This solicitation requests proposals for infrastructure upgrades at the St. Cloud Veterans Affairs Health Care System campus. The scope of work includes electrical upgrades, UPS installations, building management system integration, fiber infrastructure installation both within and between buildings, hazardous materials abatement, and HVAC assessments, reconfigurations, and expansions as necessary. Proposers must furnish all labor, materials, tools and equipment to complete the upgrades in accordance with specifications and contract drawings. The soliciting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The response due date is not provided.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud, newest first.
File Type Posted
Technical Questions - LATE - St. Cloud 8-10-22.pdf PDF
01-M204 - ROOF REMODEL -MECHANICAL.pdf PDF
Specifications Addendum Information.pdf PDF
Drawings Addendum Information.pdf PDF
Atch 1 - Specifications Volume 1 addendum.pdf PDF
Atch 11 - BLDG 5 addendum.pdf PDF
Atch 17 - BLDG 11 addendum.pdf PDF
Atch 18 - BLDG 14 addendum.pdf PDF
Atch 28 - BLDG 108 addendum.pdf PDF
Atch 33 - BLDG 116 addendum.pdf PDF
Atch 5 - General 2 of 2 addendum.pdf PDF
Atch 14 - BLDG 8 addendum.pdf PDF
Atch 15 - BLDG 9 addendum.pdf PDF
Atch 20 - BLDG 29 addendum.pdf PDF
Atch 22 - BLDG 49 addendum.pdf PDF
Atch 24 - BLDG 51 addendum.pdf PDF
Atch 25 - BLDG 54 and 69 addendum.pdf PDF
Atch 32 - BLDG 115 addendum.pdf PDF
OIT Design Requirements - St. Cloud - Backbone Cabling.zip ZIP file
Atch 10 - BLDG 4 addendum.pdf PDF
Atch 21 - BLDG 48 addendum.pdf PDF
Site Visit Sign-in Sheets - 6-28-22 - 6-30-22.pdf PDF
36C77622B0035 0001.pdf PDF
Atch 5 - General 2 of 2.pdf PDF
Atch 8 - BLDG 2.pdf PDF
Atch 23 - BLDG 50.pdf PDF
Atch 24 - BLDG 51.pdf PDF
Atch 27 - BLDG 96.pdf PDF
Atch 31 - BLDG 112.pdf PDF
Atch 10 - BLDG 4.pdf PDF
Atch 34 - BLDG 118.pdf PDF
Atch 1 - Specifications Volume 1.pdf PDF
Atch 7 - BLDG 1 - 2 of 2.pdf PDF
Atch 12 - BLDG 6.pdf PDF
Atch 15 - BLDG 9.pdf PDF
Atch 18 - BLDG 14.pdf PDF
Atch 21 - BLDG 48.pdf PDF
Atch 25 - BLDG 54 and 69.pdf PDF
Atch 26 - BLDG 95 and 88.pdf PDF
Atch 28 - BLDG 108.pdf PDF
Atch 30 - BLDG 111.pdf PDF
Atch 32 - BLDG 115.pdf PDF
Atch 36 - Parking Structure.pdf PDF
Atch 40 - Limitations on Subcontracting - Construction.docx DOCX document
Atch 43 - Site Visit Instructions.pdf PDF
Atch 20 - BLDG 29.pdf PDF
36C77622B0035 - 6-9-22.pdf PDF
Atch 6 - BLDG 1 - 1 of 2.pdf PDF
Atch 16 - BLDG 10.pdf PDF
Atch 19 - BLDG 28.pdf PDF
Show all 50

Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING FIBER - INSIDE

VFY EXIST

EXISTING FIBER - OUTSIDE

VFY EXIST

FIBER ROUTE - INSIDE

SEE TELECOM

FIBER ROUTE - OUTSIDE

SEE CIVIL

BUILDING OUTLINE

VFY EXIST

CORRIDOR OUTLINE

VFY EXIST

LEGEND

TO 8TH ST WEST ONLYTO 8TH ST EAST & WEST

44TH AVE.

TRAIL 1

TRAIL 2

TRANSFER

SWITCH

CAPACITOR

BANK (3)

SWITCH

(2)

15KV

MAIN

SW

BATT

35 KV

TO

15 KV

TRANSFORMER

35KV

FUSED

SWITCH

METER 35KV

SWITCH

GRAVEL

GRAVEL

GRAVEL

EXISTING

ROAD

CHAIN LINK FENCE

CHAIN LINK FENCE

16' GATE

GRAVEL

ELECTRICAL

SUBSTATION

G E N E R A T O R

FUEL LINES

CONDU ITS TO TU NNEL

M V

D U

C T

B A

N K

1 1 2 W

PHARMACY ADDIT ION

11 2 E

G E N E R A T O R

B

CORRIDOR LINK

A

C T

TR

A

IL

ER

174 s .f.

256 s .f.

185 s .f.

149 s ..f.

155 s .f.

104 s .f.

70 s. .f .

72 s .f.

110 s .f.

276 s .f.

112 s .f.

99 s .f.

57 s .f.

146 s .f.

434 s .f.

R A

MP

U P

1:

M A X

R A

MP

U P

1:

M A X

RA

M P

UP

1:2 0 M

AX

TRANSFER

SWITCH

CAPACITOR

BANK (3)

SWITCH

(2) 15KV

MAIN

SW

BATT

35 KV

TO

15 KV

TRANSFORMER

35KV

FUSED

SWITCH

METER 35KV

SWITCH

.3

TRANSFORMER

BUILD ING

#91

5,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

EXISTIN G G AS SU P P LY EQ U IP M EN T TO R EM AIN

O P ER ATIO N AL D U R IN G D EM O LITIO N AN D N EW

C O N STR U C TIO N. P R O TEC T EQU IP M EN T AN D

P IP ELIN ES IN AC C O R D AN C E W ITH G AS SU P P LIER 'S

R EC O M M EN D ATIO N S

N EW G AS SU P P LY M AIN

IN TO B U ILD IN G

SP AR E

P H O N E LIN E

EXTEN D S TO

E XISTIN G

P H O N E IN

B O ILER R O O M

P ER P LAN .

SP AR E

P H O N E

LIN E TO

M ETER

TU N N EL

E XTEN D S

A D D ITIO N AL

2'- 0" U N D ER

B U ILD IN G

FUEL LINE

VENT LINE

1,000 GAL.

UNDERGROUND

DIESEL FUEL

TANK

1,000/5,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

1,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

1,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

S 1

LIG H T

N EW G AS SU P P LY

(C O O R D IN ATE W ITH SU P P LIER )

12"D

10"D

"D

TP TP

EXIST. BUILDING

EXIST. BUILDING

EXIST.

BUS STOP

CC

L O

O P

16"

20"

12"

3"

8"

DN

BIRDCAGE

B

IR

D C

A G

E

NSP ELECTRICAL

FOR HWY DEPT

T101

I.T.

CHILLER

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

VESTIBULE

DN

DN

DN

FD

DN

F B

F

B

F B

F

B

F B

F

B

SOUTH

VESTIBULE

PASS

THROUGH

LINK TO

BUILDI NG 51

6 3. 32 56

1 13 5. 35 78

PARKING

NO

PARKING

93 49

37 6

109 5

1A

S M

O K

E B

L D

G

SMOKE

BLDG

SMOKE

BLDG

S M

O K

E B

L D

G

SMOKE

BLDG

M.H.

STOR.

SMOKE

BLDG

SMOKE

BLDG

SMOKE

BLDG

SMOKE

BLDG

SMOKE

BLDG

STOR.

BIO-

HAZ.

SAUK RIVER

GP

HOLDING POND

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of

Minnesota.

Name:

Date: License Number: MN# 18157

Typed or Printed Name: Tom Olesak

OWNER AND

CONSULTANTS:

CONTACT:

ADDRESS:

MIKE ENGMARK

ST CLOUD VA MEDICAL CENTER

4801 VETERANS DRIVE

ST. CLOUD, MN 56303

NAME:

ADDRESS:

CONTACT:

ADVANCED STRUCTURAL TECHNOLOGIES

7301 OHMS LANE; SUITE 215

EDINA, MN 55439

ZACHARY CRAIG

PHONE:

NAME:

ADDRESS:

CONTACT:

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIRCLE

OMAHA, NE 68134

KRIS BURNHAM

PHONE: 402-991-5520

NAME:

ADDRESS:

CONTACT:

PHONE:

NAME:

ADDRESS:

CONTACT:

PHONE:

NAME:

ADDRESS:

CONTACT:

PHONE:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

IAN WEBER

763-412-4000

ARCHITECT:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

EDWARD MARKFORT

763-412-4000

952-854-9302

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIRCLE

OMAHA, NE 68134

KRIS BURNHAM

402-991-5520

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

COVER

DATE:

APPROVED: APPROVED: PROJECTS SECTION MANAGER

APPROVED: OIT MANAGER DATE: APPROVED: ASSISTANT CHIEF ENGINEER DATE:

APPROVED: SAFETY MANAGER

APPROVED: CHIEF OF POLICE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE: APPROVED: EMS MANAGER

APPROVED: M/O MANAGER

DATE:

DATE:

DATE:DATE:

APPROVED: MEDICAL CENTER DIRECTOR

APPROVED: PROJECT COR DATE:

APPROVED: INFECTION CONTROL NURSE DATE:

APPROVED: SERVICE LINE DIRECTOR

APPROVED: GEMS COORDINATOR DATE:

DATE:

APPROVED: NURSE EXECUTIVE

APPROVED: CHIEF OF STAFF DATE:

APPROVED: DIRECTOR FMS

APPROVED: ASSOCIATE DIRECTOR

DATE:

DATE:

DATE:

DATE:APPROVED: DATE:

APPROVED: DATE:

APPROVED: DATE:

Main Campus, St. Cloud, Minnesota St. Cloud VA Health Care System

N

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

VICINITY MAP:

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHONE: 320-252-1670

CIVIL ENGINEER:

VA COR:

TELECOMMUNICATIONS ENGINEER:

CONTACT:

ADDRESS:

JONATHAN WEST

ST CLOUD VA MEDICAL CENTER

4801 VETERANS DRIVE

ST. CLOUD, MN 56303

PHONE: 504-250-2699

PROGRAM MANAGER:

EMAIL: Jonathan.West@vciint.com

STRUCTURAL ENGINEER:

MECH/ELEC/PLUMB/FIRE ENGINEER:

C

U s e rs

\P u b li c \D o c u m e n ts \R e v it

P ro je c ts

\1 -0

-C a m p u s -R

E

M a rk fo rt

.r v t

/2

/2

:0 :1

P

M

GI000

COVER SHEET

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

TO EM, BW

16305

ST CLOUD EHRM INFRASTRUCTURE UPGRADES

GENERAL

03/30/2022

EXISTING CONDITIONS DIGITAL REPRESENTATION

PROPOSED ADDITIONS

BUILDING 5 TELECOM RM

BUILDING 1 TELECOM RM

GENERAL CONDITIONS

A. All dimensions on drawings are approximate; Drawings are not to be scaled. It is the responsibility of the contractor to verify all field conditions and physical dimensions that influence the construction area.

B. It is recommended that contractors visit the proposed construction site prior to submitting their bids and they are encouraged to do so.

C. Contractor shall adhere strictly to State and Federal Occupational Safety and Health Administration ( OSHA ) Standards.

D. Contractor shall park only in the designated parking areas and are not to park on the lawn areas; the only exception is to load or unload supplies or equipment in designated and approved areas and times.

E. Contractor is responsible for the safeguarding of tools, equipment, and materials for the project. All tools and equipment are not to be left unattended and are to be secured at all times when the contractor is not present, or the construction site is not supervised by the contractor.

F. All VA property is to be safeguarded from damage. Any damaged VA property is to be restored to original condition prior to damage or replaced completely. This includes installation, labor, and procurement expenses.

G. All demolished material becomes the property and the responsibility of the contractor with the exception of specified items designated either in the plans or verbally requested by the COR to be retained by the VA.

Offsite disposal of the demolished items is the responsibility of the contractor.

H. Contractor must control demolition and construction dust from facility by erecting a dust barrier and ventilation with HEPA filters. If venting to outside, the contractor will insure negative air pressure is maintained in encapsulated work area. When transporting debris, wet down sufficiently to prevent dust spreading.

I. If scaffolding is used, it must be used in accordance with (OSHA) regulations and is to be enclosed for the first eight feet above ground at end of each working day, until dismantled. Ladders must be removed and locked up at the end of each working day to prevent unauthorized persons from having access.

J. Clean all debris from construction site to the satisfaction of the COR.

K. Contractor is responsible for erecting a barrier around work site to prevent patients, staff and visitors from entering construction site. Coordinate construction materials and location of fence with COR.

L. Contractor is responsible for repairing and replacing any damaged lawn. The restoration will be performed by a landscape contractor that regularly does sodding as part of their business. All damaged lawn will be overcut by 6" or more to accommodate full width rolls of sod. Certified topsoil to be tilled and graded to a smooth matching grade of undamaged lawn. Sod to be thoroughly saturated with water upon placement.

The contractor is responsible for watering and maintaining new sod, to include but not limited to fertilizing and mowing, until project acceptance by the COR.

M. Access to all buildings and parking areas must be maintained throughout the project.

N. Contractors are to coordinate all work with the Contracting Officers Representative. (C.O.R.)

O. All carts, tool boxes / bags, and ladders are to be clearly labeled identifying the contractors and subcontractors name and project name.

P. RFI's to be submitted to COR through Submital Exchange or as specified by the VA.

SHEET INDEX - BUILDING 1 - SET 1 OF 2

SHEET NO. SHEET TITLE

1-GI000 BUILDING 1 COVER SHEET & SHEET INDEX

1-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN

1-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

1-GI120 SECOND FLOOR LIFE SAFETY PLAN

1-GI121 SECOND FLOOR - INFECTION CONTROL & PHASING PLAN

1-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY

1-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

1-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY

1-HA-4A REFERENCE - THIRD / ATTIC FLOOR ASBESOTS RE-SURVEY

1-AS100 BASEMENT FLOOR - OVERALL PLAN

1-AS110 FIRST FLOOR - OVERALL PLAN

1-AS120 SECOND FLOOR - OVERALL PLAN

1-AS130 ATTIC FLOOR - OVERALL PLAN

1-AS400 LARGE SCALE PLANS

1-AS430 BUILDING ADDITION AND ROOF PLAN

1-AS600 ELEVATIONS, DETAILS, SCHEDULES

1-AS601 INTERIOR PARTITION TYPES AND DETAILS

1-AS602 SECTION DETAILS

1-S120 SECOND FLOOR PLAN - OVERALL

1-S130 ATTIC FLOOR PLAN - OVERALL

1-S400 LARGE SCALE PLANS

01-E100 BASEMENT DEMOLITION - ELECTRICAL

01-E101 FIRST FLOOR DEMOLITION - ELECTRICAL

01-E200 BASEMENT - ELECTRICAL

01-E201 FIRST FLOOR - ELECTRICAL

01-E202 SECOND FLOOR - ELECTRICAL

01-E204 ROOF - ELECTRICAL

01-M000 MECHANICAL COVERSHEET

01-M100 BASEMENT DEMOLITION - MECHANICAL

01-M101 FIRST FLOOR DEMOLITION - MECHANICAL

01-M102 SECOND FLOOR DEMOLITION - MECHANICAL

01-M200 BASEMENT REMODEL - MECHANICAL

01-M201 FIRST FLOOR REMODEL - MECHANICAL

01-M202 SECOND FLOOR REMODEL - MECHANICAL

01-M400 MECHANICAL DETAILS AND DIAGRAMS

01-M600 MECHANICAL SCHEDULES

SEE GENERAL AND SET 2 SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 1 - SET 2 OF 2

SHEET NO. SHEET TITLE

1-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION

1-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

1-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION

1-TD130 THIRD FLOOR PLAN - TELECOM - DEMOLITION

1-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

1-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

1-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS

1-TN130 THIRD FLOOR PLAN - TELECOMMUNICATIONS

1-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE

1-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

1-TN220 SECOND FLOOR PLAN - TELECOM - CABLE DISTANCE

1-TN230 THIRD FLOOR PLAN - TELECOM - CABLE DISTANCE

1-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO

1-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

1-TN401 ENLARGED PLANS - TELECOMMUNICATIONS

1-TN402 ENLARGED PLANS - TELECOMMUNICATIONS

1-TN403 ENLARGED PLANS - TELECOMMUNICATIONS

SEE GENERAL AND SET 1 SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 2

SHEET NO. SHEET TITLE

2-GI000 BUILDING 2 COVER SHEET & SHEET INDEX

2-GI101 BASEMENT FLOOR INFECTION CONTROL & PHASING PLAN

2-HA-1A REFERENCE - BASEMENT FLOOR - ASBESTOS RE-SURVEY

2-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

2-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY

2-AS100 BASEMENT PLANS

2-AS110 FIRST FLOOR - OVERALL PLAN

2-AS120 SECOND FLOOR - OVERALL PLAN

2-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION

2-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

2-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION

2-TD130 THIRD FLOOR PLAN - TELECOM - DEMOLITION

2-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

2-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

2-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS

2-TN130 THIRD FLOOR PLAN - TELECOMMUNICATIONS

2-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE

2-TN300 ENLARGED PLAN - TELECOMMUNICATIONS - DEMO

2-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

02-E200 BASEMENT FLOOR PLAN - ELECTRICAL

02-E201 FIRST FLOOR PLAN - ELECTRICAL

02-E300 ELECTRICAL ENLARGED PLANS

02-E400 ELECTRICAL DIAGRAMS

02-E500 ELECTRICAL SCHEDULES

02-M100 BASEMENT AND FIRST FLOOR DEMOLITION - MECHANICAL

02-M200 BASEMENT FLOOR REMODEL - MECHANICAL

02-M201 FIRST FLOOR REMODEL- MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 3

SHEET NO. SHEET TITLE

3-GI000 BUILDING 3 COVER SHEET & SHEET INDEX

3-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

3-GI121 SECOND FLOOR INFECTION CONTROL & PHASING PLAN

3-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY

3-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

3-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY

3-HA-4A REFERENCE - THIRD FLOOR / ATTIC ASBESTOS RE-SURVEY

3-AS110 BASEMENT AND FIRST FLOOR PLANS

3-AS120 SECOND FLOOR AND ATTIC PLANS

3-TD100 BASEMENT & FIRST FLOOR PLANS - TELECOM - DEMOLITION

3-TD120 SECOND & THIRD FLOOR PLANS - TELECOM - DEMOLITION

3-TN100 BASEMENT & FIRST FLOOR PLANS - TELECOMMUNICATIONS

3-TN120 SECOND & THIRD FLOOR PLANS - TELECOMMUNICATIONS

3-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

3-TN220 SECOND FLOOR PLAN - TELECOM - CABLE DISTANCE

3-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO

3-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

3-TN401 ENLARGED PLANS - TELECOMMUNICATIONS

03-E200 BASEMENT FLOOR PLAN - ELECTRICAL

03-E201 FIRST FLOOR - ELECTRICAL

03-E202 SECOND FLOOR - ELECTRICAL

03-E300 ELECTRICAL ENLARGED PLANS

03-E400 ELECTRICAL RISER DIAGRAMS

03-E500 ELECTRICAL SCHEDULES

03-M101 FIRST FLOOR DEMOLITION - MECHANICAL

03-M102 SECOND FLOOR DEMOLITION - MECHANICAL

03-M201 FIRST FLOOR - MECHANICAL

03-M202 SECOND FLOOR REMODEL - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 4

SHEET NO. SHEET TITLE

4-GI000 BUILDING 4 COVER SHEET & SHEET INDEX

4-GI100 BASEMENT LIFE SAFETY PLAN

4-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN

4-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

4-GI121 SECOND FLOOR - INFECTION CONTROL & PHASING PLAN

4-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY

4-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

4-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY

4-AS100 BASEMENT FLOOR - OVERALL PLANS

4-AS110 FIRST FLOOR - OVERALL PLANS

4-AS120 SECOND FLOOR - OVERALL PLANS

4-AS400 LARGE SCALE PLANS

4-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION

4-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

4-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION

4-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

4-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

4-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS

4-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE

4-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

4-TN220 SECOND FLOOR PLAN - TELECOM - CABLE DISTANCE

4-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO

4-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

4-TN401 ENLARGED PLANS - TELECOMMUNICATIONS

4-TN402 ENLARGED PLANS - TELECOMMUNICATIONS

4-TN403 ENLARGED PLANS - TELECOMMUNICATIONS

4-TN500 ONE-LINE DIAGRAM

4-TN501 PANEL SCHEDULES

04-E200 BASEMENT FLOOR PLAN - ELECTRICAL - EAST

04-E201 FIRST FLOOR PLAN - ELECTRICAL - EAST

04-E202 SECOND FLOOR PLAN - ELECTRICAL - EAST

04-E300 ELECTRICAL ENLARGED PLANS

04-E400 ELECTRICAL ONE-LINE DIAGRAMS

04-E500 ELECTRICAL SCHEDULES

04-M100B BASEMENT DEMOLITION - MECHANICAL - AREA B

04-M101B FIRST FLOOR DEMOLITION - MECHANICAL - AREA B

04-M200B BASEMENT FLOOR - MECHANICAL - AREA B

04-M201 FIRST FLOOR - MECHANICAL

04-M201B FIRST FLOOR - MECHANICAL - AREA B

04-M600 MECHANICAL SCHEDULES

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 5

SHEET NO. SHEET TITLE

5-GI000 BUILDING 5 COVER SHEET & SHEET INDEX

5-GI110 FIRST LEVEL LIFE SAFETY PLAN

5-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

5-AS110 FIRST FLOOR PLANS

5-AS500 SECTIONS, DETAILS

5-AS600 ELEVATIONS, DETAILS

5-S110 FIRST FLOOR PLANS

5-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

5-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

5-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

5-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

5-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO

05-E200 FIRST FLOOR PLAN - ELECTRICAL

05-E300 ELECTRICAL ENLARGED PLANS

05-E400 ELECTRICAL ONE-LINE DIAGRAMS

05-E500 ELECTRICAL SCHEDULES

05-M101 FIRST FLOOR DEMOLITION - MECHANICAL

05-M201 FIRST FLOOR REMODEL - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 6

SHEET NO. SHEET TITLE

6-GI000 BUILDING 6 COVER SHEET & SHEET INDEX

6-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

6-AS110 FIRST FLOOR PLAN - OVERALL

6-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

6-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 7 & 13

SHEET NO. SHEET TITLE

7-GI000 BUILDINGS 7 & 13 COVER SHEET & SHEET INDEX

7-GI001 FIRST FLOOR LIFE SAFETY PLAN

7-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

7-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

7-HA-2A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY

13-HA-1A REFERENCE - FIRST FLOOR - ASBESTOS RE-SURVEY

7-AS110 FIRST FLOOR PLANS

7-S110 FIRST FLOOR PLANS

7-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

7-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

7-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

7-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO

7-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

07-E100 FIRST FLOOR DEMOLITION PLAN - ELECTRICAL

07-E200 FIRST FLOOR PLAN - ELECTRICAL

07-E300 ELECTRICAL ENLARGED PLANS

07-E500 ELECTRICAL ONE-LINE DIAGRAMS

07-E600 ELECTRICAL SCHEDULES

07-M101 FIRST FLOOR DEMOLITION - MECHANICAL

07-M201 FIRST FLOOR REMODEL - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 8

SHEET NO. SHEET TITLE

8-GI000 BUILDING 8 COVER SHEET & SHEET INDEX

8-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

8-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY

8-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

8-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY

8-HA-4A REFERENCE - ATTIC ASBESTOS RE-SURVEY

8-AS100 BASEMENT FLOOR - OVERALL PLAN

8-AS110 FIRST FLOOR PLANS

8-AS120 SECOND FLOOR - OVERALL PLAN

8-TD101 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION

8-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

8-TN101 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

8-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

8-TN200 FIRST LEVEL FLOOR PLAN - TELECOM - CABLE DISTANCE

8-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

08-E100 FIRST FLOOR DEMOLITION PLAN - ELECTRICAL

08-E200 BASEMENT FLOOR PLAN - ELECTRICAL

08-E201 FIRST FLOOR PLAN - ELECTRICAL

08-E300 ELECTRICAL ENLARGED PLANS

08-E400 ELECTRICAL ONE-LINE DIAGRAMS

08-E500 ELECTRICAL SCHEDULES

08-M101 FIRST FLOOR DEMOLITION - MECHANICAL

08-M201 FIRST FLOOR REMODEL - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 9

SHEET NO. SHEET TITLE

9-GI000 BUILDING 9 COVER SHEET & SHEET INDEX

9-GI110 FIRST FLOOR LIFE SAFETY PLAN

9-GI111 FIRST FLOOR INFECTION CONTROL & PHASING PLAN

9-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY

9-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

9-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY

9-HA-4A REFERENCE - ATTIC FLOOR ASBESTOS RE-SURVEY

9-AS100 BASEMENT, FIRST, AND SECOND FLOOR PLANS

9-TD100 FLOOR PLANS - TELECOM - DEMOLITION

9-TN100 FLOOR PLANS - TELECOMMUNICATIONS

9-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

9-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO

9-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

09-E100 FIRST FLOOR DEMOLITION - ELECTRICAL

09-E200 BASEMENT - ELECTRICAL

09-E201 FIRST FLOOR - ELECTRICAL

09-E300 ELECTRICAL ENLARGED PLANS

09-E500 ELECTRICAL ONE-LINE DIAGRAMS

09-E600 ELECTRICAL SCHEDULES

09-M101 FIRST FLOOR DEMOLITION - MECHANICAL

09-M201 FIRST FLOOR REMODEL - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 10

SHEET NO. SHEET TITLE

10-GI000 BUILDING 10 COVER SHEET & SHEET INDEX

10-GI101 BASEMENT FLOOR INFECTION CONTROL & PHASING PLAN

10-HA-1A REFERENCE - BASEMENT FLOOR - ASBESTOS RE-SURVEY

10-HA-2A REFERENCE - FIRST FLOOR - ASBESTOS RE-SURVEY

10-HA-3A REFERENCE - SECOND FLOOR - ASBESTOS RE-SURVEY

10-AS100 BASEMENT, FIRST, AND SECOND FLOOR PLANS

10-TD100 BASEMENT FLOOR PLANS - TELECOM - DEMOLITION

10-TN100 BASEMENT FLOOR PLANS - TELECOMMUNICATIONS

10-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

10-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION

10-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

10-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS

10-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE

10-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO

10-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

10-E200 BASEMENT - ELECTRICAL

10-E201 FIRST FLOOR - ELECTRICAL

10-E300 ELECTRICAL ENLARGED PLANS

10-E500 ELECTRICAL ONE-LINE DIAGRAMS

10-E600 ELECTRICAL SCHEDULES

10-M100 BASEMENT DEMOLITION - MECHANICAL

10-M200 BASEMENT FLOOR - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 11

SHEET NO. SHEET TITLE

11-GI000 BUILDING 11 COVER SHEET & SHEET INDEX

11-GI101 BASEMENT FLOOR INFECTION CONTROL & PHASING PLAN

11-HA-1A REFERENCE - BASEMENT FIRST FLOOR ASBESTOS RE-SURVEY

11-HA-2A REFERENCE - SECOND ATTIC FLOOR ASBESTOS RE-SURVEY

11-AS100 BASEMENT, FIRST, AND SECOND FLOOR PLANS

11-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION

11-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

11-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

11-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION

11-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

11-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS

11-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE

11-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO

11-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

11-E200 BASEMENT - ELECTRICAL

11-E300 ELECTRICAL ENLARGED PLANS

11-E600 ELECTRICAL SCHEDULES

11-M100 BASEMENT DEMOLITION - MECHANICAL

11-M200 BASEMENT FLOOR - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

ISSUED

NOT ISSUED

ISSUED FOR REFERENCE ONLY

ISSUED AS NOTED

R

N

SHEET ABBREVIATION AND NUMBERING

XXX-AS 1 1 0

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

FL

O

O R

LE

VE

L

SH

EE

T G

RO

UP

IN

G

AE 110

ARCHITECTURAL DRAWING, PLAN, FIRST LEVEL

XXX-QJ 1 1 0

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

FL

O

O R

LE

VE

L

SH

EE

T G

RO

UP

IN

G

QJ110

EQUIPMENT, PLAN, FIRST LEVEL

DISCIPLINE

DESIGNATOR

SHEET TYPE

DESIGNATOR

FLOOR

LEVEL

SHEET

GROUPING

GI - GENERAL INFORMATION

HA - HAZARD MATERIAL

DRAWINGS

CD - SITE DEMOLITION

CU - SITE UTILITY

CP - SITE PROFILES

CS - SITE RESTORATION

CJ - SITE DETAILS

AS - ARCHITECTURAL

S - STRUCTURAL

T - TELECOM

E - ELECTRICAL

M - MECH, PLUMBING,

FIRE PROTECTION

0 - GENERAL

1 - PLANS

2 - ELEVATIONS

3 - SECTIONS

4 - LARGE SCALE VIEWS

5 - DETAILS

6 - SCHEDULES & DIAGRAMS

0 - LOWER LEVEL

1 - FIRST LEVEL

2 - SECOND LEVEL

3 - THIRD LEVEL

4 - FOURTH LEVEL

GENERAL:

00-10 - TITLE SHEET, NOTES,

ABBREVIATIONS, SYMBOLS,

SCHEDULES

PLANS:

1 - LEVEL FLOOR PLAN

2 - DIMENSION PLAN

ELEVATIONS:

01-10 - EXTERIOR ELEVATIONS

11-19 - INTERIOR ELEVATION

SECTIONS:

01-10 - BUILDING SECTIONS

11-19 - WALL SECTIONS

20-29 -STAIR SECTIONS & PLANS

DETAILS:

01-19 - EXTERIOR PLAN DETAILS

20-29 - EXTERIOR SECTION DETAILS

30-39 - ROOF DETAILS

40-49 - INTERIOR PLAN DETAILS

50-59 - INTERIOR SECTION DETAILS

60-69 - CEILING DETAILS

PLANS ONLY

XXX-AS 2 0 1

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

SH

EE

T G

RO

UP

IN

G

AS 201

ARCHITECTURAL ELEVATIONS

XXX-AS 6 0 0

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

SH

EE

T G

RO

UP

IN

G

AS600

ARCHITECTURAL SCHEDULE

BU

IL

DI

NG

N

UM

BE

R

BU

IL

DI

NG

N

UM

BE

R

BU

IL

DI

NG

N

UM

BE

R

BU

IL

DI

NG

N

UM

BE

R

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name:

Date: License Number: MN# 18157

Typed or Printed Name: Tom Olesak

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 C

U s e rs

\P u b li c \D o c u m e n ts \R e v it

P ro je c ts

\1 -0

-S h e e tI n d e x -R

E

M a rk fo rt

.r v t

/2

/2

:2 :5

P

M

GI001

SHEET INDEX - 1

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

EM

16305

CAMPUS

03/30/2022

SHEET INDEX - GENERAL

SHEET NO. SHEET TITLE

GI000 COVER SHEET

GI001 SHEET INDEX - 1

GI002 SHEET INDEX - 2

GI003 ABBREVIATIONS

GI004 GENERAL NOTES, LIFE SAFETY, ICRA, PHASING, SCHEDULE

GI005 GENERAL NOTES AND SYMBOLS

GI100 SITE - OVERALL PLAN

GI101 ICRA OVERVIEW PLAN

SEE BUILDING SETS FOR ADDITIONAL DRAWINGS

SHEET INDEX - ARCHITECTURE

SHEET NO. SHEET TITLE

AS600 INTERIOR SCHEDULES & SIGNAGE DETAILS

AS601 BUILDING ELEMENT TYPES AND DETAILS

AS602 DOOR SCHEDULE AND ELEVATIONS

SEE BUILDING SETS FOR ADDITIONAL DRAWINGS

SHEET INDEX - CIVIL

SHEET NO. SHEET TITLE

CD100 OVERALL DEMOLITION PLAN

CD101 DEMOLITION PLAN 1

CD102 DEMOLITION PLAN 2

CD103 DEMOLITION PLAN 3

CU100 OVERALL UTILITY PLAN

CU101 UTILITY PLAN 1

CU102 UTILITY PLAN 2

CU103 UTILITY PLAN 3

CP401 PROFILE 1

CP402 PROFILE 2

CP403 PROFILE 3

CS100 OVERALL SITE RESTORATION PLAN

CS101 SITE RESTORATION PLAN 1

CS102 SITE RESTORATION PLAN 2

CS103 SITE RESTORATION PLAN 3

CJ501 CIVIL DETAILS

CJ502 CIVIL DETAILS

SHEET INDEX - MECHANICAL

SHEET NO. SHEET TITLE

M SERIES SEE BUILDING 1 SET FOR GENERAL NOTES. SEE BUILDING SETS FOR

MECHANICAL AND PLUMBING DRAWINGS

SHEET INDEX - STRUCTURAL

SHEET NO. SHEET TITLE

S100 TITLE SHEET

S101 STRUCTURAL NOTES

S500 FOUNDATION DETAILS

S600 MASONRY DETAILS

S700 CONCRETE DETAILS

S800 LIGHT GAUGE DETAILS

SEE BUILDING SETS FOR ADDITIONAL DRAWINGS

SHEET INDEX - ELECTRICAL

SHEET NO. SHEET TITLE

0-GE000 ELECTRICAL COVERSHEET

0-GE400 ELECTRICAL COMMON DETAILS

0-GE600 ELECTRICAL COMMON SCHEDULES

SEE BUILDING SETS FOR ADDITIONAL DRAWINGS

SHEET INDEX - TELECOMMUNICATION

SHEET NO. SHEET TITLE

T000 TELECOM SYMBOLS AND ABBREVIATIONS

TS001 TELECOMMUNICATION SITE PLAN

T800 TELECOMMUNICATION ROUTING SCHEMATIC

T801 TELECOMMUNICATION ROUTING SCHEMATIC

T802 TELECOMMUNICATION ROUTING SCHEMATIC

T803 TELECOMMUNICATION ROUTING SCHEMATIC

T804 TELECOMMUNICATION DETAILS

SEE BUILDING SETS FOR ADDITIONAL DRAWINGS

SHEET INDEX - HAZARD PLANS

SHEET NO. SHEET TITLE

HA100 REFERENCE HAZARDOUS MATERIAL SITE PLAN - ASBESTOS / LEAD

HA-CE-1A REFERENCE - EAST CORRIDORS - ASBESTOS RE-SURVEY

HA-CW-1A REFERENCE - WEST CORRIDORS - ASBESTOS RE-SURVEY

HA-TU-1A REFERENCE - CAMPUS STEAM TUNNELS - ASBESTOS RE-SURVEY

SEE BUILDING SETS FOR ADDITIONAL DRAWINGS

SHEET INDEX - BUILDING 14

SHEET NO. SHEET TITLE

14-GI000 BUILDING 14 COVER SHEET & SHEET INDEX

14-GI111 FIRST FLOOR INFECTION CONTROL & PHASING PLAN

14-HA-1A REFERENCE - BASEMENT FIRST FLOOR ASBESTOS RE-SURVEY

14-AS110 FIRST FLOOR PLANS

14-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

14-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

14-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

14-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

14-E101 FIRST FLOOR DEMOLITION - ELECTRICAL

14-E201 FIRST FLOOR - ELECTRICAL

14-E300 ELECTRICAL ENLARGED PLANS

14-E400 ELECTRICAL ONE-LINE DIAGRAMS

14-E500 ELECTRICAL SCHEDULES

14-M101 FIRST FLOOR DEMOLITION PLAN - MECHANICAL

14-M201 FIRST FLOOR PLAN REMODEL - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 28

SHEET NO. SHEET TITLE

28-GI000 BUILDING 28 COVER SHEET & SHEET INDEX

28-GI100 BASEMENT FLOOR - LIFE SAFETY PLAN

28-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN

28-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY

28-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

28-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY

28-HA-4A REFERENCE - ATTIC FLOOR FLOOR ASBESTOS RE-SURVEY

28-AS100 BASEMENT FLOOR - OVERALL PLAN

28-AS110 FIRST FLOOR - OVERALL PLAN

28-AS120 SECOND FLOOR - OVERALL PLAN

28-AS400 LARGE SCALE PLANS

28-S100 BASEMENT FLOOR PLAN - OVERALL

28-S110 FIRST FLOOR PLAN - OVERALL

28-S400 LARGE SCALE PLANS

28-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION

28-TD110 FIRSTFLOOR PLAN - TELECOM - DEMOLITION

28-TD120 SECONDFLOOR PLAN - TELECOM - DEMOLITION

28-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

28-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

28-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS

28-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE

28-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO

28-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

28-TN401 ENLARGED PLANS - TELECOMMUNICATIONS

28-E200 BASEMENT - ELECTRICAL

28-E201 FIRST FLOOR - ELECTRICAL

28-E300 ELECTRICAL ENLARGED PLANS

28-E400 ELECTRICAL ONE-LINE DIAGRAMS

28-E500 ELECTRICAL SCHEDULES

28-M100 BASEMENT DEMOLITION - MECHANICAL

28-M200 BASEMENT REMODEL - MECHANICAL

28-M201 FIRST FLOOR REMODEL - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 29

SHEET NO. SHEET TITLE

29-GI000 BUILDING 29 COVER SHEET & SHEET INDEX

29-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN

29-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

29-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY

29-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

29-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY

29-HA-4A REFERENCE - ATTIC FLOOR ASBESTOS RE-SURVEY

29-AS100 BASEMENT PLANS

29-AS110 FIRST FLOOR PLANS

29-AS120 SECOND FLOOR - OVERALL PLAN

29-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION

29-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

29-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION

29-TD130 ATTIC FLOOR PLAN - TELECOM - DEMOLITION

29-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

29-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

29-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS

29-TN130 ATTIC FLOOR PLAN - TELECOMMUNICATIONS

29-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE

29-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

29-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

29-TN401 ENLARGED PLANS - TELECOMMUNICATIONS

29-E200 BASEMENT - ELECTRICAL

29-E201 FIRST FLOOR - ELECTRICAL

29-E300 ELECTRICAL ENLARGED PLANS

29-M100 BASEMENT DEMOLITION - MECHANICAL

29-M101 FIRST FLOOR DEMOLITION - MECHANICAL

29-M200 BASEMENT FLOOR - MECHANICAL

29-M201 FIRST FLOOR REMODEL - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 48

SHEET NO. SHEET TITLE

48-GI000 BUILDING 48 COVER SHEET & SHEET INDEX

48-GI110 FIRST FLOOR - LIFE SAFETY PLAN

48-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

48-GI121 SECOND FLOOR - INFECTION CONTROL & PHASING PLAN

48-HA-1A REFERENCE - CRAWLSPACE FLOOR - ASBESTOS RE-SURVEY

48-HA-2A REFERENCE - BASEMENT FLOOR - ASBESTOS RE-SURVEY

48-HA-3A REFERENCE - FIRST FLOOR - ASBESTOS RE-SURVEY

48-HA-4A REFERENCE - SECOND FLOOR - ASBESTOS RE-SURVEY

48-HA-5A REFERENCE - THIRD ATTIC FLOOR - ASBESTOS RE-SURVEY

48-AS100 BASEMENT FLOOR - OVERALL PLAN

48-AS110 FIRST FLOOR PLANS

48-AS120 SECOND FLOOR PLANS

48-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION

48-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

48-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION

48-TD130 ATTIC FLOOR PLAN - TELECOM - DEMOLITION

48-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

48-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

48-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS

48-TN130 ATTIC FLOOR PLAN - TELECOMMUNICATIONS

48-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

48-TN220 SECOND FLOOR PLAN - TELECOM - CABLE DISTANCE

48-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

48-TN401 ENLARGED PLANS - TELECOMMUNICATIONS

48-E200 BASEMENT FLOOR PLAN - ELECTRICAL

48-E201 FIRST FLOOR PLAN - ELECTRICAL

48-E202 SECOND FLOOR PLAN - ELECTRICAL

48-E300 ELECTRICAL ENLARGED PLANS

48-E500 ELECTRICAL ONE-LINE DIAGRAMS

48-E600 ELECTRICAL SCHEDULES

48-M101 FIRST FLOOR DEMOLITION PLAN - MECHANICAL

48-M102 SECOND FLOOR DEMOLITION PLAN - MECHANICAL

48-M201 FIRST FLOOR PLAN - MECHANICAL

48-M202 SECOND FLOOR PLAN - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 49

SHEET NO. SHEET TITLE

49-GI000 BUILDING 49 COVER SHEET & SHEET INDEX

49-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN

49-HA-1A REFERENCE - CRAWLSPACE FLOOR - ASBESTOS RE-SURVEY

49-HA-2A REFERENCE - BASEMENT FLOOR - ASBESTOS RE-SURVEY

49-HA-3A REFERENCE - FIRST FLOOR - ASBESTOS RE-SURVEY

49-HA-4A REFERENCE - SECOND FLOOR - ASBESTOS RE-SURVEY

49-AS100 BASEMENT PLANS

49-AS110 FIRST FLOOR - OVERALL PLAN

49-AS120 SECOND FLOOR - OVERALL PLAN

49-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION

49-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

49-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION

49-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

49-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

49-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS

49-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE

49-TN300 ENLARGED PLANS -TELECOMMUNICATIONS - DEMO

49-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

49-E200 BASEMENT - ELECTRICAL

49-E201 FIRST FLOOR - ELECTRICAL

49-E300 ELECTRICAL ENLARGED PLANS

49-E500 ELECTRICAL ONE-LINE DIAGRAMS

49-E600 ELECTRICAL SCHEDULES

49-M100 BASEMENT DEMOLITION - MECHANICAL

49-M200 BASEMENT - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 50

SHEET NO. SHEET TITLE

50-GI000 BUILDING 50 COVER SHEET & SHEET INDEX

50-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN

50-HA-1A REFERENCE - CRAWLSPACE FLOOR ASBESTOS RE-SURVEY

50-HA-2A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY

50-HA-3A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

50-HA-4A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY

50-HA-5A REFERENCE - ATTIC FLOOR ASBESTOS RE-SURVEY

50-AS100 BASEMENT PLANS

50-AS110 FIRST FLOOR - OVERALL PLAN

50-AS120 SECOND FLOOR - OVERALL PLAN

50-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION

50-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

50-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION

50-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

50-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

50-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS

50-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE

50-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO

50-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

50-E100 BASEMENT FLOOR PLAN - ELECTRICAL

50-E101 FIRST FLOOR PLAN - ELECTRICAL

50-E300 ENLARGED PLANS - ELECTRICAL

50-E500 ELECTRICAL POWER DIAGRAMS

50-E600 ELECTRICAL SCHEDULES

50-M100 BASEMENT DEMOLITION PLAN - MECHANICAL

50-M200 BASEMENT FLOOR PLAN - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 51

SHEET NO. SHEET TITLE

51-GI000 BUILDING 51 COVER SHEET & SHEET INDEX

51-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN

51-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

51-HA-1A REFERENCE - SUBBASEMENT FLOOR ASBESTOS RE-SURVEY

51-HA-2A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY

51-HA-3A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

51-HA-4A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY

51-AS100 BASEMENT FLOOR PLANS

51-AS110 FIRST FLOOR - OVERALL PLAN

51-AS120 SECOND FLOOR - OVERALL PLAN

51-TD100 BASEMENT FLOOR PLAN - ELECTRICAL DEMOLITION

51-TD110 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION

51-TD120 SECOND FLOOR PLAN - ELECTRICAL DEMOLITION

51-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

51-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

51-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS

51-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE

51-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

51-E100 BASEMENT FLOOR PLAN - ELECTRICAL

51-E101 FIRST FLOOR PLAN - ELECTRICAL

51-E300 ENLARGED PLANS - ELECTRICAL

51-E500 ELECTRICAL DIAGRAMS

51-E600 ELECTRICAL SCHEDULES

51-M100 BASEMENT DEMOLITION PLAN - MECHANICAL

51-M200 BASEMENT FLOOR PLAN - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDINGS 54 & 69

SHEET NO. SHEET TITLE

54-GI000 BUILDINGS 54 & 69 COVER SHEET & SHEET INDEX

54-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

54-AS110 FIRST FLOOR PLANS

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDINGS 95 & 88

SHEET NO. SHEET TITLE

95-GI000 BUILDINGS 95 & 88 COVER SHEET & SHEET INDEX

95-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

88-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

95-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

95-AS100 FIRST FLOOR PLANS (BUILDING 95 & 88)

95-TD110 FIRST FLOOR PLAN (BUILDING 88 & 95) - TELECOM - DEMOLITION

95-TN110 FIRST FLOOR PLAN (BUILDING 88 & 95) - TELECOMMUNICATION

95-TN210 FIRST FLOOR PLAN (BUILDING 88 & 95) - TELECOM - CABLE DISTANCE

95-TN400 ENLARGED PLANS (BUILDING 95) - TELECOMMUNICATIONS

95-E201 FIRST FLOOR PLAN - ELECTRICAL

95-E600 ELECTRICAL SCHEDULES

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - ADHC

ADHC SHEET TITLE

FB1-GI000 CONSTRUCT ADULT DAY HEALTH CARE COVER SHEET & SHEET INDEX

FB1-AS110 FIRST FLOOR - OVERALL PLAN

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 96

SHEET NO. SHEET TITLE

96-GI000 BUILDING 96 COVER SHEET & SHEET INDEX

96-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

96-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

96-AS110 FIRST FLOOR PLANS

96-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

96-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

96-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

96-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO

96-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

96-E201 FIRST FLOOR PLAN - ELECTRICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 108

SHEET NO. SHEET TITLE

108-GI000 BUILDING 108 COVER SHEET & SHEET INDEX

108-AS110 FIRST FLOOR PLAN - OVERALL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDINGS 109 & 57

SHEET NO. SHEET TITLE

109-GI000 BUILDINGS 109 & 57 COVER SHEET & SHEET INDEX

109-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

109-AS110 FIRST FLOOR PLANS (BUILDINGS 109 & 57)

109-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

109-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

109-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

109-TN400 ENLARGED PLANS (B57 AND B109) - TELECOMMUNICATIONS

109-E201 FIRST FLOOR PLAN - ELECTRICAL

109-M101 FIRST FLOOR DEMOLITION - MECHANICAL

109-M201 FIRST FLOOR REMODEL - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 111

SHEET NO. SHEET TITLE

111-GI000 BUILDING 111 COVER SHEET & SHEET INDEX

111-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN

111-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

111-AS100 BASEMENT FLOOR PLANS

111-AS110 FIRST FLOOR PLANS

111-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION

111-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

111-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

111-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

111-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

111-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE

111-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

111-TN401 ENLARGED PLANS - TELECOMMUNICATIONS

111-E200 BASEMENT FLOOR PLAN - ELECTRICAL

111-E201 FIRST FLOOR PLAN - ELECTRICAL

111-E300 ELECTRICAL ENLARGED PLANS

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 112

SHEET NO. SHEET TITLE

112-GI000 BUILDING 112 COVER SHEET & SHEET INDEX

112-AS110 FIRST FLOOR PLANS

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 115

SHEET NO. SHEET TITLE

115-GI000 BUILDING 115 COVER SHEET & SHEET INDEX

115-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

115-AS110 FIRST FLOOR PLANS

115-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

115-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

115-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

115-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

115-E201 FIRST FLOOR - ELECTRICAL

115-E300 ELECTRICAL ENLARGED PLANS

115-M101 FIRST FLOOR DEMOLITION - MECHANICAL

115-M201 FIRST FLOOR - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 116

SHEET NO. SHEET TITLE

116-GI000 BUILDING 116 COVER SHEET & SHEET INDEX

116-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

116-AS110 FIRST FLOOR PLANS

116-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

116-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

116-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

116-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

116-E201 FIRST FLOOR - ELECTRICAL

116-E300 ELECTRICAL ENLARGED PLANS

116-M101 FIRST FLOOR DEMOLITION - MECHANICAL

116-M201 FIRST FLOOR REMODEL - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - BUILDING 118

SHEET NO. SHEET TITLE

118-GI000 BUILDING 118 COVER SHEET & SHEET INDEX

118-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN

118-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

118-AS100 BASEMENT FLOOR PLANS

118-AS110 FIRST FLOOR PLANS

118-TD100 BASEMENT FLOOR PLAN - ELECTRICAL DEMOLITION

118-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

118-TD110 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION

118-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

118-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE

118-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

118-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

118-TN401 ENLARGED PLANS - TELECOMMUNICATIONS

118-E200 BASEMENT - ELECTRICAL

118-E201 FIRST FLOOR - ELECTRICAL

118-E300 ELECTRICAL ENLARGED PLANS

118-E400 ELECTRICAL ONE-LINE DIAGRAMS

118-E500 ELECTRICAL SCHEDULES

118-M100 BASEMENT DEMOLITION - MECHANICAL

118-M101 FIRST FLOOR DEMOLITION - MECHANICAL

118-M200 BASEMENT FLOOR - MECHANICAL

118-M201 FIRST FLOOR - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

SHEET INDEX - CONSTRUCT PARKING...

SHEET NO. SHEET TITLE

FB2-GI000 CONSTRUCT PARKING STRUCTURE COVER SHEET & SHEET INDEX

FB2-AS110 FIRST FLOOR - OVERALL PLAN

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of

Minnesota.

Name:

Date: License Number: MN# 18157

Typed or Printed Name: Tom Olesak

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 C

U s e rs

\P u b li c \D o c u m e n ts \R e v it

P ro je c ts

\1 -0

-S h e e tI n d e x -R

E

M a rk fo rt

.r v t

/2

/2

:2 :2

P

M

GI002

SHEET INDEX - 2

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

EM

16305

CAMPUS

03/30/2022

COMMON ABBREVIATIONS - ADDITIONAL ABBREVIATIONS MAY BE FOUND ON CONSULTANT DRAWINGS

A/C

A/C UNIT

A/E

AAMA

AAP

AB

ABC

ACC

ACI

ACT

ACS DR

ACS FLR

ACS PNL

ACST

AD

ADA

ADC

ADDL

ADDN

ADH

ADJ

ADMIN

AFF

AFG

AFS

AGC

AGGR

AHJ

AHR

AHU

AIA

AISC

ALT

ALT NO

ALUM

AMT

ANOD

ANSI

ANT

AP

APA

APC

APPD

APPROX

AR

ARCH

ASB

ASI

ASKLR

ASPH

ASSN

ASTM

ATCH

ATM

AUTO

AUX

AV

AVG

AW

AWI

AWPA

AWS

B PL

BAT

BD

BD FT

BEV

BHMA

BI FLD DR

BITUM

BKG

BLD

BLDG

BM

BOT

BRCG

BRDG

BRDG JST

BRG

BRG PL

BRKT

BRZ

BSMT

BTWN

BUR

C CONC

C TO C

CAB

CAC

CB

CBB

CCD

CCTV

CCW

CD

CEM

CEM PLAS

CER

CF

CF/CI

CF/OI

CFLG

CFMF

CG

CGSFU

CH

CHEM

CHFR

CHK

CI

CIP

CIR

CIRC

CJ

CL

CLDG

CLG

CLR

CM

CMU

AIR CONDITION

AIR CONDITIONING UNIT

ARCHITECT/ENGINEER

AMERICAN ARCHITECTURAL MANUFACTURERS ASSN

ALARM ANNUNCIATOR PANEL

ANCHOR BOLT

AGGREGATE BASE COURSE

ACCESSIBLE

AMERICAN CONCRETE INSTITUTE

ACOUSTICAL CEILING TILE

ACCESS DOOR

ACCESS FLOOR

ACCESS PANEL

ACOUSTIC

AREA DRAIN

AMERICANS WITH DISABILITIES ACT

AUTOMATIC DOOR CLOSER

ADDITIONAL

ADDITION

ADHESIVE

ADJACENT, ADJOINING, OR ADJUSTABLE

ADMINISTRATION

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ABOVE FINISHED SLAB

ASSOCIATED GENERAL CONTRACTORS

AGGREGATE

AUTHORITY HAVING JURISDICTION

ANCHOR

AIR HANDLING UNIT

AMERICAN INSTITUTE OF ARCHITECTS

AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALTERNATE

ALTERNATE NUMBER

ALUMINUM

AMOUNT

ANODIZE

AMERICAN NATIONAL STANDARDS INSTITUTE

ANTENNA

ACCESS PANEL

AMERICAN PLYWOOD ASSOCIATION

ARCHITECTURAL PRECAST CONCRETE

APPROVED

APPROXIMATE

AS REQUIRED

ARCHITECT

ASBESTOS

ARCHITECT'S SUPPLEMENTAL INSTRUCTION

AUTOMATIC SPRINKLER

ASPHALT

ASSOCIATION

AMERICAN SOCIETY FOR TESTING AND MATERIALS

ATTACHMENT

AUTOMATIC TELLER MACHINE

AUTOMATIC

AUXILIARY

AUDIO VISUAL

AVERAGE

ACID WASTE

ARCHITECTURAL WOODWORKING INSTITUTE

AMERICAN WOOD PRESERVERS' ASSOCIATION

AMERICAN WELDING SOCIETY

BASE PLATE

BATTEN

BOARD

BOARD FEET (FOOT)

BEVEL

BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION

BIFOLDING DOORS

BITUMINOUS

BACKING

BUILD

BUILDING

BEAM OR BENCHMARK

BOTTOM

BRACING

BRIDGING

BRIDGING JOIST

BEARING

BEARING PLATE

BRACKET

BRONZE

BASEMENT

BETWEEN

BUILT-UP ROOFING

CAST CONCRETE

CENTER TO CENTER

CABINET

CEILING ATTENUATION CLASS

CATCH BASIN OR CORNER BEAD

CEMENTITIOUS (BACKER) BOARD

CONSTRUCTION CHANGE DIRECTIVE

CLOSED CIRCUIT TELEVISION

COUNTERCLOCKWISE

CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS

CEMENT

CEMENT PLASTER

CERAMIC

CONTRACTOR FURNISHED

CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CONTRACTOR FURNISHED/OWNER INSTALLED

COUNTERFLASHING

COLD-FORMED METAL FRAMING

CORNER GUARD

CERAMIC GLAZED STRUCTURAL FACING UNITS

COAT HOOK

CHEMICAL

CHAMFER

CHECK

CAST IRON

CAST-IN-PLACE

CIRCLE

CIRCULAR

CONSTRUCTION JOINT OR CONTROL JOINT

CENTER LINE

CLADDING

CEILING

CLEAR

CONSTRUCTION MANAGEMENT

CONCRETE MASONRY UNIT

CNR

CNTR

CRTP

CO

CO2

COL

COM

COMB

COMM

COMP

CONC

CONC FLR

COND

CONF

CONN

CONSTR

CONT

CONTR

COORD

CORR

CPM

CPRS

CR

CRS

CRSI

CSB

CSG

CSI

CSK

CSMT

CSWK

CTG

CTR

CTRL

CTV

CU FT

CU IN

CU YD

CURT

CYL

CYL L

D

DAT

DBL

DBL GLZ

DCS

DP

DEG

DEL

DEMO

DEPT

DET

DF

DIA

DIAG

DIFF

DIM

DIR

DISP

DIST

DIV

DL

DOC

DR

DR CL

DR FR

DR OPNG

DS

DSGN

DW

DWG

E

EA

EDICT

EFF

EFS

EHRM

EIFS

EJ

EL

ELAST

ELEC

ELEC DR OP

ELEV

EMER

EMER SHR

ENCL

ENGR

ENVIR

EO

EPA

EPDM

EPO

EPS

EQ

EQL SP

EQUIP

EQUIV

ERD

ESC

ESMT

ESP

EST

ETC

EW

EWC

EWS

EXH

EXIST

EXP

EXP BT

EXST GR

EXT

EXT GR

CORNER

COUNTER

COUNTERTOP

CARBON MONOXIDE

CARBON DIOXIDE

COLUMN

COMMON

COMBINATION, COMBINED

COMMUNICATION

COMPONENT

CONCRETE

CONCRETE FLOOR

CONDENSER OR CONDITION

CONFERENCE

CONNECT

CONSTRUCTION

CONTINUE

CONTRACTOR

COORDINATE

CORRIDOR

CRITICAL PATH METHOD

COMPRESSIBLE

CARD READER

COLD ROLLED STEEL

CONCRETE REINFORCING STEEL INSTITUTE

CONCRETE SPLASH BLOCK

CASING

CONSTRUCTION SPECIFICATIONS INSTITUTE

COUNTER SUNK

CASEMENT

CASEWORK

COATING

CENTER

CONTROL

CABLE TELEVISION

CUBIC FEET

CUBIC INCH

CUBIC YARD

CURTAIN

CYLINDER

CYLINDER LOCK

DEPTH OR PENNY (NAIL)

DATUM

DOUBLE

DOUBLE GLAZE

DIAPER CHANGING STATION

DECORATIVE PANEL

DEGREE

DELETE

DEMOLITION

DEPARTMENT

DETAIL

DRINKING FOUNTAIN

DIAMETER

DIAGONAL

DIFFERENCE OR DIFFUSER

DIMENSION

DIRECTION

DISPENSER

DISTANCE

DIVIDE OR DIVISION

DEAD LOAD

DOCUMENT

DOOR, DRAIN, DRESSING ROOM, OR DRIVE

DOOR CLOSER

DOOR FRAME

DOOR OPENING

DOWNSPOUT

DESIGN

DISHWASHER

DRAWING

EAST

EACH

ENTERPRISE DATA CENTER INFRASTRUCTURE

COLLABORATION TEAM

EFFICIENCY

EXTERIOR FINISH SYSTEM

ELECTRONIC HEALTH RECORDS MODERNIZATION

EXTERIOR INSULATION AND FINISH SYSTEM

EXPANSION JOINT

ELEVATION

ELASTOMERIC

ELECTRIC

ELECTRIC DOOR OPENER

ELEVATOR

EMERGENCY

EMERGENCY SHOWER

ENCLOSURE

ENGINEER

ENVIRONMENT

ELECTRICAL OUTLET

ENVIRONMENTAL PROTECTION AGENCY

ETHYLENE PROPYLENE DIENE MONOMER

EMERGENCY POWER OFF

EXPANDED POLYSTYRENE BOARD (INSULATION)

EQUAL

EQUALLY SPACED

EQUIPMENT

EQUIVALENT

EXISTING ROOF DRAIN

ESCAPE OR ESCUTCHEON

EASEMENT

ESPECIALLY

ESTIMATE

AND SO FORTH OR ET CETERA

EACH WAY

ELECTRIC WATER COOLER

EYE WASH STATION

EXHAUST

EXISTING

EXPANSION OR EXPOSED

EXPANSION BOLT

EXISTING GRADE

EXTERIOR, EXTERNAL, OR EXTINGUISHER

EXTERIOR GRADE

F

FA

FAB

FAC

FACIL

FAS

FAS BD

FCU

FCO

FCTY

FD

FDC

FDTN

FE

FEC

FF

FF EL

FF&E

FHC

FHP

FIG

FIL

FIN

FIN FLR

FIN GR

FIN WD

FIXT

FL

FLASH

FLDG

FLEX

FLG

FLR

FLR FIN

FLR SK

FLUOR

FLUOR FIX

FM

FM-G

FO

FOC

FOF

FOM

FOS

FOUNT

FOW

FP

FR

FR SNK

FREQ

FRMG

FRP

FRZ

FS

FSB

FSTNR

FT

FTG

FURG

FURN

FUT

FVC

GA

GAL

GALV

GALV STL

GB

GC

GD

GDR

GEN

GFRC

GFRG

GFRP

GI

GL

GL BLK

GLU LAM

GP

GR FL

GRAN

GRTG

GSB

GSM

GSU

GT

GUAR

GUT

GYP

GYP BD

GYP PLAS

H

HAZ MAT

HB

HC

HCWD

HDBD

HDO

HDR

HDW

HDWD

HEPA

HEX

HGR

HM

HMD

HMDF

HMF

HNDRL

HO

HORIZ

HOSP

HP

HPD

HPDL

HQ

HS

HSE

HSKPG

FAHRENHEIT OR FEMALE

FIRE ALARM

FABRIC

FACTOR

FACILITY

FASCIA

FASCIA BOARD

FAN COIL UNIT

FLOOR CLEANOUT

FACTORY

FLOOR DRAIN

FIRE DEPARTMENT CONNECTION

FOUNDATION

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FINISH FACE

FINISH FLOOR ELEVATION

FURNITURE, FIXTURE, AND EQUIPMENT

FIRE HOSE CABINET

FULL HEIGHT PARTITION

FIGURE

FILLET

FINISH

FINISH FLOOR

FINISH GRADE

FINISH WOOD

FIXTURE

FLOORLINE

FLASHING

FOLDING

FLEXIBLE

FLOORING

FLOOR

FLOOR FINISH

FLOOR SINK

FLUORESCENT

FLUORESCENT FIXTURE

FACTORY MUTUAL

FACTORY MUTUAL GLOBAL

FINISHED OPENING

FACE OF CONCRETE OR FACE OF CURB

FACE OF FINISH

FACE OF MASONRY

FACE OF SLAB OR FACE OF STUD

FOUNTAIN

FACE OF WALL

FIRE PROTECTION OR FIREPROOF

FIRE RATING, FIRE RESISTANT, OR FRAME

FLUSHING RIM SINK

FREQUENCY

FRAMING

FIBERGLASS REINFORCED PLASTIC

FREEZER

FEDERAL SPECIFICATION

FOLDING SHOWER BENCH

FASTENER

FEET OR FOOT

FOOTING

FURRING

FURNISH OR FURNITURE

FUTURE

FIRE VALVE CABINET

GAGE OR GYPSUM ASSOCIATION

GALLON

GALVANIC OR GALVANIZED

GALVANIZED STEEL

GRAB BAR

GENERAL CONTRACTOR

GUARD

GUARD RAIL

GENERAL OR GENERATOR

GLASS-FIBER-REINFORCED CONCRETE

GLASS-FIBER-REINFORCED GYPSUM

GLASS-FIBER-REINFORCED PLASTIC

GALVANIZED IRON

GLASS

GLASS BLOCK

GLUED LAMINATED WOOD

GRAB BAR

GROUND FLOOR

GRANITE

GRATING

GYPSUM SHEATHING BOARD

GALVANIZED SHEET METAL

GLAZED STRUCTURAL UNIT

GROUT

GUARANTEE

GUTTER

GYPSUM

GYPSUM BOARD

GYPSUM PLASTER

HIGH OR HUMIDISTAT

HAZARDOUS MATERIALS

HOSE BIBB

HOLLOW CORE

HOLLOW CORE WOOD DOOR

HARDBOARD

HIGH DENSITY OVERLAY

HEADER

HARDWARE

HARDWOOD

HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HEXAGON

HANGER

HOLLOW METAL

HOLLOW METAL DOOR

HOLLOW METAL DOOR AND FRAME

HOLLOW METAL FRAME

HANDRAIL

HOLD OPEN

HORIZONTAL

HOSPITAL

HIGH PRESSURE

HYGIENE PRODUCT DISPOSAL

HIGH PRESSURE DECORATIVE LAMINATE

HEADQUARTERS

HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH

HOUSE

HOUSEKEEPING

HST

HSS

HT

HVAC

HVY

HW

HYD

HYDR

IAQ

IBC

IC

ICW

ID

ID NO

ILLUM

INCL

IND

INFO

INSUL

INT

INTL

IWH

JAN

KD

KIT

KO

KPL

LAB

LAD

LAM

LAM GL

LAU

LAV

LBR

LBS

LCS

LD BRG

LDR

LED

LF

LIB

LIN

LIQ

LKR

LKR RM

LL

LMST

LRG

LRV

LS

LT

LT GA

LT WT

LTG

LTNG

LVD

LVR

LWC

LWIC

LYR

MACH

MACH RM

MAINT

MAN

MATL

MATV

MAX

MBD

MCB

MD

ME

MEAS

MECH

MECH RM

MED

MEK

MEMB

MEMO

MEZZ

MF

MFD

MFG

MFR

MFR REC

MGT

MIC

MID

MIL STD

MIN

MIR

MISC

MIT

MKR

ML

MLDG

MLWK

mm

MO

MOD

MOD BIT

MON

MOPR

MR

MS

MTD

MTG

MTL

MULL

MW

MWP

HOIST

HOLLOW STRUCTURAL STEEL

HEIGHT

HEATING, VENTILATING, AND AIR CONDITIONING

HEAVY

HOT WATER

HYDRANT

HYDRAULIC

INDOOR AIR QUALITY

INTERNATIONAL BUILDING CODE

INFECTION CONTROL

INFECTION CONTROL WALL

INSIDE DIAMETER

IDENTIFICATION NUMBER

ILLUMINATION

INCLUDED

INDEPENDENT OR INDUSTRIAL

INFORMATION

INSULATION

INTERIOR

INTERNATIONAL

INSTANTANEOUS WATER HEATER

JANITOR

KILN DRIED OR KNOCKED DOWN

KITCHEN

KNOCKOUT

KICKPLATE

ANGLE

LABORATORY

LADDER

LAMINATE

LAMINATED GLASS

LAUNDRY

LAVATORY

LUMBER

POUND

LOCKABLE CHARTING STATION/MED CABINET

LOAD-BEARING

LEADER

LIGHT EMITTING DIODE

LINEAR FEET (FOOT)

LIBRARY

LINEAR

LIQUID

LOCKER

LOCKER ROOM

LEAD LINED

LIMESTONE

LARGE

LOUVERED ROOF VENT

LIGHT SWITCH

LIGHT

LIGHT GAGE

LIGHTWEIGHT

LIGHTING

LIGHTNING

LOUVERED

LOUVER

LIGHTWEIGHT CONCRETE

LIGHTWEIGHT INSULATING CONCRETE

LAYER

MACHINE

MACHINE ROOM

MAINTENANCE

MANUAL

MATERIAL

MASTER ANTENNA TELEVISION SYSTEM

MAXIMUM

MARKER BOARD

METAL CORNER BEAD

DECK

MECHANICAL ENGINEER

MEASURE

MECHANICAL

MECHANICAL ROOM

MEDICAL, MEDIUM

METHYL ETHYL KETONE

MEMBRANE

MEMORANDUM

MEZZANINE

MILL FINISH

MANUFACTURED

MANUFACTURING

MANUFACTURER

MANUFACTURER'S RECOMMENDATION

MANAGEMENT

MICROPHONE

MIDDLE

MILITARY STANDARD

MINIMUM

MIRROR

MISCELLANEOUS

MITER

MARKER

METAL LATH

MOLDING (MOULDING)

MILLWORK

MILLIMETER

MASONRY OPENING

MODEL, MODIFY OR MODULE

MODIFIED BITUMEN

MONITOR

MOP RACK

MOISTURE RESISTANT

MOP SINK

MOUNTED

MOUNTING

METAL

MULLION

MICROWAVE

MEMBRANE WATERPROOFING

N

NA

NAT

NATL

NC

NCOMBL

NEC

NEG

NEMA

NEUT

NFC

NFPA

NIC

NO

NOM

NR

NRC

NRCA

NRP

NS

NUM

O/O O

OA

OC

OCC

OCT

OD

OD

OF/CI

OFD

OFF

OF/OI

OH

OH DR

OIT

OPH

OPNG

OPP

OPR

OPT

OR

ORD

ORG

ORIG

ORN

OSHA

OUT

OZ

P

PAR

PARA

PART

PAT

PB

PBD

PC

PCA

PCC

PCCP

PCD

PCF

PCP

PCT

PED

PEN

PEND

PERF

PERIM

PERP

PHAR

PHOTO

PKG

PL

PL GL

PLAM

PLAS

PLBG

PLYWD

PMTL

PNEU

PNL

PO

POLY

PP

PR

PRCST

PREFAB

PREFIN

PRELIM

PREP

PRESS

PREV

PRKG

PRMLD

PROJ

PROP

PSF

PSI

PT

PTD

PTN

PTS

PVC

PVG

PWR

QA

QC

QRY

QTR

QTY

QUAD

QUAL

R

RA

RAD

RBM

RBR

NORTH

NOT APPLICABLE

NATURAL

NATIONAL

NOISE CRITERIA OR NURSE CALL

NONCOMBUSTIBLE

NATIONAL ELECTRICAL CODE

NEGATIVE

NATIONAL ELECTRICAL MANUFACTURERS ASSN

NEUTRAL

NATIONAL FIRE CODE

NATIONAL FIRE PROTECTION ASSOCIATION

NOT IN CONTRACT

NUMBER

NOMINAL

NOISE REDUCTION

NOISE REDUCTION COEFFICIENT

NATIONAL ROOFING CONTRACTORS ASSOCIATION

NONREMOVABLE

NARROW STILE

NUMERAL

OUT TO OUT

OXYGEN

OUTSIDE AIR OR OVERALL

ON CENTER

OCCUPY

OCTAGON

OUTSIDE DIAMETER, OUTSIDE DIMENSION

OUTSIDE DIAMETER/OUTSIDE DIMENSION

OWNER FURNISHED/CONTRACTOR INSTALLED

OVERFLOW DRAIN

OFFICE

OWNER…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .