Technical Questions - LATE - St. Cloud 8-10-22.pdf
PDF 523 KB Posted
- Attached to
- Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud Federal contract opportunity
- Solicitation number
- 36C77622B0035
About this file
This document contains technical questions and responses related to a solicitation for infrastructure upgrades at the St. Cloud Veterans Affairs Health Care System campus. The contractor will be responsible for improvements to electrical systems, UPS equipment, building management systems, data center infrastructure, fiber optic cabling, and hazardous materials abatement across multiple campus buildings. Key aspects of the work include installing new electrical panels and transformers, upgrading fiber optic backbone and data center connectivity, and renovating space as needed for mechanical and IT systems. The document addresses 32 questions received between July 27 and August 10, 2022 regarding project specifications and drawings. The responses provide clarification on equipment details, conduit and cable routing, and correct discrepancies in the contract documents.
View the file
Other files for this federal contract opportunity
Show all 50
Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item NO.
Date Question Received
Date Question Answered Question Government Response
1 7/27/2022 8/10/2022 TS001 shows what appears to be conduits running between the buildings
Also see GI100 for overview and CU-100 for Fiber Utility plan
2 7/27/2022 8/10/2022 Missing Mech Dwg 01-M204 Refer to attached copy of Sheet 1-M204
3 7/27/2022 8/10/2022 Building 4, Basement, drawing shows conduit and tray going from B4 West to B4 East, B4 West shows nothing
Provide continuation of conduits through B4 West to Building 5 and Building 3.
4 7/27/2022 8/10/2022 Building 4, Basement, drawing shows conduit and tray going from B4 West exiting the building to ?
Provide continuation of conduits through B4 West to Building 5 and Building 3.
5 7/27/2022 8/10/2022 Building 9, TR118 shows 4” conduit running to new telecon room.
Building 115?
The new A Side fiber runs through building 115 into building 9 through an existing 3" conduit.
6 7/27/2022 8/10/2022
For every bldg. receiving new electrical panel, we need the information of the switchgear/switchboard/panel feeding it. Such as Amp frame size, make, model, etc.
This will need to be verified on site by the contractor.
7 7/27/2022 8/10/2022 Where is the lighting schedule to determine the types & make of the lights to be installed?
Refer to Campus Electrical drawing 0-
GE600.
8 7/27/2022 8/10/2022 What are the preferred electrical panel types or is it up to the Electrical contractors discretion?
Contractor needs to supply panels that meet the requirements of the panelboard specifications.
9 7/27/2022 8/10/2022
There are a few discrepancies in the type of Blade Ups plugs to be used. Some Panel schedules say 20A and others Say 30A plugs but all are feeding the same size 5KW Blade UPS. Which is it?
The plug size is based on the electric load for one, two or three rack layouts.
10 7/27/2022 8/10/2022
Blueprint 1-E200 there are two electrical outlets to be installed one in the Mech room and one in a Locker Room. What panel is providing power or do we just tap into the nearest electrical J-box? Refer to sheets 1-E300 and 1-E301.
Solicitation #36C77622B0035 EHRM Infrastructure Upgrades – St. Cloud
Late Technical Questions and VA Response Tracking Sheet
11 7/27/2022 8/10/2022
Bldg. Number- CAMPUS, Blueprint# T804, enlarged detail #2 “Above Ground Conduit Penetration” show the use of an LB condulet line box for the raceway of the (fiber/armored fiber?) if this project calls for armored fiber like I think it might. Using an LB will not allow sufficient room for the bending radius of the Armored Fiber Cable. It will cause damage and problems. Please consider using 24”X 24” NEMA 3R J-Box or larger instead. Making this determination off experience gained on similar Job we completed for the VAMC in Salisbury, NC.
Provide indoor/outdoor loose tube OS2 fiber. Armored fiber will not be utilized, as the path is in conduit.
12 7/27/2022 8/10/2022
Blueprint TN-500 On the one-line schedule there are a bunch of notes with wire sizes on them for a retrofit UPS/EG system. Are we to provide a quote on pulling all these feeders? If so I we need all electrical equipment shown on the one lines to be drawn on the bldg.
layout or at the very least provide a feeder schedule.
Sheet TN-500, Sheet Notes #4 through #9 are for information only, and identify existing feeders to remain. New work includes: Transformer TF-4C-B, Panel 4C- MSB-B, Switch 4C-EQ-DS-B, Switch 4C-ES-DS- B, ATS-4C-ES-B, ATS-4C-EQ-B, Panel 4C- EQDP-B, Panel 4C-ESDP-B, UPS-B, and asssociated feeders as scheduled for this new equipment. Source feeder to Transformer TF-4C-B shall be 3-#1/0 in 4" conduit. New equipment layout is shown on Sheet 4-TN403. Serve AC-053 with 3#10,#10G from 30/3 in Panel 4C-ESDP-B, and CU-053 with 3#12,#12G from 20/3 in Panel 4C-ESDP-B. The following source feeders are to be routed in concrete encased duct banks: Transformer TF-4C-B, Panel, 4C-MSB-B, Switch 4C-EQ-DS-B, Panle 4C-EQDP-B (these are in addition to concrete encased ducts shown on site plans).
13 7/27/2022 8/10/2022 Bldg. 6. Electrical & DATA Details are missing for panels and Racks respectively. No electrical at this time.
14 7/27/2022 8/10/2022 Blueprint 7-TN110 shows no wire tray outside of data room. Is it existing?
No existing cable tray. Existing cables are routed in J-Hooks.
15 7/27/2022 8/10/2022 Blueprint 7-E200 shows Bldg. 13 Not to receive data rack, data cable, no electrical panel upgrade, correct? Correct, no electrical work in building 13.
16 7/27/2022 8/10/2022 Blueprint 8-TN110 where does the 2 inch pipe go leaving the telecom room? What is its purpose?
Delete 2" conduit from B8 sheets as new fiber will not be pulled to B8.
17 7/27/2022 8/10/2022 Blueprint 8-TN110 all CAT 5 to remain? No new Wire Tray for this bldg.?
All 105 existing cables are now existing as Cat6 cables and are to remain as is. No new cable tray is needed for B8
18 7/27/2022 8/10/2022 Blueprint 9-TN100 detail 1 & 2. Shows 4in pipes but where do they need to go? Where is sheet T000 for additional detail?
4" conduits are shown to transition over inaccessible segments of existing ceiling conditions. Detail 1 conduits route from corridor to below Telecommunications Room above. Detail 2 conduits route from corridor to lobby across inaccessible stairway ceiling.
19 7/27/2022 8/10/2022 Why does the wire tray raceway have intermittent runs of 4 inch conduit randomly inserted into the run?
Conduit transitions are shown to accommodate inaccessible segments of existing ceiling conditions.
20 7/27/2022 8/10/2022
Blueprint 14-E400 Panel B14IT-1 is to be fed from bldg. 7 Switchgear 7- MDP-EQ roughly 450 feet away. I made this length determination by referencing the “Site Electrical Plan” in the “CAMPUS” set of prints on sheet “TS-001 detail one.” as well as the bldg. 14 & & prints. Please provide clear directive on how the race way needs to be run above, below, under, through and how far. Also, there will be a voltage drop calculation issue given the distance of the feed. Review, revise, & advise.
Contractor shall determine routing based on existing conditions. Intent is to route feeder underground to tunnel leading into building 7.
21 7/27/2022 8/10/2022 Bldg.. 29 where are the elect panels to run pwer to L21-20R, A/C, GFI, Lights Etc?
Need to verify exact location on site in basement and first floor.
22 7/27/2022 8/10/2022 Bldg. 48 sheet 48-E201 shows A/C condenser in the dining room.
Please advise.
Condensing unit is located outside, west of the dining room.
23 7/27/2022 8/10/2022
Bldg.. 48. Sheet 48-E300 sheet detail 3 TR221 references Pnl EC2-1 which doesn’t exist or I cant find on drawings. Also, looks like this panel only feeds one L21-R20 plug. Which means you have to run a line from the basement to the 2nd floor for ONE plug.. Suggest use the panels on the first floor which do exist and are closer. Please advise.
Reference to panel EC2 should be panel
B48IT-1-CR.
24 7/27/2022 8/10/2022 Bldg. 48 sheet 48-E500 Power riser has Pnl B48IT-1 fed by B-MDP which is not shown on the drawings. Please advise. Should be labeled 48-MSB.
25 7/27/2022 8/10/2022 Bldg 51 sheets 51-E300 thru 51-E600 are from bldg. 50. Please advise.
Building 50 is a typo for titleblock that should read as Building 51 on sheets 51- E100 through 51-E600.
26 7/27/2022 8/10/2022
Bldg.88 & 95 sheet 95-TN110 is the EC responsible for running (4) 4inch in tunnel between bldg. 88 & 95? Where do they start, stop, and how long?
Refer to Building 3 Basement (Sheet 3- TN100) for continuation to the east. Refer to site civil drawings for continuation to the northwest.
27 7/27/2022 8/10/2022 Bldg 96. Sheet 96-E201 where isn’t he bldg. are panels LP2, LP3, & LP1 that are feeding the A/C, GFI’s, & lights? Located in the lower right side of drawing.
28 7/27/2022 8/10/2022 Bldg. 109 sheet E201. Is the existing panel in room 101 to power outlets in room and lights? Yes.
29 7/27/2022 8/10/2022 Bldg.. 116 sheet TN110 Note1 says to put fiber in wire tray but shows 2inch pipe on drawings. Please advise.
Sheet Note 1 references cable tray for are outlet cables. Sheet Note 2 references 2" conduit for A-side fiber. Route area outlet cables in cable tray, and A-side fiber in conduit.
30 7/27/2022 8/10/2022 Bldg 118 sheet E201 per key note 1 where is the condenser unit located? Refer to left side of drawing E201.
31 7/27/2022 8/10/2022 Is the existing Transformer TF-4B the preferred source for New Transformer TF-4C, or if an alternative source would be preferred?
Intercept existing 13.8kV circuit in primary compartment of existing Transformer TF- 4A. Provide elbows for loop feed configuration of existing Transformer TF-4A and utilize to serve new Transformer TF-4C- B. Locate new transformer adjacent to existing Transformer TF-4B. Provide with concrete equipment pad, and modify/supplement chain link fence to enclose new equipment.
32 7/27/2022 8/10/2022 What is the KVA rating for the new UPS? 225kVA 33 7/27/2022 8/10/2022 Do circuits need to be in conduit runs in walls. Yes.