This solicitation requests proposals for infrastructure upgrades at the St. Cloud Veterans Affairs Health Care System campus. The scope of work includes electrical upgrades, UPS installations, building management system integration, fiber infrastructure installation both within and between buildings, hazardous materials abatement, and HVAC assessments, reconfigurations, and expansions as necessary. Proposers must furnish all labor, materials, tools and equipment to complete the upgrades in accordance with specifications and contract drawings. The soliciting agency is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The response due date is not provided.
View the file
Other files for this federal contract opportunity
Show all 50
Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING FIBER - INSIDE
VFY EXIST
EXISTING FIBER - OUTSIDE
VFY EXIST
FIBER ROUTE - INSIDE
SEE TELECOM
FIBER ROUTE - OUTSIDE
SEE CIVIL
BUILDING OUTLINE
VFY EXIST
CORRIDOR OUTLINE
VFY EXIST
LEGEND
TO 8TH ST WEST ONLYTO 8TH ST EAST & WEST
44TH AVE.
TRAIL 1
TRAIL 2
TRANSFER
SWITCH
CAPACITOR
BANK (3)
SWITCH
(2)
15KV
MAIN
SW
BATT
35 KV
TO
15 KV
TRANSFORMER
35KV
FUSED
SWITCH
METER 35KV
SWITCH
GRAVEL
GRAVEL
GRAVEL
EXISTING
ROAD
CHAIN LINK FENCE
CHAIN LINK FENCE
16' GATE
GRAVEL
ELECTRICAL
SUBSTATION
G E N E R A T O R
FUEL LINES
CONDU ITS TO TU NNEL
M V
D U
C T
B A
N K
1 1 2 W
PHARMACY ADDIT ION
11 2 E
G E N E R A T O R
B
CORRIDOR LINK
A
C T
TR
A
IL
ER
174 s .f.
256 s .f.
185 s .f.
149 s ..f.
155 s .f.
104 s .f.
70 s. .f .
72 s .f.
110 s .f.
276 s .f.
112 s .f.
99 s .f.
57 s .f.
146 s .f.
434 s .f.
R A
MP
U P
1:
M A X
R A
MP
U P
1:
M A X
RA
M P
UP
1:2 0 M
AX
TRANSFER
SWITCH
CAPACITOR
BANK (3)
SWITCH
(2) 15KV
MAIN
SW
BATT
35 KV
TO
15 KV
TRANSFORMER
35KV
FUSED
SWITCH
METER 35KV
SWITCH
.3
TRANSFORMER
BUILD ING
#91
5,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
EXISTIN G G AS SU P P LY EQ U IP M EN T TO R EM AIN
O P ER ATIO N AL D U R IN G D EM O LITIO N AN D N EW
C O N STR U C TIO N. P R O TEC T EQU IP M EN T AN D
P IP ELIN ES IN AC C O R D AN C E W ITH G AS SU P P LIER 'S
R EC O M M EN D ATIO N S
N EW G AS SU P P LY M AIN
IN TO B U ILD IN G
SP AR E
P H O N E LIN E
EXTEN D S TO
E XISTIN G
P H O N E IN
B O ILER R O O M
P ER P LAN .
SP AR E
P H O N E
LIN E TO
M ETER
TU N N EL
E XTEN D S
A D D ITIO N AL
2'- 0" U N D ER
B U ILD IN G
FUEL LINE
VENT LINE
1,000 GAL.
UNDERGROUND
DIESEL FUEL
TANK
1,000/5,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
1,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
1,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
S 1
LIG H T
N EW G AS SU P P LY
(C O O R D IN ATE W ITH SU P P LIER )
12"D
10"D
"D
TP TP
EXIST. BUILDING
EXIST. BUILDING
EXIST.
BUS STOP
CC
L O
O P
16"
20"
12"
3"
8"
DN
BIRDCAGE
B
IR
D C
A G
E
NSP ELECTRICAL
FOR HWY DEPT
T101
I.T.
CHILLER
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
VESTIBULE
DN
DN
DN
FD
DN
F B
F
B
F B
F
B
F B
F
B
SOUTH
VESTIBULE
PASS
THROUGH
LINK TO
BUILDI NG 51
6 3. 32 56
1 13 5. 35 78
PARKING
NO
PARKING
93 49
37 6
109 5
1A
S M
O K
E B
L D
G
SMOKE
BLDG
SMOKE
BLDG
S M
O K
E B
L D
G
SMOKE
BLDG
M.H.
STOR.
SMOKE
BLDG
SMOKE
BLDG
SMOKE
BLDG
SMOKE
BLDG
SMOKE
BLDG
STOR.
BIO-
HAZ.
SAUK RIVER
GP
HOLDING POND
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of
Minnesota.
Name:
Date: License Number: MN# 18157
Typed or Printed Name: Tom Olesak
OWNER AND
CONSULTANTS:
CONTACT:
ADDRESS:
MIKE ENGMARK
ST CLOUD VA MEDICAL CENTER
4801 VETERANS DRIVE
ST. CLOUD, MN 56303
NAME:
ADDRESS:
CONTACT:
ADVANCED STRUCTURAL TECHNOLOGIES
7301 OHMS LANE; SUITE 215
EDINA, MN 55439
ZACHARY CRAIG
PHONE:
NAME:
ADDRESS:
CONTACT:
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIRCLE
OMAHA, NE 68134
KRIS BURNHAM
PHONE: 402-991-5520
NAME:
ADDRESS:
CONTACT:
PHONE:
NAME:
ADDRESS:
CONTACT:
PHONE:
NAME:
ADDRESS:
CONTACT:
PHONE:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
IAN WEBER
763-412-4000
ARCHITECT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
EDWARD MARKFORT
763-412-4000
952-854-9302
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIRCLE
OMAHA, NE 68134
KRIS BURNHAM
402-991-5520
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
COVER
DATE:
APPROVED: APPROVED: PROJECTS SECTION MANAGER
APPROVED: OIT MANAGER DATE: APPROVED: ASSISTANT CHIEF ENGINEER DATE:
APPROVED: SAFETY MANAGER
APPROVED: CHIEF OF POLICE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE: APPROVED: EMS MANAGER
APPROVED: M/O MANAGER
DATE:
DATE:
DATE:DATE:
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: PROJECT COR DATE:
APPROVED: INFECTION CONTROL NURSE DATE:
APPROVED: SERVICE LINE DIRECTOR
APPROVED: GEMS COORDINATOR DATE:
DATE:
APPROVED: NURSE EXECUTIVE
APPROVED: CHIEF OF STAFF DATE:
APPROVED: DIRECTOR FMS
APPROVED: ASSOCIATE DIRECTOR
DATE:
DATE:
DATE:
DATE:APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
Main Campus, St. Cloud, Minnesota St. Cloud VA Health Care System
N
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
VICINITY MAP:
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHONE: 320-252-1670
CIVIL ENGINEER:
VA COR:
TELECOMMUNICATIONS ENGINEER:
CONTACT:
ADDRESS:
JONATHAN WEST
ST CLOUD VA MEDICAL CENTER
4801 VETERANS DRIVE
ST. CLOUD, MN 56303
PHONE: 504-250-2699
PROGRAM MANAGER:
EMAIL: Jonathan.West@vciint.com
STRUCTURAL ENGINEER:
MECH/ELEC/PLUMB/FIRE ENGINEER:
C
U s e rs
\P u b li c \D o c u m e n ts \R e v it
P ro je c ts
\1 -0
-C a m p u s -R
E
M a rk fo rt
.r v t
/2
/2
:0 :1
P
M
GI000
COVER SHEET
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
TO EM, BW
16305
ST CLOUD EHRM INFRASTRUCTURE UPGRADES
GENERAL
03/30/2022
EXISTING CONDITIONS DIGITAL REPRESENTATION
PROPOSED ADDITIONS
BUILDING 5 TELECOM RM
BUILDING 1 TELECOM RM
GENERAL CONDITIONS
A. All dimensions on drawings are approximate; Drawings are not to be scaled. It is the responsibility of the contractor to verify all field conditions and physical dimensions that influence the construction area.
B. It is recommended that contractors visit the proposed construction site prior to submitting their bids and they are encouraged to do so.
C. Contractor shall adhere strictly to State and Federal Occupational Safety and Health Administration ( OSHA ) Standards.
D. Contractor shall park only in the designated parking areas and are not to park on the lawn areas; the only exception is to load or unload supplies or equipment in designated and approved areas and times.
E. Contractor is responsible for the safeguarding of tools, equipment, and materials for the project. All tools and equipment are not to be left unattended and are to be secured at all times when the contractor is not present, or the construction site is not supervised by the contractor.
F. All VA property is to be safeguarded from damage. Any damaged VA property is to be restored to original condition prior to damage or replaced completely. This includes installation, labor, and procurement expenses.
G. All demolished material becomes the property and the responsibility of the contractor with the exception of specified items designated either in the plans or verbally requested by the COR to be retained by the VA.
Offsite disposal of the demolished items is the responsibility of the contractor.
H. Contractor must control demolition and construction dust from facility by erecting a dust barrier and ventilation with HEPA filters. If venting to outside, the contractor will insure negative air pressure is maintained in encapsulated work area. When transporting debris, wet down sufficiently to prevent dust spreading.
I. If scaffolding is used, it must be used in accordance with (OSHA) regulations and is to be enclosed for the first eight feet above ground at end of each working day, until dismantled. Ladders must be removed and locked up at the end of each working day to prevent unauthorized persons from having access.
J. Clean all debris from construction site to the satisfaction of the COR.
K. Contractor is responsible for erecting a barrier around work site to prevent patients, staff and visitors from entering construction site. Coordinate construction materials and location of fence with COR.
L. Contractor is responsible for repairing and replacing any damaged lawn. The restoration will be performed by a landscape contractor that regularly does sodding as part of their business. All damaged lawn will be overcut by 6" or more to accommodate full width rolls of sod. Certified topsoil to be tilled and graded to a smooth matching grade of undamaged lawn. Sod to be thoroughly saturated with water upon placement.
The contractor is responsible for watering and maintaining new sod, to include but not limited to fertilizing and mowing, until project acceptance by the COR.
M. Access to all buildings and parking areas must be maintained throughout the project.
N. Contractors are to coordinate all work with the Contracting Officers Representative. (C.O.R.)
O. All carts, tool boxes / bags, and ladders are to be clearly labeled identifying the contractors and subcontractors name and project name.
P. RFI's to be submitted to COR through Submital Exchange or as specified by the VA.
SHEET INDEX - BUILDING 1 - SET 1 OF 2
SHEET NO. SHEET TITLE
1-GI000 BUILDING 1 COVER SHEET & SHEET INDEX
1-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
1-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
1-GI120 SECOND FLOOR LIFE SAFETY PLAN
1-GI121 SECOND FLOOR - INFECTION CONTROL & PHASING PLAN
1-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
1-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
1-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
1-HA-4A REFERENCE - THIRD / ATTIC FLOOR ASBESOTS RE-SURVEY
1-AS100 BASEMENT FLOOR - OVERALL PLAN
1-AS110 FIRST FLOOR - OVERALL PLAN
1-AS120 SECOND FLOOR - OVERALL PLAN
1-AS130 ATTIC FLOOR - OVERALL PLAN
1-AS400 LARGE SCALE PLANS
1-AS430 BUILDING ADDITION AND ROOF PLAN
1-AS600 ELEVATIONS, DETAILS, SCHEDULES
1-AS601 INTERIOR PARTITION TYPES AND DETAILS
1-AS602 SECTION DETAILS
1-S120 SECOND FLOOR PLAN - OVERALL
1-S130 ATTIC FLOOR PLAN - OVERALL
1-S400 LARGE SCALE PLANS
01-E100 BASEMENT DEMOLITION - ELECTRICAL
01-E101 FIRST FLOOR DEMOLITION - ELECTRICAL
01-E200 BASEMENT - ELECTRICAL
01-E201 FIRST FLOOR - ELECTRICAL
01-E202 SECOND FLOOR - ELECTRICAL
01-E204 ROOF - ELECTRICAL
01-M000 MECHANICAL COVERSHEET
01-M100 BASEMENT DEMOLITION - MECHANICAL
01-M101 FIRST FLOOR DEMOLITION - MECHANICAL
01-M102 SECOND FLOOR DEMOLITION - MECHANICAL
01-M200 BASEMENT REMODEL - MECHANICAL
01-M201 FIRST FLOOR REMODEL - MECHANICAL
01-M202 SECOND FLOOR REMODEL - MECHANICAL
01-M400 MECHANICAL DETAILS AND DIAGRAMS
01-M600 MECHANICAL SCHEDULES
SEE GENERAL AND SET 2 SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 1 - SET 2 OF 2
SHEET NO. SHEET TITLE
1-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
1-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
1-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
1-TD130 THIRD FLOOR PLAN - TELECOM - DEMOLITION
1-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
1-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
1-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
1-TN130 THIRD FLOOR PLAN - TELECOMMUNICATIONS
1-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
1-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
1-TN220 SECOND FLOOR PLAN - TELECOM - CABLE DISTANCE
1-TN230 THIRD FLOOR PLAN - TELECOM - CABLE DISTANCE
1-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
1-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
1-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
1-TN402 ENLARGED PLANS - TELECOMMUNICATIONS
1-TN403 ENLARGED PLANS - TELECOMMUNICATIONS
SEE GENERAL AND SET 1 SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 2
SHEET NO. SHEET TITLE
2-GI000 BUILDING 2 COVER SHEET & SHEET INDEX
2-GI101 BASEMENT FLOOR INFECTION CONTROL & PHASING PLAN
2-HA-1A REFERENCE - BASEMENT FLOOR - ASBESTOS RE-SURVEY
2-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
2-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
2-AS100 BASEMENT PLANS
2-AS110 FIRST FLOOR - OVERALL PLAN
2-AS120 SECOND FLOOR - OVERALL PLAN
2-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
2-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
2-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
2-TD130 THIRD FLOOR PLAN - TELECOM - DEMOLITION
2-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
2-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
2-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
2-TN130 THIRD FLOOR PLAN - TELECOMMUNICATIONS
2-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
2-TN300 ENLARGED PLAN - TELECOMMUNICATIONS - DEMO
2-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
02-E200 BASEMENT FLOOR PLAN - ELECTRICAL
02-E201 FIRST FLOOR PLAN - ELECTRICAL
02-E300 ELECTRICAL ENLARGED PLANS
02-E400 ELECTRICAL DIAGRAMS
02-E500 ELECTRICAL SCHEDULES
02-M100 BASEMENT AND FIRST FLOOR DEMOLITION - MECHANICAL
02-M200 BASEMENT FLOOR REMODEL - MECHANICAL
02-M201 FIRST FLOOR REMODEL- MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 3
SHEET NO. SHEET TITLE
3-GI000 BUILDING 3 COVER SHEET & SHEET INDEX
3-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
3-GI121 SECOND FLOOR INFECTION CONTROL & PHASING PLAN
3-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
3-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
3-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
3-HA-4A REFERENCE - THIRD FLOOR / ATTIC ASBESTOS RE-SURVEY
3-AS110 BASEMENT AND FIRST FLOOR PLANS
3-AS120 SECOND FLOOR AND ATTIC PLANS
3-TD100 BASEMENT & FIRST FLOOR PLANS - TELECOM - DEMOLITION
3-TD120 SECOND & THIRD FLOOR PLANS - TELECOM - DEMOLITION
3-TN100 BASEMENT & FIRST FLOOR PLANS - TELECOMMUNICATIONS
3-TN120 SECOND & THIRD FLOOR PLANS - TELECOMMUNICATIONS
3-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
3-TN220 SECOND FLOOR PLAN - TELECOM - CABLE DISTANCE
3-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
3-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
3-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
03-E200 BASEMENT FLOOR PLAN - ELECTRICAL
03-E201 FIRST FLOOR - ELECTRICAL
03-E202 SECOND FLOOR - ELECTRICAL
03-E300 ELECTRICAL ENLARGED PLANS
03-E400 ELECTRICAL RISER DIAGRAMS
03-E500 ELECTRICAL SCHEDULES
03-M101 FIRST FLOOR DEMOLITION - MECHANICAL
03-M102 SECOND FLOOR DEMOLITION - MECHANICAL
03-M201 FIRST FLOOR - MECHANICAL
03-M202 SECOND FLOOR REMODEL - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 4
SHEET NO. SHEET TITLE
4-GI000 BUILDING 4 COVER SHEET & SHEET INDEX
4-GI100 BASEMENT LIFE SAFETY PLAN
4-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
4-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
4-GI121 SECOND FLOOR - INFECTION CONTROL & PHASING PLAN
4-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
4-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
4-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
4-AS100 BASEMENT FLOOR - OVERALL PLANS
4-AS110 FIRST FLOOR - OVERALL PLANS
4-AS120 SECOND FLOOR - OVERALL PLANS
4-AS400 LARGE SCALE PLANS
4-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
4-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
4-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
4-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
4-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
4-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
4-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
4-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
4-TN220 SECOND FLOOR PLAN - TELECOM - CABLE DISTANCE
4-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
4-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
4-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
4-TN402 ENLARGED PLANS - TELECOMMUNICATIONS
4-TN403 ENLARGED PLANS - TELECOMMUNICATIONS
4-TN500 ONE-LINE DIAGRAM
4-TN501 PANEL SCHEDULES
04-E200 BASEMENT FLOOR PLAN - ELECTRICAL - EAST
04-E201 FIRST FLOOR PLAN - ELECTRICAL - EAST
04-E202 SECOND FLOOR PLAN - ELECTRICAL - EAST
04-E300 ELECTRICAL ENLARGED PLANS
04-E400 ELECTRICAL ONE-LINE DIAGRAMS
04-E500 ELECTRICAL SCHEDULES
04-M100B BASEMENT DEMOLITION - MECHANICAL - AREA B
04-M101B FIRST FLOOR DEMOLITION - MECHANICAL - AREA B
04-M200B BASEMENT FLOOR - MECHANICAL - AREA B
04-M201 FIRST FLOOR - MECHANICAL
04-M201B FIRST FLOOR - MECHANICAL - AREA B
04-M600 MECHANICAL SCHEDULES
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 5
SHEET NO. SHEET TITLE
5-GI000 BUILDING 5 COVER SHEET & SHEET INDEX
5-GI110 FIRST LEVEL LIFE SAFETY PLAN
5-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
5-AS110 FIRST FLOOR PLANS
5-AS500 SECTIONS, DETAILS
5-AS600 ELEVATIONS, DETAILS
5-S110 FIRST FLOOR PLANS
5-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
5-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
5-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
5-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
5-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
05-E200 FIRST FLOOR PLAN - ELECTRICAL
05-E300 ELECTRICAL ENLARGED PLANS
05-E400 ELECTRICAL ONE-LINE DIAGRAMS
05-E500 ELECTRICAL SCHEDULES
05-M101 FIRST FLOOR DEMOLITION - MECHANICAL
05-M201 FIRST FLOOR REMODEL - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 6
SHEET NO. SHEET TITLE
6-GI000 BUILDING 6 COVER SHEET & SHEET INDEX
6-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
6-AS110 FIRST FLOOR PLAN - OVERALL
6-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
6-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 7 & 13
SHEET NO. SHEET TITLE
7-GI000 BUILDINGS 7 & 13 COVER SHEET & SHEET INDEX
7-GI001 FIRST FLOOR LIFE SAFETY PLAN
7-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
7-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
7-HA-2A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
13-HA-1A REFERENCE - FIRST FLOOR - ASBESTOS RE-SURVEY
7-AS110 FIRST FLOOR PLANS
7-S110 FIRST FLOOR PLANS
7-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
7-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
7-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
7-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
7-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
07-E100 FIRST FLOOR DEMOLITION PLAN - ELECTRICAL
07-E200 FIRST FLOOR PLAN - ELECTRICAL
07-E300 ELECTRICAL ENLARGED PLANS
07-E500 ELECTRICAL ONE-LINE DIAGRAMS
07-E600 ELECTRICAL SCHEDULES
07-M101 FIRST FLOOR DEMOLITION - MECHANICAL
07-M201 FIRST FLOOR REMODEL - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 8
SHEET NO. SHEET TITLE
8-GI000 BUILDING 8 COVER SHEET & SHEET INDEX
8-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
8-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
8-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
8-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
8-HA-4A REFERENCE - ATTIC ASBESTOS RE-SURVEY
8-AS100 BASEMENT FLOOR - OVERALL PLAN
8-AS110 FIRST FLOOR PLANS
8-AS120 SECOND FLOOR - OVERALL PLAN
8-TD101 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
8-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
8-TN101 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
8-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
8-TN200 FIRST LEVEL FLOOR PLAN - TELECOM - CABLE DISTANCE
8-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
08-E100 FIRST FLOOR DEMOLITION PLAN - ELECTRICAL
08-E200 BASEMENT FLOOR PLAN - ELECTRICAL
08-E201 FIRST FLOOR PLAN - ELECTRICAL
08-E300 ELECTRICAL ENLARGED PLANS
08-E400 ELECTRICAL ONE-LINE DIAGRAMS
08-E500 ELECTRICAL SCHEDULES
08-M101 FIRST FLOOR DEMOLITION - MECHANICAL
08-M201 FIRST FLOOR REMODEL - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 9
SHEET NO. SHEET TITLE
9-GI000 BUILDING 9 COVER SHEET & SHEET INDEX
9-GI110 FIRST FLOOR LIFE SAFETY PLAN
9-GI111 FIRST FLOOR INFECTION CONTROL & PHASING PLAN
9-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
9-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
9-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
9-HA-4A REFERENCE - ATTIC FLOOR ASBESTOS RE-SURVEY
9-AS100 BASEMENT, FIRST, AND SECOND FLOOR PLANS
9-TD100 FLOOR PLANS - TELECOM - DEMOLITION
9-TN100 FLOOR PLANS - TELECOMMUNICATIONS
9-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
9-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
9-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
09-E100 FIRST FLOOR DEMOLITION - ELECTRICAL
09-E200 BASEMENT - ELECTRICAL
09-E201 FIRST FLOOR - ELECTRICAL
09-E300 ELECTRICAL ENLARGED PLANS
09-E500 ELECTRICAL ONE-LINE DIAGRAMS
09-E600 ELECTRICAL SCHEDULES
09-M101 FIRST FLOOR DEMOLITION - MECHANICAL
09-M201 FIRST FLOOR REMODEL - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 10
SHEET NO. SHEET TITLE
10-GI000 BUILDING 10 COVER SHEET & SHEET INDEX
10-GI101 BASEMENT FLOOR INFECTION CONTROL & PHASING PLAN
10-HA-1A REFERENCE - BASEMENT FLOOR - ASBESTOS RE-SURVEY
10-HA-2A REFERENCE - FIRST FLOOR - ASBESTOS RE-SURVEY
10-HA-3A REFERENCE - SECOND FLOOR - ASBESTOS RE-SURVEY
10-AS100 BASEMENT, FIRST, AND SECOND FLOOR PLANS
10-TD100 BASEMENT FLOOR PLANS - TELECOM - DEMOLITION
10-TN100 BASEMENT FLOOR PLANS - TELECOMMUNICATIONS
10-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
10-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
10-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
10-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
10-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
10-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
10-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
10-E200 BASEMENT - ELECTRICAL
10-E201 FIRST FLOOR - ELECTRICAL
10-E300 ELECTRICAL ENLARGED PLANS
10-E500 ELECTRICAL ONE-LINE DIAGRAMS
10-E600 ELECTRICAL SCHEDULES
10-M100 BASEMENT DEMOLITION - MECHANICAL
10-M200 BASEMENT FLOOR - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 11
SHEET NO. SHEET TITLE
11-GI000 BUILDING 11 COVER SHEET & SHEET INDEX
11-GI101 BASEMENT FLOOR INFECTION CONTROL & PHASING PLAN
11-HA-1A REFERENCE - BASEMENT FIRST FLOOR ASBESTOS RE-SURVEY
11-HA-2A REFERENCE - SECOND ATTIC FLOOR ASBESTOS RE-SURVEY
11-AS100 BASEMENT, FIRST, AND SECOND FLOOR PLANS
11-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
11-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
11-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
11-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
11-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
11-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
11-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
11-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
11-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
11-E200 BASEMENT - ELECTRICAL
11-E300 ELECTRICAL ENLARGED PLANS
11-E600 ELECTRICAL SCHEDULES
11-M100 BASEMENT DEMOLITION - MECHANICAL
11-M200 BASEMENT FLOOR - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
ISSUED
NOT ISSUED
ISSUED FOR REFERENCE ONLY
ISSUED AS NOTED
R
N
SHEET ABBREVIATION AND NUMBERING
XXX-AS 1 1 0
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
FL
O
O R
LE
VE
L
SH
EE
T G
RO
UP
IN
G
AE 110
ARCHITECTURAL DRAWING, PLAN, FIRST LEVEL
XXX-QJ 1 1 0
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
FL
O
O R
LE
VE
L
SH
EE
T G
RO
UP
IN
G
QJ110
EQUIPMENT, PLAN, FIRST LEVEL
DISCIPLINE
DESIGNATOR
SHEET TYPE
DESIGNATOR
FLOOR
LEVEL
SHEET
GROUPING
GI - GENERAL INFORMATION
HA - HAZARD MATERIAL
DRAWINGS
CD - SITE DEMOLITION
CU - SITE UTILITY
CP - SITE PROFILES
CS - SITE RESTORATION
CJ - SITE DETAILS
AS - ARCHITECTURAL
S - STRUCTURAL
T - TELECOM
E - ELECTRICAL
M - MECH, PLUMBING,
FIRE PROTECTION
0 - GENERAL
1 - PLANS
2 - ELEVATIONS
3 - SECTIONS
4 - LARGE SCALE VIEWS
5 - DETAILS
6 - SCHEDULES & DIAGRAMS
0 - LOWER LEVEL
1 - FIRST LEVEL
2 - SECOND LEVEL
3 - THIRD LEVEL
4 - FOURTH LEVEL
GENERAL:
00-10 - TITLE SHEET, NOTES,
ABBREVIATIONS, SYMBOLS,
SCHEDULES
PLANS:
1 - LEVEL FLOOR PLAN
2 - DIMENSION PLAN
ELEVATIONS:
01-10 - EXTERIOR ELEVATIONS
11-19 - INTERIOR ELEVATION
SECTIONS:
01-10 - BUILDING SECTIONS
11-19 - WALL SECTIONS
20-29 -STAIR SECTIONS & PLANS
DETAILS:
01-19 - EXTERIOR PLAN DETAILS
20-29 - EXTERIOR SECTION DETAILS
30-39 - ROOF DETAILS
40-49 - INTERIOR PLAN DETAILS
50-59 - INTERIOR SECTION DETAILS
60-69 - CEILING DETAILS
PLANS ONLY
XXX-AS 2 0 1
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
SH
EE
T G
RO
UP
IN
G
AS 201
ARCHITECTURAL ELEVATIONS
XXX-AS 6 0 0
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
SH
EE
T G
RO
UP
IN
G
AS600
ARCHITECTURAL SCHEDULE
BU
IL
DI
NG
N
UM
BE
R
BU
IL
DI
NG
N
UM
BE
R
BU
IL
DI
NG
N
UM
BE
R
BU
IL
DI
NG
N
UM
BE
R
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name:
Date: License Number: MN# 18157
Typed or Printed Name: Tom Olesak
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10 C
U s e rs
\P u b li c \D o c u m e n ts \R e v it
P ro je c ts
\1 -0
-S h e e tI n d e x -R
E
M a rk fo rt
.r v t
/2
/2
:2 :5
P
M
GI001
SHEET INDEX - 1
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
EM
16305
CAMPUS
03/30/2022
SHEET INDEX - GENERAL
SHEET NO. SHEET TITLE
GI000 COVER SHEET
GI001 SHEET INDEX - 1
GI002 SHEET INDEX - 2
GI003 ABBREVIATIONS
GI004 GENERAL NOTES, LIFE SAFETY, ICRA, PHASING, SCHEDULE
GI005 GENERAL NOTES AND SYMBOLS
GI100 SITE - OVERALL PLAN
GI101 ICRA OVERVIEW PLAN
SEE BUILDING SETS FOR ADDITIONAL DRAWINGS
SHEET INDEX - ARCHITECTURE
SHEET NO. SHEET TITLE
AS600 INTERIOR SCHEDULES & SIGNAGE DETAILS
AS601 BUILDING ELEMENT TYPES AND DETAILS
AS602 DOOR SCHEDULE AND ELEVATIONS
SEE BUILDING SETS FOR ADDITIONAL DRAWINGS
SHEET INDEX - CIVIL
SHEET NO. SHEET TITLE
CD100 OVERALL DEMOLITION PLAN
CD101 DEMOLITION PLAN 1
CD102 DEMOLITION PLAN 2
CD103 DEMOLITION PLAN 3
CU100 OVERALL UTILITY PLAN
CU101 UTILITY PLAN 1
CU102 UTILITY PLAN 2
CU103 UTILITY PLAN 3
CP401 PROFILE 1
CP402 PROFILE 2
CP403 PROFILE 3
CS100 OVERALL SITE RESTORATION PLAN
CS101 SITE RESTORATION PLAN 1
CS102 SITE RESTORATION PLAN 2
CS103 SITE RESTORATION PLAN 3
CJ501 CIVIL DETAILS
CJ502 CIVIL DETAILS
SHEET INDEX - MECHANICAL
SHEET NO. SHEET TITLE
M SERIES SEE BUILDING 1 SET FOR GENERAL NOTES. SEE BUILDING SETS FOR
MECHANICAL AND PLUMBING DRAWINGS
SHEET INDEX - STRUCTURAL
SHEET NO. SHEET TITLE
S100 TITLE SHEET
S101 STRUCTURAL NOTES
S500 FOUNDATION DETAILS
S600 MASONRY DETAILS
S700 CONCRETE DETAILS
S800 LIGHT GAUGE DETAILS
SEE BUILDING SETS FOR ADDITIONAL DRAWINGS
SHEET INDEX - ELECTRICAL
SHEET NO. SHEET TITLE
0-GE000 ELECTRICAL COVERSHEET
0-GE400 ELECTRICAL COMMON DETAILS
0-GE600 ELECTRICAL COMMON SCHEDULES
SEE BUILDING SETS FOR ADDITIONAL DRAWINGS
SHEET INDEX - TELECOMMUNICATION
SHEET NO. SHEET TITLE
T000 TELECOM SYMBOLS AND ABBREVIATIONS
TS001 TELECOMMUNICATION SITE PLAN
T800 TELECOMMUNICATION ROUTING SCHEMATIC
T801 TELECOMMUNICATION ROUTING SCHEMATIC
T802 TELECOMMUNICATION ROUTING SCHEMATIC
T803 TELECOMMUNICATION ROUTING SCHEMATIC
T804 TELECOMMUNICATION DETAILS
SEE BUILDING SETS FOR ADDITIONAL DRAWINGS
SHEET INDEX - HAZARD PLANS
SHEET NO. SHEET TITLE
HA100 REFERENCE HAZARDOUS MATERIAL SITE PLAN - ASBESTOS / LEAD
HA-CE-1A REFERENCE - EAST CORRIDORS - ASBESTOS RE-SURVEY
HA-CW-1A REFERENCE - WEST CORRIDORS - ASBESTOS RE-SURVEY
HA-TU-1A REFERENCE - CAMPUS STEAM TUNNELS - ASBESTOS RE-SURVEY
SEE BUILDING SETS FOR ADDITIONAL DRAWINGS
SHEET INDEX - BUILDING 14
SHEET NO. SHEET TITLE
14-GI000 BUILDING 14 COVER SHEET & SHEET INDEX
14-GI111 FIRST FLOOR INFECTION CONTROL & PHASING PLAN
14-HA-1A REFERENCE - BASEMENT FIRST FLOOR ASBESTOS RE-SURVEY
14-AS110 FIRST FLOOR PLANS
14-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
14-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
14-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
14-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
14-E101 FIRST FLOOR DEMOLITION - ELECTRICAL
14-E201 FIRST FLOOR - ELECTRICAL
14-E300 ELECTRICAL ENLARGED PLANS
14-E400 ELECTRICAL ONE-LINE DIAGRAMS
14-E500 ELECTRICAL SCHEDULES
14-M101 FIRST FLOOR DEMOLITION PLAN - MECHANICAL
14-M201 FIRST FLOOR PLAN REMODEL - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 28
SHEET NO. SHEET TITLE
28-GI000 BUILDING 28 COVER SHEET & SHEET INDEX
28-GI100 BASEMENT FLOOR - LIFE SAFETY PLAN
28-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
28-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
28-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
28-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
28-HA-4A REFERENCE - ATTIC FLOOR FLOOR ASBESTOS RE-SURVEY
28-AS100 BASEMENT FLOOR - OVERALL PLAN
28-AS110 FIRST FLOOR - OVERALL PLAN
28-AS120 SECOND FLOOR - OVERALL PLAN
28-AS400 LARGE SCALE PLANS
28-S100 BASEMENT FLOOR PLAN - OVERALL
28-S110 FIRST FLOOR PLAN - OVERALL
28-S400 LARGE SCALE PLANS
28-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
28-TD110 FIRSTFLOOR PLAN - TELECOM - DEMOLITION
28-TD120 SECONDFLOOR PLAN - TELECOM - DEMOLITION
28-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
28-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
28-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
28-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
28-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
28-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
28-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
28-E200 BASEMENT - ELECTRICAL
28-E201 FIRST FLOOR - ELECTRICAL
28-E300 ELECTRICAL ENLARGED PLANS
28-E400 ELECTRICAL ONE-LINE DIAGRAMS
28-E500 ELECTRICAL SCHEDULES
28-M100 BASEMENT DEMOLITION - MECHANICAL
28-M200 BASEMENT REMODEL - MECHANICAL
28-M201 FIRST FLOOR REMODEL - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 29
SHEET NO. SHEET TITLE
29-GI000 BUILDING 29 COVER SHEET & SHEET INDEX
29-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
29-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
29-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
29-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
29-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
29-HA-4A REFERENCE - ATTIC FLOOR ASBESTOS RE-SURVEY
29-AS100 BASEMENT PLANS
29-AS110 FIRST FLOOR PLANS
29-AS120 SECOND FLOOR - OVERALL PLAN
29-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
29-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
29-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
29-TD130 ATTIC FLOOR PLAN - TELECOM - DEMOLITION
29-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
29-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
29-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
29-TN130 ATTIC FLOOR PLAN - TELECOMMUNICATIONS
29-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
29-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
29-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
29-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
29-E200 BASEMENT - ELECTRICAL
29-E201 FIRST FLOOR - ELECTRICAL
29-E300 ELECTRICAL ENLARGED PLANS
29-M100 BASEMENT DEMOLITION - MECHANICAL
29-M101 FIRST FLOOR DEMOLITION - MECHANICAL
29-M200 BASEMENT FLOOR - MECHANICAL
29-M201 FIRST FLOOR REMODEL - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 48
SHEET NO. SHEET TITLE
48-GI000 BUILDING 48 COVER SHEET & SHEET INDEX
48-GI110 FIRST FLOOR - LIFE SAFETY PLAN
48-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
48-GI121 SECOND FLOOR - INFECTION CONTROL & PHASING PLAN
48-HA-1A REFERENCE - CRAWLSPACE FLOOR - ASBESTOS RE-SURVEY
48-HA-2A REFERENCE - BASEMENT FLOOR - ASBESTOS RE-SURVEY
48-HA-3A REFERENCE - FIRST FLOOR - ASBESTOS RE-SURVEY
48-HA-4A REFERENCE - SECOND FLOOR - ASBESTOS RE-SURVEY
48-HA-5A REFERENCE - THIRD ATTIC FLOOR - ASBESTOS RE-SURVEY
48-AS100 BASEMENT FLOOR - OVERALL PLAN
48-AS110 FIRST FLOOR PLANS
48-AS120 SECOND FLOOR PLANS
48-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
48-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
48-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
48-TD130 ATTIC FLOOR PLAN - TELECOM - DEMOLITION
48-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
48-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
48-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
48-TN130 ATTIC FLOOR PLAN - TELECOMMUNICATIONS
48-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
48-TN220 SECOND FLOOR PLAN - TELECOM - CABLE DISTANCE
48-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
48-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
48-E200 BASEMENT FLOOR PLAN - ELECTRICAL
48-E201 FIRST FLOOR PLAN - ELECTRICAL
48-E202 SECOND FLOOR PLAN - ELECTRICAL
48-E300 ELECTRICAL ENLARGED PLANS
48-E500 ELECTRICAL ONE-LINE DIAGRAMS
48-E600 ELECTRICAL SCHEDULES
48-M101 FIRST FLOOR DEMOLITION PLAN - MECHANICAL
48-M102 SECOND FLOOR DEMOLITION PLAN - MECHANICAL
48-M201 FIRST FLOOR PLAN - MECHANICAL
48-M202 SECOND FLOOR PLAN - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 49
SHEET NO. SHEET TITLE
49-GI000 BUILDING 49 COVER SHEET & SHEET INDEX
49-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
49-HA-1A REFERENCE - CRAWLSPACE FLOOR - ASBESTOS RE-SURVEY
49-HA-2A REFERENCE - BASEMENT FLOOR - ASBESTOS RE-SURVEY
49-HA-3A REFERENCE - FIRST FLOOR - ASBESTOS RE-SURVEY
49-HA-4A REFERENCE - SECOND FLOOR - ASBESTOS RE-SURVEY
49-AS100 BASEMENT PLANS
49-AS110 FIRST FLOOR - OVERALL PLAN
49-AS120 SECOND FLOOR - OVERALL PLAN
49-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
49-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
49-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
49-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
49-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
49-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
49-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
49-TN300 ENLARGED PLANS -TELECOMMUNICATIONS - DEMO
49-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
49-E200 BASEMENT - ELECTRICAL
49-E201 FIRST FLOOR - ELECTRICAL
49-E300 ELECTRICAL ENLARGED PLANS
49-E500 ELECTRICAL ONE-LINE DIAGRAMS
49-E600 ELECTRICAL SCHEDULES
49-M100 BASEMENT DEMOLITION - MECHANICAL
49-M200 BASEMENT - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 50
SHEET NO. SHEET TITLE
50-GI000 BUILDING 50 COVER SHEET & SHEET INDEX
50-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
50-HA-1A REFERENCE - CRAWLSPACE FLOOR ASBESTOS RE-SURVEY
50-HA-2A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
50-HA-3A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
50-HA-4A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
50-HA-5A REFERENCE - ATTIC FLOOR ASBESTOS RE-SURVEY
50-AS100 BASEMENT PLANS
50-AS110 FIRST FLOOR - OVERALL PLAN
50-AS120 SECOND FLOOR - OVERALL PLAN
50-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
50-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
50-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
50-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
50-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
50-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
50-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
50-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
50-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
50-E100 BASEMENT FLOOR PLAN - ELECTRICAL
50-E101 FIRST FLOOR PLAN - ELECTRICAL
50-E300 ENLARGED PLANS - ELECTRICAL
50-E500 ELECTRICAL POWER DIAGRAMS
50-E600 ELECTRICAL SCHEDULES
50-M100 BASEMENT DEMOLITION PLAN - MECHANICAL
50-M200 BASEMENT FLOOR PLAN - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 51
SHEET NO. SHEET TITLE
51-GI000 BUILDING 51 COVER SHEET & SHEET INDEX
51-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
51-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
51-HA-1A REFERENCE - SUBBASEMENT FLOOR ASBESTOS RE-SURVEY
51-HA-2A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
51-HA-3A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
51-HA-4A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
51-AS100 BASEMENT FLOOR PLANS
51-AS110 FIRST FLOOR - OVERALL PLAN
51-AS120 SECOND FLOOR - OVERALL PLAN
51-TD100 BASEMENT FLOOR PLAN - ELECTRICAL DEMOLITION
51-TD110 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION
51-TD120 SECOND FLOOR PLAN - ELECTRICAL DEMOLITION
51-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
51-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
51-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
51-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
51-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
51-E100 BASEMENT FLOOR PLAN - ELECTRICAL
51-E101 FIRST FLOOR PLAN - ELECTRICAL
51-E300 ENLARGED PLANS - ELECTRICAL
51-E500 ELECTRICAL DIAGRAMS
51-E600 ELECTRICAL SCHEDULES
51-M100 BASEMENT DEMOLITION PLAN - MECHANICAL
51-M200 BASEMENT FLOOR PLAN - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDINGS 54 & 69
SHEET NO. SHEET TITLE
54-GI000 BUILDINGS 54 & 69 COVER SHEET & SHEET INDEX
54-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
54-AS110 FIRST FLOOR PLANS
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDINGS 95 & 88
SHEET NO. SHEET TITLE
95-GI000 BUILDINGS 95 & 88 COVER SHEET & SHEET INDEX
95-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
88-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
95-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
95-AS100 FIRST FLOOR PLANS (BUILDING 95 & 88)
95-TD110 FIRST FLOOR PLAN (BUILDING 88 & 95) - TELECOM - DEMOLITION
95-TN110 FIRST FLOOR PLAN (BUILDING 88 & 95) - TELECOMMUNICATION
95-TN210 FIRST FLOOR PLAN (BUILDING 88 & 95) - TELECOM - CABLE DISTANCE
95-TN400 ENLARGED PLANS (BUILDING 95) - TELECOMMUNICATIONS
95-E201 FIRST FLOOR PLAN - ELECTRICAL
95-E600 ELECTRICAL SCHEDULES
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - ADHC
ADHC SHEET TITLE
FB1-GI000 CONSTRUCT ADULT DAY HEALTH CARE COVER SHEET & SHEET INDEX
FB1-AS110 FIRST FLOOR - OVERALL PLAN
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 96
SHEET NO. SHEET TITLE
96-GI000 BUILDING 96 COVER SHEET & SHEET INDEX
96-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
96-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
96-AS110 FIRST FLOOR PLANS
96-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
96-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
96-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
96-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
96-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
96-E201 FIRST FLOOR PLAN - ELECTRICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 108
SHEET NO. SHEET TITLE
108-GI000 BUILDING 108 COVER SHEET & SHEET INDEX
108-AS110 FIRST FLOOR PLAN - OVERALL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDINGS 109 & 57
SHEET NO. SHEET TITLE
109-GI000 BUILDINGS 109 & 57 COVER SHEET & SHEET INDEX
109-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
109-AS110 FIRST FLOOR PLANS (BUILDINGS 109 & 57)
109-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
109-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
109-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
109-TN400 ENLARGED PLANS (B57 AND B109) - TELECOMMUNICATIONS
109-E201 FIRST FLOOR PLAN - ELECTRICAL
109-M101 FIRST FLOOR DEMOLITION - MECHANICAL
109-M201 FIRST FLOOR REMODEL - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 111
SHEET NO. SHEET TITLE
111-GI000 BUILDING 111 COVER SHEET & SHEET INDEX
111-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
111-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
111-AS100 BASEMENT FLOOR PLANS
111-AS110 FIRST FLOOR PLANS
111-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
111-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
111-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
111-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
111-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
111-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
111-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
111-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
111-E200 BASEMENT FLOOR PLAN - ELECTRICAL
111-E201 FIRST FLOOR PLAN - ELECTRICAL
111-E300 ELECTRICAL ENLARGED PLANS
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 112
SHEET NO. SHEET TITLE
112-GI000 BUILDING 112 COVER SHEET & SHEET INDEX
112-AS110 FIRST FLOOR PLANS
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 115
SHEET NO. SHEET TITLE
115-GI000 BUILDING 115 COVER SHEET & SHEET INDEX
115-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
115-AS110 FIRST FLOOR PLANS
115-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
115-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
115-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
115-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
115-E201 FIRST FLOOR - ELECTRICAL
115-E300 ELECTRICAL ENLARGED PLANS
115-M101 FIRST FLOOR DEMOLITION - MECHANICAL
115-M201 FIRST FLOOR - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 116
SHEET NO. SHEET TITLE
116-GI000 BUILDING 116 COVER SHEET & SHEET INDEX
116-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
116-AS110 FIRST FLOOR PLANS
116-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
116-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
116-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
116-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
116-E201 FIRST FLOOR - ELECTRICAL
116-E300 ELECTRICAL ENLARGED PLANS
116-M101 FIRST FLOOR DEMOLITION - MECHANICAL
116-M201 FIRST FLOOR REMODEL - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 118
SHEET NO. SHEET TITLE
118-GI000 BUILDING 118 COVER SHEET & SHEET INDEX
118-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
118-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
118-AS100 BASEMENT FLOOR PLANS
118-AS110 FIRST FLOOR PLANS
118-TD100 BASEMENT FLOOR PLAN - ELECTRICAL DEMOLITION
118-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
118-TD110 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION
118-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
118-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
118-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
118-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
118-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
118-E200 BASEMENT - ELECTRICAL
118-E201 FIRST FLOOR - ELECTRICAL
118-E300 ELECTRICAL ENLARGED PLANS
118-E400 ELECTRICAL ONE-LINE DIAGRAMS
118-E500 ELECTRICAL SCHEDULES
118-M100 BASEMENT DEMOLITION - MECHANICAL
118-M101 FIRST FLOOR DEMOLITION - MECHANICAL
118-M200 BASEMENT FLOOR - MECHANICAL
118-M201 FIRST FLOOR - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - CONSTRUCT PARKING...
SHEET NO. SHEET TITLE
FB2-GI000 CONSTRUCT PARKING STRUCTURE COVER SHEET & SHEET INDEX
FB2-AS110 FIRST FLOOR - OVERALL PLAN
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of
Minnesota.
Name:
Date: License Number: MN# 18157
Typed or Printed Name: Tom Olesak
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10 C
U s e rs
\P u b li c \D o c u m e n ts \R e v it
P ro je c ts
\1 -0
-S h e e tI n d e x -R
E
M a rk fo rt
.r v t
/2
/2
:2 :2
P
M
GI002
SHEET INDEX - 2
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
EM
16305
CAMPUS
03/30/2022
COMMON ABBREVIATIONS - ADDITIONAL ABBREVIATIONS MAY BE FOUND ON CONSULTANT DRAWINGS
A/C
A/C UNIT
A/E
AAMA
AAP
AB
ABC
ACC
ACI
ACT
ACS DR
ACS FLR
ACS PNL
ACST
AD
ADA
ADC
ADDL
ADDN
ADH
ADJ
ADMIN
AFF
AFG
AFS
AGC
AGGR
AHJ
AHR
AHU
AIA
AISC
ALT
ALT NO
ALUM
AMT
ANOD
ANSI
ANT
AP
APA
APC
APPD
APPROX
AR
ARCH
ASB
ASI
ASKLR
ASPH
ASSN
ASTM
ATCH
ATM
AUTO
AUX
AV
AVG
AW
AWI
AWPA
AWS
B PL
BAT
BD
BD FT
BEV
BHMA
BI FLD DR
BITUM
BKG
BLD
BLDG
BM
BOT
BRCG
BRDG
BRDG JST
BRG
BRG PL
BRKT
BRZ
BSMT
BTWN
BUR
C CONC
C TO C
CAB
CAC
CB
CBB
CCD
CCTV
CCW
CD
CEM
CEM PLAS
CER
CF
CF/CI
CF/OI
CFLG
CFMF
CG
CGSFU
CH
CHEM
CHFR
CHK
CI
CIP
CIR
CIRC
CJ
CL
CLDG
CLG
CLR
CM
CMU
AIR CONDITION
AIR CONDITIONING UNIT
ARCHITECT/ENGINEER
AMERICAN ARCHITECTURAL MANUFACTURERS ASSN
ALARM ANNUNCIATOR PANEL
ANCHOR BOLT
AGGREGATE BASE COURSE
ACCESSIBLE
AMERICAN CONCRETE INSTITUTE
ACOUSTICAL CEILING TILE
ACCESS DOOR
ACCESS FLOOR
ACCESS PANEL
ACOUSTIC
AREA DRAIN
AMERICANS WITH DISABILITIES ACT
AUTOMATIC DOOR CLOSER
ADDITIONAL
ADDITION
ADHESIVE
ADJACENT, ADJOINING, OR ADJUSTABLE
ADMINISTRATION
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ABOVE FINISHED SLAB
ASSOCIATED GENERAL CONTRACTORS
AGGREGATE
AUTHORITY HAVING JURISDICTION
ANCHOR
AIR HANDLING UNIT
AMERICAN INSTITUTE OF ARCHITECTS
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALTERNATE
ALTERNATE NUMBER
ALUMINUM
AMOUNT
ANODIZE
AMERICAN NATIONAL STANDARDS INSTITUTE
ANTENNA
ACCESS PANEL
AMERICAN PLYWOOD ASSOCIATION
ARCHITECTURAL PRECAST CONCRETE
APPROVED
APPROXIMATE
AS REQUIRED
ARCHITECT
ASBESTOS
ARCHITECT'S SUPPLEMENTAL INSTRUCTION
AUTOMATIC SPRINKLER
ASPHALT
ASSOCIATION
AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATTACHMENT
AUTOMATIC TELLER MACHINE
AUTOMATIC
AUXILIARY
AUDIO VISUAL
AVERAGE
ACID WASTE
ARCHITECTURAL WOODWORKING INSTITUTE
AMERICAN WOOD PRESERVERS' ASSOCIATION
AMERICAN WELDING SOCIETY
BASE PLATE
BATTEN
BOARD
BOARD FEET (FOOT)
BEVEL
BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION
BIFOLDING DOORS
BITUMINOUS
BACKING
BUILD
BUILDING
BEAM OR BENCHMARK
BOTTOM
BRACING
BRIDGING
BRIDGING JOIST
BEARING
BEARING PLATE
BRACKET
BRONZE
BASEMENT
BETWEEN
BUILT-UP ROOFING
CAST CONCRETE
CENTER TO CENTER
CABINET
CEILING ATTENUATION CLASS
CATCH BASIN OR CORNER BEAD
CEMENTITIOUS (BACKER) BOARD
CONSTRUCTION CHANGE DIRECTIVE
CLOSED CIRCUIT TELEVISION
COUNTERCLOCKWISE
CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS
CEMENT
CEMENT PLASTER
CERAMIC
CONTRACTOR FURNISHED
CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CONTRACTOR FURNISHED/OWNER INSTALLED
COUNTERFLASHING
COLD-FORMED METAL FRAMING
CORNER GUARD
CERAMIC GLAZED STRUCTURAL FACING UNITS
COAT HOOK
CHEMICAL
CHAMFER
CHECK
CAST IRON
CAST-IN-PLACE
CIRCLE
CIRCULAR
CONSTRUCTION JOINT OR CONTROL JOINT
CENTER LINE
CLADDING
CEILING
CLEAR
CONSTRUCTION MANAGEMENT
CONCRETE MASONRY UNIT
CNR
CNTR
CRTP
CO
CO2
COL
COM
COMB
COMM
COMP
CONC
CONC FLR
COND
CONF
CONN
CONSTR
CONT
CONTR
COORD
CORR
CPM
CPRS
CR
CRS
CRSI
CSB
CSG
CSI
CSK
CSMT
CSWK
CTG
CTR
CTRL
CTV
CU FT
CU IN
CU YD
CURT
CYL
CYL L
D
DAT
DBL
DBL GLZ
DCS
DP
DEG
DEL
DEMO
DEPT
DET
DF
DIA
DIAG
DIFF
DIM
DIR
DISP
DIST
DIV
DL
DOC
DR
DR CL
DR FR
DR OPNG
DS
DSGN
DW
DWG
E
EA
EDICT
EFF
EFS
EHRM
EIFS
EJ
EL
ELAST
ELEC
ELEC DR OP
ELEV
EMER
EMER SHR
ENCL
ENGR
ENVIR
EO
EPA
EPDM
EPO
EPS
EQ
EQL SP
EQUIP
EQUIV
ERD
ESC
ESMT
ESP
EST
ETC
EW
EWC
EWS
EXH
EXIST
EXP
EXP BT
EXST GR
EXT
EXT GR
CORNER
COUNTER
COUNTERTOP
CARBON MONOXIDE
CARBON DIOXIDE
COLUMN
COMMON
COMBINATION, COMBINED
COMMUNICATION
COMPONENT
CONCRETE
CONCRETE FLOOR
CONDENSER OR CONDITION
CONFERENCE
CONNECT
CONSTRUCTION
CONTINUE
CONTRACTOR
COORDINATE
CORRIDOR
CRITICAL PATH METHOD
COMPRESSIBLE
CARD READER
COLD ROLLED STEEL
CONCRETE REINFORCING STEEL INSTITUTE
CONCRETE SPLASH BLOCK
CASING
CONSTRUCTION SPECIFICATIONS INSTITUTE
COUNTER SUNK
CASEMENT
CASEWORK
COATING
CENTER
CONTROL
CABLE TELEVISION
CUBIC FEET
CUBIC INCH
CUBIC YARD
CURTAIN
CYLINDER
CYLINDER LOCK
DEPTH OR PENNY (NAIL)
DATUM
DOUBLE
DOUBLE GLAZE
DIAPER CHANGING STATION
DECORATIVE PANEL
DEGREE
DELETE
DEMOLITION
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIFFERENCE OR DIFFUSER
DIMENSION
DIRECTION
DISPENSER
DISTANCE
DIVIDE OR DIVISION
DEAD LOAD
DOCUMENT
DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DOOR CLOSER
DOOR FRAME
DOOR OPENING
DOWNSPOUT
DESIGN
DISHWASHER
DRAWING
EAST
EACH
ENTERPRISE DATA CENTER INFRASTRUCTURE
COLLABORATION TEAM
EFFICIENCY
EXTERIOR FINISH SYSTEM
ELECTRONIC HEALTH RECORDS MODERNIZATION
EXTERIOR INSULATION AND FINISH SYSTEM
EXPANSION JOINT
ELEVATION
ELASTOMERIC
ELECTRIC
ELECTRIC DOOR OPENER
ELEVATOR
EMERGENCY
EMERGENCY SHOWER
ENCLOSURE
ENGINEER
ENVIRONMENT
ELECTRICAL OUTLET
ENVIRONMENTAL PROTECTION AGENCY
ETHYLENE PROPYLENE DIENE MONOMER
EMERGENCY POWER OFF
EXPANDED POLYSTYRENE BOARD (INSULATION)
EQUAL
EQUALLY SPACED
EQUIPMENT
EQUIVALENT
EXISTING ROOF DRAIN
ESCAPE OR ESCUTCHEON
EASEMENT
ESPECIALLY
ESTIMATE
AND SO FORTH OR ET CETERA
EACH WAY
ELECTRIC WATER COOLER
EYE WASH STATION
EXHAUST
EXISTING
EXPANSION OR EXPOSED
EXPANSION BOLT
EXISTING GRADE
EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXTERIOR GRADE
F
FA
FAB
FAC
FACIL
FAS
FAS BD
FCU
FCO
FCTY
FD
FDC
FDTN
FE
FEC
FF
FF EL
FF&E
FHC
FHP
FIG
FIL
FIN
FIN FLR
FIN GR
FIN WD
FIXT
FL
FLASH
FLDG
FLEX
FLG
FLR
FLR FIN
FLR SK
FLUOR
FLUOR FIX
FM
FM-G
FO
FOC
FOF
FOM
FOS
FOUNT
FOW
FP
FR
FR SNK
FREQ
FRMG
FRP
FRZ
FS
FSB
FSTNR
FT
FTG
FURG
FURN
FUT
FVC
GA
GAL
GALV
GALV STL
GB
GC
GD
GDR
GEN
GFRC
GFRG
GFRP
GI
GL
GL BLK
GLU LAM
GP
GR FL
GRAN
GRTG
GSB
GSM
GSU
GT
GUAR
GUT
GYP
GYP BD
GYP PLAS
H
HAZ MAT
HB
HC
HCWD
HDBD
HDO
HDR
HDW
HDWD
HEPA
HEX
HGR
HM
HMD
HMDF
HMF
HNDRL
HO
HORIZ
HOSP
HP
HPD
HPDL
HQ
HS
HSE
HSKPG
FAHRENHEIT OR FEMALE
FIRE ALARM
FABRIC
FACTOR
FACILITY
FASCIA
FASCIA BOARD
FAN COIL UNIT
FLOOR CLEANOUT
FACTORY
FLOOR DRAIN
FIRE DEPARTMENT CONNECTION
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FINISH FACE
FINISH FLOOR ELEVATION
FURNITURE, FIXTURE, AND EQUIPMENT
FIRE HOSE CABINET
FULL HEIGHT PARTITION
FIGURE
FILLET
FINISH
FINISH FLOOR
FINISH GRADE
FINISH WOOD
FIXTURE
FLOORLINE
FLASHING
FOLDING
FLEXIBLE
FLOORING
FLOOR
FLOOR FINISH
FLOOR SINK
FLUORESCENT
FLUORESCENT FIXTURE
FACTORY MUTUAL
FACTORY MUTUAL GLOBAL
FINISHED OPENING
FACE OF CONCRETE OR FACE OF CURB
FACE OF FINISH
FACE OF MASONRY
FACE OF SLAB OR FACE OF STUD
FOUNTAIN
FACE OF WALL
FIRE PROTECTION OR FIREPROOF
FIRE RATING, FIRE RESISTANT, OR FRAME
FLUSHING RIM SINK
FREQUENCY
FRAMING
FIBERGLASS REINFORCED PLASTIC
FREEZER
FEDERAL SPECIFICATION
FOLDING SHOWER BENCH
FASTENER
FEET OR FOOT
FOOTING
FURRING
FURNISH OR FURNITURE
FUTURE
FIRE VALVE CABINET
GAGE OR GYPSUM ASSOCIATION
GALLON
GALVANIC OR GALVANIZED
GALVANIZED STEEL
GRAB BAR
GENERAL CONTRACTOR
GUARD
GUARD RAIL
GENERAL OR GENERATOR
GLASS-FIBER-REINFORCED CONCRETE
GLASS-FIBER-REINFORCED GYPSUM
GLASS-FIBER-REINFORCED PLASTIC
GALVANIZED IRON
GLASS
GLASS BLOCK
GLUED LAMINATED WOOD
GRAB BAR
GROUND FLOOR
GRANITE
GRATING
GYPSUM SHEATHING BOARD
GALVANIZED SHEET METAL
GLAZED STRUCTURAL UNIT
GROUT
GUARANTEE
GUTTER
GYPSUM
GYPSUM BOARD
GYPSUM PLASTER
HIGH OR HUMIDISTAT
HAZARDOUS MATERIALS
HOSE BIBB
HOLLOW CORE
HOLLOW CORE WOOD DOOR
HARDBOARD
HIGH DENSITY OVERLAY
HEADER
HARDWARE
HARDWOOD
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEXAGON
HANGER
HOLLOW METAL
HOLLOW METAL DOOR
HOLLOW METAL DOOR AND FRAME
HOLLOW METAL FRAME
HANDRAIL
HOLD OPEN
HORIZONTAL
HOSPITAL
HIGH PRESSURE
HYGIENE PRODUCT DISPOSAL
HIGH PRESSURE DECORATIVE LAMINATE
HEADQUARTERS
HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HOUSE
HOUSEKEEPING
HST
HSS
HT
HVAC
HVY
HW
HYD
HYDR
IAQ
IBC
IC
ICW
ID
ID NO
ILLUM
INCL
IND
INFO
INSUL
INT
INTL
IWH
JAN
KD
KIT
KO
KPL
LAB
LAD
LAM
LAM GL
LAU
LAV
LBR
LBS
LCS
LD BRG
LDR
LED
LF
LIB
LIN
LIQ
LKR
LKR RM
LL
LMST
LRG
LRV
LS
LT
LT GA
LT WT
LTG
LTNG
LVD
LVR
LWC
LWIC
LYR
MACH
MACH RM
MAINT
MAN
MATL
MATV
MAX
MBD
MCB
MD
ME
MEAS
MECH
MECH RM
MED
MEK
MEMB
MEMO
MEZZ
MF
MFD
MFG
MFR
MFR REC
MGT
MIC
MID
MIL STD
MIN
MIR
MISC
MIT
MKR
ML
MLDG
MLWK
mm
MO
MOD
MOD BIT
MON
MOPR
MR
MS
MTD
MTG
MTL
MULL
MW
MWP
HOIST
HOLLOW STRUCTURAL STEEL
HEIGHT
HEATING, VENTILATING, AND AIR CONDITIONING
HEAVY
HOT WATER
HYDRANT
HYDRAULIC
INDOOR AIR QUALITY
INTERNATIONAL BUILDING CODE
INFECTION CONTROL
INFECTION CONTROL WALL
INSIDE DIAMETER
IDENTIFICATION NUMBER
ILLUMINATION
INCLUDED
INDEPENDENT OR INDUSTRIAL
INFORMATION
INSULATION
INTERIOR
INTERNATIONAL
INSTANTANEOUS WATER HEATER
JANITOR
KILN DRIED OR KNOCKED DOWN
KITCHEN
KNOCKOUT
KICKPLATE
ANGLE
LABORATORY
LADDER
LAMINATE
LAMINATED GLASS
LAUNDRY
LAVATORY
LUMBER
POUND
LOCKABLE CHARTING STATION/MED CABINET
LOAD-BEARING
LEADER
LIGHT EMITTING DIODE
LINEAR FEET (FOOT)
LIBRARY
LINEAR
LIQUID
LOCKER
LOCKER ROOM
LEAD LINED
LIMESTONE
LARGE
LOUVERED ROOF VENT
LIGHT SWITCH
LIGHT
LIGHT GAGE
LIGHTWEIGHT
LIGHTING
LIGHTNING
LOUVERED
LOUVER
LIGHTWEIGHT CONCRETE
LIGHTWEIGHT INSULATING CONCRETE
LAYER
MACHINE
MACHINE ROOM
MAINTENANCE
MANUAL
MATERIAL
MASTER ANTENNA TELEVISION SYSTEM
MAXIMUM
MARKER BOARD
METAL CORNER BEAD
DECK
MECHANICAL ENGINEER
MEASURE
MECHANICAL
MECHANICAL ROOM
MEDICAL, MEDIUM
METHYL ETHYL KETONE
MEMBRANE
MEMORANDUM
MEZZANINE
MILL FINISH
MANUFACTURED
MANUFACTURING
MANUFACTURER
MANUFACTURER'S RECOMMENDATION
MANAGEMENT
MICROPHONE
MIDDLE
MILITARY STANDARD
MINIMUM
MIRROR
MISCELLANEOUS
MITER
MARKER
METAL LATH
MOLDING (MOULDING)
MILLWORK
MILLIMETER
MASONRY OPENING
MODEL, MODIFY OR MODULE
MODIFIED BITUMEN
MONITOR
MOP RACK
MOISTURE RESISTANT
MOP SINK
MOUNTED
MOUNTING
METAL
MULLION
MICROWAVE
MEMBRANE WATERPROOFING
N
NA
NAT
NATL
NC
NCOMBL
NEC
NEG
NEMA
NEUT
NFC
NFPA
NIC
NO
NOM
NR
NRC
NRCA
NRP
NS
NUM
O/O O
OA
OC
OCC
OCT
OD
OD
OF/CI
OFD
OFF
OF/OI
OH
OH DR
OIT
OPH
OPNG
OPP
OPR
OPT
OR
ORD
ORG
ORIG
ORN
OSHA
OUT
OZ
P
PAR
PARA
PART
PAT
PB
PBD
PC
PCA
PCC
PCCP
PCD
PCF
PCP
PCT
PED
PEN
PEND
PERF
PERIM
PERP
PHAR
PHOTO
PKG
PL
PL GL
PLAM
PLAS
PLBG
PLYWD
PMTL
PNEU
PNL
PO
POLY
PP
PR
PRCST
PREFAB
PREFIN
PRELIM
PREP
PRESS
PREV
PRKG
PRMLD
PROJ
PROP
PSF
PSI
PT
PTD
PTN
PTS
PVC
PVG
PWR
QA
QC
QRY
QTR
QTY
QUAD
QUAL
R
RA
RAD
RBM
RBR
NORTH
NOT APPLICABLE
NATURAL
NATIONAL
NOISE CRITERIA OR NURSE CALL
NONCOMBUSTIBLE
NATIONAL ELECTRICAL CODE
NEGATIVE
NATIONAL ELECTRICAL MANUFACTURERS ASSN
NEUTRAL
NATIONAL FIRE CODE
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NUMBER
NOMINAL
NOISE REDUCTION
NOISE REDUCTION COEFFICIENT
NATIONAL ROOFING CONTRACTORS ASSOCIATION
NONREMOVABLE
NARROW STILE
NUMERAL
OUT TO OUT
OXYGEN
OUTSIDE AIR OR OVERALL
ON CENTER
OCCUPY
OCTAGON
OUTSIDE DIAMETER, OUTSIDE DIMENSION
OUTSIDE DIAMETER/OUTSIDE DIMENSION
OWNER FURNISHED/CONTRACTOR INSTALLED
OVERFLOW DRAIN
OFFICE
OWNER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .