This document package includes construction drawings and specifications for infrastructure upgrades at the St. Cloud Veterans Affairs Health Care System campus. The project involves electrical, bonding, UPS, building management system, access security, and HVAC upgrades and renovations across multiple buildings. It also includes data center/server room physical security upgrades, a diversified fiber path to the data center, and campus-wide fiber infrastructure backbone upgrades within and between buildings. Hazardous materials abatement is required. The solicitation seeks a contractor to provide all labor, materials, tools and equipment to complete the upgrades in accordance with the specifications and contract drawings. The federal agency issuing this opportunity is the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files for this federal contract opportunity
Show all 50
Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEGEND
CORRIDOR OUTLINE
VFY EXIST
BUILDING OUTLINE
VFY EXIST
TO 8TH ST WEST ONLYTO 8TH ST EAST & WEST
44TH AVE.
TRAIL 1
TRAIL 2
TRANSFER
SWITCH
CAPACITOR
BANK (3)
SWITCH
(2)
15KV
MAIN
SW
BATT
35 KV
TO
15 KV
TRANSFORMER
35KV
FUSED
SWITCH
METER 35KV
SWITCH
GRAVEL
GRAVEL
GRAVEL
EXISTING
ROAD
CHAIN LINK FENCE
CHAIN LINK FENCE
16' GATE
GRAVEL
ELECTRICAL
SUBSTATION
FUEL LINES
CONDU ITS TO TU NNEL
M V
D U
C T
B A
N K
PHARMACY ADDITION
B
CORRIDOR LINK
A
C T
TR
A
IL
ER
174 s .f.
256 s .f.
185 s .f.
149 s ..f.
155 s .f.
104 s .f.
70 s. .f .
72 s .f.
110 s .f.
276 s .f.
112 s .f.
99 s .f.
57 s .f.
146 s .f.
434 s .f.
R A
MP
U P
1:
M A X
R A
MP
U P
1:
M A X
RA
M P
UP
1:2 0 M
AX
TRANSFER
SWITCH
CAPACITOR
BANK (3)
SWITCH
(2) 15KV
MAIN
SW
BATT
35 KV
TO
15 KV
TRANSFORMER
35KV
FUSED
SWITCH
METER 35KV
SWITCH
.3
TRANSFORMER
BUILD ING
#91
5,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
EXISTIN G G AS SU P P LY EQ U IP M EN T TO R EM AIN
O P ER ATIO N AL DU R IN G D EM O LITIO N AN D N EW
C O N STR U C TIO N. P R O TEC T EQU IP M EN T AN D
P IP ELIN ES IN AC C O R D AN C E W ITH G AS SU P P LIER 'S
R EC O M M EN D ATIO N S
N EW G AS SU P P LY M AIN
IN TO B U ILD IN G
SP AR E
P H O N E LIN E
EXTEN D S TO
E XISTIN G
P H O N E IN
B O ILER R O O M
P ER P LAN .
SP AR E
P H O N E
LIN E TO
M ETER
TU N N EL
E XTEN D S
A D D ITIO N AL
2'- 0" U N D ER
B U ILD IN G
FUEL LINE
VENT LINE
1,000 GAL.
UNDERGROUND
DIESEL FUEL
TANK
1,000/5,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
1,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
1,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
S 1
LIG H T
N EW G AS SU P P LY
(C O O R D IN ATE W ITH SU P P LIER )
12"D
10"D
"D
TP TP
EXIST. BUILDING
EXIST.
BUS STOP
CC
L O
O P
16"
20"
12"
3"
8"
DN
0.
0’
BIRDCAGE
B
IR
D C
A G
E
NSP ELECTRICAL
FOR HWY DEPT
T101
I.T.
CHILLER
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
VESTIBULE
DN
DN
DN
FD
DN
F B
F
B
F B
F
B
F B
F
B
SOUTH
VESTIBULE
PASS
THROUGH
LINK TO
BUILDI NG 51
6 3. 32 56
1 13 5. 35 78
PARKING
NO
PARKING
93 49
37 6
109 5
1A
S M
O K
E B
L D
G
SMOKE
BLDG
SMOKE
BLDG
S M
O K
E B
L D
G
SMOKE
BLDG
M.H.
STOR.
SMOKE
BLDG
SMOKE
BLDG
SMOKE
BLDG
SMOKE
BLDG
SMOKE
BLDG
STOR.
BIO-
HAZ.
SAUK RIVER
GP
HOLDING POND
PROPOSED TR
SEE 6-GI000
SEE 7-GI000
SEE 7-GI000
SEE 54-GI000
SEE 54-GI000
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of
Minnesota.
Name:
Date: License Number: MN# 18157
Typed or Printed Name: Tom Olesak
OWNER AND
CONSULTANTS:
CONTACT:
ADDRESS:
MIKE ENGMARK
ST CLOUD VA MEDICAL CENTER
4801 VETERANS DRIVE
ST. CLOUD, MN 56303
NAME:
ADDRESS:
CONTACT:
ADVANCED STRUCTURAL TECHNOLOGIES
7301 OHMS LANE; SUITE 215
EDINA, MN 55439
ZACHARY CRAIG
PHONE:
NAME:
ADDRESS:
CONTACT:
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIRCLE
OMAHA, NE 68134
KRIS BURNHAM
PHONE: 402-991-5520
NAME:
ADDRESS:
CONTACT:
PHONE:
NAME:
ADDRESS:
CONTACT:
PHONE:
NAME:
ADDRESS:
CONTACT:
PHONE:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
IAN WEBER
763-412-4000
ARCHITECT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
EDWARD MARKFORT
763-412-4000
952-854-9302
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIRCLE
OMAHA, NE 68134
KRIS BURNHAM
402-991-5520
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
COVER
DATE:
APPROVED: APPROVED: PROJECTS SECTION MANAGER
APPROVED: OIT MANAGER DATE: APPROVED: ASSISTANT CHIEF ENGINEER DATE:
APPROVED: SAFETY MANAGER
APPROVED: CHIEF OF POLICE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE: APPROVED: EMS MANAGER
APPROVED: M/O MANAGER
DATE:
DATE:
DATE:DATE:
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: PROJECT COR DATE:
APPROVED: INFECTION CONTROL NURSE DATE:
APPROVED: SERVICE LINE DIRECTOR
APPROVED: GEMS COORDINATOR DATE:
DATE:
APPROVED: NURSE EXECUTIVE
APPROVED: CHIEF OF STAFF DATE:
APPROVED: DIRECTOR FMS
APPROVED: ASSOCIATE DIRECTOR
DATE:
DATE:
DATE:
DATE:APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
Main Campus, St. Cloud, Minnesota St. Cloud VA Health Care System
N
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
VICINITY MAP:
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHONE: 320-252-1670
CIVIL ENGINEER:
VA COR:
TELECOMMUNICATIONS ENGINEER:
CONTACT:
ADDRESS:
JONATHAN WEST
ST CLOUD VA MEDICAL CENTER
4801 VETERANS DRIVE
ST. CLOUD, MN 56303
PHONE: 504-250-2699
PROGRAM MANAGER:
EMAIL: Jonathan.West@vciint.com
STRUCTURAL ENGINEER:
MECH/ELEC/PLUMB/FIRE ENGINEER:
C
U s e rs
\P u b li c \D o c u m e n ts \R e v it
P ro je c ts
\1 -1
-R
E
M a rk fo rt
.r v t
/2
/2
:4
:5
P
M
112-GI000
BUILDING 112 COVER SHEET &
SHEET INDEX
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
EM EM
16305
BUILDING 112 - EHRM INFRASTRUCTURE UPGRADES
03/30/2022
0APPROX 150' 300'75'
SHEET INDEX - BUILDING 112
SHEET NO. SHEET TITLE
112-GI000 BUILDING 112 COVER SHEET & SHEET INDEX
112-AS110 FIRST FLOOR PLANS
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
1" = 50'-0"
KEY PLAN
ROOM SCHEDULE
NO. NAME C
A
B
LI
N G
P A
T C
H P
A N
E L
F
IB
E R
P O
W E
R
B O
N D
IN
G
U P
S
D E
D
IC
A T
E D
C O
O
LI
N G
T E
M P
E R
A T
U R
E
H U
M
ID
IT
Y
R A
C K
S E
N S
O R
S P
A C
E
AREA
WIDTH
(FT)
LENGTH
(FT) REMARKS
FIRST FLOOR
112W PLACEHOLDER
BUILDING 112W
850 SF SEE BUILDING 7 FOR TELECOM ROOM. SEE TELECOMMUNICATION
DRAWINGS
HAZARDOUS MATERIAL SCHEDULE
LEVEL
ROOM
NO. ROOM NAME
QUESTIONABLE HAZARDOUS
ELEMENT POSSIBLE ABATEMENT ACTION
FIRST FLOOR 112W PLACEHOLDER
BUILDING 112W
NONE NONE
HAZARDOUS MATERIALS MAY BE ENCOUNTERED THROUGHOUT THE DISTRIBUTION ROUTING THROUGH CEILING PLENUMS AND UTILITY TUNNELS. INSTALLATION OF DISTRIBUTION SHALL NOT
DISTURB QUESTIONABLE HAZARDOUS MATERIAL.
LEAK PREVENTION / DIVERTER SCHEDULE
LEVEL
ROOM
NO. ROOM NAME OVERHEAD LEAK DIVERTER AND DRAIN PIPING LEAK PREVENTION BARRIER WATERPROOFING
FIRST FLOOR 112W PLACEHOLDER
BUILDING 112W
SEE GENERAL NOTES SHEET FOR DETAIL. MWP = MEMBRANE WATERPROOFING. MASONRY = FLUID-APPLIED WATERPROOFING. INT = INTERIOR. EXT = EXTERIOR
ICRA PHASE CONSTRUCTION ROOM SCHEDULE
LEVEL
ROOM
NO. ROOM NAME
CAI BLDG NAME /
FUNCTION
CONSTRUCTION
PROJECT ACTIVITY
INFECTION CONTROL
RISK GROUP
CONTROL
PROCEDURE CLASS SECTION
CONSTRUCTION ZONE /
OCCUPIED CONSTR
DAY /
NIGHT
FIRST FLOOR 112W PLACEHOLDER
BUILDING 112W
GENERATOR BUILDING TYPE A GROUP 1 CLASS I CENTER OCCUPIED CONSTRUCTION DAY
SEE GENERAL NOTES SHEET FOR CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA) DESCRIPTIONS. TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE.
FINAL DETERMINATION BY THE VA WILL BE MADE AT A LATER DATE.
PROPOSED TR
SEE 6-GI000
SEE 7-GI000
SEE 7-GI000
SEE 54-GI000
SEE 54-GI000
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of
Minnesota.
Name:
Date: License Number: MN# 18157
Typed or Printed Name: Tom Olesak
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10 C
U s e rs
\P u b li c \D o c u m e n ts \R e v it
P ro je c ts
\1 -1
-R
E
M a rk fo rt
.r v t
/2
/2
:0 :0
P
M
112-AS110
FIRST FLOOR PLANS
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
EM EM
16305
03/30/2022
N
0 4' 8'2' 1/4" = 1'-0"
FIRST FLOOR PLAN
1" = 50'-0"
KEY PLAN
_SHEET NOTES
1. SEE GENERAL NOTES AND CAMPUS DRAWINGS FOR GENERAL
INFORMATION, LIFE SAFETY, ICRA, AND PHASING
2. ALL EXISTING CONDITIONS MUST BE FIELD VERIFIED BY THE
CONTRACTOR PRIOR TO DEMOLITION OR CONSTRUCTION. EXISTING
CONDITIONS THAT DIFFER FROM THOSE SHOWN MUST BE BROUGHT TO
THE ATTENTION OF THE C.O.R. TO INFORM THE ARCHITECTS AND
ENGINEERS.
3. THE INFORMATION SHOWN ON THE DRAWINGS IS BASED ON DRAWINGS
AND PHOTOGRAPHS PROVIDED BY THE C.O.R. COMBINED WITH
OBSERVATIONS AND SURVEYED DATA FROM THE ARCHITECTS AND
ENGINEERS.
4. SEE CIVIL, STRUCTURAL, TELECOM, ELECTRICAL, MECHANICAL, AND
PLUMBING DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL
DEMOLITION AND CONSTRUCTION REQUIREMENTS.
5. PORTABLE FIRE EXTINGUISHERS (CO2 OR HALOGENATED TYPE AS
DETERMINED BY VA) WITH WALL MOUNT BRACKET AND CODE REQUIRED
SIGNAGE SHALL BE PROVIDED BY THE CONTRACTOR WITHIN TELECOM
ROOMS.
| 112-GI000 - BUILDING 112 COVER SHEET & SHEET INDEX |
| 112-AS110 - FIRST FLOOR PLANS |