01-M204 - ROOF REMODEL -MECHANICAL.pdf

PDF 587 KB Posted

Attached to
Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud Federal contract opportunity
Solicitation number
36C77622B0035
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document package includes construction drawings and a federal contract opportunity notice. The drawings depict roof remodeling and mechanical work at the St. Cloud Veterans Affairs Health Care System facility in Minnesota. The work includes routing refrigerant piping to various telecom and equipment rooms, relocating condensing units, and verifying existing site conditions.

The related federal contract opportunity is seeking construction services for infrastructure upgrades at the St. Cloud VAHCS. Required work includes electrical and data cabling installation, UPS and building management system integration, access security upgrades, HVAC reconfiguration and expansion, data center physical security enhancements, fiber backbone installation between buildings, and hazardous materials abatement. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud, newest first.
File Type Posted
Atch 41 - Construction Wage Rates - Stearns 7-29-22.pdf PDF
Technical Questions - LATE - St. Cloud 8-10-22.pdf PDF
Atch 3 - Specifications Volume 3 - Asbestos addendum.pdf PDF
Atch 4 - General 1 of 2 addendum.pdf PDF
Atch 6 - BLDG 1 - 1 of 2 addendum.pdf PDF
Atch 8 - BLDG 2 addendum.pdf PDF
Atch 9 - BLDG 3 addendum.pdf PDF
Atch 12 - BLDG 6 addendum.pdf PDF
Atch 13 - BLDG 7 and 13 addendum.pdf PDF
Atch 27 - BLDG 96 addendum.pdf PDF
Atch 30 - BLDG 111 addendum.pdf PDF
Atch 31 - BLDG 112 addendum.pdf PDF
Specifications Addendum Information.pdf PDF
Drawings Addendum Information.pdf PDF
Atch 1 - Specifications Volume 1 addendum.pdf PDF
Atch 11 - BLDG 5 addendum.pdf PDF
Atch 17 - BLDG 11 addendum.pdf PDF
Atch 18 - BLDG 14 addendum.pdf PDF
Atch 28 - BLDG 108 addendum.pdf PDF
Atch 33 - BLDG 116 addendum.pdf PDF
Site Visit Sign-in Sheets - 6-28-22 - 6-30-22.pdf PDF
36C77622B0035 - 6-9-22.pdf PDF
Atch 6 - BLDG 1 - 1 of 2.pdf PDF
Atch 16 - BLDG 10.pdf PDF
Atch 19 - BLDG 28.pdf PDF
Atch 22 - BLDG 49.pdf PDF
Atch 35 - ADHC.pdf PDF
Atch 4 - General 1 of 2.pdf PDF
Atch 5 - General 2 of 2.pdf PDF
Atch 8 - BLDG 2.pdf PDF
Atch 23 - BLDG 50.pdf PDF
Atch 24 - BLDG 51.pdf PDF
Atch 27 - BLDG 96.pdf PDF
Atch 31 - BLDG 112.pdf PDF
Atch 10 - BLDG 4.pdf PDF
Atch 34 - BLDG 118.pdf PDF
Atch 2 - Specifications Volume 2.pdf PDF
Atch 3 - Specifications Volume 3 - Asbestos.pdf PDF
Atch 9 - BLDG 3.pdf PDF
Atch 11 - BLDG 5.pdf PDF
Atch 13 - BLDG 7 and 13.pdf PDF
Atch 14 - BLDG 8.pdf PDF
Atch 17 - BLDG 11.pdf PDF
Atch 29 - BLDG 109 and 57.pdf PDF
Atch 33 - BLDG 116.pdf PDF
Atch 37 - Brand Name Justification - St. Cloud.pdf PDF
Atch 38 - Contractor Core Work Hours.pdf PDF
Atch 39 - COVID-19 Safety Protocols 12-14-21.pdf PDF
Atch 41 - Construction Wage Rates - Stearns 4-1-22.pdf PDF
Atch 42 - Contractor Safety - Environmental Form.docx DOCX document
Show all 50

Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CU-1-2 CU-1-4

1 2

3 (TYP 1 OF 3)

S L O

P E

D O

W N

/4

CU-1-3

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTA ARCHITECT/ENGINEER OF STAM

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 1

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Minnesota.

Name:

Date: 03/30/2022

License Number: MN#

03/30/2022

B

IM

/2

.0

V A

S t C lo u d

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.M

R

.r v t

/1

/2

:0

:0

A

M

01-M204

ROOF REMODEL -

MECHANICAL

EHRM

INFRASTRUCTURE

UPGRADES

656‐21‐235

RDL JCL

16305

1/4" = 1'-0"

ROOF - MECHANICAL - TELECOM A101/A200 - CONDENSING UNITS

1 1/4" = 1'-0"

ROOF - MECHANICAL - TELECOM 005F - CONDENSING UNITS

KEYED NOTES 2/01-M204:

1. ROUTE REFRIGERANT PIPING DOWN TO BASEMENT LEVEL - THRU CORRIDOR

C2EB AND CORRIDOR C1EB TO TELECOM ROOM 005F FOR EVAPORATOR UNIT

AC-1-3.

2. FIELD COORDINATE FINAL INSTALLATION LOCATION OF CONDENSING UNIT TO

MAINTAIN MINIMUM 10'-0" DISTANCE FROM ROOF EDGES FOR MAINTENANCE.

#KEYED NOTES 1/01-M204:

1. ROUTE REFRIGERANT PIPING DOWN TO LEVEL 01 - THRU CORRIDOR C2-A2 AND

CORRIDOR C1NC TO TELECOM ROOM A101 FOR EVAPORATOR UNITS AC-1-4.

2. ROUTE REFRIGERANT PIPING DOWN TO LEVEL 02 - THRU CORRIDOR C2-AS TO

TELECOM A22 FOR EVAPORATOR UNITS AC-1-6 AND AC-1-7.

3. FIELD COORDINATE FINAL INSTALLATION LOCATION OF CONDENSING UNIT TO

MAINTAIN MINIMUM 10'-0" DISTANCE FROM ROOF EDGES FOR MAINTENANCE.

4. EXTEND REFRIGERANT PIPING TO RELOCATED CONDENSING UNIT NEW

LOCATION.

FIELD VERIFICATION NOTES

1. THE HVAC CONTRACTOR SHOULD VISIT THE SITE PRIOR TO BID TO FIELD VERIFY ALL EXISTING CONDITIONS WHICH MAY AFFECT THEIR

BID. THE FOLLOWING ITEMS SHALL BE VERIFIED:

A. EXACT PLACEMENT, SIZE, CAPACITY MANUFACTURER AND CONDITION OF ALL EXISTING HVAC EQUIPMENT WITHIN SCOPE OF

WORK, WHETHER EXPLICITY SHOWN OR NOT.

B. SIZE AND LOCATION OF ALL EXISTING DUCTWORK.

C. SIZE AND LOCATION OF ALL EXISTING GRILLES, REGISTERS AND DIFFUSERS.

D. SIZE AND LOCATION OF ALL EXISTING THERMOSTATIC CONTROL DEVICES.

E. SIZE AND LOCATION OF ALL EXISTING PLUMBING AND HYRONIC PIPING.

2. ALL REFERENCES ON THESE DRAWINGS TO EXISTING EQUIPMENT, DUCTWORK, DIFFUSERS, THERMOSTATS AND PIPING ARE FOR REFERENCE ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL THESE ITEMS PRIOR TO BID AND INCLUDE IN THEIR

BID ANY AND ALL AMOUNTS REQUIRED TO ACCOMMODATE EXISTING CONDITIONS.

3. NO ALLOWANCES WILL BE MADE AFTER THE PROJECT HAS BEEN AWARDED FOR FAILURE TO VERIFY EXISTING CONDITIONS.

4. ANY DISCREPANCIES WHICH MAY AFFECT THE CONTRACTORS BID SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND

ARCHITECT FOR DIRECTION.

0 4' 8'2' 0 4' 8'2'

NN

100% CD 03/3

03/30

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

EMarkfort Snapshot

EMarkfort Cloud

EMarkfort Snapshot

EMarkfort Snapshot

File details come from the government source that posted it. Updated .