Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408_30 MAR 21.pdf

Standard Form Mar 30, 2021 PDF 1 MB Posted

Attached to
EAGLE Schofield Barracks, HI W519TC-23-R-0018
Solicitation number
W519TC23R0018
Issued by

View the file

Other versions and copies of SF 1408

File Revision Posted Attached to
B08 - Attachment 0006 - Preaward Survey of Prospective KTR Accounting Sys (SF 1408) - 11SEP2025.pdf Sep 11, 2025 EAGLE Fort Irwin, CA W519TC-25-R-0009
B08 Attachment 0006 Preaward Survey of Prospective KTR Accounting Sys (SF 1408).pdf Revision not stated EAGLE Fort Riley KS W519TC-26-R-A054
Standard Form 1408 - Pre-Award Survey.pdf Revision not stated Next Generation Ammunition & Munitions Equipment (NGAME) for MMHE RFP/Solicitation
Attachment 10-SF1408-14f.pdf Revision not stated Mid-Atlantic Regional Maintenance Center (MARMC) Technical and Professional Services
Attachment 11 - SF1408-14f.pdf Revision not stated Submarine Peculiar Special and Support Equipment (PSSE) Support Services for the Mid-Atlantic Regional Maintenance Center
47QFHA25R0017_T10_08_PRISM MATOC Attachment 4_Modified Preaward Survey (SF 1408).pdf Revision not stated Personnel & Readiness Infrastructure Support Management Services (PRISM) MDoDS Pool Small Business On-Ramp
B08 - Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Picatinny Arsenal, NJ W519TC-25-R-0023
Attachment 7 Pre-Award Survey (SF1408).pdf Revision not stated Joint Safety Health Institutional Facilities Team (JSHIFT) 80LARC25R7001
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Dugway Proving Ground, UT: W519TC-25-R-0008
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Revision not stated EAGLE Ft. Bliss, TX, W519TC-25-R-0007
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Fort Huachuca, AZ W519TC-24-R-0027
1305M325R0002 - Attachment 6 - SF1408-14f.pdf Revision not stated Phased Array Radar (PAR) Test Article
SF1408-14e.pdf Revision not stated PNW Regional Planning Facilitator
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort McCoy, WI - W519TC-23-R-0119
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort Knox, KY W519TC-23-R-0088
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Revision not stated EAGLE Fort Jackson, SC W519TC-24-R-0026
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Fort Cavazos, TX W519TC-23-R-0102
Attach 4a - SF 1408.pdf Revision not stated USSOCOM Intelligence Support Services -- DRAFT RFP (H92402-24-R-0001)
J.1.b.3 - SF1408-14e.pdf Revision not stated NASA Ames Research Center - Request for Proposal - Aerospace Research Technology and Simulations (ARTS)
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Presidio of Monterey, CA, W519TC-23-R-0104
Show all 20

Who attaches SF 1408

Other files

File Type Posted
W519TC23R0018-0006.pdf PDF
W519TC23R0018-0005.pdf PDF
Amendment 0004.pdf PDF
W519TC23R0018-0002.pdf PDF
W519TC23R0018-0001.pdf PDF
Attachment 0010 Blocked File Extensions.pdf PDF
Exhibit C - CD-02 Burn Rate Report Format.xlsx XLSX spreadsheet
Attachment 0022 Annex F Environmental Requirements (12.10.2021).docx DOCX document
Exhibit F PM-01 Contractor Employee Information Format.xlsx XLSX spreadsheet
Exhibit M - PM-14 OSHA Requirement Plan and Reporting.pdf PDF
Exhibit A DD1423-1.pdf PDF
Exhibit H PM-09 Performance Management Review Format (6-16-20).pptx PPTX presentation
Attachment 0009 - Purchasing Invoicing Guide (PIG).docx DOCX document
Attachment 0021 Annex E MDRS (03.11.21).docx DOCX document
Attachment 0049 PTA Performance Work Statement (31OCT22).docx DOCX document
Attachment 0007 Department of Labor Wage Determinations (2015-5689).pdf PDF
W519TC23R0018.pdf PDF
Attachment 0048 MDRS PRS for SBHI (10-31-22).docx DOCX document
Exhibit J SS-01 Supply and Services Report Format.xlsx XLSX spreadsheet
Attachment 0020 Annex D Ammunition PRS (10.27.2021).docx DOCX document
Attachment 0003 - Performance Questionnaire_09 MAY 23.pdf PDF
Exhibit K ITD-01 Transportation Report Format Recompete.xlsx XLSX spreadsheet
Attachment 0027 Appendix C - Non-ASC Customer 3rd Marine Regt.pdf PDF
Attachment 0034 Appendix J - Non-ASC Customer MAG-24.pdf PDF
Exhibit G PM-08 GFE GFP CAP Listing Format.xlsx XLSX spreadsheet
Attachment 0026 Appendix B - Non-ASC Customer 25th ID ABLS.pdf PDF
Attachment 0032 Appendix H - Non-ASC Customer HIARNG.pdf PDF
Attachment 0028 Appendix D - Non-ASC Customer 500th MIB-T.pdf PDF
Attachment 0025 Appendix A - Non-ASC Customer 130th EN BDE.pdf PDF
Attachment 0017 Annex A Maintenance PRS (03.30.2021).docx DOCX document
Attachment 0001 PWS.pdf PDF
Attachment 0015 - Subcontractor Cost Information Submission_09 MAY 23.pdf PDF
Attachment 0002 Staffing and Labor Mix (10.31.22).xlsx XLSX spreadsheet
Attachment 0029 Appendix E - Non-ASC Customer 8th MP-303 EOD.pdf PDF
Exhibit E MMD-02 MDRS Maintenance Report Format.XLSX XLSX spreadsheet
Exhibit B CDRL Listing (06.01.2023).xlsx XLSX spreadsheet
Attachment 0023 Annex G Definitions - Acronyms - Abbreviations.docx DOCX document
Attachment 0011 - Contract References Spreadsheet_5 NOV 18.xlsx XLSX spreadsheet
Exhibit D MMD-01 Maintenance Report Format.xlsx XLSX spreadsheet
Attachment 0018 Annex B Supply PRS (03.31.2021).docx DOCX document
Attachment 0019 Annex C Transportation PRS (03.30.2021).docx DOCX document
Attachment 0031 Appendix G - Non-ASC Customer HHBN 25th ID.pdf PDF
Attachment 0033 Appendix I - Non-ASC Customer USARHAW.pdf PDF
Attachment 0004 - Letter of Consent_09 MAY 23.pdf PDF
Attachment 0047 MDRS PWS attachment for SBHI (10-31-22).docx DOCX document
Attachment 0013 Mission Essential Services Memo (04.08.2021).pdf PDF
Attachment 0030 Appendix F - Non-ASC Customer 9th MSC.pdf PDF
Exhibit L - PM-12 KTR Accident Reporting Format.xlsx XLSX spreadsheet
Attachment 0005 - Cost Price Matrix_11 MAR 22.xlsx XLSX spreadsheet
Attachment 0024 Annex H Publications and Forms (7-15-21).docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION I - RECOMMENDATION

YES

YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE)

NO (Explain in 2. NARRATIVE)

PREAWARD SURVEY OF PROSPECTIVE

CONTRACTOR

ACCOUNTING SYSTEM

SERIAL NUMBER (For surveying activity use)

PROSPECTIVE CONTRACTOR

OMB Control Number: 9000-0011 Expiration Date: 6/30/2020

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0011. We estimate that it will take 24 hours to read the instructions, gather the facts, and answer the questions.

Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S.

General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT

2. NARRATIVE (Clarification of deficiencies and other pertinent comments. If additional space is required, continue on plain sheets of paper.)

IF CONTINUATION SHEETS

ATTACHED - MARK HERE

b. TELEPHONE NUMBER (include area code)

b. TELEPHONE NUMBER (include area code)

c. DATE SIGNED

c. DATE REVIEWED

3. SURVEY

MADE BY

4. SURVEY

REVIEWING

OFFICIAL

a. SIGNATURE AND OFFICE (Include, typed or printed name)

a. SIGNATURE AND OFFICE (Include typed or printed name)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition usable

STANDARD FORM 1408 (REV. 1/2014)

Prescribed by GSA FAR (48 CFR) 53.209 -1(f)

SECTION II - EVALUATION CHECKLIST

MARK "X" IN THE APPROPRIATE COLUMN (Explain any deficiencies in SECTION I NARRATIVE) YES NO

NOT

APPLIC-

CABLE

1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED

ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. ACCOUNTING SYSTEM PROVIDES FINANCIAL INFORMATION:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments

(FAR 52.216-16).

b. Required to support requests for progress payments.

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS?

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION?

(If not, describe in Section I Narrative which portions are

(1) in operation, (2) set up, but not yet in operation,

(3) anticipated, or (4) nonexistent.)

STANDARD FORM 1408 (REV. 1/2014) BACK

SECTION I - RECOMMENDATION

YES

YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE) NO (Explain in 2. NARRATIVE)

PREAWARD SURVEY OF PROSPECTIVE CONTRACTOR

ACCOUNTING SYSTEM

SERIAL NUMBER (For surveying activity use)

PROSPECTIVE CONTRACTOR

OMB Control Number: 9000-0011 Expiration Date: 6/30/2020 Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0011. We estimate that it will take 24 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT

2. NARRATIVE (Clarification of deficiencies and other pertinent comments. If additional space is required, continue on plain sheets of paper.)

IF CONTINUATION SHEETS

ATTACHED - MARK HERE

b. TELEPHONE NUMBER (include area code)

b. TELEPHONE NUMBER (include area code)

c. DATE SIGNED

c. DATE REVIEWED

3. SURVEY MADE BY

4. SURVEY REVIEWING OFFICIAL

a. SIGNATURE AND OFFICE (Include, typed or printed name)

a. SIGNATURE AND OFFICE (Include typed or printed name)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition usable

STANDARD FORM 1408 (REV. 1/2014)

Prescribed by GSA FAR (48 CFR) 53.209 -1(f)

SECTION II - EVALUATION CHECKLIST

MARK "X" IN THE APPROPRIATE COLUMN (Explain any deficiencies in SECTION I NARRATIVE)

YES

NO

NOT APPLIC-CABLE

1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. ACCOUNTING SYSTEM PROVIDES FINANCIAL INFORMATION:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments

(FAR 52.216-16).

b. Required to support requests for progress payments.

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS?

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION?(If not, describe in Section I Narrative which portions are

(1) in operation, (2) set up, but not yet in operation,

(3) anticipated, or (4) nonexistent.)

STANDARD FORM 1408 (REV. 1/2014) BACK

8.2.1.3144.1.471865.466429

IF CONTINUATION SHEETS ATTACHED - MARK HERE: 0
1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT. YES: 0
1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT. YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE): 0
1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT. NO (Explain in 2. NARRATIVE): 0
SERIAL NUMBER (For surveying activity use):
PROSPECTIVE CONTRACTOR:
2. NARRATIVE (Clarification of deficiencies, and other pertinent comments,. If additional space is required, continue on plain sheets of paper.):
4. SURVEY REVIEWING OFFICIAL. a. SIGNATURE AND OFFICE (include, typed or printed name) (Typed name):
3. SURVEY MADE BY. a. SIGNATURE AND OFFICE (include, typed or printed name) (Typed name):
4. SURVEY REVIEWING OFFICIAL. a. SIGNATURE AND OFFICE (include, typed or printed name):
3. SURVEY MADE BY. a. SIGNATURE AND OFFICE (include, typed or printed name):
4. SURVEY REVIEWING OFFICIAL. a. SIGNATURE AND OFFICE (include, typed or printed name):
c. DATE REVIEWED. Enter 2 digit month, 2 digit day and 4 digit year.:
c. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.:
b. TELEPHONE NUMBER (include area code):
b. TELEPHONE NUMBER (include area code):
1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES? YES.: 0
a. Proper segregation of direct costs from indirect costs. YES.: 0
b. Identification and accumulation of direct costs by contract. YES.: 0
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) YES.: 0
1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES? NO.: 0
a. Proper segregation of direct costs from indirect costs. NO.: 0
b. Identification and accumulation of direct costs by contract. NO.: 0
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) NO.: 0
1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES? NOT APPLICABLE.: 0
a. Proper segregation of direct costs from indirect costs. NOT APPLICABLE.: 0
b. Identification and accumulation of direct costs by contract. NOT APPLICABLE. : 0
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) NOT APPLICABLE. : 0
d. Accumulation of costs under general ledger control. YES.: 0
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. NOT APPLICABLE.: 0
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. YES.: 0
g. Interim (at least monthly) determination of cost charged to a contract through routine posting of books of account. NOT APPLICABLE.: 0
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. YES.: 0
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. NOT APPLICABLE.: 0
j. Segregation of preproduction costs from production costs. YES.: 0
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). NOT APPLICABLE.: 0
b. Required to support request for progress payments. YES : 0
4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS? NOT APPLICABLE.:
5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? YES

(If not, describe in Section I Narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.): 0

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? NO

(If not, describe in Section I Narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) : 0

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? NOT APPLICABLE

(If not, describe in Section I Narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) : 0

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS? NO.: 0
4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS? YES: 0
b. Required to support request for progress payments. NO.: 0
b. Required to support request for progress payments. NOT APPLICABLE.: 0
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). NO.: 0
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). YES.: 0
j. Segregation of preproduction costs from production costs. NO.: 0
j. Segregation of preproduction costs from production costs. NOT APPLICABLE.: 0
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. NO.: 0
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. YES.: 0
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. NO.: 0
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. NOT APPLICABLE.: 0
g. Interim (at least monthly) determination of cost charged to a contract through routine posting of books of account. NO. : 0
g. Interim (at least monthly) determination of cost charged to a contract through routine posting of books of account. YES.: 0
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. NO.: 0
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. NOT APPLICABLE.: 0
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. NO.: 0
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. YES.: 0
d. Accumulation of costs under general ledger control. NO.: 0
d. Accumulation of costs under general ledger control. NOT APPLICABLE. : 0

File details come from the government source that posted it. Updated .