Atch 8 - BLDG 2 addendum.pdf

PDF 10 MB Posted

Attached to
Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud Federal contract opportunity
Solicitation number
36C77622B0035
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document includes details for a federal solicitation seeking construction services. The solicitation seeks a contractor to perform infrastructure upgrades at the St. Cloud Veterans Affairs Health Care System campus, including electrical, bonding, UPS, building management systems, access security, HVAC assessments and upgrades, data center/server room physical security upgrades, installing a diversified fiber path to the data center and upgrading the fiber infrastructure backbone across campus and between buildings. The solicitation also involves hazardous materials abatement. The selected contractor will furnish all labor, materials, tools and equipment to complete the upgrades in accordance with provided specifications and contract drawings. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud, newest first.
File Type Posted
Atch 41 - Construction Wage Rates - Stearns 7-29-22.pdf PDF
Technical Questions - LATE - St. Cloud 8-10-22.pdf PDF
01-M204 - ROOF REMODEL -MECHANICAL.pdf PDF
Atch 3 - Specifications Volume 3 - Asbestos addendum.pdf PDF
Atch 4 - General 1 of 2 addendum.pdf PDF
Atch 6 - BLDG 1 - 1 of 2 addendum.pdf PDF
Atch 9 - BLDG 3 addendum.pdf PDF
Atch 12 - BLDG 6 addendum.pdf PDF
Atch 13 - BLDG 7 and 13 addendum.pdf PDF
Atch 27 - BLDG 96 addendum.pdf PDF
Atch 30 - BLDG 111 addendum.pdf PDF
Atch 31 - BLDG 112 addendum.pdf PDF
Specifications Addendum Information.pdf PDF
Drawings Addendum Information.pdf PDF
Atch 1 - Specifications Volume 1 addendum.pdf PDF
Atch 11 - BLDG 5 addendum.pdf PDF
Atch 17 - BLDG 11 addendum.pdf PDF
Atch 18 - BLDG 14 addendum.pdf PDF
Atch 28 - BLDG 108 addendum.pdf PDF
Atch 33 - BLDG 116 addendum.pdf PDF
Site Visit Sign-in Sheets - 6-28-22 - 6-30-22.pdf PDF
36C77622B0035 - 6-9-22.pdf PDF
Atch 6 - BLDG 1 - 1 of 2.pdf PDF
Atch 16 - BLDG 10.pdf PDF
Atch 19 - BLDG 28.pdf PDF
Atch 22 - BLDG 49.pdf PDF
Atch 35 - ADHC.pdf PDF
Atch 4 - General 1 of 2.pdf PDF
Atch 5 - General 2 of 2.pdf PDF
Atch 8 - BLDG 2.pdf PDF
Atch 23 - BLDG 50.pdf PDF
Atch 24 - BLDG 51.pdf PDF
Atch 27 - BLDG 96.pdf PDF
Atch 31 - BLDG 112.pdf PDF
Atch 10 - BLDG 4.pdf PDF
Atch 34 - BLDG 118.pdf PDF
Atch 2 - Specifications Volume 2.pdf PDF
Atch 3 - Specifications Volume 3 - Asbestos.pdf PDF
Atch 9 - BLDG 3.pdf PDF
Atch 11 - BLDG 5.pdf PDF
Atch 13 - BLDG 7 and 13.pdf PDF
Atch 14 - BLDG 8.pdf PDF
Atch 17 - BLDG 11.pdf PDF
Atch 29 - BLDG 109 and 57.pdf PDF
Atch 33 - BLDG 116.pdf PDF
Atch 37 - Brand Name Justification - St. Cloud.pdf PDF
Atch 38 - Contractor Core Work Hours.pdf PDF
Atch 39 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Atch 41 - Construction Wage Rates - Stearns 4-1-22.pdf PDF
Atch 42 - Contractor Safety - Environmental Form.docx DOCX document
Show all 50

Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEGEND

CORRIDOR OUTLINE

VFY EXIST

BUILDING OUTLINE

VFY EXIST

TO 8TH ST WEST ONLYTO 8TH ST EAST & WEST

44TH AVE.

TRAIL 1

TRAIL 2

TRANSFER

SWITCH

CAPACITOR

BANK (3)

SWITCH

(2)

15KV

MAIN

SW

BATT

35 KV

TO

15 KV

TRANSFORMER

35KV

FUSED

SWITCH

METER 35KV

SWITCH

GRAVEL

GRAVEL

GRAVEL

EXISTING

ROAD

CHAIN LINK FENCE

CHAIN LINK FENCE

16' GATE

GRAVEL

ELECTRICAL

SUBSTATION

G E N E R A T O R

FUEL LINES

CONDU ITS TO TU NNEL

M V

D U

C T

B A

N K

1 1 2 W

PHARMACY ADDITION

11 2 E

G E N E R A T O R

B

CORRIDOR LINK

A

C T

TR

A

IL

ER

174 s .f.

256 s .f.

185 s .f.

149 s ..f.

155 s .f.

104 s .f.

70 s. .f .

72 s .f.

110 s .f.

276 s .f.

112 s .f.

99 s .f.

57 s .f.

146 s .f.

434 s .f.

R A

MP

U P

1:

M A X

R A

MP

U P

1:

M A X

RA

M P

UP

1:2 0 M

AX

TRANSFER

SWITCH

CAPACITOR

BANK (3)

SWITCH

(2) 15KV

MAIN

SW

BATT

35 KV

TO

15 KV

TRANSFORMER

35KV

FUSED

SWITCH

METER 35KV

SWITCH

.3

TRANSFORMER

BUILD ING

#91

5,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

EXISTIN G G AS SU P P LY EQ U IP M EN T TO R EM AIN

O P ER ATIO N AL DU R IN G D EM O LITIO N AN D N EW

C O N STR U C TIO N. P R O TEC T EQU IP M EN T AN D

P IP ELIN ES IN AC C O R D AN C E W ITH G AS SU P P LIER 'S

R EC O M M EN D ATIO N S

N EW G AS SU P P LY M AIN

IN TO B U ILD IN G

SP AR E

P H O N E LIN E

EXTEN D S TO

E XISTIN G

P H O N E IN

B O ILER R O O M

P ER P LAN .

SP AR E

P H O N E

LIN E TO

M ETER

TU N N EL

E XTEN D S

A D D ITIO N AL

2'- 0" U N D ER

B U ILD IN G

FUEL LINE

VENT LINE

1,000 GAL.

UNDERGROUND

DIESEL FUEL

TANK

1,000/5,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

1,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

1,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

S 1

LIG H T

N EW G AS SU P P LY

(C O O R D IN ATE W ITH SU P P LIER )

12"D

10"D

"D

TP TP

EXIST. BUILDING

EXIST.

BUS STOP

CC

L O

O P

16"

20"

12"

3"

8"

DN

0.

0’

BIRDCAGE

B

IR

D C

A G

E

NSP ELECTRICAL

FOR HWY DEPT

T101

I.T.

CHILLER

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

VESTIBULE

DN

DN

DN

FD

DN

F B

F

B

F B

F

B

F B

F

B

SOUTH

VESTIBULE

PASS

THROUGH

LINK TO

BUILDI NG 51

6 3. 32 56

1 13 5. 35 78

PARKING

NO

PARKING

93 49

37 6

109 5

1A

S M

O K

E B

L D

G

SMOKE

BLDG

SMOKE

BLDG

S M

O K

E B

L D

G

SMOKE

BLDG

M.H.

STOR.

SMOKE

BLDG

SMOKE

BLDG

SMOKE

BLDG

SMOKE

BLDG

SMOKE

BLDG

STOR.

BIO-

HAZ.

SAUK RIVER

GP

HOLDING POND

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of

Minnesota.

Name:

Date: License Number: MN# 18157

Typed or Printed Name: Tom Olesak

OWNER AND

CONSULTANTS:

CONTACT:

ADDRESS:

MIKE ENGMARK

ST CLOUD VA MEDICAL CENTER

4801 VETERANS DRIVE

ST. CLOUD, MN 56303

NAME:

ADDRESS:

CONTACT:

ADVANCED STRUCTURAL TECHNOLOGIES

7301 OHMS LANE; SUITE 215

EDINA, MN 55439

ZACHARY CRAIG

PHONE:

NAME:

ADDRESS:

CONTACT:

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIRCLE

OMAHA, NE 68134

KRIS BURNHAM

PHONE: 402-991-5520

NAME:

ADDRESS:

CONTACT:

PHONE:

NAME:

ADDRESS:

CONTACT:

PHONE:

NAME:

ADDRESS:

CONTACT:

PHONE:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

IAN WEBER

763-412-4000

ARCHITECT:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

EDWARD MARKFORT

763-412-4000

952-854-9302

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIRCLE

OMAHA, NE 68134

KRIS BURNHAM

402-991-5520

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

COVER

DATE:

APPROVED: APPROVED: PROJECTS SECTION MANAGER

APPROVED: OIT MANAGER DATE: APPROVED: ASSISTANT CHIEF ENGINEER DATE:

APPROVED: SAFETY MANAGER

APPROVED: CHIEF OF POLICE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE: APPROVED: EMS MANAGER

APPROVED: M/O MANAGER

DATE:

DATE:

DATE:DATE:

APPROVED: MEDICAL CENTER DIRECTOR

APPROVED: PROJECT COR DATE:

APPROVED: INFECTION CONTROL NURSE DATE:

APPROVED: SERVICE LINE DIRECTOR

APPROVED: GEMS COORDINATOR DATE:

DATE:

APPROVED: NURSE EXECUTIVE

APPROVED: CHIEF OF STAFF DATE:

APPROVED: DIRECTOR FMS

APPROVED: ASSOCIATE DIRECTOR

DATE:

DATE:

DATE:

DATE:APPROVED: DATE:

APPROVED: DATE:

APPROVED: DATE:

Main Campus, St. Cloud, Minnesota St. Cloud VA Health Care System

N

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

VICINITY MAP:

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHONE: 320-252-1670

CIVIL ENGINEER:

VA COR:

TELECOMMUNICATIONS ENGINEER:

CONTACT:

ADDRESS:

JONATHAN WEST

ST CLOUD VA MEDICAL CENTER

4801 VETERANS DRIVE

ST. CLOUD, MN 56303

PHONE: 504-250-2699

PROGRAM MANAGER:

EMAIL: Jonathan.West@vciint.com

STRUCTURAL ENGINEER:

MECH/ELEC/PLUMB/FIRE ENGINEER:

C

U s e rs

\P u b li c \D o c u m e n ts \R e v it

P ro je c ts

\1 -2

-R E

M a rk fo rt

.r v t

/2

/2

:1

:2

A

M

2-GI000

BUILDING 2 COVER SHEET &

SHEET INDEX

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

EM EM

16305

BUILDING 2 - EHRM INFRASTRUCTURE UPGRADES

03/30/2022

0APPROX 150' 300'75'

SHEET INDEX - BUILDING 2

SHEET NO. SHEET TITLE

2-GI000 BUILDING 2 COVER SHEET & SHEET INDEX

2-GI101 BASEMENT FLOOR INFECTION CONTROL & PHASING PLAN

2-HA-1A REFERENCE - BASEMENT FLOOR - ASBESTOS RE-SURVEY

2-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY

2-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY

2-AS100 BASEMENT PLANS

2-AS110 FIRST FLOOR - OVERALL PLAN

2-AS120 SECOND FLOOR - OVERALL PLAN

2-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION

2-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

2-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION

2-TD130 THIRD FLOOR PLAN - TELECOM - DEMOLITION

2-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

2-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

2-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS

2-TN130 THIRD FLOOR PLAN - TELECOMMUNICATIONS

2-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE

2-TN300 ENLARGED PLAN - TELECOMMUNICATIONS - DEMO

2-TN400 ENLARGED PLANS - TELECOMMUNICATIONS

02-E200 BASEMENT FLOOR PLAN - ELECTRICAL

02-E201 FIRST FLOOR PLAN - ELECTRICAL

02-E300 ELECTRICAL ENLARGED PLANS

02-E400 ELECTRICAL DIAGRAMS

02-E500 ELECTRICAL SCHEDULES

02-M100 BASEMENT AND FIRST FLOOR DEMOLITION - MECHANICAL

02-M200 BASEMENT FLOOR REMODEL - MECHANICAL

02-M201 FIRST FLOOR REMODEL- MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

ROOM SCHEDULE

NO. NAME C

A

B

LI

N G

P A

T C

H P

A N

E L

F

IB

E R

P O

W E

R

B O

N D

IN

G

U P

S

D E

D

IC

A T

E D

C O

O

LI

N G

T E

M P

E R

A T

U R

E

H U

M

ID

IT

Y

R A

C K

S E

N S

O R

S P

A C

E

AREA

WIDTH

(FT)

LENGTH

(FT) REMARKS

BASEMENT

001A TELECOM ROOM X X X X X X X 64 SF 5.4 11.8 UPDATE EXIST IT/DATA ROOM TO EHRM TELECOM

ROOM STANDARDS. SEE TELECOM DRAWINGS

OPENING SCHEDULE

VA Building Number

ASSOCIATED ROOMS OPENING PANEL INFORMATION FRAME INFORMATION

H D

W G

R O

U P

F

IR

E L

A B

E L

(M

IN

G A

S K

E T

E

LE

C T

R

IC

A L

S L

A B

E L

COMMENTSFROM ROOM NAME TO ROOM NAME NUMBER WIDTH HEIGHT

PANEL

TYPE

2ND

PANEL

TYPE

PANEL

GLAZING FRAME TYPE

FRAME

GLAZING

HAZARDOUS MATERIAL SCHEDULE

LEVEL ROOM NO. ROOM NAME QUESTIONABLE HAZARDOUS ELEMENT POSSIBLE ABATEMENT ACTION

BASEMENT 001A TELECOM ROOM NONE. SEE 2-HA-1A NONE. ACM TO REMAIN UNDISTURBED

HAZARDOUS MATERIALS MAY BE ENCOUNTERED THROUGHOUT THE DISTRIBUTION ROUTING THROUGH CEILING PLENUMS AND UTILITY TUNNELS. INSTALLATION OF DISTRIBUTION SHALL NOT

DISTURB QUESTIONABLE HAZARDOUS MATERIAL.

ICRA PHASE CONSTRUCTION ROOM SCHEDULE

LEVEL

ROOM

NO. ROOM NAME

CAI BLDG NAME /

FUNCTION

CONSTRUCTION

PROJECT ACTIVITY

INFECTION CONTROL

RISK GROUP

CONTROL

PROCEDURE CLASS SECTION

CONSTRUCTION ZONE /

OCCUPIED CONSTR

DAY /

NIGHT

BASEMENT 001A TELECOM ROOM DOMICILIARY TYPE B GROUP 1 CLASS II EAST OCCUPIED CONSTRUCTION DAY

SEE GENERAL NOTES SHEET FOR CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA) DESCRIPTIONS. TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE.

FINAL DETERMINATION BY THE VA WILL BE MADE AT A LATER DATE.

1 UPDATE TO BID DOCUMENTS 06/29/22

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

STAIR

STORAGE

OFFICE

10A

MECH

ELECT

OFFICE

OFFICE 3

OFFICE

MECH

C0W

CORRIDOR

LOCKER

FEMALE

2A

BATH

HAC 1A

PHONE

STAIR

LOCKER

MALE

12A

BATH

C0E

CORRIDOR

LOBBY

3A

OFFICE

4A

OFFICE

5A

OFFICE

001A

TELECOM

ROOM

INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND

LIMITS OF CONSTRUCTION

1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER

LOCATION, AND DOOR, WHERE SHOWN

TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER

LOCATION, WHERE APPROVED BY THE VA FOR USE IN RISK TYPE B.

UPGRADE TO 1 HOUR RATED PARTITION WHEN DIRECTED BY THE VA

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of

Minnesota.

Name:

Date: License Number: MN# 18157

Typed or Printed Name: Tom Olesak

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 C

U s e rs

\P u b li c \D o c u m e n ts \R e v it

P ro je c ts

\1 -2

-R E

M a rk fo rt

.r v t

/2

/2

:2 :4

A

M

2-GI101

BASEMENT FLOOR INFECTION

CONTROL & PHASING PLAN

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

EM BMW

16305

03/30/2022

ROOM ICRA SCHEDULE

LEVEL

ROOM

NO. ROOM NAME CAI BLDG NAME / FUNCTION CONSTRUCTION PROJECT ACTIVITY INFECTION CONTROL RISK GROUP CONTROL PROCEDURE CLASS

BASEMENT 001A TELECOM ROOM DOMICILIARY TYPE B GROUP 1 CLASS II

SEE GENERAL NOTES SHEET FOR CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA) DESCRIPTIONS. TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE.

FINAL DETERMINATION BY THE VA WILL BE MADE AT A LATER DATE.

1/8" = 1'-0"

BASEMENT - CONST BARRIER PLAN

N

0 8' 16'4'

-ASBESTOS-CONTAINING FIRE DOOR

-ASBESTOS-CONTAMINATED SOIL IN CRAWLSPACE

-ASBESTOS-CONTAINING WINDOW CAULK (OLD RESIDUAL CAULK)

-ASBESTOS-CONTAINING BLACK WALL ADHESIVE

CASTLE HILL ASSOCIATES, LLC.

N

S

W

E

LEGEND

BUILDING #2 - BASEMENT FLOOR PLAN

-POSITIVE SAMPLE LOCATION

-SAMPLE LOCATION

-ASBESTOS-CONTAINING WINDOW CAULK (OLD RESIDUAL CAULK)

-ASBESTOS-CONTAINING BLACK WALL ADHESIVE

-ASBESTOS-CONTAINING HARD FITTINGS ON FIBERGLASS

-ASBESTOS-CONTAINING BLACK TAR ON RAIN LEADER DOWNSPOUT

CASTLE HILL ASSOCIATES, LLC.

N

S

W E

LEGEND

BUILDING #2 - FIRST FLOOR PLAN

-ASBESTOS-CONTAINING WINDOW CAULK (OLD RESIDUAL CAULK)

CASTLE HILL ASSOCIATES, LLC.

N

S

W E

LEGEND BUILDING #2 - SECOND FLOOR PLAN

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

STAIR

STORAGE

OFFICE

10A

MECH

ELECT

OFFICE

OFFICE 3

OFFICE

MECH

C0W

CORRIDOR

LOCKER

FEMALE

2A

BATH

HAC 1A

PHONE

STAIR

LOCKER

MALE

12A

BATH

C0E

CORRIDOR

LOBBY

3A

OFFICE

4A

OFFICE

5A

OFFICE

001A

TELECOM

ROOM

2-AS100

5'-5"

'-1

0"

001A

TELECOM

ROOM

HAC

IN-03.01

3' -7

/2

2'

-6

5' -8

/2

001A

TELECOM

ROOM

TELECOM

ROOM

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of

Minnesota.

Name:

Date: License Number: MN# 18157

Typed or Printed Name: Tom Olesak

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 C

U s e rs

\P u b li c \D o c u m e n ts \R e v it

P ro je c ts

\1 -2

-R E

M a rk fo rt

.r v t

/3

/2

:2 :1

P

M

2-AS100

BASEMENT PLANS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

EM EM

16305

03/30/2022

1/8" = 1'-0"

BASEMENT FLOOR - OVERALL PLAN

N

0 8' 16'4'

1/4" = 1'-0"

ENLARGED FLOOR PLAN

N

0 4' 8'2'

1/4" = 1'-0"

PARTIAL DEMOLITION PLAN

N

0 8' 16'4'

1/4" = 1'-0"

REFLECTED CEILING PLAN

N

0 8' 16'4'

_DEMOLITION PLAN KEYED NOTES

DE1 PREPARE WALL FOR PLYWOOD BACKBOARD INSTALLATION AND EHRM

REQUIREMENTS, SEE FLOOR PLAN AND TELECOM DRAWINGS

DE23 PREPARE EXISTING PARTITION FOR LEAK PREVENTION BARRIER. SEE

FLOOR PLAN AND SHEET AS601

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

_FLOOR PLAN KEYED NOTES_FLOOR PLAN KEYED NOTES

FL1 ALL FOUR PERIMETER WALL PARTITIONS APPLY 4' BY 8' AC GRADE ¾”

TRADE SIZE FIRE RATED PLYWOOD BACKBOARD FINISHED WITH

HIGH-GLOSS WHITE PAINT OVER TWO COATS OF FIRE RESISTANT PAINT

FOR SERVICE PROVIDER / SECURITY / VIDEO / ET CETERA. DO NOT PAINT

OVER FIRE RATING STAMP.

FL3 UPGRADE PARTITION TO 1 HOUR FIRE AND SMOKE BARRIER. PROVIDE

TESTED HEAD OF PARTITION ASSEMBLY WITH MATERIALS THAT RESIST

THE PASSAGE OF SMOKE. SEAL JOINT AT HEAD AND ALL PENETRATIONS

WITH FIRE CAULK.

FL20 TELECOM EQUIPMENT, SEE TELECOM DRAWINGS.

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

_REFLECTED CEILING PLAN KEYED NOTES

RC1 LED LIGHTING, SEE ELECTRICAL. IN FRONT OF AND BEHIND CABINET

ROWS PROVIDE 500 LUMENS IN HORIZONTAL AND 200 LUMENS IN THE

VERTICAL AT 3 FT AFF. OPERATED BY MOTION SENSOR PER CABINET

ROW OR SECTION.

RC2 OPEN TO STRUCTURAL FLOOR ABOVE

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

DE1

RC1 RC2

DE1

DE1

FL1

FL3

FL20

FL3

_SHEET NOTES

1. SEE GENERAL NOTES AND CAMPUS DRAWINGS FOR GENERAL

INFORMATION, LIFE SAFETY, ICRA, AND PHASING

2. ALL EXISTING CONDITIONS MUST BE FIELD VERIFIED BY THE

CONTRACTOR PRIOR TO DEMOLITION OR CONSTRUCTION. EXISTING

CONDITIONS THAT DIFFER FROM THOSE SHOWN MUST BE BROUGHT TO

THE ATTENTION OF THE C.O.R. TO INFORM THE ARCHITECTS AND

ENGINEERS.

3. THE INFORMATION SHOWN ON THE DRAWINGS IS BASED ON DRAWINGS

AND PHOTOGRAPHS PROVIDED BY THE C.O.R. COMBINED WITH

OBSERVATIONS AND SURVEYED DATA FROM THE ARCHITECTS AND

ENGINEERS.

4. SEE CIVIL, STRUCTURAL, TELECOM, ELECTRICAL, MECHANICAL, AND

PLUMBING DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL

DEMOLITION AND CONSTRUCTION REQUIREMENTS.

5. PORTABLE FIRE EXTINGUISHERS (CO2 OR HALOGENATED TYPE AS

DETERMINED BY VA) WITH WALL MOUNT BRACKET AND CODE REQUIRED

SIGNAGE SHALL BE PROVIDED BY THE CONTRACTOR WITHIN TELECOM

ROOMS.

DE23

FL3

1 UPDATE TO BID DOCUMENTS 06/29/22

WS1WS2

WS3

WS6

WS5 WS4

VEST

101A

BEDROOM

BEDROOM 102

OFFICE

BEDROOM

STAFF

HAC

OFFICE

STATION

NURSE

WAITING

C1C

CORRIDOR

LOBBY

FEMALE

OFFICE

OFFICE

OFFICE

OFFICE

DIRECTOR

OFFICE

OFFICE

OFFICE

0FFICE

STAIR

116A

CHASE

PIPE

115A

CHASE

PIPE

131A

CHASE

PIPE

132A

CHASE

PIPE

105A

OFFICE

106A

DAYROOM

4 BED

4 BED

STAIR

3 BED

111A

BATH

2 BED

3 BED

C1E

CORRIDOR

STOR

104A

CHASE

PIPE

STAIR

BATH

SHOWER

ROOM

GROUP

STOR

BATH

MALE

BATH

FEMALE

ROOM

GROUP

OFFICE

ROOM

GROUP

STAIR

ROOM

GROUP

C1W

CORRIDOR135

OFFICE

OFFICE

OFFICE

OFFICE

ROOM

GROUP

ROOM

GROUP

CONFERENCE

STAFF

OFFICE

OFFICE

PURPOSE

MULTI-

STATION

NURSE

105B

MEDROOM

EXAM

W D

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of

Minnesota.

Name:

Date: License Number: MN# 18157

Typed or Printed Name: Tom Olesak

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 C

U s e rs

\P u b li c \D o c u m e n ts \R e v it

P ro je c ts

\1 -2

-R E

M a rk fo rt

.r v t

/2

/2

:2 :3

A

M

2-AS110

FIRST FLOOR - OVERALL PLAN

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

EM EM

16305

03/30/2022

N

0 8' 16'4'

1/8" = 1'-0"

FIRST FLOOR - OVERALL PLAN

N

0 8' 16'4'

_SHEET NOTES

1. SEE GENERAL NOTES AND CAMPUS DRAWINGS FOR GENERAL

INFORMATION, LIFE SAFETY, ICRA, AND PHASING

2. ALL EXISTING CONDITIONS MUST BE FIELD VERIFIED BY THE

CONTRACTOR PRIOR TO DEMOLITION OR CONSTRUCTION. EXISTING

CONDITIONS THAT DIFFER FROM THOSE SHOWN MUST BE BROUGHT TO

THE ATTENTION OF THE C.O.R. TO INFORM THE ARCHITECTS AND

ENGINEERS.

3. THE INFORMATION SHOWN ON THE DRAWINGS IS BASED ON DRAWINGS

AND PHOTOGRAPHS PROVIDED BY THE C.O.R. COMBINED WITH

OBSERVATIONS AND SURVEYED DATA FROM THE ARCHITECTS AND

ENGINEERS.

4. SEE CIVIL, STRUCTURAL, TELECOM, ELECTRICAL, MECHANICAL, AND

PLUMBING DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL

DEMOLITION AND CONSTRUCTION REQUIREMENTS.

5. PORTABLE FIRE EXTINGUISHERS (CO2 OR HALOGENATED TYPE AS

DETERMINED BY VA) WITH WALL MOUNT BRACKET AND CODE REQUIRED

SIGNAGE SHALL BE PROVIDED BY THE CONTRACTOR WITHIN TELECOM

ROOMS.

3 BED

1 BED

1 BED

1 BED

1 BED

1 BED

1 BED

C2C

CORRIDOR

STAIR

LINEN

CLEAN

2 BED

229A

EFFECTS

PATIENT

LOBBY

2 BED

LAUNDRY

1 BED

243A

CHASE

PIPE

1 BED

2 BED

205A

BATH

OFFICE

STAIR

HAC

1 BED

1 BED

235A

CHASE

PIPE

219A

CHASE

PIPE

220A

CHASE

PIPE

205B

CHASE

PIPE

2 BED

2 BED

2 BED

4 BED

2 BED

4 BED

C2E

CORRIDOR

STAIR

4 BED

4 BED

3 BED

NURSE

BATH

SHOWER

4 BED

NURSE

BATH

SHOWER

4 BED

3 BED

4 BED

4 BED

STAIR

C2W

CORRIDOR

3 BED

4 BED

4 BED

2 BED

2 BED

OFFICE

OFFICE

D W

DN

UP

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of

Minnesota.

Name:

Date: License Number: MN# 18157

Typed or Printed Name: Tom Olesak

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 C

U s e rs

\P u b li c \D o c u m e n ts \R e v it

P ro je c ts

\1 -2

-R E

M a rk fo rt

.r v t

/2

/2

:2 :3

A

M

2-AS120

SECOND FLOOR - OVERALL

PLAN

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

EM EM

16305

03/30/2022

1/8" = 1'-0"

SECOND FLOOR - OVERALL PLAN

N

0 8' 16'4'

N

0 8' 16'4'

_SHEET NOTES

1. SEE GENERAL NOTES AND CAMPUS DRAWINGS FOR GENERAL

INFORMATION, LIFE SAFETY, ICRA, AND PHASING

2. ALL EXISTING CONDITIONS MUST BE FIELD VERIFIED BY THE

CONTRACTOR PRIOR TO DEMOLITION OR CONSTRUCTION. EXISTING

CONDITIONS THAT DIFFER FROM THOSE SHOWN MUST BE BROUGHT TO

THE ATTENTION OF THE C.O.R. TO INFORM THE ARCHITECTS AND

ENGINEERS.

3. THE INFORMATION SHOWN ON THE DRAWINGS IS BASED ON DRAWINGS

AND PHOTOGRAPHS PROVIDED BY THE C.O.R. COMBINED WITH

OBSERVATIONS AND SURVEYED DATA FROM THE ARCHITECTS AND

ENGINEERS.

4. SEE CIVIL, STRUCTURAL, TELECOM, ELECTRICAL, MECHANICAL, AND

PLUMBING DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL

DEMOLITION AND CONSTRUCTION REQUIREMENTS.

5. PORTABLE FIRE EXTINGUISHERS (CO2 OR HALOGENATED TYPE AS

DETERMINED BY VA) WITH WALL MOUNT BRACKET AND CODE REQUIRED

SIGNAGE SHALL BE PROVIDED BY THE CONTRACTOR WITHIN TELECOM

ROOMS.

CONNECTION BETWEEN

FIRE ALARM PANELS

ANNUNCIATOR

PIPE TO FIRST FLOOR

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

STAIR

STORAGE

OFFICE 10A

MECH

ELECT

OFFICE

OFFICE 3

OFFICE

MECH

C0W

CORRIDOR

LOCKER

FEMALE

2A

BATH

HAC 1A

PHONE

STAIR

LOCKER

MALE

12A

BATH

C0E

CORRIDOR

LOBBY

3A

OFFICE

4A

OFFICE

5A

OFFICE

WATER

MAIN VALVE

C C

2-TN300

LIMITS OF DATA CABLING DEMOLITION

WAP

WAP

4D 4D 4D

4D 4D 4D 4D

4D

2V

2V

E

E

E E

E

EE

E E

E

E

E

E

E E

E

E E

E

E

E

E E

E

WAP

WAP

WAP

WAP

4D

4D 4D4D

4D

4D

E 12"x2"

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/1

/2

:0

:1

P

M

2-TD100

BASEMENT FLOOR PLAN -

TELECOM - DEMOLITION

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

SHEET NOTES:

1. REMOVE AND REPLACE EXISTING DATA CABLE: REMOVE ALL EXISTING DATA CABLES AND JACKS THROUGHOUT THIS AREA. REPLACE CABLES AND JACKS 1 FOR 1, AS REQUIRED BY THE NEW WORK PLANS.

REFER TO NEW WORK PLANS FOR SERVING COMMUNICATIONS ROOM LOCATION AND NEW CABLING

ROUTES.

1/8" = 1'-0"

BASEMENT FLOOR PLAN - TELECOM - DEMOLITION

N

0 8' 16'4'

GENERAL NOTES:

A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.

WS3

WS6

WS5 WS4

VEST

101A

BEDROOM

BEDROOM 102

OFFICE

BEDROOM

STAFF

HAC

OFFICE

STATION

NURSE

WAITING

C1C

CORRIDOR

LOBBY

FEMALE

OFFICE

OFFICE

OFFICE

OFFICE

DIRECTOR

OFFICE

OFFICE

OFFICE

0FFICE

STAIR

116A

CHASE

PIPE

115A

CHASE

PIPE

131A

CHASE

PIPE

132A

CHASE

PIPE

105A

OFFICE

106A

DAYROOM

4 BED

4 BED

STAIR

3 BED

111A

BATH

2 BED

3 BED

C1E

CORRIDOR

STOR

104A

CHASE

PIPE

STAIR

BATH

SHOWER

ROOM

GROUP

STOR

BATH

MALE

BATH

FEMALE

ROOM

GROUP

OFFICE

ROOM

GROUP

STAIR

ROOM

GROUP

C1W

CORRIDOR135

OFFICE

OFFICE

OFFICE

OFFICE

ROOM

GROUP

ROOM

GROUP

CONFERENCE

STAFF

OFFICE

OFFICE

PURPOSE

MULTI-

STATION

NURSE

105B

MEDROOM

EXAM

W D

WS1WS2

WS3

WS6

WS5 WS4

VEST

101A

BEDROOM

BEDROOM 102

OFFICE

BEDROOM

STAFF

HAC

OFFICE

STATION

NURSE

WAITING

C1C

CORRIDOR

LOBBY

FEMALE

OFFICE

OFFICE

OFFICE

OFFICE

DIRECTOR

OFFICE

OFFICE

OFFICE

0FFICE

STAIR

116A

CHASE

PIPE

115A

CHASE

PIPE

131A

CHASE

PIPE

132A

CHASE

PIPE

105A

OFFICE

106A

DAYROOM

4 BED

4 BED

STAIR

3 BED

111A

BATH

2 BED

3 BED

C1E

CORRIDOR

STOR

104A

CHASE

PIPE

STAIR

BATH

SHOWER

ROOM

GROUP

STOR

BATH

MALE

BATH

FEMALE

ROOM

GROUP

OFFICE

ROOM

GROUP

STAIR

ROOM

GROUP

C1W

CORRIDOR135

OFFICE

OFFICE

OFFICE

OFFICE

ROOM

GROUP

ROOM

GROUP

CONFERENCE

STAFF

OFFICE

OFFICE

PURPOSE

MULTI-

STATION

NURSE

105B

MEDROOM

EXAM

W D

C

C

C

C

C

C

C

C

C

C

C

C

C

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

LIMITS OF DATA CABLING REPLACEMENT

FROM ROOM 001A

2V 2V 2V 2V

2D

2V 2V

2D

2V 2V

2D

2V

2D

2V

2D

2D

2V

2D

2V1D

2D/2V

2D

2V

2D2D

2V 2V

2D

2V

2V 2V

2V

2D

2V

2D

2V

2V

2V 2V

2V

2V

2V

2V4D

4D

2V

2V4D

2V

2V

2V

2V

4D 4D

2V

E

E

E

E

E

E

E

E

E

E

E

E

EE

E

EE

E

E

E E E E

E

E E

E

E

E

E

E

E

E

E E

E

E

E

E E

E

E

E E

E

E

E E E

E E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

EE

E

E E E

E E E

E E E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

2V

2V

1D

2V

2V

2V

2D/2V2V

2V

2D/2V

WAP

2D/2V 2D/2V

1D/1V2D

2D

2D 2D 2D/2V

1D/1V 2D

2D

2D

4D

2V

4D

4D

2D 2D

2D

WAP

E

E

E

E

2V

2V

2V

2V

2V2D

EE

EE

E 2V

2D 2D

EE

E

E

E

E

E

E

E

E

E

E

EE

12"x2"

"x

2"

12"x2"

"x

2"

"x

2"

12"x2"

"x

2"

12"x2"

"x

2"

"x

2"

"x

2"

E

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/1

/2

:0

:2

P

M

2-TD110

FIRST FLOOR PLAN -

TELECOM - DEMOLITION

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1/8" = 1'-0"

FIRST FLOOR PLAN - TELECOM - DEMOLITION

N

0 8' 16'4'

N

0 8' 16'4'

SHEET NOTES:

1. REMOVE AND REPLACE EXISTING DATA CABLE: REMOVE ALL EXISTING DATA CABLES AND JACKS THROUGHOUT THIS AREA. REPLACE CABLES AND JACKS 1 FOR 1, AS REQUIRED BY THE NEW WORK PLANS.

REFER TO NEW WORK PLANS FOR SERVING COMMUNICATIONS ROOM LOCATION AND NEW CABLING

ROUTES.

1 BED

1 BED

1 BED

1 BED

1 BED

1 BED

C2C

STAIR

LINEN

CLEAN

2 BED

229A

EFFECTS

PATIENT

LOBBY

2 BED

LAUNDRY

1 BED

243A

CHASE

PIPE

1 BED

2 BED

205A

BATH

OFFICE

STAIR

HAC

1 BED

1 BED

235A

CHASE

PIPE

219A

CHASE

PIPE

220A

CHASE

PIPE

205B

CHASE

PIPE

2 BED

2 BED

2 BED

4 BED

2 BED

4 BED

C2E

CORRIDOR

STAIR

4 BED

4 BED

3 BED

NURSE

BATH

SHOWER

4 BED

NURSE

BATH

SHOWER

4 BED

3 BED

4 BED

4 BED

STAIR

C2W

CORRIDOR

3 BED

4 BED

4 BED

2 BED

2 BED

OFFICE

OFFICE

DN

UP

C

C

C

C

CC

C

C

C

C

LIMITS OF DATA CABLING DEMOLITION

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

2V

2V

2V

2V

2V

2V

2V

2V

3D

2D/2V

2D/2V

2D/2V

2D/2V

2V

2V

2V

2V

2V 2V

2V

2D

2V 2V 2V 2V 2V

2D/2V

3D

2V

2V

2V

2V

2V 2V2V

2V

2V

2V

2V

2V

2V

2V

2V

2V

2V

2V

2V

2V

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

EE

E

E

EE E E E

E E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

EE

E

E

E

E E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E E

E

E

E E

E

EE

E

2V

2V

2V

2V 2V

2V

2V

WAP

WAP

2V

2V

2V

2V

2V

2V2V

2V

2V 2V

2V

2V

2V

2V

2V

2V 2V

2V

2V

2V

2V

2V2D/2V

WAP

2V 2V

2V

E E

E

E E E E E E E EE

E

E

E 2V

2V

2V 2V 2V 2V 2V 2V 2V 2V 2V2V

E

E

E E

E

EE

E

E

E

E

E E

E

E

12"x2"

"x

2"

"x 2"

12"x2"

"x

2"12 "x

2"

12"x2"

"x

2"

"x 2"

E

12"x2"

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/1

/2

:0

:2

P

M

2-TD120

SECOND FLOOR PLAN -

TELECOM - DEMOLITION

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1/8" = 1'-0"

SECOND FLOOR PLAN - TELECOM - DEMOLITION

N

0 8' 16'4'

SHEET NOTES:

1. REMOVE AND REPLACE EXISTING DATA CABLE: REMOVE ALL EXISTING DATA CABLES AND JACKS THROUGHOUT THIS AREA. REPLACE CABLES AND JACKS 1 FOR 1, AS REQUIRED BY THE NEW WORK PLANS.

REFER TO NEW WORK PLANS FOR SERVING COMMUNICATIONS ROOM LOCATION AND NEW CABLING

ROUTES.

DN

ATTIC

2' X 2' ATTIC HATCH

2' X 2' ATTIC HATCH

LIMITS OF DATA CABLING DEMOLITION

E E E

E E D V

WAP WAP WAP

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/1

/2

:0

:2

P

M

2-TD130

THIRD FLOOR PLAN -

TELECOM - DEMOLITION

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1/8" = 1'-0"

THIRD FLOOR PLAN - TELECOM - DEMOLITION

N

0 8' 16'4'

SHEET NOTES:

1. REMOVE AND REPLACE EXISTING DATA CABLE: REMOVE ALL EXISTING DATA CABLES AND JACKS THROUGHOUT THIS AREA. REPLACE CABLES AND JACKS 1 FOR 1, AS REQUIRED BY THE NEW WORK PLANS.

REFER TO NEW WORK PLANS FOR SERVING COMMUNICATIONS ROOM LOCATION AND NEW CABLING

ROUTES.

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

STAIR

STORAGE

OFFICE 10A

MECH

ELECT

OFFICE

OFFICE 3

OFFICE

MECH

C0W

CORRIDOR

LOCKER

FEMALE

2A

BATH

HAC 1A

PHONE

STAIR

LOCKER

MALE

12A

BATH

C0E

CORRIDOR

LOBBY

3A

OFFICE

4A

OFFICE

5A

OFFICE

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

STAIR

STORAGE

OFFICE 10A

MECH

ELECT

OFFICE

OFFICE 3

OFFICE

MECH

C0W

CORRIDOR

LOCKER

FEMALE

2A

BATH

HAC 1A

PHONE

STAIR

LOCKER

MALE

12A

BATH

C0E

CORRIDOR

LOBBY

3A

OFFICE

4A

OFFICE

5A

OFFICE

C C

001A

TELECOM ROOM

2-TN400

LIMITS OF DATA CABLING REPLACEMENT

FROM ROOM 001A

4D 4D 4D

4D 4D 4D 4D

4D

2V

2V

WAP

WAP

E

E

E E

E

EE

E E

E

E

E

E 12"x2"12"x2"

2"

2"

4D

4D 4D4D

4D

E E

E

E E

WAP

WAP

E

E

4D E

E

WAP

WAP

E

E

C4 126"

E

4"

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/1

/2

:0

:2

P

M

2-TN100

BASEMENT FLOOR PLAN -

TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

SHEET NOTES:

1. CONTRACTOR TO PROVIDE NEW WIRE BASKET, AS NEEDED, TO MAINTAIN A 50% OR LESS FILL OF THE CABLE TRAY SYSTEM FOR THE FLOOR. THE NEW WIRE BASKET WILL MATCH THE SIZE AND DISTANCE, EITHER BESIDE OR BELOW THE EXISTING CABLE TRAY, TO MATCH THE EXISTING TELECOM CABLE TRAY.

2. PROVIDE JUNCTION BOX TO CONNECT FIBER CONDUIT ENTRY TO EXTEND CONDUIT PATHWAY TO THE NEW

TELECOM ROOM.

1/8" = 1'-0"

BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

N

0 8' 16'4'

A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.

C

C

C

C

C

C

C

C

C

C

C

C

WS1WS2

WS3

WS6

WS5 WS4

VEST

101A

BEDROOM

BEDROOM 102

OFFICE

BEDROOM

STAFF

HAC

OFFICE

STATION

NURSE

WAITING

C1C

CORRIDOR

LOBBY

FEMALE

OFFICE

OFFICE

OFFICE

OFFICE

DIRECTOR

OFFICE

OFFICE

OFFICE

0FFICE

STAIR

116A

CHASE

PIPE

115A

CHASE

PIPE

131A

CHASE

PIPE

132A

CHASE

PIPE

105A

OFFICE

106A

DAYROOM

4 BED

4 BED

STAIR

3 BED

111A

BATH

2 BED

3 BED

C1E

CORRIDOR

STOR

104A

CHASE

PIPE

STAIR

BATH

SHOWER

ROOM

GROUP

STOR

BATH

MALE

BATH

FEMALE

ROOM

GROUP

OFFICE

ROOM

GROUP

STAIR

ROOM

GROUP

C1W

CORRIDOR135

OFFICE

OFFICE

OFFICE

OFFICE

ROOM

GROUP

ROOM

GROUP

CONFERENCE

STAFF

OFFICE

OFFICE

PURPOSE

MULTI-

STATION

NURSE

105B

MEDROOM

EXAM

W D

VERTICAL ROUTE

TO ROOM 001A

4"

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

E

E

E

E

E

E

E

E

E

E

E

E

LIMITS OF DATA CABLING REPLACEMENT

FROM ROOM 001A

12"x2"12"x2"

12"x2"

12"x2"

C1 126" 4"

2D

2V 2V

2V

2D

2V 2V

2D 2D

2V 2V 2V

2D

2V 2V

EE

E

EE

E

E

E E E E

E

E E

E

2D

2V

2D

E

E

E

2V1D E

E 2D/2V

2V

2D 2D

2V 2V

2D 2D

2V

E

E E

E

E

E

E E

E

E

E

E

E

E 2V 2V 2D

2V 2V

E E E

E E

2D

2V

E

E

E

2V

2V

2V

E

E

E

2V

2V

2V E

E

E

E

E

E

4D

4D

E

E

4D

4D 4D

E

E E

2V

2V

2V

2V

2V

2V

2V

2V

E

E

E

E

E

E

E

E

WAP

E

2V

2V

1D

2V

2V

2V

2D/2V2V

2D/2V

2V

E

E

E

E

E

E

E

EE

E

2D/2V 2D/2V

E E

2D

2D

2D 2D 2D/2V

2D

2D

2D1D/1V1D/1V

E

E E E

E E E

E

E

E

E

E

E

E

WAP

E

2V E

4D

4D

2D 2D

2D

E

E

E

E E

4D E

2V

2V

2V

2V

E

E

E

E

2D 2V E E

2V

2D 2D E

E

E

12"x2"

"x

2"

"x 2"

12"x2"

"x

2"

"x 2"

EE

E

E

E

E

E

E

E

E

E

E

E

E E

"x

2"

"x

2"

F2

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/1

/2

:0

:2

P

M

2-TN110

FIRST FLOOR PLAN -

TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1/8" = 1'-0"

FIRST FLOOR PLAN - TELECOMMUNICATIONS

N

0 8' 16'4'

N

0 8' 16'4'

SHEET NOTES:

1. CONTRACTOR TO PROVIDE NEW WIRE BASKET, AS NEEDED, TO MAINTAIN A 50% OR LESS FILL OF THE CABLE TRAY SYSTEM FOR THE FLOOR. THE NEW WIRE BASKET WILL MATCH THE SIZE AND DISTANCE, EITHER BESIDE OR BELOW THE EXISTING CABLE TRAY, TO MATCH THE EXISTING TELECOM CABLE TRAY.

1 BED

1 BED

1 BED

1 BED

1 BED

1 BED

C2C

CORRIDOR

STAIR

LINEN

CLEAN

2 BED

229A

EFFECTS

PATIENT

LOBBY

2 BED

LAUNDRY

1 BED

243A

CHASE

PIPE

1 BED

2 BED

205A

BATH

OFFICE

STAIR

HAC

1 BED

1 BED

235A

CHASE

PIPE

219A

CHASE

PIPE

220A

CHASE

PIPE

205B

CHASE

PIPE

2 BED

2 BED

2 BED

4 BED

2 BED

4 BED

C2E

CORRIDOR

STAIR

4 BED

4 BED

3 BED

NURSE

BATH

SHOWER

4 BED

NURSE

BATH

SHOWER

4 BED

3 BED

4 BED

4 BED

STAIR

C2W

CORRIDOR

3 BED

4 BED

4 BED

2 BED

2 BED

OFFICE

OFFICE

D W

DN

UP

3 BED

1 BED

1 BED

1 BED

1 BED

1 BED

1 BED

C2C

CORRIDOR

STAIR

LINEN

CLEAN

2 BED

229A

EFFECTS

PATIENT

LOBBY

2 BED

LAUNDRY

1 BED

243A

CHASE

PIPE

1 BED

2 BED

205A

BATH

OFFICE

STAIR

HAC

1 BED

1 BED

235A

CHASE

PIPE

219A

CHASE

PIPE

220A

CHASE

PIPE

205B

CHASE

PIPE

2 BED

2 BED

2 BED

4 BED

2 BED

4 BED

C2E

CORRIDOR

STAIR

4 BED

4 BED

3 BED

NURSE

BATH

SHOWER

4 BED

NURSE

BATH

SHOWER

4 BED

3 BED

4 BED

4 BED

STAIR

C2W

CORRIDOR

3 BED

4 BED

4 BED

2 BED

2 BED

OFFICE

OFFICE

D W

DN

UP

C

C

C

C

CC

C

C

C

C

LIMITS OF DATA CABLING REPLACEMENT

FROM ROOM 001A

HORIZONTAL AND VERTICAL

ROUTE TO ROOM 001A

C1 126"

4"4"

12"x2"

12"x2"2V

2V

2V

2V

E

E

E

E

2V

2V

2V

2V

E

E

E

E

2D/2V

2D/2V E

E

2D/2V E

2V

2V

2V

2V

E

E

E

E

3D E

2D/2V E

2V2V

EE

2D

2V

E

E

EE

2V 2V 2V 2V 2V E E E

2V

2V

2V

2V E E

E

E

3D E

2D/2V

2V

2V

2V

2V

2V

2V

2V

2V

2V

2V

2V

2V

2V

2V

2V

2V

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

E

E

E

E

E

E

E

E

E

E

E

E

E

EE

E

E

E

E

2V

2V

2V

2V 2V

2V

2V

2V

2V

2V

2V

2V

2V

2V2V E E

E

E E

E

E

E

E

E

E

E

E

E

E

WAP

WAP

E

E

2D/2V E

2V

2V 2V

E E

E

2V

2V

2V E

E

E

2V

2V 2V

2V

2V

2V

2V

2V

E

E

E

E E

E

EE

WAP

E

2V

2V

2V

E E

E

2V 2V 2V 2V 2V 2V 2V E E E E E E E

2V 2V

EE

E

E

E 2V

2V

2V

"x

2"

"x 2"

"x

2"

"x 2"

12"x2"12"x2"

E

E E

E

EE

E

E

E

E

E E

"x

2"

"x

2"

E E

F2

12"x2"

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/1

/2

:0

:2

P

M

2-TN120

SECOND FLOOR PLAN -

TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1/8" = 1'-0"

SECOND FLOOR PLAN - TELECOMMUNICATIONS

N

0 8' 16'4'

SHEET NOTES:

1. CONTRACTOR TO PROVIDE NEW WIRE BASKET, AS NEEDED, TO MAINTAIN A 50% OR LESS FILL OF THE CABLE TRAY SYSTEM FOR THE FLOOR. THE NEW WIRE BASKET WILL MATCH THE SIZE AND DISTANCE, EITHER BESIDE OR BELOW THE EXISTING CABLE TRAY, TO MATCH THE EXISTING TELECOM CABLE TRAY.

DN

ATTIC

2' X 2' ATTIC HATCH

2' X 2' ATTIC HATCH

LIMITS OF DATA CABLING REPLACEMENT

FROM ROOM 001A

HORIZONTAL AND VERTICAL

ROUTE TO ROOM 001A

4"

WAP WAP WAP

E E E

D V E E

4" DOWN

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/1

/2

:0

:3

P

M

2-TN130

THIRD FLOOR PLAN -

TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1/8" = 1'-0"

THIRD FLOOR PLAN - TELECOMMUNICATIONS

N

0 8' 16'4'

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

STAIR

STORAGE

OFFICE 10A

MECH

ELECT

OFFICE

OFFICE 3

OFFICE

MECH

C0W

CORRIDOR

LOCKER

FEMALE

2A

BATH

HAC 1A

PHONE

STAIR

LOCKER

MALE

12A

BATH

C0E

CORRIDOR

LOBBY

3A

OFFICE

4A

OFFICE

5A

OFFICE

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

UNEXCAVATED

STAIR

STORAGE

OFFICE 10A

MECH

ELECT

OFFICE

OFFICE 3

OFFICE

MECH

C0W

CORRIDOR

LOCKER

FEMALE

2A

BATH

HAC 1A

PHONE

STAIR

LOCKER

MALE

12A

BATH

C0E

CORRIDOR

LOBBY

3A

OFFICE

4A

OFFICE

5A

OFFICE

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/1

/2

:0

:3

P

M

2-TN200

BASEMENT FLOOR PLAN -

TELECOM - CABLE DISTANCE

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1" = 30'-0"

BASEMENT FLOOR PLAN - TELECOMMUNICATIONS - CABLE DISTANCE

N

0 30' 60'15'

AC

AC

TW

E

D

SP

E

E

E

PS

E

CABLE

TRAY

DATA

RACK

E

D

E

D

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/1

/2

:0

:3

P

M

2-TN300

ENLARGED PLAN -

TELECOMMUNICATIONS -

DEMO

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1/4" = 1'-0"

ENALRGED PLAN - EXIST RM 001A - TELECOM - DEMO

0 4' 8'2'

N

SHEET NOTES:

1. EXISTING TELECOMMUNICATIONS CAGE AND RACK SHALL BE INCLUDED WITHIN THE SCOPE OF DEMOLITION.

EXISTING CABLING AND ASSOCIATED OUTLETS SHALL BE REMOVED AND REPLACED 1 FOR 1 AND REFED FROM DISTRIBUTION EQUIPMENT LOCATED WITHIN THE NEW TELECOMMUNICATIONS ROOM. REFER TO GENERAL CABLING NOTES FOR APPROXIMATE QUANTITIES. REFER TO NEW WORK PLANS FOR SERVING

COMMUNICATIONS ROOM LOCATION AND NEW CABLING ROUTES.

GENERAL NOTES:

A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.

CABLING NOTE:

CABLING NOTES:

A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE. THE CABLE

RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE PRESENT IN THE SPACE AT THE COMPLETION OF THE

PROJECT.

1. ROOM 001A

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 251

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

CR

AC

001A

TELECOM ROOM

2-TN400

1 - a b

1 - c d

PS

AC

TW

AC

SP

E

E

E

E

E

C4 126" 2"

DATA RACK

CABLE TRAY

12"x4"

"x

4"

12"x4"

"x

4"

"x

4"

E

KEYPAD

W

E

F2

R

NOTES:

1. REFER TO NEW WORK PLAN FOR RACK LOCATIONS.

2. COORDINATE EXACT RACK COUNT AND LOCATION WITH OWNER PRIOR TO PERMANENT INSTALLATION.

3. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL RACK COMPONENTS.

4. RACK ELEVATION SHOWS A FULLY CONFIGURED SAMPLE RACK. CONTRACTOR TO PROVIDE REQUIRED EQUIPMENT TO

SUPPORT THE FINAL DATA COUNT FROM THE ENLARGED NEW SHEET. (NOT TO EXCEED 288 PORTS PER RACK).

5. COORDINATE FINAL RACK COMPONENT LAYOUT WITH OWNER'S IS/IT REPRESENTATIVE.

6. CONTRACTOR IS RESPONSIBLE FOR FINAL CABLE COUNT, QUANTITY OF PATCH PANELS, SWITCHES, FIBER ENCLOSURES, BLANKING PANELS, CABLE MANAGEMENT, AND MOUNTING HARDWARE NOT MARKED AS “OIT PROVIDED”.

7. PUNCHDOWN COPPER BACKBONES ON RACK MOUNT PATCH PANELS. TERMINATE ONE (1) PAIR PER PATCH PANEL PORT.

VERTICAL CABLE

MANAGEMENT (TYP)

RACK 1

1U 144 STRAND OM4 AND OS2 DISTRIBUTION PANEL

1U BONDING BUS BAR (BACK) 1U BLANKING PANEL (FRONT)

1U 48 PORT CAT5E BACKBONE PATCH PANEL

1U CABLE MANAGEMENT

1U CABLE MANAGEMENT

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

6U 5KW RACK MOUNT UPS

6U SPACE FOR FUTURE USE. PROVIDE BLANK

PANELS FOR UNUSED SPACES.

V E

R T

IC

A

L R

A C

K P

D U

V E

R T

IC

A

L R

A C

K P

D U

NEMA L21-20R (TYP)

CHANNEL RACK (TYP)

D

PROVIDE DATA CABLE TO RACK

MOUNTED UPS FOR CONNECTION

TO MONITORING SYSTEM

RACK 1

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

SPACE FOR FUTURE HORIZONTAL CABLE

DISTRIBUTION. PROVIDE BLANKING PANELS FOR

UNUSED SPACES.

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/1

/2

:0

:3

P

M

2-TN400

ENLARGED PLANS -

TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

N

0 2' 4'1'

0 4' 8'2' 0 4' 8'2' 0 4' 8'2' 0 4' 8'2'

GENERAL NOTES:

A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.

CABLING NOTE:

CABLING NOTES:

A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE.

THE CABLE RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED

FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE

PRESENT IN THE SPACE AT THE COMPLETION OF THE PROJECT.

1. ROOM 001A

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 251

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6A): 251

DATA (CAT6): 0

1/2" = 1'-0"

ENLARGED PLAN - TR 001A - TELECOM - CABLE TRAY AND DATA

1/4" = 1'-0"

1 - a

1/4" = 1'-0"

1 - b

1/4" = 1'-0"

1 - c

1/4" = 1'-0"

1 - d

NOT TO SCALE

COMMUNICATIONS - TYPICAL ONE RACK ELEVATION WITH RACK MOUNT UPS - RM 001A

B O

O K

S

B O

O K

S

B O

O K

S

B O

O K

S

BOOKS

X

D

E S

K

X

D

E S

K

X

D

E S

K

30X66

DESK

X

D

E S

K

X

D

E S

K

24X48 24X48 24X48

X

24X48 24X48

LA

T FILE

LA

T FILE

LA

T FILE

B O

O K

S

LA

T FILE

LA

T FILE

LA

T

FI

LE

WATER

MAIN VALVE

TELECOM ROOM

001A 02-E300

02-E300

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Minnesota.

Name:

Date: 03/30/2022

License Number: MN#

03/30/2022

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.E

R

.r v t

/6

/2

:2

:2

A M

02-E200

BASEMENT FLOOR PLAN -

ELECTRICAL

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

TBD GJL

16305

1/8" = 1'-0"

BASEMENT FLOOR PLAN - ELECTRICAL

N

100% CD 03/30 05-06-2022

E

WS3

WS6

WS5 WS4

OFFICE

STAIR

GROUP

ROOM

GROUP

ROOM

VENDING

GROUP

ROOM

OFFICE

MULTI-

PURPOSE

DIRECTOR

OFFICE

OFFICE

GROUP

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

CORRIDOR

C1W

OFFICE

STORAGE

PIPE CHASE

131A

FEMALE

TOILET

MALE

TOILET

OFFICE

OFFICE

STAIR

HALL

OFFICE

ELEVATOR

LOBBY

OFFICE

OFFICE

FEMALE

OFFICE

PIPE CHASE

132A

GROUP ROOM

OFFICE

105A

PIPE

CHASE

104A

BEDROOM

BEDROOM

101A

4 BED

VEST.

DAYROOM

106A

4 BED

STAIR

CORRIDOR

C1C

WAITING

OFFICE

NURSING

OFFICE

CORRIDOR

C1E

STAFF

HAC

119 STAIR

HALL

PIPE CHASE

116A

3 BED

TOILET

LAUNDRY/

SHOWER

PIPE CHASE

115A

GROUP

ROOM

TOILET

111A

2 BED

111 3 BED

BEDROOM

STOR

OFFICE

MEDROOM

105B

EXAM

W D

BUILDING 2 1ST FLOOR

LAST UPDATED: 4-28-20

15,715 EXISTING G.S.F.

B02IT-1-CR-11

WP

CU-2-1

B02IT-1-CR-7,9

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Minnesota.

Name:

Date: 03/30/2022

License Number: MN#

03/30/2022

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.E

R

.r v t

/6

/2

:2

:3

A M

02-E201

FIRST FLOOR PLAN -

ELECTRICAL

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

TBD GJL

16305

1/8" = 1'-0"

FIRST FLOOR PLAN - ELECTRICAL

KEYNOTES:

1. PROVIDE ELECTRICAL CONNECTION TO

CONDENSING UNIT, AS REQUIRED.

COORDINATE FINAL LOCATION AND

CONNECTION REQUIREMENTS WITH

MECHANICAL.

N

100% CD 03/30 05-06-2022

SD

E

TELECOM ROOM

001A

AC-2-1

B02IT-1-CR-1,3,5

2MDP

(20A/3P)

B02IT-1-CR

2ES

ATS-CR

ATS-LS

2EC

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Minnesota.

Name:

Date: 03/30/2022

License Number: MN#

03/30/2022

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.E

R

.r v t

/6

/2

:2

:3

A M

02-E300

ELECTRICAL ENLARGED

PLANS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

TBD GJL

16305

N O R

HT

1/4" = 1'-0"

BASEMENT ENLARGED - 001A -

POWER AND SYSTEM

KEYNOTES:

1. INDOOR UNIT TO BE POWERED BY OUTDOOR

UNIT. COORDINATE EXACT LOCATION WITH

M.C.

2. CONNECT SMOKE DETECTOR TO NEAREST

EXISTING SLC.

3. COORDINATE FINAL LOCATION OF

RECEPTACLE L21-20R WITH TELECOM

CONTRACTOR. PROVIDE 3/4"C-4#12, 1#12 GND

TO PANEL FOR EACH RECEPTACLE.

4. PROVIDE EATON BLADEUPS, 5KW, 120/208V, 3-

PHASE,4-WIRE RACK MOUNTED UPS FOR EACH

RACK TOWER.

5. PROVIDE APC#AP8861 RPDU RACK PDU 2G

WITH L21-20P CORD. (120/208V, 3-PHASE, 20A,

ZERO U, 5.7 KW, 208V, (36) C13 (6) C19 (2) 5-20R

OUTLETS. PROVIDE TWO PER RACK, MOUNTED

PER MANUFACTURER'S REQUIREMENTS.

6. VERIFY EXACT CIRCUIT AVAILABILITY IN PANEL

AND REARRANGE BREAKERS TO ALLOW 3

CONSECUTIVE SPACES.

4 5

SHEET NOTES:

1. REFER TO TECHNOLOGY PLANS FOR IT ROOM

LAYOUT AND RACK LAYOUT/DETAILS.

2. REFER TO SHEET 0-GE400 DETAIL FOR LAYOUT

& ONE-LINE OF RACK.

N O R

HT

1/4" = 1'-0"

BASEMENT ENLARGED -

ELECTRICAL - MECH 11

0 4' 8'2' 0 4' 8'2'

NN

100% CD 03/30

05-06-2022

BASEMENT

FIRST FLOOR

B02IT-1-CR

60Y

2EC

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Minnesota.

Name:

Date: 03/30/2022

License Number: MN#

03/30/2022

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.E

R

.r v t

/6

/2

:2

:3

A M

02-E400

ELECTRICAL DIAGRAMS &

SCHEDULE

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

TBD GJL

16305

12" = 1'-0"

PARTIAL POWER RISER

KEYNOTES:

1. REMOVE EXISTING 20A/3P SPARE CIRCUIT

BREAKER AND INSTALL NEW 60A/3P CIRCUIT

BREAKER TO MATCH EXISTING TYPE AND AIC

RATING.

100% CD 03/30

CIRCUIT KEY NOTES:

*TOTAL DEMAND CALCS SUBTRACT ANY REDUNDANT LOAD AND THE SMALLER OF ANY NONCOINCIDENT HVAC LOADS. THIS CALC IS DONE AT EACH PANEL.

TOTAL ESTIMATED DEMAND AMPS: 19.9 A

TOTAL CONNECTED AMPS: 19.93 A

TOTAL ESTIMATED DEMAND LOAD: 7.18 kVA

Receptacles 0.18 kVA 100.00% 0.18 kVA TOTAL CONNECTED LOAD: 7.18 kVA

Power 7 kVA 100.00% 7 kVA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND

TOTALS*

LOAD SUMMARY

Total Amps: 23.27 23.27 15.39

Total Load: 2.67 kVA 2.67 kVA 1.85 kVA

-- 29 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 30 --

-- 27 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 28 --

-- 25 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 26 --

-- 23 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 24 --

-- 21 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 22 --

-- 19 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 20 --

-- 17 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 18 --

-- 15 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 16 --

-- 13 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 14 --

11 WP GFI REC 20 A 1 0.18 0 -- -- -- 1 20 A SPARE 12 --

-- 9 -- -- -- -- -- -- 1 0 -- -- -- 1 20 A SPARE 10 --

7 CU-2-1 20 A 2 1 0 -- -- -- 1 20 A SPARE 8 --

-- 5 -- -- -- -- -- -- 1.67 0 -- -- -- 1 20 A SPARE 6 --

-- 3 -- -- -- -- -- -- 1.67 0 -- -- -- 1 20 A SPARE 4 --

1 L21-20R RACK 20 A 3 1.67 0 -- -- -- 1 20 A SPARE 2 --

K E Y

CKT

NO. LOAD DESCRIPTION

OCPD

AMPS P

WIRE

SIZE

H N G

A B C

WIRE

SIZE

G N H

OCPD

P AMPS LOAD DESCRIPTION

CKT

NO.

K E Y

NOTES:

SCCR: 10 kA

LOCATION: WIRE: 4

FED FROM: 0 A/0P @ GROUND BUS PHASE: 3

ENCLOSURE: NEMA PB 1 SOLID NEUTRAL VOLTS: 120/208 Wye

MOUNTING: SURFACE MAIN: 60 A MCB

PANEL B02IT-1-CR

2EC

05-06-2022

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Minnesota.

Name:

Date: 03/30/2022

License Number: MN#

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.E

R

.r v t

/2

/2

:5

:0

A

M

02-E500

ELECTRICAL SCHEDULES

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

TBD GJL

16305

CIRCUIT KEY NOTES:

*TOTAL DEMAND CALCS SUBTRACT ANY REDUNDANT LOAD AND THE SMALLER OF ANY NONCOINCIDENT HVAC LOADS. THIS CALC IS DONE AT EACH PANEL.

TOTAL ESTIMATED DEMAND AMPS: 19.9 A

TOTAL CONNECTED AMPS: 19.93 A

TOTAL ESTIMATED DEMAND LOAD: 7.18 kVA

Receptacles 0.18 kVA 100.00% 0.18 kVA TOTAL CONNECTED LOAD: 7.18 kVA

Power 7 kVA 100.00% 7 kVA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND

TOTALS*

LOAD SUMMARY

Total Amps: 23.27 23.27 15.39

Total Load: 2.67 kVA 2.67 kVA 1.85 kVA

-- 29 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 30 --

-- 27 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 28 --

-- 25 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 26 --

-- 23 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 24 --

-- 21 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 22 --

-- 19 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 20 --

-- 17 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 18 --

-- 15 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 16 --

-- 13 SPARE 20 A 1 -- -- -- 0 0 -- -- -- 1 20 A SPARE 14 --

11 WP GFI REC 20 A 1 0.18 0 -- -- -- 1 20 A SPARE 12 --

-- 9 -- -- -- -- -- -- 1 0 -- -- -- 1 20 A SPARE 10 --

7 CU-2-1 20 A 2 1 0 -- -- -- 1 20 A SPARE 8 --

-- 5 -- -- -- -- -- -- 1.67 0 -- -- -- 1 20 A SPARE 6 --

-- 3 -- -- -- -- -- -- 1.67 0 -- -- -- 1 20 A SPARE 4 --

1 L21-20R RACK 20 A 3 1.67 0 -- -- -- 1 20 A SPARE 2 --

K E Y

CKT

NO. LOAD DESCRIPTION

OCPD

AMPS P

WIRE

SIZE

H N G

A B C

WIRE

SIZE

G N H

OCPD

P AMPS LOAD DESCRIPTION

CKT

NO.

K E Y

NOTES:

SCCR: 10 kA

LOCATION: WIRE: 4

FED FROM: 0 A/0P @ GROUND BUS PHASE: 3

ENCLOSURE: NEMA PB 1 SOLID NEUTRAL VOLTS: 120/208 Wye

MOUNTING: SURFACE MAIN: 60 A MCB

PANEL B02IT-1-CR

2EC

100% CD 03/30

53095

T

1"CW

4"LPS

1-1/2" COND

C O

N D

3" COND

BATH

2A

HSKP CLOSET

PHONE

1A

REMOVE EXISTING

IRRIGATION LINE AND

PREPARE PIPING FOR NEW

CONNECTIONS.

BEDROOM

STAFF

PIPE CHASE

104A

OFFICE

105A

OFFICE

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTA ARCHITECT/ENGINEER OF STAM

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 1

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Minnesota.

Name:

Date: 03/30/2022

License Number: MN#

03/30/2022

B

IM

/2

.0

V A

S t C lo u d

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.M

R

.r v t

/1

/2

:0

:4

P

M

02-M100

BASEMENT AND FIRST

FLOOR DEMOLITION -

MECHANICAL

EHRM

INFRASTRUCTURE

UPGRADES

656-21-235

RDL DJC

12345

1/2" = 1'-0"

BASEMENT DEMOLITION - MECHANICAL - TELECOM 001A

KEYNOTES 1/02-M100:

1. REMOVE AND DISPOSE OF EXISTING CEILING DIFFUSER AND BRANCH DUCT

SECTION IN THIS AREA. CAP DUCT WHERE SHOWN ON PLAN.

2. EXISTING 3" WASTE TO REMAIN.

3. EXISTING 1" IRRIGATION LINE. TO BE REROUTED. SEE SHEET 02-M200 FOR NEW PIPE

ROUTING.

4. EXISTING 1-1/2" CONDENSATE TO REMAIN.

5. EXISTING 3/4" DRIP PAN DRAIN LINE TO REMAIN.

6. EXISITING 4" LOW PRESSURE STEAM TO REMAIN.

7. REMOVE AND DISPOSE OF EXISTING THERMOSTAT.

8. EXISTING DRIP PAN TO REMAIN.

FIELD VERIFICATION NOTES

1. THE HVAC CONTRACTOR SHOULD VISIT THE SITE PRIOR TO BID TO FIELD VERIFY ALL EXISTING CONDITIONS WHICH MAY AFFECT

THEIR BID. THE FOLLOWING ITEMS SHALL BE VERIFIED:

A. EXACT PLACEMENT, SIZE, CAPACITY, MANUFACTURER AND CONDITION OF ALL EXISTING HVAC EQUIPMENT WITHIN SCOPE OF

WORK, WHETHER EXPLICITLY SHOWN OR NOT.

B. SIZE AND LOCATION OF ALL EXISTING DUCTWORK.

C. SIZE AND LOCATION OF ALL EXISTING GRILLES, REGISTERS AND DIFFUSERS.

D. SIZE AND LOCATION OF ALL EXISTING THERMOSTATIC CONTROL DEVICES.

E. SIZE AND LOCATION OF ALL EXISTING PLUMBING AND HYDRONIC PIPING.

2. ALL REFERENCES ON THESE DRAWINGS TO EXISTING EQUIPMENT, DUCTWORK, DIFFUSERS, THERMOSTATS AND PIPING ARE FOR REFERENCE ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL OF THESE ITEMS PRIOR TO BID AND INCLUDE IN

THEIR BID ANY AND ALL AMOUNTS REQUIRED TO ACCOMMODATE EXISTING CONDITIONS.

3. NO ALLOWANCES WILL BE MADE AFTER THE PROJECT HAS BEEN AWARDED FOR FAILURE TO VERIFY EXISTING CONDITIONS.

4. ANY DISCREPANCIES WHICH MAY AFFECT THE CONTRACTORS BID SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND

ARCHITECT FOR DIRECTION.

0 2' 4'1'

N

1/2" = 1'-0"

FIRST FLOOR DEMOLITION - MECHANICAL

N

0 2' 4'1'

100% CD 03/2

T

TELECOM ROOM

001A

PROPOSED

RACK

LOCATION

AC-2-1

CP-2-1

3/4" PC

3"D

1-1/2" COND

C O

N D

1"CW

4"LPS

3" COND

BATH

2A

HSKP CLOSET

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTA ARCHITECT/ENGINEER OF STAM

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 1

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Minnesota.

Name:

Date: 03/30/2022

License Number: MN#

03/30/2022

B

IM

/2

.0

V A

S t C lo u d

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.M

R

.r v t

/1

/2

:0

:5

P

M

02-M200

BASEMENT FLOOR

REMODEL - MECHANICAL

EHRM

INFRASTRUCTURE

UPGRADES

656-21-235

RDL DJC

12345

1/2" = 1'-0"

BASEMENT FLOOR - MECHANICAL- TELECOM 001A

KEYNOTES 1/02-M200:

1. NEW WALL-MOUNTED DUCTLESS COOLING UNIT AC-2-1.

2. CAP SUPPLY AIR DUCT IN THIS AREA.

3. ROUTE NEW REFRIGERANT PIPING UP TO GRADE LEVEL - SEE SHEET 02-M201 FOR

CONTINUATION.

4. PROVIDE NEW THERMOSTAT.

5. ROUTE NEW CONDENSATE DRAIN PIPING TO FLOOR DRAIN IN MECH A10.

APPROXIMATELY 100 FT TO THE WEST. FIELD VERIFY EXACT ROUTING.

6. REROUTED 1" IRRIGATION LINE. FIELD VERIFY REQUIREMENTS.

7. EXISTING DRIP PAN AND DRAIN LINE TO REMAIN.

8. PROVIDE NEW CONDENSATE DRIP PAN FOR ALL CONDENSATE PIPING. SEE DETAIL

6/0-GM400 FOR REQUIREMENTS.

9. EXISTING 1 1/2" CONDENSATE DRAIN LINE.

10. EXISTING 4" LOW PRESSURE STEAM TO REMAIN.

FIELD VERIFICATION NOTES

1. THE HVAC CONTRACTOR SHOULD VISIT THE SITE PRIOR TO BID TO FIELD VERIFY ALL EXISTING

CONDITIONS WHICH MAY AFFECT THEIR BID. THE FOLLOWING ITEMS SHALL BE VERIFIED:

A. EXACT PLACEMENT, SIZE, CAPACITY, MANUFACTURER AND CONDITION OF ALL EXISTING HVAC EQUIPMENT WITHIN SCOPE OF

WORK, WHETHER EXPLICITLY SHOWN OR NOT.

B. SIZE AND LOCATION OF ALL EXISTING DUCTWORK.

C. SIZE AND LOCATION OF ALL EXISTING GRILLES, REGISTERS AND DIFFUSERS.

D. SIZE AND LOCATION OF ALL EXISTING THERMOSTATIC CONTROL DEVICES.

E. SIZE AND LOCATION OF ALL EXISTING PLUMBING AND HYDRONIC PIPING.

2. ALL REFERENCES ON THESE DRAWINGS TO EXISTING EQUIPMENT, DUCTWORK, DIFFUSERS, THERMOSTATS AND PIPING ARE FOR REFERENCE ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL OF THESE ITEMS PRIOR TO BID AND INCLUDE IN

THEIR BID ANY AND ALL AMOUNTS REQUIRED TO ACCOMMODATE EXISTING CONDITIONS.

3. NO ALLOWANCES WILL BE MADE AFTER THE PROJECT HAS BEEN AWARDED FOR FAILURE TO VERIFY

EXISTING CONDITIONS.

4. ANY DISCREPANCIES WHICH MAY AFFECT THE CONTRACTORS BID SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND

ARCHITECT FOR DIRECTION.

0 2' 4'1'

N

OFFICE

105A

MEDROOM

105B

PIPE CHASE

104A

STAFF

CORRIDOR

C1E

OFFICE

CU-2-1

1" REROUTED

I…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .