Attachment 0017 Annex A Maintenance PRS (03.30.2021).docx

DOCX document 29 KB Posted

Attached to
EAGLE Schofield Barracks, HI W519TC-23-R-0018
Solicitation number
W519TC23R0018
Issued by

View the file

Other files

File Type Posted
W519TC23R0018-0006.pdf PDF
W519TC23R0018-0005.pdf PDF
Amendment 0004.pdf PDF
W519TC23R0018-0002.pdf PDF
W519TC23R0018-0001.pdf PDF
Attachment 0010 Blocked File Extensions.pdf PDF
Exhibit C - CD-02 Burn Rate Report Format.xlsx XLSX spreadsheet
Attachment 0022 Annex F Environmental Requirements (12.10.2021).docx DOCX document
Exhibit F PM-01 Contractor Employee Information Format.xlsx XLSX spreadsheet
Exhibit M - PM-14 OSHA Requirement Plan and Reporting.pdf PDF
Exhibit A DD1423-1.pdf PDF
Exhibit H PM-09 Performance Management Review Format (6-16-20).pptx PPTX presentation
Attachment 0009 - Purchasing Invoicing Guide (PIG).docx DOCX document
Attachment 0021 Annex E MDRS (03.11.21).docx DOCX document
Attachment 0049 PTA Performance Work Statement (31OCT22).docx DOCX document
Attachment 0007 Department of Labor Wage Determinations (2015-5689).pdf PDF
W519TC23R0018.pdf PDF
Attachment 0048 MDRS PRS for SBHI (10-31-22).docx DOCX document
Exhibit J SS-01 Supply and Services Report Format.xlsx XLSX spreadsheet
Attachment 0020 Annex D Ammunition PRS (10.27.2021).docx DOCX document
Attachment 0003 - Performance Questionnaire_09 MAY 23.pdf PDF
Exhibit K ITD-01 Transportation Report Format Recompete.xlsx XLSX spreadsheet
Attachment 0027 Appendix C - Non-ASC Customer 3rd Marine Regt.pdf PDF
Attachment 0034 Appendix J - Non-ASC Customer MAG-24.pdf PDF
Exhibit G PM-08 GFE GFP CAP Listing Format.xlsx XLSX spreadsheet
Attachment 0026 Appendix B - Non-ASC Customer 25th ID ABLS.pdf PDF
Attachment 0032 Appendix H - Non-ASC Customer HIARNG.pdf PDF
Attachment 0028 Appendix D - Non-ASC Customer 500th MIB-T.pdf PDF
Attachment 0025 Appendix A - Non-ASC Customer 130th EN BDE.pdf PDF
Attachment 0001 PWS.pdf PDF
Attachment 0015 - Subcontractor Cost Information Submission_09 MAY 23.pdf PDF
Attachment 0002 Staffing and Labor Mix (10.31.22).xlsx XLSX spreadsheet
Attachment 0029 Appendix E - Non-ASC Customer 8th MP-303 EOD.pdf PDF
Exhibit E MMD-02 MDRS Maintenance Report Format.XLSX XLSX spreadsheet
Exhibit B CDRL Listing (06.01.2023).xlsx XLSX spreadsheet
Attachment 0023 Annex G Definitions - Acronyms - Abbreviations.docx DOCX document
Attachment 0011 - Contract References Spreadsheet_5 NOV 18.xlsx XLSX spreadsheet
Exhibit D MMD-01 Maintenance Report Format.xlsx XLSX spreadsheet
Attachment 0018 Annex B Supply PRS (03.31.2021).docx DOCX document
Attachment 0019 Annex C Transportation PRS (03.30.2021).docx DOCX document
Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408_30 MAR 21.pdf PDF
Attachment 0031 Appendix G - Non-ASC Customer HHBN 25th ID.pdf PDF
Attachment 0033 Appendix I - Non-ASC Customer USARHAW.pdf PDF
Attachment 0004 - Letter of Consent_09 MAY 23.pdf PDF
Attachment 0047 MDRS PWS attachment for SBHI (10-31-22).docx DOCX document
Attachment 0013 Mission Essential Services Memo (04.08.2021).pdf PDF
Attachment 0030 Appendix F - Non-ASC Customer 9th MSC.pdf PDF
Exhibit L - PM-12 KTR Accident Reporting Format.xlsx XLSX spreadsheet
Attachment 0005 - Cost Price Matrix_11 MAR 22.xlsx XLSX spreadsheet
Attachment 0024 Annex H Publications and Forms (7-15-21).docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task/Requirement

Standard
Sampling Method, Lot & Acceptable Quality Level (AQL)

MATERIEL MAINTENANCE – GENERAL

5.1.1 Establish, operate, and manage equipment repair shops, and supporting functions.

Quality: Lateral transfers processed IAW local directives, AR 710-2, DA PAM 710-2-1 and ISM Operating Manual.

Random Sampling (shop/activity scheduled periodically)

Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.

AQL: 95%

5.1.4 Perform technical inspections in accordance with the maintenance request.

Quality: IAW AR 750-1, DA PAM 750-8, applicable LIS publications, installation policies and procedures, external and internal SOPs, and materiel maintenance (COR) guidance.

Random Sampling (shop/activity scheduled periodically)

Lot: All in-process and completed work orders, files, logs, and SOPs at time of surveillance.

MATERIEL MAINTENANCE – PROGRAMS/EFFORTS

5.2.1 Perform repairs IAW work request and applicable equipment TMs or equivalent publications.

Quality: Repairs will be IAW the maintenance request and to standards, to include estimated task times, as stated in current equipment Technical Manuals (TMs), Technical Bulletins (TBs), Modification Work Orders (MWOs), Safety of Use Messages (SOUMs), Special Technical Inspection and Repairs (STIRs), other applicable Government technical publications, or OEM equivalent publications when a Government technical publication is not available.

Random Sampling

Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.

5.2.1 Ensure minimum rejection rates for mechanical and electrical repair work completed are met in order to meet first time pass rates.

Quality: IAW AR 750-1, Appendix B-11, paragraphs (a-d) Random Sampling (shop/activity scheduled periodically)

Lot: Equipment that has completed the repair cycle and has been deemed as ready for issue (RFI) back to the customer.

AQL: 97% for mechanical AQL: 98% for electrical

MATERIEL MAINTENANCE SUPPORT

5.3.2 Meet performance metrics found in AR 750-1 for base operations metrics.

Timeliness: Tasks completed within time allowed by the specific equipment publication or within times estimated at work induction or other program standard as designated by Chief, Materiel Maintenance/COR.

Quality: Perform maintenance IAW the maintenance request and to standards, to include estimated task times, as stated in current equipment TMs, TBs, MWOs, SOUMs, STIRs, other applicable government technical publications, or OEM equivalent publications when a government technical publication is not available.

Random Sampling (shop/activity scheduled periodically)

Lot: All in-process and completed work as well as all existing records and files within the shop or activity undergoing surveillance.

AQL: 95%

5.3.8 Perform tire and wheel assembly maintenance and repair services.

Timeliness: Tasks completed within time allowed by the specific equipment publication.

Quality: IAW TM 9-2610-200-14 Random Sampling (shop/activity scheduled periodically)

Lot: The number of line items on receipts processed on the day of surveillance.

5.3.9 Provide wheel alignment support.

Timeliness: Tasks completed within time allowed by the specific equipment publication.

Quality: IAW applicable TMs and standards.

Random Sampling (shop/activity scheduled periodically)

Lot: All in process and completed work related to replacing front axle components (tie-rod/sway bar).

5.3.10 Perform glass replacement for vehicles.

Timeliness: Tasks completed within time allowed by the specific equipment publication.

Quality: Glass shall be installed to original design configurations with seals that are air and watertight.

Random Sampling (shop/activity scheduled periodically)

Lot: All in process and completed glass repair work as well as all existing logs and files at time of surveillance.

AQL: 95%

5.3.11 Perform maintenance and services of sensitive items.

Timeliness: Tasks completed within time allowed by the specific equipment publication.

Quality: IAW ASC Supplement 750-1 and AR 750-1.

Monthly

Lot: All parts/items in process

AQL: 100%

5.3.11 Maintain physical security of the Material Maintenance Arms room and sensitive items.

Timeliness: Notify the COR immediately of the discovery of a missing sensitive item or major administrative discrepancy.

Quality: IAW AR 190-11, AR 710-2, AR 750-1, DA PAM 750-8, and local SOPs.

Random Sampling (shop/activity scheduled periodically)

Lot: All in process and completed sensitive item work as well as all existing records and files within the shop or activity undergoing surveillance.

AQL: 100%

5.3.12 Management of Small Arms Repair Parts (SARP).

Timeliness: As required.

Quality: IAW ASC Supplement 750-1 Monthly

Lot: All parts in process

AQL: 100%

ALLIED TRADES

5.4.1 Perform welding, and non-destructive testing as required.

Timeliness: Work completed IAW time estimates given at work induction.

Quality: Work performed IAW work request and applicable military and industry standards. Welding performed by AWS certified welders; NDI performed by ANSI/ASNT CP-189 certified persons.

Random (shop/activity scheduled periodically)

Lot: All in process and completed welding, as well as all existing logs and files at time of surveillance.

AQL: 95%

5.4.2 Perform metal machining, and fabrication operations and Non-destructive testing as required.

Timeliness: Work completed IAW time estimates given at work induction.

Quality: Work performed IAW work request and applicable military and industry standards. NDI performed by ANSI/ASNT CP-189 certified persons.

Random Sampling (shop/activity scheduled periodically)

Lot: All in process and completed metal machining and fabrication work as well as all existing logs and files at time of surveillance.

AQL: 95%

5.4.3 Prepare equipment, conduct media sand blast operations, and paint supported equipment and components as required to perform materiel maintenance.

Timeliness: Work completed IAW time estimates given at work induction.

Quality: Work completed IAW AR 750-1, TM 43-0139, TB 43-0209, and local directives.

Random Sampling (shop/activity scheduled periodically)

Lot: All in process and completed body shop work as well as all existing logs and files at time of surveillance.

5.4.3.1 Operate and maintain Materiel Maintenance paint booths and breathing air machines.

Timeliness: Work completed IAW time estimates given at work induction. Maintain equipment as required.

Quality: IAW OSHA 29 CFR 1910-107, AR 200-1 Periodic

Lot: All materiel maintenance paint booths and breathing air machines at time of surveillance.

AQL: 100%

5.4.4 Perform body repair services.

Timeliness: Work completed IAW time estimates given at work induction.

Quality: Work completed IAW AR 750-1, applicable equipment TM, and industry standard.

Random Sampling (shop/activity scheduled periodically)

Lot: All in process and completed body shop work as well as all existing logs and files at time of surveillance.

REPAIR PARTS AND MATERIEL MANAGEMENT TASKS

5.5.1 Perform shop supply services; use the automated Army supply system as the primary means of attaining materiel.

Quality: IAW AR 750-1, AR 710-2, DA PAM 25-30, AR 725-50, DA PAM 710-2-2; AR 740-1; AR 735-5; AR 710-1; AR 710-3; DA Pam 710-7; AR 710-3, DA Pam 710-2-1; FEDLOG; and LIS user’s manual Random Sampling (shop/activity scheduled periodically)

Lot: All in-process and completed work orders, requisitions, requests, files, records, SOPs, and stockages at time of surveillance.

AQL: 95%

5.5.6 Ensure timely turn-in of recoverable items within its control.

Timeliness: Meet SP turn- in criteria for timeliness of turn-ins.

Quality: Perform recovery of core return items IAW Defense Finance and Accounting Service - Indianapolis (DFAS-IN) Regulation 37-1, Chapter 13, (GCSS-Army Tracking System) and AR 710-2 as modified.

Periodic

Lot: The numbers of ORIL items processed during the period at time of surveillance.

PRODUCTION CONTROL

5.6.1 Operate a production control capability that effectively manages the maintenance workload; provide personnel technically capable of performing all tasks found in the applicable maintenance LIS End User Manual. Operate multiple equipment receiving points; provide order statuses.

Timeliness: Work completed IAW time estimates given at work induction.

Quality: IAW AR 750-1, DA PAM 750-1, DA PAM 750-8, applicable LIS publications, local policies and procedures, external and internal SOPs, and COR guidance.

Random Sampling

Lot: All in process and completed work as well as all existing logs and files at time of surveillance

AQL 95%

File details come from the government source that posted it. Updated .