Specifications Addendum Information.pdf

PDF 104 KB Posted

Attached to
Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud Federal contract opportunity
Solicitation number
36C77622B0035
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This addendum provides revisions to specifications and drawings for the EHRM Infrastructure Upgrades Construction project at the St. Cloud Veterans Affairs Health Care System. Key changes include adding and revising sections to the specifications covering direct digital control systems, communications installations requirements, grounding and bonding for communications systems, conduits and backboxes, cable trays, communications equipment identification, commissioning of communications systems, structured cabling, communications cabinets and racks, termination blocks and patch panels, rack mounted power protection, copper and optical fiber backbone cabling, horizontal cabling, cable splicing and terminations, and patch cords. The mechanical drawings were also updated to include a control schematic for temperature control in the TR room. The solicitation seeks a contractor to perform infrastructure improvements including electrical, bonding, UPS systems, building management system interfaces, access security, HVAC renovations and expansions, data center/server room physical security upgrades, fiber infrastructure upgrades between buildings, and hazardous materials abatement at the St. Cloud VAHCS in accordance with the revised specifications and drawings.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud, newest first.
File Type Posted
Technical Questions - LATE - St. Cloud 8-10-22.pdf PDF
01-M204 - ROOF REMODEL -MECHANICAL.pdf PDF
Atch 41 - Construction Wage Rates - Stearns 7-29-22.pdf PDF
Drawings Addendum Information.pdf PDF
Atch 1 - Specifications Volume 1 addendum.pdf PDF
Atch 11 - BLDG 5 addendum.pdf PDF
Atch 17 - BLDG 11 addendum.pdf PDF
Atch 18 - BLDG 14 addendum.pdf PDF
Atch 28 - BLDG 108 addendum.pdf PDF
Atch 33 - BLDG 116 addendum.pdf PDF
Atch 3 - Specifications Volume 3 - Asbestos addendum.pdf PDF
Atch 4 - General 1 of 2 addendum.pdf PDF
Atch 6 - BLDG 1 - 1 of 2 addendum.pdf PDF
Atch 8 - BLDG 2 addendum.pdf PDF
Atch 9 - BLDG 3 addendum.pdf PDF
Atch 12 - BLDG 6 addendum.pdf PDF
Atch 13 - BLDG 7 and 13 addendum.pdf PDF
Atch 27 - BLDG 96 addendum.pdf PDF
Atch 30 - BLDG 111 addendum.pdf PDF
Atch 31 - BLDG 112 addendum.pdf PDF
Site Visit Sign-in Sheets - 6-28-22 - 6-30-22.pdf PDF
Atch 4 - General 1 of 2.pdf PDF
Atch 5 - General 2 of 2.pdf PDF
Atch 8 - BLDG 2.pdf PDF
Atch 23 - BLDG 50.pdf PDF
Atch 24 - BLDG 51.pdf PDF
Atch 27 - BLDG 96.pdf PDF
Atch 31 - BLDG 112.pdf PDF
Atch 10 - BLDG 4.pdf PDF
Atch 34 - BLDG 118.pdf PDF
36C77622B0035 - 6-9-22.pdf PDF
Atch 6 - BLDG 1 - 1 of 2.pdf PDF
Atch 16 - BLDG 10.pdf PDF
Atch 19 - BLDG 28.pdf PDF
Atch 22 - BLDG 49.pdf PDF
Atch 35 - ADHC.pdf PDF
Atch 1 - Specifications Volume 1.pdf PDF
Atch 7 - BLDG 1 - 2 of 2.pdf PDF
Atch 12 - BLDG 6.pdf PDF
Atch 15 - BLDG 9.pdf PDF
Atch 18 - BLDG 14.pdf PDF
Atch 21 - BLDG 48.pdf PDF
Atch 25 - BLDG 54 and 69.pdf PDF
Atch 26 - BLDG 95 and 88.pdf PDF
Atch 28 - BLDG 108.pdf PDF
Atch 30 - BLDG 111.pdf PDF
Atch 32 - BLDG 115.pdf PDF
Atch 36 - Parking Structure.pdf PDF
Atch 40 - Limitations on Subcontracting - Construction.docx DOCX document
Atch 43 - Site Visit Instructions.pdf PDF
Show all 50

Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

656-21-235 St Cloud EHRM Infrastructure Upgrades Addendum 2 Page 1 of 2

Update to Bid Documents 2 – July 26, 2022

SPECIFICATION ITEMS:

1. 00 01 10 Table of Contents

a. Revise Division 23

b. Revise Division 27

2. 23 09 23 Direct Digital Control System For HVAC

a. Add Section

3. 27 05 11 - Requirements for Communications Installations

a. Revise Section

4. 27 05 26 Grounding and Bonding for Communications Systems

a. Revise Section

5. 27 05 33 Conduits and Backboxes for Communications Systems

a. Revise Section

6. 27 05 36 Cable Trays for Communications Systems

a. Add Section

7. 27 05 53 Identification for Communications Systems

a. Add Section

8. 27 08 00 - Commissioning of Communications Systems

a. Revise Section

9. 27 10 00 Structured Cabling

a. Revise Section

10. 27 11 00 Control, Communication and Signal Wiring

a. Remove Section

11. 27 11 16 Communications Cabinets, Racks, Frames, and Enclosures

a. Add Section

12. 27 11 19 Communications Termination Blocks and Patch Panels

a. Add Section

13. 27 11 26 Communications Rack Mounted Power Protection and Power Strips

a. Add Section

14. 27 13 13 Communications Copper Backbone Cabling

a. Add Section

15. 271313.13 Communications Copper Cable Splicing and Terminations

a. Add Section

16. 271323 Communications Optical Fiber Backbone Cabling

a. Add Section

17. 27 15 00 Communications Structured Cabling

a. Remove Section

18. 271513 Communications Copper Horizontal Cabling

a. Add Section

19. 271513.13 Communications Optical Fiber Cable Splicing and Terminations

a. Add Section

20. 271619 Communications Patch Cords, Station Cords, and Cross Connect Wire

a. Add Section

DRAWING ITEMS:

General Set 2 of 2

21. Sheet 0-GM400 – Mechanical Details and Diagrams

a. Add Control Schematic/Sequence 9/0-GM400 – TR Room Temperature Control.

REFERENCE ITEMS:

22. None

656-21-235 St Cloud EHRM Infrastructure Upgrades Addendum 2 Page 2 of 2

END OF REVISION

Enclosures 00 01 10 Table of Contents

23 09 23 Direct Digital Control System For HVAC 27 05 11 - Requirements for Communications Installations 27 05 26 Grounding and Bonding for Communications Systems 27 05 33 Conduits and Backboxes for Communications Systems 27 05 36 Cable Trays for Communications Systems 27 05 53 Identification for Communications Systems 27 08 00 - Commissioning of Communications Systems 27 10 00 Structured Cabling 27 11 00 Control, Communication and Signal Wiring 27 11 16 Communications Cabinets, Racks, Frames, and Enclosures 27 11 19 Communications Termination Blocks and Patch Panels 27 11 26 Communications Rack Mounted Power Protection and Power Strips 27 13 13 Communications Copper Backbone Cabling

271313.13 Communications Copper Cable Splicing and Terminations 271323 Communications Optical Fiber Backbone Cabling 27 15 00 Communications Structured Cabling 271513 Communications Copper Horizontal Cabling

271513.13 Communications Optical Fiber Cable Splicing and Terminations 271619 Communications Patch Cords, Station Cords, and Cross Connect Wire Sheets 0-GM400 – Mechanical Details and Diagrams

Update to Bid Documents 2 – July 26, 2022
SPECIFICATION ITEMS:
DRAWING ITEMS: