Atch 20 - BLDG 29 addendum.pdf
PDF 11 MB Posted
- Attached to
- Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud Federal contract opportunity
- Solicitation number
- 36C77622B0035
About this file
This federal contract opportunity solicitation requests contractor services to perform infrastructure upgrades and renovations at the St. Cloud Veterans Affairs Health Care System facilities. The solicitation seeks a contractor to furnish all labor, materials, tools and equipment for electrical, bonding, UPS, building management system interfaces, access security, and HVAC assessments and upgrades. Additional requirements include data center/main server room physical security upgrades, installing a diversified fiber path to the data center for the WAN, and accessing and upgrading the fiber infrastructure backbone campus-wide within and between buildings. The solicitation also includes hazardous materials abatement. All work must be completed in accordance with specifications and contract drawings. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin.
View the file
Other files for this federal contract opportunity
Show all 50
Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEGEND
CORRIDOR OUTLINE
VFY EXIST
BUILDING OUTLINE
VFY EXIST
TO 8TH ST WEST ONLYTO 8TH ST EAST & WEST
44TH AVE.
TRAIL 1
TRAIL 2
TRANSFER
SWITCH
CAPACITOR
BANK (3)
SWITCH
(2)
15KV
MAIN
SW
BATT
35 KV
TO
15 KV
TRANSFORMER
35KV
FUSED
SWITCH
METER 35KV
SWITCH
GRAVEL
GRAVEL
GRAVEL
EXISTING
ROAD
CHAIN LINK FENCE
CHAIN LINK FENCE
16' GATE
GRAVEL
ELECTRICAL
SUBSTATION
G E N E R A T O R
FUEL LINES
CONDU ITS TO TU NNEL
M V
D U
C T
B A
N K
1 1 2 W
PHARMACY ADDITION
11 2 E
G E N E R A T O R
B
CORRIDOR LINK
A
C T
TR
A
IL
ER
174 s .f.
256 s .f.
185 s .f.
149 s ..f.
155 s .f.
104 s .f.
70 s. .f .
72 s .f.
110 s .f.
276 s .f.
112 s .f.
99 s .f.
57 s .f.
146 s .f.
434 s .f.
R A
MP
U P
1:
M A X
R A
MP
U P
1:
M A X
RA
M P
UP
1:2 0 M
AX
TRANSFER
SWITCH
CAPACITOR
BANK (3)
SWITCH
(2) 15KV
MAIN
SW
BATT
35 KV
TO
15 KV
TRANSFORMER
35KV
FUSED
SWITCH
METER 35KV
SWITCH
.3
TRANSFORMER
BUILD ING
#91
5,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
EXISTIN G G AS SU P P LY EQ U IP M EN T TO R EM AIN
O P ER ATIO N AL DU R IN G D EM O LITIO N AN D N EW
C O N STR U C TIO N. P R O TEC T EQU IP M EN T AN D
P IP ELIN ES IN AC C O R D AN C E W ITH G AS SU P P LIER 'S
R EC O M M EN D ATIO N S
N EW G AS SU P P LY M AIN
IN TO B U ILD IN G
SP AR E
P H O N E LIN E
EXTEN D S TO
E XISTIN G
P H O N E IN
B O ILER R O O M
P ER P LAN .
SP AR E
P H O N E
LIN E TO
M ETER
TU N N EL
E XTEN D S
A D D ITIO N AL
2'- 0" U N D ER
B U ILD IN G
FUEL LINE
VENT LINE
1,000 GAL.
UNDERGROUND
DIESEL FUEL
TANK
1,000/5,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
1,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
1,000 GAL.
UNDERGROUND
DIESEL FUEL TANK
S 1
LIG H T
N EW G AS SU P P LY
(C O O R D IN ATE W ITH SU P P LIER )
12"D
10"D
"D
TP TP
EXIST. BUILDING
EXIST.
BUS STOP
CC
L O
O P
16"
20"
12"
3"
8"
DN
0.
0’
BIRDCAGE
B
IR
D C
A G
E
NSP ELECTRICAL
FOR HWY DEPT
T101
I.T.
CHILLER
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
C O
NC
. B
LO
CKS
PAT
I O
VESTIBULE
DN
DN
DN
FD
DN
F B
F
B
F B
F
B
F B
F
B
SOUTH
VESTIBULE
PASS
THROUGH
LINK TO
BUILDI NG 51
6 3. 32 56
1 13 5. 35 78
PARKING
NO
PARKING
93 49
37 6
109 5
1A
S M
O K
E B
L D
G
SMOKE
BLDG
SMOKE
BLDG
S M
O K
E B
L D
G
SMOKE
BLDG
M.H.
STOR.
SMOKE
BLDG
SMOKE
BLDG
SMOKE
BLDG
SMOKE
BLDG
SMOKE
BLDG
STOR.
BIO-
HAZ.
SAUK RIVER
GP
HOLDING POND29
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of
Minnesota.
Name:
Date: License Number: MN# 18157
Typed or Printed Name: Tom Olesak
OWNER AND
CONSULTANTS:
CONTACT:
ADDRESS:
MIKE ENGMARK
ST CLOUD VA MEDICAL CENTER
4801 VETERANS DRIVE
ST. CLOUD, MN 56303
NAME:
ADDRESS:
CONTACT:
ADVANCED STRUCTURAL TECHNOLOGIES
7301 OHMS LANE; SUITE 215
EDINA, MN 55439
ZACHARY CRAIG
PHONE:
NAME:
ADDRESS:
CONTACT:
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIRCLE
OMAHA, NE 68134
KRIS BURNHAM
PHONE: 402-991-5520
NAME:
ADDRESS:
CONTACT:
PHONE:
NAME:
ADDRESS:
CONTACT:
PHONE:
NAME:
ADDRESS:
CONTACT:
PHONE:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
IAN WEBER
763-412-4000
ARCHITECT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
EDWARD MARKFORT
763-412-4000
952-854-9302
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIRCLE
OMAHA, NE 68134
KRIS BURNHAM
402-991-5520
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
COVER
DATE:
APPROVED: APPROVED: PROJECTS SECTION MANAGER
APPROVED: OIT MANAGER DATE: APPROVED: ASSISTANT CHIEF ENGINEER DATE:
APPROVED: SAFETY MANAGER
APPROVED: CHIEF OF POLICE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE: APPROVED: EMS MANAGER
APPROVED: M/O MANAGER
DATE:
DATE:
DATE:DATE:
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: PROJECT COR DATE:
APPROVED: INFECTION CONTROL NURSE DATE:
APPROVED: SERVICE LINE DIRECTOR
APPROVED: GEMS COORDINATOR DATE:
DATE:
APPROVED: NURSE EXECUTIVE
APPROVED: CHIEF OF STAFF DATE:
APPROVED: DIRECTOR FMS
APPROVED: ASSOCIATE DIRECTOR
DATE:
DATE:
DATE:
DATE:APPROVED: DATE:
APPROVED: DATE:
APPROVED: DATE:
Main Campus, St. Cloud, Minnesota St. Cloud VA Health Care System
N
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
VICINITY MAP:
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHONE: 320-252-1670
CIVIL ENGINEER:
VA COR:
TELECOMMUNICATIONS ENGINEER:
CONTACT:
ADDRESS:
JONATHAN WEST
ST CLOUD VA MEDICAL CENTER
4801 VETERANS DRIVE
ST. CLOUD, MN 56303
PHONE: 504-250-2699
PROGRAM MANAGER:
EMAIL: Jonathan.West@vciint.com
STRUCTURAL ENGINEER:
MECH/ELEC/PLUMB/FIRE ENGINEER:
C
U s e rs
\P u b li c \D o c u m e n ts \R e v it
P ro je c ts
\1 -2
-R
E
M a rk fo rt
.r v t
/2
/2
:3
:3
P
M
29-GI000
BUILDING 29 COVER SHEET &
SHEET INDEX
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
EM EM
16305
BUILDING 29 - EHRM INFRASTRUCTURE UPGRADES
03/30/2022
0APPROX 150' 300'75'
SHEET INDEX - BUILDING 29
SHEET NO. SHEET TITLE
29-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
29-TN130 ATTIC FLOOR PLAN - TELECOMMUNICATIONS
29-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
29-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
29-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
29-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
29-E200 BASEMENT - ELECTRICAL
29-E201 FIRST FLOOR - ELECTRICAL
29-E300 ELECTRICAL ENLARGED PLANS
29-M100 BASEMENT DEMOLITION - MECHANICAL
29-M101 FIRST FLOOR DEMOLITION - MECHANICAL
29-M200 BASEMENT FLOOR - MECHANICAL
29-M201 FIRST FLOOR REMODEL - MECHANICAL
SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION
SHEET INDEX - BUILDING 29
SHEET NO. SHEET TITLE
29-GI000 BUILDING 29 COVER SHEET & SHEET INDEX
29-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
29-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
29-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
29-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
29-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
29-HA-4A REFERENCE - ATTIC FLOOR ASBESTOS RE-SURVEY
29-AS100 BASEMENT PLANS
29-AS110 FIRST FLOOR PLANS
29-AS120 SECOND FLOOR - OVERALL PLAN
29-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
29-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
29-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
29-TD130 ATTIC FLOOR PLAN - TELECOM - DEMOLITION
29-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
29-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
ROOM SCHEDULE
NO. NAME C
A
B
LI
N G
P A
T C
H P
A N
E L
F
IB
E R
P O
W E
R
B O
N D
IN
G
U P
S
D E
D
IC
A T
E D
C O
O
LI
N G
T E
M P
E R
A T
U R
E
H U
M
ID
IT
Y
R A
C K
S E
N S
O R
S P
A C
E
AREA
WIDTH
(FT)
LENGTH
(FT)
HT TO
CLG
STRUCT REMARKS
BASEMENT
015 TELECOM ROOM X X X X X X X X 116 SF 7.5 15.6 10.00 UPDATE EXIST IT/DATA ROOM TO EHRM TELECOM
ROOM STANDARDS. SEE TELECOM DRAWINGS
FIRST FLOOR
144 TELECOM ROOM X X X X 88 SF 6.0 14.7 10.25 UPDATE EXIST IT/DATA ROOM TO EHRM TELECOM
ROOM STANDARDS. SEE TELECOM DRAWINGS
OPENING SCHEDULE
VA Building Number
ASSOCIATED ROOMS OPENING PANEL INFORMATION FRAME INFORMATION
H D
W G
R O
U P
F
IR
E L
A B
E L
(M
IN
G A
S K
E T
E
LE
C T
R
IC
A L
S L
A B
E L
COMMENTSFROM ROOM NAME TO ROOM NAME NUMBER WIDTH HEIGHT
PANEL
TYPE
2ND
PANEL
TYPE
PANEL
GLAZING FRAME TYPE
FRAME
GLAZING
HAZARDOUS MATERIAL SCHEDULE
LEVEL
ROOM
NO. ROOM NAME
QUESTIONABLE HAZARDOUS
ELEMENT POSSIBLE ABATEMENT ACTION
BASEMENT 015 TELECOM ROOM NONE. SEE 29-HA-1A NONE. ABATEMENT COMPLETE UNDER SEPARATE CONTRACT
FIRST FLOOR 144 TELECOM ROOM NONE. WINDOW CAULK OUTSIDE OF
ROOM. SEE 29-HA-2A
NONE. ACM TO REMAIN UNDISTURBED
HAZARDOUS MATERIALS MAY BE ENCOUNTERED THROUGHOUT THE DISTRIBUTION ROUTING THROUGH CEILING PLENUMS AND UTILITY TUNNELS. INSTALLATION OF DISTRIBUTION SHALL NOT
DISTURB QUESTIONABLE HAZARDOUS MATERIAL.
ICRA PHASE CONSTRUCTION ROOM SCHEDULE
LEVEL
ROOM
NO. ROOM NAME
CAI BLDG NAME /
FUNCTION
CONSTRUCTION
PROJECT ACTIVITY
INFECTION CONTROL
RISK GROUP
CONTROL
PROCEDURE CLASS SECTION
CONSTRUCTION ZONE /
OCCUPIED CONSTR
DAY /
NIGHT
BASEMENT 015 TELECOM ROOM PRIMARY CARE /
ADMINISTRATION
TYPE C GROUP 2 CLASS III WEST OCCUPIED CONSTRUCTION NIGHT
FIRST FLOOR 144 TELECOM ROOM PRIMARY CARE /
ADMINISTRATION
TYPE C GROUP 2 CLASS III WEST OCCUPIED CONSTRUCTION NIGHT
SEE GENERAL NOTES SHEET FOR CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA) DESCRIPTIONS. TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S
KNOWLEDGE. FINAL DETERMINATION BY THE VA WILL BE MADE AT A LATER DATE.
1 UPDATE TO BID DOCUMENTS 06/29/22
P2 P11A
TOILET
MALE
LOCKER
C0C
CORRIDOR
XFMR
STORAGE
20D
STORAGE
20C
STORAGE
OT/LOW
VISION
STORAGE
20A
STAIR
HALL
ENG
STORAGE
MAS
STORAGE
MALE
BATHROOM
AUDIOLOGY
RECEP/WAITING
STORAGE
20B
HAC
22FEMALE
LOCKER
STOR
PIPE
CHASE
VESTIBULE
19 TOILET
19H
CORR
C0C
TOILET
1A
TANK ROOM
STORAGE
20E
WAITING
6A
STAIR
STAIR
026 STORAGE
RECEPTION/
SECRETARY
19A
OFFICE
19B
MECHANICAL
19W
ADMIN
OFFICER
19C
EXAM
19V
RECEPTION/
SIGN-OUT
5A
EXAM
5G
OFFICE
5I
OFFICE
5J
OFFICE
5K
FITTING
5H
EXAM
5C
AUX.
ROOM
5B
EXAM
5E
SUB
WAITING
5L
EXAM
5F
MULTI
PURPOSE
5D
CLEAN
STORAGE
6B
EXAM
19U
EXAM
19T
EXAM
19S
EXAM
19I
EXAM
19J
EXAM
19K
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
F
IR
E
ACCESS PANEL
TELECOM
ROOM
INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND
LIMITS OF CONSTRUCTION
1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER
LOCATION, AND DOOR, WHERE SHOWN
TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER
LOCATION, WHERE APPROVED BY THE VA FOR USE IN RISK TYPE B.
UPGRADE TO 1 HOUR RATED PARTITION WHEN DIRECTED BY THE VA
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of
Minnesota.
Name:
Date: License Number: MN# 18157
Typed or Printed Name: Tom Olesak
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10 C
U s e rs
\P u b li c \D o c u m e n ts \R e v it
P ro je c ts
\1 -2
-R
E
M a rk fo rt
.r v t
/2
/2
:5 :0
A
M
29-GI101
BASEMENT FLOOR -
INFECTION CONTROL &
PHASING PLAN
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
EM BMW
16305
03/30/2022
1/8" = 1'-0"
BASEMENT - CONST BARRIER PLAN
ROOM ICRA SCHEDULE
LEVEL
ROOM
NO. ROOM NAME CAI BLDG NAME / FUNCTION CONSTRUCTION PROJECT ACTIVITY INFECTION CONTROL RISK GROUP CONTROL PROCEDURE CLASS
BASEMENT 015 TELECOM ROOM PRIMARY CARE / ADMINISTRATION TYPE C GROUP 2 CLASS III
FIRST FLOOR 144 TELECOM ROOM PRIMARY CARE / ADMINISTRATION TYPE C GROUP 2 CLASS III
SEE GENERAL NOTES SHEET FOR CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA) DESCRIPTIONS. TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S
KNOWLEDGE. FINAL DETERMINATION BY THE VA WILL BE MADE AT A LATER DATE.
N
0 8' 16'4'
REF.
U C
F
UCF
U C
F
U C
F
REF.
F E
C
F E
C
F E
C
FEC
F E
C
FEC
113A
C1C
C1W
113B
123 132 134
142A
C1E
143A
167 154
149151
146142140
130129
163 165
161 164
162159
157 160
155 158
153 156
C7
C6
127128
126 125
114 115
C2
107106
104 105
103102
101100
C1
C le a n U tility
B la n k e t W a rm e r
TELECOM
ROOM
INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND
LIMITS OF CONSTRUCTION
1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER
LOCATION, AND DOOR, WHERE SHOWN
TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER
LOCATION, WHERE APPROVED BY THE VA FOR USE IN RISK TYPE B.
UPGRADE TO 1 HOUR RATED PARTITION WHEN DIRECTED BY THE VA
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of
Minnesota.
Name:
Date: License Number: MN# 18157
Typed or Printed Name: Tom Olesak
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10 C
U s e rs
\P u b li c \D o c u m e n ts \R e v it
P ro je c ts
\1 -2
-R
E
M a rk fo rt
.r v t
/2
/2
:5 :0
A
M
29-GI111
FIRST FLOOR - INFECTION
CONTROL & PHASING PLAN
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
EM BMW
16305
03/30/2022
1/8" = 1'-0"
FIRST FLOOR - CONST BARRIER PLAN
ROOM ICRA SCHEDULE
LEVEL
ROOM
NO. ROOM NAME CAI BLDG NAME / FUNCTION CONSTRUCTION PROJECT ACTIVITY INFECTION CONTROL RISK GROUP CONTROL PROCEDURE CLASS
BASEMENT 015 TELECOM ROOM PRIMARY CARE / ADMINISTRATION TYPE C GROUP 2 CLASS III
FIRST FLOOR 144 TELECOM ROOM PRIMARY CARE / ADMINISTRATION TYPE C GROUP 2 CLASS III
SEE GENERAL NOTES SHEET FOR CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA) DESCRIPTIONS. TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S
KNOWLEDGE. FINAL DETERMINATION BY THE VA WILL BE MADE AT A LATER DATE.
N
0 8' 16'4'
-ASBESTOS-CONTAINING FIRE DOOR
-ASBESTOS-CONTAINING PIPE INSULATION (VERTICAL RISERS)
-ASBESTOS-CONTAINING BLACK MASTIC UNDER CARPET
-ASBESTOS-CONTAINING WINDOW CAULK
-ASBESTOS-CONTAINING MASTIC UNDER 12" FLOOR TILE
-ASBESTOS-CONTAINING PIPE INSULATION (HORIZONTAL RUNS)
CASTLE HILL ASSOCIATES, LLC.
N
S
W E
BUILDING #29 - BASEMENT FLOOR PLAN
-ASBESTOS-CONTAINING CONVECTOR REFRACTORY
-ASBESTOS-CONTAINING BASE COVE ADHESIVE
-ASBESTOS-CONTAINING WINDOW CAULK
CASTLE HILL ASSOCIATES, LLC.
N
S
W E
BUILDING #29 - FIRST FLOOR PLAN
-ASBESTOS-CONTAINING CONVECTOR REFRACTORY
-ASBESTOS-CONTAINING WINDOW CAULK
-ASBESTOS-CONTAINING PIPE INSULATION (VERTICAL RISERS)
-ASBESTOS-CONTAINING MASTIC UNDER 12" FLOOR TILE
CASTLE HILL ASSOCIATES, LLC.
N
S
W E
BUILDING #29 - SECOND FLOOR PLAN
-ASBESTOS-CONTAINING PIPE INSULATION (VERTICAL RISERS)
-ASBESTOS-CONTAINING PIPE INSULATION (HORIZONTAL RUNS)
CASTLE HILL ASSOCIATES, LLC.
N
S
W E
LEGEND BUILDING #29 - ATTIC FLOOR PLAN
P2 P11A
TOILET
MALE
LOCKER
C0C
CORRIDOR
XFMR
STORAGE
20D
STORAGE
20C
STORAGE
OT/LOW
VISION
STORAGE
20A
STAIR
HALL
ENG
STORAGE
MAS
STORAGE
MALE
BATHROOM
AUDIOLOGY
RECEP/WAITING
STORAGE
20B
HAC
22FEMALE
LOCKER
STOR
PIPE
CHASE
VESTIBULE
19 TOILET
19H
CORR
C0C
TOILET
1A
TANK ROOM
STORAGE
20E
WAITING
6A
STAIR
STAIR
026 STORAGE
RECEPTION/
SECRETARY
19A
OFFICE
19B
MECHANICAL
19W
ADMIN
OFFICER
19C
EXAM
19V
RECEPTION/
SIGN-OUT
5A
EXAM
5G
OFFICE
5I
OFFICE
5J
OFFICE
5K
FITTING
5H
EXAM
5C
AUX.
ROOM
5B
EXAM
5E
SUB
WAITING
5L
EXAM
5F
MULTI
PURPOSE
5D
CLEAN
STORAGE
6B
EXAM
19U
EXAM
19T
EXAM
19S
EXAM
19I
EXAM
19J
EXAM
19K
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
F
IR
E
ACCESS PANEL
TELECOM
ROOM
7'-5 3/4"
'-6
/2
29-AS100
TELECOM
ROOM
3'-9 1/2" 4" 3'-2 1/4"
TELECOM
ROOM
TELECOM
ROOM
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of
Minnesota.
Name:
Date: License Number: MN# 18157
Typed or Printed Name: Tom Olesak
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10 C
U s e rs
\P u b li c \D o c u m e n ts \R e v it
P ro je c ts
\1 -2
-R
E
M a rk fo rt
.r v t
/2
/2
:5 :0
A
M
29-AS100
BASEMENT PLANS
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
EM EM
16305
03/30/2022
N
0 8' 16'4' 1/8" = 1'-0"
BASEMENT FLOOR - OVERALL PLAN
1/4" = 1'-0"
ENLARGED FLOOR PLAN
N
0 8' 16'4'
N
0 4' 8'2'
N
0 4' 8'2'
1/4" = 1'-0"2
DEMOLITION PLAN
1/4" = 1'-0"
REFLECTED CEILING PLAN
RC1 RC2
_DEMOLITION PLAN KEYED NOTES
DE1 PREPARE WALL FOR PLYWOOD BACKBOARD INSTALLATION AND EHRM
REQUIREMENTS, SEE FLOOR PLAN AND TELECOM DRAWINGS
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
_FLOOR PLAN KEYED NOTES
FL1 ALL FOUR PERIMETER WALL PARTITIONS APPLY 4' BY 8' AC GRADE ¾”
TRADE SIZE FIRE RATED PLYWOOD BACKBOARD FINISHED WITH
HIGH-GLOSS WHITE PAINT OVER TWO COATS OF FIRE RESISTANT PAINT
FOR SERVICE PROVIDER / SECURITY / VIDEO / ET CETERA. DO NOT PAINT
OVER FIRE RATING STAMP.
FL3 UPGRADE PARTITION TO 1 HOUR FIRE AND SMOKE BARRIER. PROVIDE
TESTED HEAD OF PARTITION ASSEMBLY WITH MATERIALS THAT RESIST
THE PASSAGE OF SMOKE. SEAL JOINT AT HEAD AND ALL PENETRATIONS
WITH FIRE CAULK.
FL20 TELECOM EQUIPMENT, SEE TELECOM DRAWINGS.
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
_REFLECTED CEILING PLAN KEYED NOTES
RC1 LED LIGHTING, SEE ELECTRICAL. IN FRONT OF AND BEHIND CABINET
ROWS PROVIDE 500 LUMENS IN HORIZONTAL AND 200 LUMENS IN THE
VERTICAL AT 3 FT AFF. OPERATED BY MOTION SENSOR PER CABINET
ROW OR SECTION.
RC2 OPEN TO STRUCTURAL FLOOR ABOVE
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
FL1
DE1 DE1
DE1
FL3 FL3
FL3
FL20
_SHEET NOTES
1. SEE GENERAL NOTES AND CAMPUS DRAWINGS FOR GENERAL
INFORMATION, LIFE SAFETY, ICRA, AND PHASING
2. ALL EXISTING CONDITIONS MUST BE FIELD VERIFIED BY THE
CONTRACTOR PRIOR TO DEMOLITION OR CONSTRUCTION. EXISTING
CONDITIONS THAT DIFFER FROM THOSE SHOWN MUST BE BROUGHT TO
THE ATTENTION OF THE C.O.R. TO INFORM THE ARCHITECTS AND
ENGINEERS.
3. THE INFORMATION SHOWN ON THE DRAWINGS IS BASED ON DRAWINGS
AND PHOTOGRAPHS PROVIDED BY THE C.O.R. COMBINED WITH
OBSERVATIONS AND SURVEYED DATA FROM THE ARCHITECTS AND
ENGINEERS.
4. SEE CIVIL, STRUCTURAL, TELECOM, ELECTRICAL, MECHANICAL, AND
PLUMBING DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL
DEMOLITION AND CONSTRUCTION REQUIREMENTS.
5. PORTABLE FIRE EXTINGUISHERS (CO2 OR HALOGENATED TYPE AS
DETERMINED BY VA) WITH WALL MOUNT BRACKET AND CODE REQUIRED
SIGNAGE SHALL BE PROVIDED BY THE CONTRACTOR WITHIN TELECOM
ROOMS.
C
F
UCF
U C
F
U C
F
REF.
F E
C
F E
C
F E
C
FEC
F E
C
FEC
113A
C1C
C1W
113B
123 132 134
142A
C1E
143A
167 154
149151
146142140
130129
163 165
161 164
162159
157 160
155 158
153 156
C7
C6
127128
126 125
114 115
C2
107106
104 105
103102
101100
C1
C le a n U tility
B la n k e t W a rm e r
CORRIDOR
TELECOM
ROOM
6'-0 1/4"
'-8
/2
29-AS110
TELECOM
ROOM
2'-9 3/4" 4" 2'-10 1/2"
TELECOM
ROOM
TELECOM
ROOM
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of
Minnesota.
Name:
Date: License Number: MN# 18157
Typed or Printed Name: Tom Olesak
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10 C
U s e rs
\P u b li c \D o c u m e n ts \R e v it
P ro je c ts
\1 -2
-R
E
M a rk fo rt
.r v t
/2
/2
:5 :1
A
M
29-AS110
FIRST FLOOR PLANS
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
EM EM
16305
03/30/2022
1/8" = 1'-0"
FIRST FLOOR - OVERALL PLAN
N
0 8' 16'4'
N
0 8' 16'4'
N
0 4' 8'2'
N
0 8' 16'4'
1/4" = 1'-0"
ENLARGED FLOOR PLAN
1/4" = 1'-0"
DEMOLITION PLAN
1/4" = 1'-0"
REFLECTED CEILING PLAN
FL3
RC1 RC2
_DEMOLITION PLAN KEYED NOTES
DE1 PREPARE WALL FOR PLYWOOD BACKBOARD INSTALLATION AND EHRM
REQUIREMENTS, SEE FLOOR PLAN AND TELECOM DRAWINGS
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
_FLOOR PLAN KEYED NOTES
FL1 ALL FOUR PERIMETER WALL PARTITIONS APPLY 4' BY 8' AC GRADE ¾”
TRADE SIZE FIRE RATED PLYWOOD BACKBOARD FINISHED WITH
HIGH-GLOSS WHITE PAINT OVER TWO COATS OF FIRE RESISTANT PAINT
FOR SERVICE PROVIDER / SECURITY / VIDEO / ET CETERA. DO NOT PAINT
OVER FIRE RATING STAMP.
FL3 UPGRADE PARTITION TO 1 HOUR FIRE AND SMOKE BARRIER. PROVIDE
TESTED HEAD OF PARTITION ASSEMBLY WITH MATERIALS THAT RESIST
THE PASSAGE OF SMOKE. SEAL JOINT AT HEAD AND ALL PENETRATIONS
WITH FIRE CAULK.
FL20 TELECOM EQUIPMENT, SEE TELECOM DRAWINGS.
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
_REFLECTED CEILING PLAN KEYED NOTES
RC1 LED LIGHTING, SEE ELECTRICAL. IN FRONT OF AND BEHIND CABINET
ROWS PROVIDE 500 LUMENS IN HORIZONTAL AND 200 LUMENS IN THE
VERTICAL AT 3 FT AFF. OPERATED BY MOTION SENSOR PER CABINET
ROW OR SECTION.
RC2 OPEN TO STRUCTURAL FLOOR ABOVE
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
FL1
DE1 DE1
DE1
FL3
FL3
FL20
_SHEET NOTES
1. SEE GENERAL NOTES AND CAMPUS DRAWINGS FOR GENERAL
INFORMATION, LIFE SAFETY, ICRA, AND PHASING
2. ALL EXISTING CONDITIONS MUST BE FIELD VERIFIED BY THE
CONTRACTOR PRIOR TO DEMOLITION OR CONSTRUCTION. EXISTING
CONDITIONS THAT DIFFER FROM THOSE SHOWN MUST BE BROUGHT TO
THE ATTENTION OF THE C.O.R. TO INFORM THE ARCHITECTS AND
ENGINEERS.
3. THE INFORMATION SHOWN ON THE DRAWINGS IS BASED ON DRAWINGS
AND PHOTOGRAPHS PROVIDED BY THE C.O.R. COMBINED WITH
OBSERVATIONS AND SURVEYED DATA FROM THE ARCHITECTS AND
ENGINEERS.
4. SEE CIVIL, STRUCTURAL, TELECOM, ELECTRICAL, MECHANICAL, AND
PLUMBING DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL
DEMOLITION AND CONSTRUCTION REQUIREMENTS.
5. PORTABLE FIRE EXTINGUISHERS (CO2 OR HALOGENATED TYPE AS
DETERMINED BY VA) WITH WALL MOUNT BRACKET AND CODE REQUIRED
OFFICE
STAIR
HALL
OFFICE
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
SPD
STORAGE
PIPE CHASE
214A
PIPE CHASE
215A
PIPE CHASE
243A
OFFICE
OFFICE
CORRIDOR
C2CW
CORRIDOR
C2SW
OFFICE
TOUCHDOWN
ROOM
HAC
CORRIDOR
C2W
TOILET
TOILET
OFFICE
OFFICE
LOBBY
OFFICE
BATH
253A
PIPE CHASE
244A
OFFICE
OFFICE
CORRIDOR
C2SE
OFFICE
OFFICE
245A
OFFICE
245B
OFFICE
OFFICE
OFFICE
CLEAN
LINEN
201A
TOILET
LACTATION
ROOM
HAC
STOR.
TOI
204B
STOR.
OFFICE
STORAGE
OFFICE
231PHONE
CLOSET
231A
OFFICE
OFFICE
CONFERENCE
ROOM
STAIR
HALL
OFFICE
HAC
TOILET
PIPE CHASE
243A
CORRIDOR
C2E
STORAGE
ROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
C2CE
CORRIDOR
C2SW
EXAM
ROOM
208A
EXAM
ROOM
208B
EXAM
ROOM
209A
EXAM
ROOM
209B
EXAM
ROOM
210A
EXAM
ROOM
210B
EXAM
ROOM
213B
EXAM
ROOM
213A
EXAM
ROOM
212B
EXAM
ROOM
212A
EXAM
ROOM
211B
EXAM
ROOM
211A
CORRIDOR
C2SW
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of
Minnesota.
Name:
Date: License Number: MN# 18157
Typed or Printed Name: Tom Olesak
No DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10 C
U s e rs
\P u b li c \D o c u m e n ts \R e v it
P ro je c ts
\1 -2
-R
E
M a rk fo rt
.r v t
/2
/2
:5 :1
A
M
29-AS120
SECOND FLOOR - OVERALL
PLAN
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
EM EM
16305
03/30/2022
1/8" = 1'-0"1
SECOND FLOOR - OVERALL PLAN
N
0 8' 16'4'
_SHEET NOTES
1. SEE GENERAL NOTES AND CAMPUS DRAWINGS FOR GENERAL
INFORMATION, LIFE SAFETY, ICRA, AND PHASING
2. ALL EXISTING CONDITIONS MUST BE FIELD VERIFIED BY THE
CONTRACTOR PRIOR TO DEMOLITION OR CONSTRUCTION. EXISTING
CONDITIONS THAT DIFFER FROM THOSE SHOWN MUST BE BROUGHT TO
THE ATTENTION OF THE C.O.R. TO INFORM THE ARCHITECTS AND
ENGINEERS.
3. THE INFORMATION SHOWN ON THE DRAWINGS IS BASED ON DRAWINGS
AND PHOTOGRAPHS PROVIDED BY THE C.O.R. COMBINED WITH
OBSERVATIONS AND SURVEYED DATA FROM THE ARCHITECTS AND
ENGINEERS.
4. SEE CIVIL, STRUCTURAL, TELECOM, ELECTRICAL, MECHANICAL, AND
PLUMBING DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL
DEMOLITION AND CONSTRUCTION REQUIREMENTS.
5. PORTABLE FIRE EXTINGUISHERS (CO2 OR HALOGENATED TYPE AS
DETERMINED BY VA) WITH WALL MOUNT BRACKET AND CODE REQUIRED
UP
DISCHARGE
UP
UP
DN
RAMP
UP
UP
EXISTING GLYCOL TANK
EXISTING PUMPS/ EQUIPMENT
FEC
FEC
FEC
FEC
24x36
TABLE
24x48
TABLE
1A
TOILET
5B
ROOM
AUX.
5A
SIGN-OUT
RECEPT/
RECEP/WAITING
OPTOMETRY
MALE
CHASE
PIPE
C0C
CORRIDOR
C 0W
C O
R R
ID
O
R
STAIR
6F
OFFICE
6E
OFFICE
ELECTRICAL
STORE
CANTEEN
OFFICE
DATA
ROOM
TANK
STAIR
INTERN OFFICE
CHAPLAINS
20A
MECHANICAL
20D
CLASSROOM
20E
CLASSROOM
20C
CLASSROOM
20B
CLASSROOM
RECEPTION
5F
EXAM
5H
ROOM
EXAM
5I
OFFICE
5J
OFFICE
5K
OFFICE
STAIR
CHASE
CORR 027
CHASE
STAIR
STAIR
STAIR
HAC
5C
EXAM
5D
PURPOSE
MULTI
5E
EXAM
5G
EXAM
5L
CORR
20L
CLOSET
20K
CLOSET
20J
CLOSET
20I
CLOSET
20H
CLOSET
20G
CLOSET
20F
CLOSET
P1
ELEV
P1
ELEV
P2
ELEV
LOCKER
FEMALE
6D
OFFICE
6C
OFFICE
6B
LAB
AUDIOLOGY
RECEPTION
6A
WAITING
AUDIOLOGY
7A
FITTING
OFFICE
7B
FITTING
OFFICE
7C
FITTING
OFFICE
7D
FITTING
OFFICE
7E
OFFICE
EXAM
10A
MECHANICAL
SUITE
AUDIO/EXAM
SUITE
AUDIO/EXAM
SUITE
AUDIO/EXAM
STORAGE
SPD
CO2A
VOLTAGE
LOW
COWA
STOR
SOILED
CO1
HALL
CO1A
STORAGE
LINEN
CO1B
STORAGE
PROSTHETICS
CO2
CORRIDOR
EXIT
1-B
PHONE
EMERGENCY
19I
EXAM
19J
EXAM
19K
EXAM
19L
EXAM
19F
EXAM
19G
EXAM
19H
EXAM
19C
EXAM
19D
EXAM
19E
EXAM
19S
EXAM
19T
EXAM
19U
EXAM
19V
EXAM
19B
WAITING
19B.1
RECEPTION 19N
PRE-TEST
19O
PRE-TEST
19Q
PRE-TEST
19P
OFFICE
19Y
SUPPORT
C19-1
CORRIDOR
C19-3
CORRIDOR
19X
WAITING
DILATION
C19-4
CORRIDOR
19R
MEDS
19W
MECHANICAL
C 19-2
C O
R R
ID
O
R
18A
CORRIDOR
P
IP
E C
H A
S E 19A
ENTRY
F
IR
E
ACCESS PANEL
C
DATA
29-TD100
LIMITS OF DATA CABLING DEMOLITION
LIMITS OF DATA CABLING REPLACEMENT
FROM ROOM 015
FURNITURE FEED
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E E E
E
E
E
E
E E
E
E
E
E
E E
E
E
E
EE
E
E
E
E
E
E
EE
E
E
E
E
E
E
E
E
EEE
E
E
E E
E E
E E
E
E
E
E E
E E
E
E
E
E
E E
E E
E
E
E
E
E E
E
E
E E
E
E E
E
4D
4D
4D
4D
2D/2V
2D/2V
4D
4D
4D
4D
5D 4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D 4D
4D
4D
4D
4D
4D
4D 4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D4D
4D
4D
4D
4D 4D
1V
4D
4D
4D 4D
4D 4D
4D
4D
4D 4D
4D
4D
4D 4D
4D
4D 4D
4D
4D 4D
4D
4D
4D
4D
4D 4D
4D
4D 4D
4D
4D 4D
4D
4D 4D
4D
4D 4D
4D
4D 4D
4D
4D
4D
4D
4D
4D 4D
4D
4D 4D
4D
4D
4D
4D
4D 4D
4D
4D 4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
1V
2D/2V
2D/2V
2D/2V
2D/2V
2D 4D
4D
4D
2D
2D
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
4D E
2D /2
V
2D/2V
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
EEE
E
E
E
E E
E
EE
E
E
E
12"x4" 12"x4" 12"x4"
"x
4"
"x 4"
"x
4"
12"x4"
"x
4"
"x
4"
EE
E
12"x4"
"x
4"
12"x4" 12"x4"
"x
4"
"x 4"
R
SP
TW
SP
AC
FAPS
D
E
E
E
E
E
DATA
RACK
CABLE
TRAY
R
DATA
RACKD
D
D
Nathan M. TimmNo DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
B
IM
/2
.0
V A
S t C lo u d E
H R
M I n fr a s tr u c tu re U p g ra d e s /6
-2
.B
.T
R
.r v t
/1
/2
:3
:5
P
M
29-TD100
BASEMENT FLOOR PLAN -
TELECOM - DEMOLITION
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
KSB SSK
16305
SHEET NOTES:
1. REMOVE AND REPLACE EXISTING DATA CABLE: REMOVE ALL EXISTING DATA CABLES AND JACKS THROUGHOUT THIS AREA. REPLACE CABLES AND JACKS 1 FOR 1, AS REQUIRED BY THE NEW WORK PLANS.
REFER TO NEW WORK PLANS FOR SERVING COMMUNICATIONS ROOM LOCATION AND NEW CABLING
ROUTES.
2. EXISTING TELECOMMUNICATIONS CAGE AND RACK SHALL BE INCLUDED WITHIN THE SCOPE OF DEMOLITION.
EXISTING CABLING AND ASSOCIATED OUTLETS SHALL BE REMOVED AND REPLACED 1 FOR 1 AND REFED FROM DISTRIBUTION EQUIPMENT LOCATED WITHIN THE NEW TELECOMMUNICATIONS ROOM. REFER TO GENERAL CABLING NOTES FOR APPROXIMATE QUANTITIES. REFER TO NEW WORK PLANS FOR SERVING
COMMUNICATIONS ROOM LOCATION AND NEW CABLING ROUTES.
N
0 8' 16'4' 1/8" = 1'-0"
BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
1/4" = 1'-0"
TELECOM DEMO - ENLARGED PLAN -EXIST RM 15
N
0 4' 8'2'
GENERAL NOTES:
A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.
CABLING NOTE:
CABLING NOTES:
A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE. THE CABLE
RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE PRESENT IN THE SPACE AT THE COMPLETION OF THE
PROJECT.
1. ROOM 015
EXISTING CABLE COUNT
DATA (CAT6): 0
DATA (CAT5e): 460
DATA (CAT5): 0
DATA (CAT3): 0
CABLE RELOCATION COUNT
DATA (CAT6): 0
DATA (CAT5e): 0
DATA (CAT5): 0
DATA (CAT3): 0
EXISTING CABLE TO REMAIN
DATA (CAT6): 0
DATA (CAT5e): 0
DATA (CAT5): 0
DATA (CAT3): 0
FINAL CABLE COUNT
DATA (CAT6): 0
DATA (CAT5e): 0
DATA (CAT5): 0
DATA (CAT3): 0
C
F
UCF
U C
F
U C
F
REF.
F E
C
F E
C
F E
C
FEC
F E
C
FEC
137A
STAIR
119A
STAIR
ENCOUNTER
PATIENT
TEAM 5 & 6
EXAM
EXAM
EXAM
EXAM
TOILET
PROCEDURE
C1E
CORRIDOR
142A
CHASE
PIPE
TEAM 3 & 4
143A
CHASE
PIPE
LOUNGE
STAFF
STORAGE
WAITING
SPD
CLEAN/
SOILED
MECH.
EXAM
EXAM
C3
CORR
WAITING
OPTOMETRY
TEAM 7 & 8
113B
CHASE
PIPE
113A
CHASE
PIPE
STAIR123
STAIR
RECEPTION
VESTIBULE
RECEPTION
P2
ELEV
P1
ELEV
TOILET
EXAM RM
OPTOMETRY
TOILET
LOBBY
TOILET
LINEN
C4
CORRIDOR
TEAM 1
TEAM 2
EXAM 1
EXAM 1
EXAM 2
EXAM 2
EXAM 3
EXAM 3
EXAM 4
EXAM 4
EXAM 5
EXAM 5
C7
CORRIDOR
STOR.
MED.
EXAM
C6
CORR.
EXAM
EXAM
STORAGE
MED
INFUSION
INFUSION
INFUSION
INFUSION
AREA
WORK122
INFUSION
INFUSION
INFUSION
INFUSION
INFUSION
INFUSION
WAITING
WAITING
TOILET
STORAGE
MED.
C2
CORRIDOR
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
ENCOUNTER
PATIENT
ENCOUNTER
PATIENT
HAC
UTILITY
CLEAN
C1
CORRIDOR
C5
CORRIDOR
UTILITY
SOILEDC
le a n U tility
B la n k e t W a rm e r
REF.
U C
F
UCF
U C
F
U C
F
REF.
F E
C
F E
C
F E
C
FEC
F E
C
FEC
137A
STAIR
119A
STAIR
ENCOUNTER
PATIENT
TEAM 5 & 6
EXAM
EXAM
EXAM
EXAM
TOILET
PROCEDURE
C1E
CORRIDOR
142A
CHASE
PIPE
TEAM 3 & 4
143A
CHASE
PIPE
LOUNGE
STAFF
STORAGE
WAITING
SPD
CLEAN/
SOILED
MECH.
EXAM
EXAM
C3
CORR
WAITING
OPTOMETRY
TEAM 7 & 8
113B
CHASE
PIPE
113A
CHASE
PIPE
STAIR123
STAIR
RECEPTION
VESTIBULE
RECEPTION
P2
ELEV
P1
ELEV
TOILET
EXAM RM
OPTOMETRY
TOILET
LOBBY
TOILET
LINEN
C4
CORRIDOR
TEAM 1
TEAM 2
EXAM 1
EXAM 1
EXAM 2
EXAM 2
EXAM 3
EXAM 3
EXAM 4
EXAM 4
EXAM 5
EXAM 5
C7
CORRIDOR
STOR.
MED.
EXAM
C6
CORR.
EXAM
EXAM
STORAGE
MED
INFUSION
INFUSION
INFUSION
INFUSION
AREA
WORK122
INFUSION
INFUSION
INFUSION
INFUSION
INFUSION
INFUSION
WAITING
WAITING
TOILET
STORAGE
MED.
C2
CORRIDOR
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
ENCOUNTER
PATIENT
ENCOUNTER
PATIENT
HAC
UTILITY
CLEAN
C1
CORRIDOR
C5
CORRIDOR
UTILITY
SOILEDC
le a n U tility
B la n k e t W a rm e r
C C C C
C
E
3D
3D 3D
3D
3D 3D
3D
3D 3D
3D
3D
3D
3D
3D3D
3D
3D
3D
3D
3D 3D
3D
3D
3D
3D 3D3D3D
3D 3D
3D
3D
3D
3D
3D
3D
3D
3D 3D 3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D3D
3D
3D
3D
3D
3D
3D
3D
3D 3D
3D
3D 3D
3D 3D
3D 3D 3D 3D 3D 3D 3D 3D
3D 3D3D 3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D 3D
3D 3D 3D
3D 1D 3D
3D 3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D 3D3D 3D
3D3D 3D3D3D
WAP
E E E E
E
E
E E
E
E
E
E
E E
E
E
E
E E E E
E E
E
E
E
E
E
E
E
E
EEE
E
E
E
E
E
E
E
E
E
E
EE
E E
E
E
E
E
E
E E E
E E
E E
E
EE
E
E
E
E
E E
E
E
E
E E E E E E E E
E E
E E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
EEE
E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EEEEE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EEEE
29-TD110
LIMITS OF DATA CABLING DEMOLITION
LIMITS OF DATA CABLING REPLACEMENT
FROM ROOM 144
E
E
E E E E
EE
E
E
E
E
E
E
"x
4"
"x
4"
"x
4"
"x
4"
"x
4"
"x 4"
12"x4"12"x4"
12"x4"
12"x4"
DATA RACK
D
D
Nathan M. TimmNo DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
B
IM
/2
.0
V A
S t C lo u d E
H R
M I n fr a s tr u c tu re U p g ra d e s /6
-2
.B
.T
R
.r v t
/1
/2
:3
:5
P
M
29-TD110
FIRST FLOOR PLAN -
TELECOM - DEMOLITION
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
KSB SSK
16305
N
0 8' 16'4' 1/8" = 1'-0"
FIRST FLOOR PLAN - TELECOM - DEMOLITION
GENERAL NOTES:
A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.
1/4" = 1'-0"
TELECOM DEMO - ENLARGED PLAN -EXIST RM 144
N
0 4' 8'2'
CABLING NOTE:
CABLING NOTES:
A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE. THE CABLE
RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE PRESENT IN THE SPACE AT THE COMPLETION OF THE
PROJECT.
1. ROOM 144
EXISTING CABLE COUNT
DATA (CAT6): 0
DATA (CAT5e): 484
DATA (CAT5): 0
DATA (CAT3): 0
CABLE RELOCATION COUNT
DATA (CAT6): 0
DATA (CAT5e): 0
DATA (CAT5): 0
DATA (CAT3): 0
EXISTING CABLE TO REMAIN
DATA (CAT6): 484
DATA (CAT5e): 0
DATA (CAT5): 0
DATA (CAT3): 0
FINAL CABLE COUNT
DATA (CAT6): 484
DATA (CAT5e): 0
DATA (CAT5): 0
DATA (CAT3): 0
SHEET NOTES:
1. REMOVE AND REPLACE EXISTING DATA CABLE: REMOVE ALL EXISTING DATA CABLES AND JACKS THROUGHOUT THIS AREA. REPLACE CABLES AND JACKS 1 FOR 1, AS REQUIRED BY THE NEW WORK PLANS.
REFER TO NEW WORK PLANS FOR SERVING COMMUNICATIONS ROOM LOCATION AND NEW CABLING
ROUTES.
2. EXISTING TELECOMMUNICATIONS CAGE AND RACK SHALL BE INCLUDED WITHIN THE SCOPE OF DEMOLITION.
EXISTING CABLING AND ASSOCIATED OUTLETS SHALL BE REMOVED AND REPLACED 1 FOR 1 AND REFED FROM DISTRIBUTION EQUIPMENT LOCATED WITHIN THE NEW TELECOMMUNICATIONS ROOM. REFER TO GENERAL CABLING NOTES FOR APPROXIMATE QUANTITIES. REFER TO NEW WORK PLANS FOR SERVING
COMMUNICATIONS ROOM LOCATION AND NEW CABLING ROUTES.
30x30
DESK
30x30
DESK
30x30
DESK
30x54
DESK
24x48
DESK
24x48
DESK
FILE
LAT
P R
IN
T
E R
24x48
DESK
29-
EC2-1
214A
CHASE
PIPE
BATH
STORAGE
SPDC2W
CORR
HAC
ROOM
TOUCHDOWN
OFFICE
OFFICE
STORAGE
OFFICE
OFFICE
OFFICE
STAIR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE 230
OFFICE 231
OFFICE
OFFICE
OFFICE
R.O.I.
STAIR
STOR
HAC
ROOM
LACTATION
OFFICE
OFFICE
CONFERENCE
C2E
CORR
HAC
STORAGE
COPY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
243A
CHASE
PIPE
BATH
244A
CHASE
PIPE
OFFICE
245B
STORAGE
245A
OFFICE
OFFICE
OFFICE
C2SE
CORR
OFFICE
OFFICE
C2CW
CORRIDOR
OFFICE
C2CE
CORRIDOR
208A
ROOM
EXAM
208B
ROOM
EXAM
209A
ROOM
EXAM
209B
ROOM
EXAM
210A
ROOM
EXAM
210B
ROOM
EXAM
211A
ROOM
EXAM
211B
ROOM
EXAM
212A
ROOM
EXAM
212B
ROOM
EXAM
213A
ROOM
EXAM
213B
OFFICE
C2SW
CORR
OFFICE
LOBBY
OFFICE
253A
STORAGE
E02
ELEV
E01
ELEV
2D
2D
2D/2V
2D/2V
2D/2V
2D/1V
6D1D
5D/1V
3D 3D 3D 3D
2D
2D
2D
2D
2D
2D
2D
2D
1D
4D
4D
2D/2V
2D/2V 2D/2V
2D/2V
2D/2V
1D
2D/2V
2D/2V
2D/2V
2D/2V
2D/2V
2D/2V
2D/2V2D/2V
2D/2V
2D/2V
2D/2V
2D/2V 2D/2V
2D/2V
2D/2V
4D
4D
2D/3V
2D/3V
1D/1V
1D
1D/2V
2D/2V
1D
1D
1D/1V
3D/1V 1D/2V
3D
1D/2V
1D/2V
2D/2V E
E
E
E
E
E
E
E
E
E
WAP
WAP
WAP
WAP
WAP
1D
WAP
WAP
WAP
PROJECTOR
WAP
WAP
E
E
E
E
E
E
E
E
EE
E
E
E
E
E
E
EEEE
E
E
E
E E
E E
E
EE
E
E
E
E E
EE
E
E
E
E
E
E
E
E
EE
E
E
E
E
E
E
E
E
EE
E
E E
E
E E
E
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D1D
4D
4D
4D
4D
4D/1V
4D 4D 4D
4D
3D/1V
3D/1V
3D
3D
3D
2V
E
WAP
WAP
E
E
E
E E
E
E
E
E
E
E
E
E E
E E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
4D
4D
4D
4D
4D
4D
E 4D
E
E
E EE
E
E
E
E
E
E
"x
4"
"x
4"
"x 4"
"x
4"
"x 4"
12"x4" 12"x4"
LIMITS OF DATA CABLING DEMOLITION
Nathan M. TimmNo DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
B
IM
/2
.0
V A
S t C lo u d E
H R
M I n fr a s tr u c tu re U p g ra d e s /6
-2
.B
.T
R
.r v t
/1
/2
:3
:5
P
M
29-TD120
SECOND FLOOR PLAN -
TELECOM - DEMOLITION
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
KSB SSK
16305
N
0 8' 16'4' 1/8" = 1'-0"
SECOND FLOOR PLAN - TELECOM - DEMOLITION
GENERAL NOTES:
A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.
SHEET NOTES:
1. REMOVE AND REPLACE EXISTING DATA CABLE: REMOVE ALL EXISTING DATA CABLES AND JACKS THROUGHOUT THIS AREA. REPLACE CABLES AND JACKS 1 FOR 1, AS REQUIRED BY THE NEW WORK PLANS.
REFER TO NEW WORK PLANS FOR SERVING COMMUNICATIONS ROOM LOCATION AND NEW CABLING
ROUTES.
E
PENTHOUSE
ATTIC
E 3D
Nathan M. TimmNo DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
B
IM
/2
.0
V A
S t C lo u d E
H R
M I n fr a s tr u c tu re U p g ra d e s /6
-2
.B
.T
R
.r v t
/1
/2
:3
:5
P
M
29-TD130
ATTIC FLOOR PLAN -
TELECOM - DEMOLITION
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
KSB SSK
16305
1/8" = 1'-0"
ATTIC FLOOR PLAN - ELECTRICAL - DEMOLITION
GENERAL NOTES:
A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.
EXISTING GLYCOL TANK
EXISTING PUMPS/ EQUIPMENT
P2 P11A
TOILET
MALE
LOCKER
C0C
CORRIDOR
XFMR
STORAGE
20D
STORAGE
20C
STORAGE
OT/LOW
VISION
STORAGE
20A
STAIR
HALL
ENG
STORAGE
MAS
STORAGE
MALE
BATHROOM
AUDIOLOGY
RECEP/WAITING
STORAGE
20B
HAC
22FEMALE
LOCKER
STOR
PIPE
CHASE
VESTIBULE
19 TOILET
19H
CORR
C0C
TOILET
1A
TANK ROOM
STORAGE
20E
WAITING
6A
STAIR
STAIR
026 STORAGE
RECEPTION/
SECRETARY
19A
OFFICE
19B
MECHANICAL
19W
ADMIN
OFFICER
19C
EXAM
19V
RECEPTION/
SIGN-OUT
5A
EXAM
5G
OFFICE
5I
OFFICE
5J
OFFICE
5K
FITTING
5H
EXAM
5C
AUX.
ROOM
5B
EXAM
5E
SUB
WAITING
5L
EXAM
5F
MULTI
PURPOSE
5D
CLEAN
STORAGE
6B
EXAM
19U
EXAM
19T
EXAM
19S
EXAM
19I
EXAM
19J
EXAM
19K
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
F
IR
E
ACCESS PANEL
EXISTING GLYCOL TANK
EXISTING PUMPS/ EQUIPMENT
P2 P11A
TOILET
MALE
LOCKER
C0C
CORRIDOR
XFMR
STORAGE
20D
STORAGE
20C
STORAGE
OT/LOW
VISION
STORAGE
20A
STAIR
HALL
ENG
STORAGE
MAS
STORAGE
MALE
BATHROOM
AUDIOLOGY
RECEP/WAITING
STORAGE
20B
HAC
22FEMALE
LOCKER
STOR
PIPE
CHASE
VESTIBULE
19 TOILET
19H
CORR
C0C
TOILET
1A
TANK ROOM
STORAGE
20E
WAITING
6A
STAIR
STAIR
026 STORAGE
RECEPTION/
SECRETARY
19A
OFFICE
19B
MECHANICAL
19W
ADMIN
OFFICER
19C
EXAM
19V
RECEPTION/
SIGN-OUT
5A
EXAM
5G
OFFICE
5I
OFFICE
5J
OFFICE
5K
FITTING
5H
EXAM
5C
AUX.
ROOM
5B
EXAM
5E
SUB
WAITING
5L
EXAM
5F
MULTI
PURPOSE
5D
CLEAN
STORAGE
6B
EXAM
19U
EXAM
19T
EXAM
19S
EXAM
19I
EXAM
19J
EXAM
19K
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
F
IR
E
ACCESS PANEL
TELECOM ROOM
LIMITS OF DATA CABLING REPLACEMENT
FROM ROOM 015
12"x4"
12"x4"
"x
4"
12"x4"
12"x4"
G
G
FURNITURE FEED
WAP
WAP
WAP
E
4D
4D
4D
4D
2D/2V
2D/2V
4D
4D
4D
4D
5D 4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D 4D
4D
4D
4D
4D
4D 4D
4D
4D
4D
4D
4D
4D
4D
4D
4D 4D
4D4D
4D
4D
4D
4D 4D
1V
4D
4D
4D 4D
4D 4D
4D
4D
4D 4D
4D
4D
4D 4D
4D
4D 4D
4D
4D 4D
4D
4D
4D
4D
4D 4D
4D
4D 4D
4D
4D 4D
4D
4D 4D
4D
4D 4D
4D
4D 4D
4D
4D
4D
4D
4D
4D 4D
4D
4D 4D
4D
4D
4D
4D
4D 4D
4D
4D 4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
1V
2D/2V
2D/2V
2D/2V
2D/2V
2D 4D
4D
4D
2D
2D
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
E E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E E
E
E E
E
E
E
E
E
E E
E
E
E
E
E
E E E
E
E
E
E
E E
E
E
E
E
E E
E
E
E
EE
E
E
E
E
E
E
2D/2V
2D /2
V
EE
E
E
E
E
E
E
E
E
EEE
E
E
E E
E E
E E
E
E
E
E E
E E
E
E
E
E
E E
E E
E
E
E
E
E E
E
E
E E
E
E E
E
E 4D
E
2D
CABLE TRAY
29-TN400
4"
"x
4"
"x 4"
"x
4"
"x
4"
12"x4"
12"x4" 12"x4"
E
E
E
E
E E
EEEE
E
E
E
E E
E
EE
E
E
E
4"
EE
E
"x
4"
12"x4"
"x
4"
"x 4"
C5 126"
Nathan M. TimmNo DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
B
IM
/2
.0
V A
S t C lo u d E
H R
M I n fr a s tr u c tu re U p g ra d e s /6
-2
.B
.T
R
.r v t
/1
/2
:3
:5
P
M
29-TN100
BASEMENT FLOOR PLAN -
TELECOMMUNICATIONS
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
KSB SSK
16305
SHEET NOTES:
1. CONTRACTOR TO PROVIDE NEW WIRE BASKET, AS NEEDED, TO MAINTAIN A 50% OR LESS FILL OF THE CABLE TRAY SYSTEM FOR THE FLOOR. THE NEW WIRE BASKET WILL MATCH THE SIZE AND DISTANCE, EITHER BESIDE OR BELOW THE EXISTING CABLE TRAY, TO MATCH THE EXISTING TELECOM CABLE TRAY.
2. PROVIDE JUNCTION BOX TO CONNECT FIBER CONDUIT ENTRY TO EXTEND CONDUIT PATHWAY TO THE NEW
TELECOM ROOM.
1/8" = 1'-0"
BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
N
0 8' 16'4'
A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.
C
F
UCF
U C
F
U C
F
REF.
F E
C
F E
C
F E
C
FEC
F E
C
FEC
113A
C1C
C1W
113B
123 132 134
142A
C1E
143A
167 154
149151
146142140
130129
163 165
161 164
162159
157 160
155 158
153 156
C7
C6
127128
126 125
114 115
C2
107106
104 105
103102
101100
C1
C le a n U tility
B la n k e t W a rm e r
REF.
U C
F
UCF
U C
F
U C
F
REF.
F E
C
F E
C
F E
C
FEC
F E
C
FEC
113A
C1C
C1W
113B
123 132 134
142A
C1E
143A
167 154
149151
146142140
130129
163 165
161 164
162159
157 160
155 158
153 156
C7
C6
127128
126 125
114 115
C2
107106
104 105
103102
101100
C1
C le a n U tility
B la n k e t W a rm e r
C C C C
C
TELECOM ROOM
WAP E
3D
3D 3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D 3D3D3D
3D 3D
3D
3D
3D
3D
3D
3D
3D
3D 3D 3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D 3D
3D3D
3D
3D
3D
3D
3D
3D
3D
3D 3D 3D
3D 3D
3D 3D
3D 3D 3D 3D 3D 3D 3D 3D
3D 3D 3D 3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D 3D
3D 3D 3D
3D 1D 3D
3D 3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D
3D 3D3D 3D
3D3D 3D3D3D
E
EEEE
E
E E
E
E
E
E
E E
E
E
E
E E E E
E E
E
E
E
E
E
E
E
E
EEE
E
E
E
E
E
E
E
E
E
E
EE
E E
E
E
E
E
E
E E E
E E
E E
E
EE
E
E
E
E
E E
E
E
E
E E E E E E E E
E E
E E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
EEE
E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EEEEE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EEEE
LIMITS OF DATA CABLING REPLACEMENT
FROM ROOM 144
29-TN401
12"x4" 12"x4" 12"x4"
12"x4"
"x
4"
"x
4"
"x
4"
"x
4"
"x 4"
"x
4"
E
E
E E E E
EE
E
E
E
E
E
E
C5 126"
12"x4"
Nathan M. TimmNo DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
B
IM
/2
.0
V A
S t C lo u d E
H R
M I n fr a s tr u c tu re U p g ra d e s /6
-2
.B
.T
R
.r v t
/1
/2
:3
:0
P
M
29-TN110
FIRST FLOOR PLAN -
TELECOMMUNICATIONS
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
KSB SSK
16305
1/8" = 1'-0"
FIRST FLOOR PLAN - TELECOMMUNICATIONS
N
0 8' 16'4'
GENERAL NOTES:
A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.
SHEET NOTES:
1. CONTRACTOR TO PROVIDE NEW WIRE BASKET, AS NEEDED, TO MAINTAIN A 50% OR LESS FILL OF THE CABLE TRAY SYSTEM FOR THE FLOOR. THE NEW WIRE BASKET WILL MATCH THE SIZE AND DISTANCE, EITHER BESIDE OR BELOW THE EXISTING CABLE TRAY, TO MATCH THE EXISTING TELECOM CABLE TRAY.
OFFICE
STAIR
HALL
OFFICE
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
SPD
STORAGE
PIPE CHASE
214A
PIPE CHASE
215A
PIPE CHASE
243A
OFFICE
OFFICE
CORRIDOR
C2CW
CORRIDOR
C2SW
OFFICE
TOUCHDOWN
ROOM
HAC
CORRIDOR
C2W
TOILET
TOILET
OFFICE
OFFICE
LOBBY
OFFICE
BATH
253A
PIPE CHASE
244A
OFFICE
OFFICE
CORRIDOR
C2SE
OFFICE
OFFICE
245A
OFFICE
245B
OFFICE
OFFICE
OFFICE
CLEAN
LINEN
201A
TOILET
LACTATION
ROOM
HAC
STOR.
TOI
204B
STOR.
OFFICE
STORAGE
OFFICE
231PHONE
CLOSET
231A
OFFICE
OFFICE
CONFERENCE
ROOM
STAIR
HALL
OFFICE
HAC
TOILET
PIPE CHASE
243A
CORRIDOR
C2E
STORAGE
ROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
C2CE
CORRIDOR
C2SW
EXAM
ROOM
208A
EXAM
ROOM
208B
EXAM
ROOM
209A
EXAM
ROOM
209B
EXAM
ROOM
210A
EXAM
ROOM
210B
EXAM
ROOM
213B
EXAM
ROOM
213A
EXAM
ROOM
212B
EXAM
ROOM
212A
EXAM
ROOM
211B
EXAM
ROOM
211A
CORRIDOR
C2SW
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
EXAM
ROOM
1D
PROJECTOR
2D
2D
2D/2V
2D/2V
2D/2V
2D/1V
6D1D
5D/1V
3D 3D 3D 3D
2D
2D
2D
2D
2D
2D
2D
2D
1D
4D
4D
2D/2V
2D/2V 2D/2V
2D/2V
2D/2V
1D
2D/2V
2D/2V
2D/2V
2D/2V
2D/2V
2D/2V
2D/2V2D/2V
2D/2V
2D/2V
2D/2V
2D/2V 2D/2V
2D/2V 2D/2V
4D
4D
2D/3V
2D/3V
1D/1V
1D
1D/2V
2D/2V
1D
1D
1D/1V
3D/1V 1D/2V
3D
1D/2V
1D/2V
2D/2V
WAP
E
E
E
E
E
E
E
WAP
E
WAP
WAP
E
WAP
E
WAP
WAP
WAP
WAP
WAP
E
E
E
E
E
E
E
E
EE
E
E
E
E
E
E
EEEE
E
E
E
E E
E E
E
EE
E
E
E
E E
EE
E
E
E
E
E
E
E
E
EE
E
E
E
E
E
E
E
E
EE
E
E E
E
E E
WAP
WAP
E
E
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D1D
4D
4D
4D
4D
4D/1V
4D 4D 4D
4D
3D/1V
3D/1V
3D
3D
3D
2V
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E E
E
E
E
E
4D
4D 4D
4D
4D
4D
E
E
E
E
E
E
4D E
E
E
E E
EE
E
E
E
E
E
E
E
"x
4"
"x 4" 12
"x 4"
"x
4"
"x
4"
12"x4"12"x4"
LIMITS OF DATA CABLING REPLACEMENT
FROM ROOM 015
12" LADDER
"x
4"
F2
"x
4"
Nathan M. TimmNo DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
B
IM
/2
.0
V A
S t C lo u d E
H R
M I n fr a s tr u c tu re U p g ra d e s /6
-2
.B
.T
R
.r v t
/1
/2
:3
:0
P
M
29-TN120
SECOND FLOOR PLAN -
TELECOMMUNICATIONS
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
KSB SSK
16305
1/8" = 1'-0"
SECOND FLOOR PLAN - TELECOMMUNICATIONS
N
0 8' 16'4'
GENERAL NOTES:
A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.
SHEET NOTES:
1. CONTRACTOR TO PROVIDE NEW WIRE BASKET, AS NEEDED, TO MAINTAIN A 50% OR LESS FILL OF THE CABLE TRAY SYSTEM FOR THE FLOOR. THE NEW WIRE BASKET WILL MATCH THE SIZE AND DISTANCE, EITHER BESIDE OR BELOW THE EXISTING CABLE TRAY, TO MATCH THE EXISTING TELECOM CABLE TRAY.
PENTHOUSE
ATTIC
B29-ATTIC
3D E
Nathan M. TimmNo DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
B
IM
/2
.0
V A
S t C lo u d E
H R
M I n fr a s tr u c tu re U p g ra d e s /6
-2
.B
.T
R
.r v t
/1
/2
:3
:0
P
M
29-TN130
ATTIC FLOOR PLAN -
TELECOMMUNICATIONS
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
KSB SSK
16305
1/8" = 1'-0"
THIRD FLOOR PLAN - TELECOMMUNICATIONS
P2 P11A
TOILET
MALE
LOCKER
C0C
CORRIDOR
XFMR
STOR AGE
20D
STOR AGE
20C
STOR AGE
OT/ LOW
VISION
STOR AGE
20A
STAIR
HALL
ENG
STOR AGE
MAS
STOR AGE
MALE
BATHR OOM
AUD IOLOGY
RECEP/W AITING
STOR AGE
20B
HAC
22FEMALE
LOCK ER
STOR
PIPE
CHASE
VESTI BULE
19 TOILET
19H
CORR
C0C
TOILET
1A
TANK ROOM
STOR AGE
20E
WAITING
6A
STAIR
STAIR
026 STOR AGE
REC EPTI ON /
SEC R ET AR Y
19A
OF FI C E
19B
MEC H ANI C AL
19W
AD MI N
OF F IC ER
19C
EXAM
19V
RECEPTION/
SIGN-OUT
5A
EXA M
5G
OFFICE
5I
OFFICE
5J
OFFICE
5K
FITTING
5H
EXA M
5C
AUX.
ROOM
5B
EXA M
5E
SUB
WAITING
5L
EXA M
5F
MULTI
PUR POSE
5D
CLEAN
STOR AGE
6B
EXAM
19U
EXAM
19T
EXAM
19S
EXAM
19I
EXAM
19J
EXAM
19K
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
F
IR
E
ACCESS PANEL
EXISTING GLYCOL TANK
EXISTING PUMPS/ EQUIPMENT
P2 P11A
TOILET
MALE
LOCKER
C0C
CORRIDOR
XFMR
STOR AGE
20D
STOR AGE
20C
STOR AGE
OT/ LOW
VISION
STOR AGE
20A
STAIR
HALL
ENG
STOR AGE
MAS
STOR AGE
MALE
BATHR OOM
AUD IOLOGY
RECEP/W AITING
STOR AGE
20B
HAC
22FEMALE
LOCK ER
STOR
PIPE
CHASE
VESTI BULE
19 TOILET
19H
CORR
C0C
TOILET
1A
TANK ROOM
STOR AGE
20E
WAITING
6A
STAIR
STAIR
026 STOR AGE
REC EPTI ON /
SEC R ET AR Y
19A
OF FI C E
19B
MEC H ANI C AL
19W
AD MI N
OF F IC ER
19C
EXAM
19V
RECEPTION/
SIGN-OUT
5A
EXA M
5G
OFFICE
5I
OFFICE
5J
OFFICE
5K
FITTING
5H
EXA M
5C
AUX.
ROOM
5B
EXA M
5E
SUB
WAITING
5L
EXA M
5F
MULTI
PUR POSE
5D
CLEAN
STOR AGE
6B
EXAM
19U
EXAM
19T
EXAM
19S
EXAM
19I
EXAM
19J
EXAM
19K
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
EXAM
19V
F
IR
E
ACCESS PANEL
Nathan M. TimmNo DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
B
IM
/2
.0
V A
S t C lo u d E
H R
M I n fr a s tr u c tu re U p g ra d e s /6
-2
.B
.T
R
.r v t
/1
/2
:3
:0
P
M
29-TN200
BASEMENT FLOOR PLAN -
TELECOM - CABLE DISTANCE
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
KSB SSK
16305
N
0 30' 60'15' 1" = 30'-0"
BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
C
F
UCF
U C
F
U C
F
REF.
F E
C
F E
C
F E
C
FEC
F E
C
FEC
113A
C1C
C1W
113B
123 132 134
142A
C1E
143A
167 154
149151
146142140
130129
163 165
161 164
162159
157 160
155 158
153 156
C7
C6
127128
126 125
114 115
C2
107106
104 105
103102
101100
C1
C le a n
U tility
B la n k e t W a rm e r
REF.
U C
F
UCF
U C
F
U C
F
REF.
F E
C
F E
C
F E
C
FEC
F E
C
FEC
113A
C1C
C1W
113B
123 132 134
142A
C1E
143A
167 154
149151
146142140
130129
163 165
161 164
162159
157 160
155 158
153 156
C7
C6
127128
126 125
114 115
C2
107106
104 105
103102
101100
C1
C le a n
U tility
B la n k e t W a rm e r
Nathan M. TimmNo DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
B
IM
/2
.0
V A
S t C lo u d E
H R
M I n fr a s tr u c tu re U p g ra d e s /6
-2
.B
.T
R
.r v t
/1
/2
:3
:1
P
M
29-TN210
FIRST FLOOR PLAN -
TELECOM - CABLE DISTANCE
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
KSB SSK
16305
N
0 30' 60'15' 1" = 30'-0"
FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
STORAGESTORAGE
AC
CR
C
29-TN400
1 - a b
1 - c d
FAPS
AC
SP
TW
SP
E
E
E
E
E
TELECOM ROOM
DATA
RACK
CABLE
TRAY
C5 126"
KEYPAD
W
E
4"
12"x4"
E
R
DATA
RACK
DATA
RACK
DATA
RACK
"x
4"
"x
4"
12"x4"
12"x4"
NOTES:
1. REFER TO NEW WORK PLAN FOR RACK LOCATIONS.
2. COORDINATE EXACT RACK COUNT AND LOCATION WITH OWNER PRIOR TO PERMANENT INSTALLATION.
3. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL RACK COMPONENTS.
4. RACK ELEVATION SHOWS A FULLY CONFIGURED SAMPLE RACK. CONTRACTOR TO PROVIDE REQUIRED EQUIPMENT TO
SUPPORT THE FINAL DATA COUNT FROM THE ENLARGED NEW SHEET. (NOT TO EXCEED 288 PORTS PER RACK).
5. COORDINATE FINAL RACK COMPONENT LAYOUT WITH OWNER'S IS/IT REPRESENTATIVE.
6. CONTRACTOR IS RESPONSIBLE FOR FINAL CABLE COUNT, QUANTITY OF PATCH PANELS, SWITCHES, FIBER ENCLOSURES, BLANKING PANELS, CABLE MANAGEMENT, AND MOUNTING HARDWARE NOT MARKED AS “OIT PROVIDED”.
7. PUNCHDOWN COPPER BACKBONES ON RACK MOUNT PATCH PANELS. TERMINATE ONE (1) PAIR PER PATCH PANEL PORT.
VERTICAL CABLE
MANAGEMENT (TYP)
RACK 1
1U 144 STRAND OM4 AND OS2 DISTRIBUTION PANEL
1U BONDING BUS BAR (BACK) 1U BLANKING PANEL (FRONT)
1U 48 PORT CAT5E BACKBONE PATCH PANEL
1U CABLE MANAGEMENT
1U CABLE MANAGEMENT
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
6U 5KW RACK MOUNT UPS
V E
R T
IC
A
L R
A C
K P
D U
V E
R T
IC
A
L R
A C
K P
D U
NEMA L21-20R (TYP)
CHANNEL RACK (TYP)
D
PROVIDE DATA CABLE TO RACK
MOUNTED UPS FOR CONNECTION
TO MONITORING SYSTEM
RACK 1
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U CABLE MANAGEMENT
2U CABLE MANAGEMENT
2U CABLE MANAGEMENT
1U CABLE MANAGEMENT
2U CABLE MANAGEMENT
2U CABLE MANAGEMENT
2U CABLE MANAGEMENT
1U BONDING BUS BAR (BACK) 1U BLANKING PANEL (FRONT)
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
6U 5KW RACK MOUNT UPS
V E
R T
IC
A
L R
A C
K P
D U
V E
R T
IC
A
L R
A C
K P
D U
NEMA L21-20R (TYP)
D
RACK 2
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U CABLE MANAGEMENT
2U CABLE MANAGEMENT
2U CABLE MANAGEMENT
1U CABLE MANAGEMENT
2U CABLE MANAGEMENT
2U CABLE MANAGEMENT
2U CABLE MANAGEMENT
1U BONDING BUS BAR (BACK) 1U BLANKING PANEL (FRONT)
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
6U 5KW RACK MOUNT UPS
V E
R T
IC
A
L R
A C
K P
D U
V E
R T
IC
A
L R
A C
K P
D U
NEMA L21-20R (TYP)
D
RACK 3
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U CABLE MANAGEMENT
2U CABLE MANAGEMENT
2U CABLE MANAGEMENT
1U CABLE MANAGEMENT
2U CABLE MANAGEMENT
2U CABLE MANAGEMENT
2U CABLE MANAGEMENT
RACK 2 RACK 3
6U SPACE FOR FUTURE USE. PROVIDE BLANK
PANELS FOR UNUSED SPACES.
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
SPACE FOR FUTURE HORIZONTAL CABLE
DISTRIBUTION. PROVIDE BLANKING PANELS FOR
UNUSED SPACES.
6U SPACE FOR FUTURE USE. PROVIDE BLANK
PANELS FOR UNUSED SPACES.
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
SPACE FOR FUTURE HORIZONTAL CABLE
DISTRIBUTION. PROVIDE BLANKING PANELS FOR
UNUSED SPACES.
6U SPACE FOR FUTURE USE. PROVIDE BLANK
PANELS FOR UNUSED SPACES.
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
SPACE FOR FUTURE HORIZONTAL CABLE
DISTRIBUTION. PROVIDE BLANKING PANELS FOR
UNUSED SPACES.
1U BONDING BUS BAR (BACK) 1U BLANKING PANEL (FRONT)
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
6U 5KW RACK MOUNT UPS
V E
R T
IC
A
L R
A C
K P
D U
V E
R T
IC
A
L R
A C
K P
D U
NEMA L21-20R (TYP)
D
RACK 3
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U 48 PORT CAT6A ANGLED DATA PATCH PANEL
1U CABLE MANAGEMENT
2U CABLE MANAGEMENT
2U CABLE MANAGEMENT
1U CABLE MANAGEMENT
2U CABLE MANAGEMENT
2U CABLE MANAGEMENT
2U CABLE MANAGEMENT
RACK 3
6U SPACE FOR FUTURE USE. PROVIDE BLANK
PANELS FOR UNUSED SPACES.
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
VA OIT PROVIDED 1U 48 PORT SWITCH
SPACE FOR FUTURE HORIZONTAL CABLE
DISTRIBUTION. PROVIDE BLANKING PANELS FOR
UNUSED SPACES.
Nathan M. TimmNo DATEREVISION
DRAWING TITLE
CHECKED BY
ST.CLOUD, MN 56303
VA MEDICAL CENTER
BUILDING No
LOCATION
DRAWING NO.DRAWN
DWG. OF
PROJECT TITLE
PLOT SCALE
PROJECT NO.
DATE:
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP
FULLY
SPRINKLERED
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
B
IM
/2
.0
V A
S t C lo u d E
H R
M I n fr a s tr u c tu re U p g ra d e s /6
-2
.B
.T
R
.r v t
/1
/2
:3
:1
P
M
29-TN400
ENLARGED PLANS -
TELECOMMUNICATIONS
EHRM INFRASTRUCTURE
UPGRADES
656‐21‐235
03/30/2022
KSB SSK
16305
N
0 2' 4'1'
0 4' 8'2' 0 4' 8'2' 0 4' 8'2' 0 4' 8'2'
CABLING NOTE:
CABLING NOTES:
A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE.
THE CABLE RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED
FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE
PRESENT IN THE SPACE AT THE COMPLETION OF THE PROJECT.
1. ROOM 15
EXISTING CABLE COUNT
DATA (CAT6): 0
DATA (CAT5e): 460
DATA (CAT5): 0
DATA (CAT3): 0
CABLE RELOCATION COUNT
DATA (CAT6): 0
DATA (CAT5e): 0
DATA (CAT5): 0
DATA (CAT3): 0
EXISTING CABLE TO REMAIN
DATA (CAT6): 0
DATA (CAT5e): 0
DATA (CAT5): 0
DATA (CAT3): 0
FINAL CABLE COUNT
DATA (CAT6A): 460
DATA (CAT6): 0
1/2" = 1'-0"
ENALRGED PLAN - TR 15 - TELECOM
1/4" = 1'-0"
1 - a 1/4" = 1'-0"
1 - b
1/4" = 1'-0"
1 - c
1/4" = 1'-0"
1 - d
NOT TO SCALE
COMMUNICATIONS - TYPICAL FOUR RACK ELEVATION WITH RACK MOUNT UPS - TR 15
AC
CR
C
29-TN400
1 - a b
1 - c d
29-TN401
2 - a
29-TN401
b
29-TN401
d
29-TN401
2 - c
TELECOM ROOM
KEYPAD
W
24"x4"
DATA
RACK
CABLE
TRAY
12"x4"
"x
4"
"x
4"
12"x4"
C5 126"
DATA
RACK
NOTES:
1. REFER TO NEW WORK PLAN FOR RACK LOCATIONS.
2. COORDINATE EXACT RACK COUNT AND LOCATION WITH OWNER PRIOR TO PERMANENT INSTALLATION.
3. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL RACK COMPONENTS.
4. RACK ELEVATION SHOWS A FULLY CONFIGURED SAMPLE RACK. CONTRACTOR TO PROVIDE REQUIRED EQUIPMENT TO
SUPPORT THE FINAL DATA COUNT FROM THE ENLARGED NEW SHEET. (NOT TO EXCEED 288 PORTS PER RACK).
5. COORDINATE FINAL RACK COMPONENT LAYOUT WITH OWNER'S IS/IT…