. The COR may request items be relocated at any point.

C. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the

Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the

Contractor at its expense upon completion of the work. With the written consent of the

Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

Possible locations and requirements will be discussed and determined by the COR during the post bid, pre-construction meeting.

D. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways when authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

E. Working space and space available for storing materials shall be as determined by the COR.

F. Workers are subject to rules of Medical Center applicable to their conduct.

G. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

H. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working or storage areas within buildings in use by Department of Veterans Affairs in quantities sufficient for

GENERAL REQUIREMENTS 01 00 00 - 06

not more than two workdays. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

I. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the

Contractor.

J. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director and Contractor, as follows:

3. Contractor shall provide phasing plan to VA for final approval. Contractor shall consider the following constraints in phasing

a. Contractor shall not progress to the next building without authorization from the COR.

Work outside of the current building shall be directly coordinated with the COR

GENERAL REQUIREMENTS 01 00 00 - 07

b. Contractor shall notify the COR 14 calendar days prior to beginning work on the next building.

c. The Government may halt work in patient care facilities at no cost if work impedes patient care.

d. The contractor will coordinate for movement and storage of furniture from new TR spaces prior to work starting.

K. All buildings will be occupied during the performance of work. But immediate areas of alterations will be vacated.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by

Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

2. Immediate areas of alterations not mentioned in preceding Subparagraph 1 will be temporarily vacated while alterations are performed.

L. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around any arranged laydown sites coordinated with the COR. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches).

Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.

M. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

GENERAL REQUIREMENTS 01 00 00 - 08

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

N. Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of the COR.

Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center.

Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of

COR. Such approval will be confirmed in writing as soon as practical.

GENERAL REQUIREMENTS 01 00 00 - 09

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the

Contractor.

O. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged-in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

P. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

Q. Coordinate the work for this contract with other construction operations as directed by COR.

This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF

ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting

Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of buildings.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

GENERAL REQUIREMENTS 01 00 00 - 10

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur, and which have been agreed upon by

Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be…