Atch 29 - BLDG 109 and 57 addendum.pdf

PDF 4 MB Posted

Attached to
Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud Federal contract opportunity
Solicitation number
36C77622B0035
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation is for a construction contract to perform infrastructure upgrades at the St. Cloud Veterans Affairs Health Care System facilities in Minnesota. The selected contractor shall provide all labor, materials, tools and equipment to complete electrical, bonding and UPS system upgrades; building management system interface work; access security improvements; HVAC renovations, expansions and configuration changes; data center and server room physical security upgrades; installation of a diversified fiber optic path to the data center; and campus-wide fiber infrastructure backbone work within and between buildings. The solicitation also includes hazardous materials abatement. All work must be completed according to the specifications and contract drawings. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.

View the file

Other files for this federal contract opportunity

Other files attached to Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud, newest first.
File Type Posted
Technical Questions - LATE - St. Cloud 8-10-22.pdf PDF
01-M204 - ROOF REMODEL -MECHANICAL.pdf PDF
Atch 41 - Construction Wage Rates - Stearns 7-29-22.pdf PDF
Specifications Addendum Information.pdf PDF
Drawings Addendum Information.pdf PDF
Atch 1 - Specifications Volume 1 addendum.pdf PDF
Atch 11 - BLDG 5 addendum.pdf PDF
Atch 17 - BLDG 11 addendum.pdf PDF
Atch 18 - BLDG 14 addendum.pdf PDF
Atch 28 - BLDG 108 addendum.pdf PDF
Atch 33 - BLDG 116 addendum.pdf PDF
Atch 3 - Specifications Volume 3 - Asbestos addendum.pdf PDF
Atch 4 - General 1 of 2 addendum.pdf PDF
Atch 6 - BLDG 1 - 1 of 2 addendum.pdf PDF
Atch 8 - BLDG 2 addendum.pdf PDF
Atch 9 - BLDG 3 addendum.pdf PDF
Atch 12 - BLDG 6 addendum.pdf PDF
Atch 13 - BLDG 7 and 13 addendum.pdf PDF
Atch 27 - BLDG 96 addendum.pdf PDF
Atch 30 - BLDG 111 addendum.pdf PDF
Atch 31 - BLDG 112 addendum.pdf PDF
Site Visit Sign-in Sheets - 6-28-22 - 6-30-22.pdf PDF
Atch 4 - General 1 of 2.pdf PDF
Atch 5 - General 2 of 2.pdf PDF
Atch 8 - BLDG 2.pdf PDF
Atch 23 - BLDG 50.pdf PDF
Atch 24 - BLDG 51.pdf PDF
Atch 27 - BLDG 96.pdf PDF
Atch 31 - BLDG 112.pdf PDF
Atch 10 - BLDG 4.pdf PDF
Atch 34 - BLDG 118.pdf PDF
36C77622B0035 - 6-9-22.pdf PDF
Atch 6 - BLDG 1 - 1 of 2.pdf PDF
Atch 16 - BLDG 10.pdf PDF
Atch 19 - BLDG 28.pdf PDF
Atch 22 - BLDG 49.pdf PDF
Atch 35 - ADHC.pdf PDF
Atch 1 - Specifications Volume 1.pdf PDF
Atch 7 - BLDG 1 - 2 of 2.pdf PDF
Atch 12 - BLDG 6.pdf PDF
Atch 15 - BLDG 9.pdf PDF
Atch 18 - BLDG 14.pdf PDF
Atch 21 - BLDG 48.pdf PDF
Atch 25 - BLDG 54 and 69.pdf PDF
Atch 26 - BLDG 95 and 88.pdf PDF
Atch 28 - BLDG 108.pdf PDF
Atch 30 - BLDG 111.pdf PDF
Atch 32 - BLDG 115.pdf PDF
Atch 36 - Parking Structure.pdf PDF
Atch 40 - Limitations on Subcontracting - Construction.docx DOCX document
Show all 50

Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEGEND

CORRIDOR OUTLINE

VFY EXIST

BUILDING OUTLINE

VFY EXIST

TO 8TH ST WEST ONLYTO 8TH ST EAST & WEST

TRAIL 1

TRANSFER

SWITCH

CAPACITOR

BANK (3)

SWITCH

(2)

15KV

MAIN

SW

BATT

35 KV

TO

15 KV

TRANSFORMER

35KV

FUSED

SWITCH

METER 35KV

SWITCH

GRAVEL

GRAVEL

GRAVEL

EXISTING

ROAD

CHAIN LINK FENCE

CHAIN LINK FENCE

16' GATE

GRAVEL

ELECTRICAL

SUBSTATION

G E N E R A T O R

FUEL LINES

CONDU ITS TO TU NNEL

M V

D U

C T

B A

N K

1 1 2 W

PHARMACY ADDITION

11 2 E

G E N E R A T O R

B

CORRIDOR LINK

A

C T

TR

A

IL

ER

174 s .f.

256 s .f.

185 s .f.

149 s ..f.

155 s .f.

104 s .f.

70 s. .f .

72 s .f.

110 s .f.

276 s .f.

112 s .f.

99 s .f.

57 s .f.

146 s .f.

434 s .f.

R A

MP

U P

1:

M A X

R A

MP

U P

1:

M A X

RA

M P

UP

1:2 0 M

AX

TRANSFER

SWITCH

CAPACITOR

BANK (3)

SWITCH

(2) 15KV

MAIN

SW

BATT

35 KV

TO

15 KV

TRANSFORMER

35KV

FUSED

SWITCH

METER 35KV

SWITCH

.3

TRANSFORMER

BUILD ING

#91

5,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

EXISTIN G G AS SU P P LY EQ U IP M EN T TO R EM AIN

O P ER ATIO N AL DU R IN G D EM O LITIO N AN D N EW

C O N STR U C TIO N. P R O TEC T EQU IP M EN T AN D

P IP ELIN ES IN AC C O R D AN C E W ITH G AS SU P P LIER 'S

R EC O M M EN D ATIO N S

N EW G AS SU P P LY M AIN

IN TO B U ILD IN G

SP AR E

P H O N E LIN E

EXTEN D S TO

E XISTIN G

P H O N E IN

B O ILER R O O M

P ER P LAN .

SP AR E

P H O N E

LIN E TO

M ETER

TU N N EL

E XTEN D S

A D D ITIO N AL

2'- 0" U N D ER

B U ILD IN G

FUEL LINE

VENT LINE

1,000 GAL.

UNDERGROUND

DIESEL FUEL

TANK

1,000/5,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

1,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

1,000 GAL.

UNDERGROUND

DIESEL FUEL TANK

S 1

LIG H T

N EW G AS SU P P LY

(C O O R D IN ATE W ITH SU P P LIER )

12"D

10"D

"D

TP TP

EXIST. BUILDING

EXIST.

BUS STOP

CC

L O

O P

16"

20"

12"

3"

8"

DN

0.

0’

BIRDCAGE

B

IR

D C

A G

E

NSP ELECTRICAL

FOR HWY DEPT

T101

I.T.

CHILLER

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

C O

NC

. B

LO

CKS

PAT

I O

VESTIBULE

DN

DN

DN

FD

DN

F B

F

B

F B

F

B

F B

F

B

SOUTH

VESTIBULE

PASS

THROUGH

LINK TO

BUILDI NG 51

6 3. 32 56

1 13 5. 35 78

PARKING

NO

PARKING

93 49

37 6

1A

S M

O K

E B

L D

G

SMOKE

BLDG

SMOKE

BLDG

S M

O K

E B

L D

G

SMOKE

BLDG

M.H.

STOR.

SMOKE

BLDG

SMOKE

BLDG

SMOKE

BLDG

SMOKE

BLDG

SMOKE

BLDG

STOR.

BIO-

HAZ.

SAUK RIVER

GP

HOLDING POND

PROPOSED TR

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of

Minnesota.

Name:

Date: License Number: MN# 18157

Typed or Printed Name: Tom Olesak

OWNER AND

CONSULTANTS:

CONTACT:

ADDRESS:

MIKE ENGMARK

ST CLOUD VA MEDICAL CENTER

4801 VETERANS DRIVE

ST. CLOUD, MN 56303

NAME:

ADDRESS:

CONTACT:

ADVANCED STRUCTURAL TECHNOLOGIES

7301 OHMS LANE; SUITE 215

EDINA, MN 55439

ZACHARY CRAIG

PHONE:

NAME:

ADDRESS:

CONTACT:

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIRCLE

OMAHA, NE 68134

KRIS BURNHAM

PHONE: 402-991-5520

NAME:

ADDRESS:

CONTACT:

PHONE:

NAME:

ADDRESS:

CONTACT:

PHONE:

NAME:

ADDRESS:

CONTACT:

PHONE:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

IAN WEBER

763-412-4000

ARCHITECT:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

EDWARD MARKFORT

763-412-4000

952-854-9302

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIRCLE

OMAHA, NE 68134

KRIS BURNHAM

402-991-5520

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

COVER

DATE:

APPROVED: APPROVED: PROJECTS SECTION MANAGER

APPROVED: OIT MANAGER DATE: APPROVED: ASSISTANT CHIEF ENGINEER DATE:

APPROVED: SAFETY MANAGER

APPROVED: CHIEF OF POLICE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE: APPROVED: EMS MANAGER

APPROVED: M/O MANAGER

DATE:

DATE:

DATE:DATE:

APPROVED: MEDICAL CENTER DIRECTOR

APPROVED: PROJECT COR DATE:

APPROVED: INFECTION CONTROL NURSE DATE:

APPROVED: SERVICE LINE DIRECTOR

APPROVED: GEMS COORDINATOR DATE:

DATE:

APPROVED: NURSE EXECUTIVE

APPROVED: CHIEF OF STAFF DATE:

APPROVED: DIRECTOR FMS

APPROVED: ASSOCIATE DIRECTOR

DATE:

DATE:

DATE:

DATE:APPROVED: DATE:

APPROVED: DATE:

APPROVED: DATE:

Main Campus, St. Cloud, Minnesota St. Cloud VA Health Care System

N

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

VICINITY MAP:

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHONE: 320-252-1670

CIVIL ENGINEER:

VA COR:

TELECOMMUNICATIONS ENGINEER:

CONTACT:

ADDRESS:

JONATHAN WEST

ST CLOUD VA MEDICAL CENTER

4801 VETERANS DRIVE

ST. CLOUD, MN 56303

PHONE: 504-250-2699

PROGRAM MANAGER:

EMAIL: Jonathan.West@vciint.com

STRUCTURAL ENGINEER:

MECH/ELEC/PLUMB/FIRE ENGINEER:

C

U s e rs

\P u b li c \D o c u m e n ts \R e v it

P ro je c ts

\1 -1

-R

E

M a rk fo rt

.r v t

/2

/2

:4

:1

P

M

109-GI000

BUILDINGS 109 & 57 COVER

SHEET & SHEET INDEX

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

EM EM

16305

BUILDINGS 109 AND 57 - EHRM INFRASTRUCTURE UPGRADES

109 & 57

03/30/2022

0APPROX 150' 300'75'

SHEET INDEX - BUILDINGS 109 & 57

SHEET NO. SHEET TITLE

109-GI000 BUILDINGS 109 & 57 COVER SHEET & SHEET INDEX

109-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN

109-AS110 FIRST FLOOR PLANS (BUILDINGS 109 & 57)

109-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION

109-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS

109-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE

109-TN400 ENLARGED PLANS (B57 AND B109) - TELECOMMUNICATIONS

109-E201 FIRST FLOOR PLAN - ELECTRICAL

109-M101 FIRST FLOOR DEMOLITION - MECHANICAL

109-M201 FIRST FLOOR REMODEL - MECHANICAL

SEE GENERAL SHEETS FOR ADDITIONAL INFORMATION

1" = 50'-0"

KEY PLAN

ROOM SCHEDULE

VA

Building Number NO. NAME C

A B

LI

N

G

P A

T C

H P

A N

E L

F

IB

E R

P O

W E

R

B O

N D

IN

G

U P

S

D E

D

IC

A T

E D

C O

O

LI

N G

T E

M P

E R

A T

U R

E

H U

M

ID

IT

Y

R A

C K

S E

N S

O R

S P

A C

E

AREA

WIDTH

(FT)

LENGTH

(FT)

HT TO

CLG

STRUCT REMARKS

FIRST FLOOR

57 101A EXIST RM 50 SF 6.5 7.7 DECOMMISSION EXIST IT/DATA ROOM. SEE TELECOM

DRAWINGS. RELOCATE FUNCTION TO BUILDING 101

109 101 TELECOM ROOM X X X X X X X X X X 88 SF 7.6 11.6 13.25 UPDATE EXIST IT/DATA ROOM TO EHRM TELECOM

ROOM STANDARDS. SEE TELECOM DRAWINGS

N

OPENING SCHEDULE

VA Building Number

ASSOCIATED ROOMS OPENING PANEL INFORMATION FRAME INFORMATION

H D

W G

R O

U P

F

IR

E L

A B

E L

(M

IN

G A

S K

E T

E

LE

C T

R

IC

A L

S L

A B

E L

COMMENTSFROM ROOM NAME TO ROOM NAME NUMBER WIDTH HEIGHT

PANEL

TYPE

2ND

PANEL

TYPE

PANEL

GLAZING FRAME TYPE

FRAME

GLAZING

HAZARDOUS MATERIAL SCHEDULE

BUILDING

ROOM

NO. ROOM NAME

QUESTIONABLE HAZARDOUS

ELEMENT POSSIBLE ABATEMENT ACTION

57 101A EXIST RM NONE NONE

109 101 TELECOM ROOM NONE NONE

HAZARDOUS MATERIALS MAY BE ENCOUNTERED THROUGHOUT THE DISTRIBUTION ROUTING THROUGH CEILING PLENUMS AND UTILITY TUNNELS. INSTALLATION OF DISTRIBUTION SHALL NOT DISTURB

QUESTIONABLE HAZARDOUS MATERIAL.

ICRA PHASE CONSTRUCTION ROOM SCHEDULE

BUILDING NO.

ROOM

NO. ROOM NAME

CAI BLDG NAME /

FUNCTION

CONSTRUCTION

PROJECT ACTIVITY

INFECTION CONTROL

RISK GROUP

CONTROL

PROCEDURE CLASS SECTION

CONSTRUCTION ZONE /

OCCUPIED CONSTR

DAY /

NIGHT

57 101A EXIST RM CWT TYPE B GROUP 1 CLASS II EAST OCCUPIED CONSTRUCTION DAY

109 101 TELECOM ROOM CWT TYPE C GROUP 1 CLASS II EAST OCCUPIED CONSTRUCTION DAY

SEE GENERAL NOTES SHEET FOR CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA) DESCRIPTIONS. TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE.

FINAL DETERMINATION BY THE VA WILL BE MADE AT A LATER DATE.

1 UPDATE TO BID DOCUMENTS 06/29/22

A.C.

PHONE/

DATA

WATER

HEATER

D E

S K

X

L A

T . F

IL

E

X

DESK

30X60

L A

T . F

IL

E

X

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

T A

B L E x

T A

B L E x

C O

M P

U T

E R

PALLET

34X36

PALLET

34X36

PALLET PALLET

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

S H

E

LF

X

D E

S K

X

L A

T . F

IL

E

X

CABINET

18X36

C A

B

IN

E T

X

T

A B

L E x

34X36 34X36

103A102C

102B

102A

101A

LOUNGE/TV/DVD

AREA.

COMPUTER

AREA

PALLET JACK,

FORKLIFT AREA

C O

N V

E C

T O

R C

O N

V E

C T

O R

CONVECTOR

I.D.

E

CWT WORK

AREA

TOILET

102101

TELECOM

ROOM

BUILDING 57

BUILDING 109

101A

EXIST RM

INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND

LIMITS OF CONSTRUCTION

1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER

LOCATION, AND DOOR, WHERE SHOWN

TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER

LOCATION, WHERE APPROVED BY THE VA FOR USE IN RISK TYPE B.

UPGRADE TO 1 HOUR RATED PARTITION WHEN DIRECTED BY THE VA

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of

Minnesota.

Name:

Date: License Number: MN# 18157

Typed or Printed Name: Tom Olesak

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 C

U s e rs

\P u b li c \D o c u m e n ts \R e v it

P ro je c ts

\1 -1

-R

E

M a rk fo rt

.r v t

/2

/2

:3

:5

P

M

109-GI111

FIRST FLOOR - INFECTION

CONTROL & PHASING PLAN

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

EM BMW

16305

109 & 57

03/30/2022

1/4" = 1'-0"1

FIRST FLOOR - CONST BARRIER PLAN

ROOM ICRA SCHEDULE

VA Building

Number

ROOM

NO. ROOM NAME CAI BLDG NAME / FUNCTION CONSTRUCTION PROJECT ACTIVITY INFECTION CONTROL RISK GROUP CONTROL PROCEDURE CLASS

57 101A EXIST RM CWT TYPE B GROUP 1 CLASS II

109 101 TELECOM ROOM CWT TYPE C GROUP 1 CLASS II

SEE GENERAL NOTES SHEET FOR CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA) DESCRIPTIONS. TYPE, GROUP AND CLASS SELECTED TO BEST OF DESIGN TEAM'S KNOWLEDGE.

FINAL DETERMINATION BY THE VA WILL BE MADE AT A LATER DATE.

N

0 4' 8'2'

PHONE/

DATA

WATER

HEATER

D E

S K

X

L A

T . F

IL

E

X

DESK

30X60

L A

T . F

IL

E

X

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

T A

B L E x

T A

B L E x

C O

M P

U T

E R

PALLET

34X36

PALLET

34X36

PALLET PALLET

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

S H

E

LF

X

D E

S K

X

L A

T . F

IL

E

X

CABINET

18X36

C A

B

IN

E T

X

T

A B

L E x

34X36 34X36

103A102C

102B

102A

101A

LOUNGE/TV/DVD

AREA.

COMPUTER

AREA

PALLET JACK,

FORKLIFT AREA

C O

N V

E C

T O

R C

O N

V E

C T

O R

CONVECTOR

I.D.

E

CWT WORK

AREA

TOILET

PROPOSED TR

TELECOM

ROOM

7'-7"

'-7

6'

-5

/4

7'-8"

BUILDING 57

BUILDING 109

A P

P R

O X

F E

E T

, V .I.

F

101A

EXIST RM

109-AS110

TELECOM

ROOM

TELECOM

ROOM

TELECOM

ROOM

IN-03.01

7'-7"

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of

Minnesota.

Name:

Date: License Number: MN# 18157

Typed or Printed Name: Tom Olesak

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 C

U s e rs

\P u b li c \D o c u m e n ts \R e v it

P ro je c ts

\1 -1

-R

E

M a rk fo rt

.r v t

/2

/2

:3

:0

P

M

109-AS110

FIRST FLOOR PLANS

(BUILDINGS 109 & 57)

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

EM EM

16305

109 & 57

03/30/2022

N

0 4' 8'2'

1" = 50'-0"

KEY PLAN

1/4" = 1'-0"1

FIRST FLOOR - OVERALL PLAN - BUILDINGS 109 AND 57

N

1/4" = 1'-0"

REFLECTED CEILING PLAN

N

0 4' 8'2'

1/4" = 1'-0"

DEMOLITION PLAN

N

0 4' 8'2'

DE1

RC1

_DEMOLITION PLAN KEYED NOTES

DE1 PREPARE WALL FOR PLYWOOD BACKBOARD INSTALLATION AND EHRM

REQUIREMENTS, SEE FLOOR PLAN AND TELECOM DRAWINGS

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

_FLOOR PLAN KEYED NOTES

FL1 ALL FOUR PERIMETER WALL PARTITIONS APPLY 4' BY 8' AC GRADE ¾”

TRADE SIZE FIRE RATED PLYWOOD BACKBOARD FINISHED WITH

HIGH-GLOSS WHITE PAINT OVER TWO COATS OF FIRE RESISTANT PAINT

FOR SERVICE PROVIDER / SECURITY / VIDEO / ET CETERA. DO NOT PAINT

OVER FIRE RATING STAMP.

FL20 TELECOM EQUIPMENT, SEE TELECOM DRAWINGS.

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

_REFLECTED CEILING PLAN KEYED NOTES

RC1 LED LIGHTING, SEE ELECTRICAL. IN FRONT OF AND BEHIND CABINET

ROWS PROVIDE 500 LUMENS IN HORIZONTAL AND 200 LUMENS IN THE

VERTICAL AT 3 FT AFF. OPERATED BY MOTION SENSOR PER CABINET

ROW OR SECTION.

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

FL1

1/4" = 1'-0"

ENLARGED FLOOR PLAN

N

0 4' 8'2'

DE1DE1

_SHEET NOTES

1. SEE GENERAL NOTES AND CAMPUS DRAWINGS FOR GENERAL

INFORMATION, LIFE SAFETY, ICRA, AND PHASING

2. ALL EXISTING CONDITIONS MUST BE FIELD VERIFIED BY THE

CONTRACTOR PRIOR TO DEMOLITION OR CONSTRUCTION. EXISTING

CONDITIONS THAT DIFFER FROM THOSE SHOWN MUST BE BROUGHT TO

THE ATTENTION OF THE C.O.R. TO INFORM THE ARCHITECTS AND

ENGINEERS.

3. THE INFORMATION SHOWN ON THE DRAWINGS IS BASED ON DRAWINGS

AND PHOTOGRAPHS PROVIDED BY THE C.O.R. COMBINED WITH

OBSERVATIONS AND SURVEYED DATA FROM THE ARCHITECTS AND

ENGINEERS.

4. SEE CIVIL, STRUCTURAL, TELECOM, ELECTRICAL, MECHANICAL, AND

PLUMBING DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL

DEMOLITION AND CONSTRUCTION REQUIREMENTS.

5. PORTABLE FIRE EXTINGUISHERS (CO2 OR HALOGENATED TYPE AS

DETERMINED BY VA) WITH WALL MOUNT BRACKET AND CODE REQUIRED

SIGNAGE SHALL BE PROVIDED BY THE CONTRACTOR WITHIN TELECOM

ROOMS.

FL20

I.D.

E

STORAGE

BATH

DATA

A.C.

A.C.

PHONE/

DATA

WATER

HEATER

D E

S K

X

L

A T

. F

IL

E

X

DESK

30X60

L A

T . F

IL

E

X

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

T A

B L E x

T

A B

L E x

C O

M P

U T

E R

PALLET

34X36

PALLET

34X36

PALLET PALLET

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

S H

E

LF

X

D E

S K

X

L A

T . F

IL

E

X

CABINET

18X36

C A

B

IN

E T

X

T

A B

L E x

34X36 34X36

ROOM

WORK

ROOM

WORK

BATH

OFFICE

1O3

HAC

101A

MECH

I.D.

E

STORAGE

BATH

DATA

A.C.

A.C.

PHONE/

DATA

WATER

HEATER

D E

S K

X

L

A T

. F

IL

E

X

DESK

30X60

L A

T . F

IL

E

X

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

T A

B L E x

T

A B

L E x

C O

M P

U T

E R

PALLET

34X36

PALLET

34X36

PALLET PALLET

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

S H

E

LF

X

D E

S K

X

L A

T . F

IL

E

X

CABINET

18X36

C A

B

IN

E T

X

T

A B

L E x

34X36 34X36

ROOM

WORK

ROOM

WORK

BATH

OFFICE

1O3

HAC

101A

MECH

I.D.

DATA

I.D.

DATA

101A

MECH

101A

MECH

PROPOSED TR

109-TD110

LIMITS OF DATA CABLING DEMOLITION

LIMITS OF DATA CABLING DEMOLITION

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

WAP

WAP

WAP

WAP

WAP

WAP

WAP

4D 4D

2D

2D-BLACK/4D-WHITE

1D-BLACK/2D-WHITE

3D

1D-BLACK/2D-WHITE

3D

1D/1V

3D

3D

3D E

109-TD110

TW

FB

PP

E

D

D

E

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/2

/2

:4

:4

A

M

109-TD110

FIRST FLOOR PLAN -

TELECOM - DEMOLITION

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

109 & 57

SHEET NOTES:

1. EXISTING TELECOMMUNICATIONS CAGE AND RACK SHALL BE INCLUDED WITHIN THE SCOPE OF DEMOLITION.

EXISTING CABLING AND ASSOCIATED OUTLETS SHALL BE REMOVED AND REPLACED 1 FOR 1 AND REFED FROM DISTRIBUTION EQUIPMENT LOCATED WITHIN THE NEW TELECOMMUNICATIONS ROOM. REFER TO GENERAL CABLING NOTES FOR APPROXIMATE QUANTITIES. REFER TO NEW WORK PLANS FOR SERVING

COMMUNICATIONS ROOM LOCATION AND NEW CABLING ROUTES.

N

0 8' 16'4'

TRUE

NORTH

1" = 50'-0"

KEY PLAN

N

1/4" = 1'-0"

FIRST FLOOR PLAN (BUILDINGS 57 AND BUIDLING 109) - TELECOM - DEMOLITION

1/4" = 1'-0"

ENLARGED PLAN -EXIST RM 101 - TELECOM - DEMO

N

0 4' 8'2'

TRUE

NORTH

1/4" = 1'-0"

ENLARGED PLAN - EXIST RM 101A - TELECOM - DEMO

GENERAL NOTES:

A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.

N

0 4' 8'2'

TRUE

NORTH

CABLING NOTE:

CABLING NOTES:

A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE. THE CABLE

RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE PRESENT IN THE SPACE AT THE COMPLETION OF THE

PROJECT.

1. ROOM 101 (BUILDING 109)

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 56

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

2. ROOM 101A (BUILDING 57)

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 32

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

CWT WORK

AREA

TOILET

A.C.

A.C.

PHONE/

DATA

WATER

HEATER

D E

S K

X

L A

T . F

IL

E

X

DESK

30X60

L A

T . F

IL

E

X

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

T A

B L E x

T

A B

L E x

C O

M P

U T

E R

PALLET

34X36

PALLET

34X36

PALLET PALLET

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

S H

E

LF

X

D E

S K

X

L A

T . F

IL

E

X

CABINET

18X36

C A

B

IN

E T

X

T

A B

L E x

34X36 34X36

103A102C

102B

102A

101A

LOUNGE/TV/DVD

AREA.

COMPUTER

AREA

PALLET JACK,

FORKLIFT AREA

C O

N V

E C

T O

R C

O N

V E

C T

O R

CONVECTOR

I.D.

E

CWT WORK

AREA

TOILET

A.C.

A.C.

PHONE/

DATA

WATER

HEATER

D E

S K

X

L A

T . F

IL

E

X

DESK

30X60

L A

T . F

IL

E

X

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

T A

B L E x

T

A B

L E x

C O

M P

U T

E R

PALLET

34X36

PALLET

34X36

PALLET PALLET

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

S H

E

LF

X

D E

S K

X

L A

T . F

IL

E

X

CABINET

18X36

C A

B

IN

E T

X

T

A B

L E x

34X36 34X36

103A102C

102B

102A

101A

LOUNGE/TV/DVD

AREA.

COMPUTER

AREA

PALLET JACK,

FORKLIFT AREA

C O

N V

E C

T O

R C

O N

V E

C T

O R

CONVECTOR

TELECOM

ROOM

101A

EXIST RM

109-TN400

LIMITS OF DATA CABLING REPLACEMENT

FROM ROOM 101

LIMITS OF DATA CABLING REPLACEMENT

FROM ROOM 101

HORIZONTAL AND VERTICAL ROUTE TO

ROOM 101

4"4"

4D 4D E E

3D

3D

3D

3D

3D

1D/1V

WAP

E

E

E

E

E

E

E

E

WAP

WAP

WAP

E

E

WAP

E

E 2D

2D-BLACK/4D-WHITE

E

1D-BLACK/2D-WHITE

E

1D-BLACK/2D-WHITE

E

WAP

E

WAP

E

C2 126"

PROPOSED TR

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/2

/2

:4

:4

A

M

109-TN110

FIRST FLOOR PLAN -

TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

109 & 57

N

0 4' 8'2' 1/4" = 1'-0"

FIRST FLOOR PLAN (BUILDINGS 57 AND BUIDLING 109) - TELECOMMUNICATIONS

1" = 50'-0"

KEY PLAN

N

TRUE

NORTH

GENERAL NOTES:

A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.

XFMR

CWT WORK

AREA

TOILET

A.C.

A.C.

P H O N E /

DA T A

WATER

HEATER

D E

S K

X

L A

T . F

IL

E

X

DESK

30X60

L A

T . F

IL

E

X

T A

B L

E x

C O

M P

U T

E R

T A

B L

E x

C O

M P

U T

E R

T A

B L

E x

C O

M P

U T

E R

T A

B L

E x

C O

M P

U T

E R

T A

B L

E x

C O

M P

U T

E R

T A

B L

E x

T A

B L

E x

T

A B

L E x

C O

M P

U T

E R

PALLET

34X36

PALLET

34X36

PALLET PALLET

T A

B L

E x

T A

B L

E x

T A

B L

E x

T A

B L

E x

T A

B L

E x

T A

B L

E x

T A

B L

E x

T A

B L

E x

T A

B L

E x

SH

E

LF

X

D E

S K

X

L A

T . F

IL

E

X

CABINET

18X36

C A

B

IN

E T

X

T

A B

L E x

34X36 34X36

103A102C

102B

102A

101A

LOUNGE/TV/DVD

AREA.

COMPUTER

AREA

PALLET JACK,

FORKLIFT AREA

C O

N V

E C

T O

R C

O N

V E

C T

O R

CONVECTOR

CWT BUILDING

Last Updated: 8-19-11

I.D.

E

XFMR

CWT WORK

AREA

TOILET

A.C.

A.C.

P H O N E /

DA T A

WATER

HEATER

D E

S K

X

L A

T . F

IL

E

X

DESK

30X60

L A

T . F

IL

E

X

T A

B L

E x

C O

M P

U T

E R

T A

B L

E x

C O

M P

U T

E R

T A

B L

E x

C O

M P

U T

E R

T A

B L

E x

C O

M P

U T

E R

T A

B L

E x

C O

M P

U T

E R

T A

B L

E x

T A

B L

E x

T

A B

L E x

C O

M P

U T

E R

PALLET

34X36

PALLET

34X36

PALLET PALLET

T A

B L

E x

T A

B L

E x

T A

B L

E x

T A

B L

E x

T A

B L

E x

T A

B L

E x

T A

B L

E x

T A

B L

E x

T A

B L

E x

SH

E

LF

X

D E

S K

X

L A

T . F

IL

E

X

CABINET

18X36

C A

B

IN

E T

X

T

A B

L E x

34X36 34X36

103A102C

102B

102A

101A

LOUNGE/TV/DVD

AREA.

COMPUTER

AREA

PALLET JACK,

FORKLIFT AREA

C O

N V

E C

T O

R C

O N

V E

C T

O R

CONVECTOR

CWT BUILDING

Last Updated: 8-19-11

TELECOM

ROOM10

101A

EXIST RM

101A

EXIST RM

PROPOSED TR

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/2

/2

:4

:4

A

M

109-TN210

FIRST FLOOR PLAN -

TELECOM - CABLE DISTANCE

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

109 & 57

0 30' 60'15' 1" = 30'-0"

FIRST FLOOR PLAN (BUILDING 57 AND BUILDING 109) - TELECOM - CABLE DISTANCE

N

TRUE

NORTH

1" = 50'-0"

KEY PLAN

N

I.D.I.D.

AC

CR

C

TELECOM

ROOM

109-TN400

1 - a b

1 - c d

TW

E

E

"x

2"

"x

2"

12"x2"

12"x2"

C2 126"

1 2

DATA

RACK

CABLE

TRAY

4"4"

12"x2"

KEYPAD

W

1U 144 STRAND OM4 AND OS2 DISTRIBUTION PANEL

1U 48 PORT CAT5E BACKBONE/ANALOG PATCH PANEL

1U CABLE MANAGEMENT

2U CABLE MANAGEMENT

1U 48 PORT CAT6A DATA PATCH PANEL

1U RACK BONDING BUSBAR

2U RACK MOUNT UPS

2U CABLE MANAGEMENT

9U SPACE FOR OIT PROVIDED

EQUIPMENT. PROVIDE BLANKING

PANELS FOR UNUSED SPACES

NOTES:

1. REFER TO NEW WORK PLAN FOR RACK LOCATIONS.

2. COORDINATE EXACT RACK COUNT AND LOCATION WITH OWNER PRIOR TO PERMANENT INSTALLATION.

3. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL RACK COMPONENTS.

4. CONTRACTOR TO PROVIDE PATCH PANELS AND HORIZONTAL CABLE MANAGEMENT TO SUPPORT THE DATA COUNT ON

THE WORK PLAN + 1 ADDITIONAL SPARE PATCH PANEL. (NOT TO EXCEED 288 PORTS PER RACK)

5. SPARE RACKS WITH NO HARDWARE CONFIGURED IN THEM MUST HAVE THE STANDARD UPS INSTALLED UNLESS THE

ROOM HAS A CENTRAL UPS SOURCE.

6. COORDINATE FINAL RACK COMPONENT LAYOUT WITH OWNER'S IS/IT REPRESENTATIVE.

7. CONTRACTOR IS RESPONSIBLE FOR FINAL CABLE COUNT, QUANTITY OF PATCH PANELS, SWITCHES, FIBER

ENCLOSURES, BLANKING PANELS, CABLE MANAGEMENT, AND MOUNTING HARDWARE NOT MARKED AS “OIT PROVIDED”.

8. PUNCHDOWN COPPER BACKBONES ON RACK MOUNT PATCH PANELS. TERMINATE ONE (1) PAIR PER PATCH PANEL PORT.

D

PROVIDE DATA CABLE TO RACK

MOUNTED UPS FOR CONNECTION

TO MONITORING SYSTEM

1U 48 PORT VA PROVIDED SWITCH

1U 48 PORT CAT6A DATA PATCH PANEL

1U 48 PORT VA PROVIDED SWITCH

1U CABLE MANAGEMENT

2U CABLE MANAGEMENT

Nathan M. TimmNo DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10 B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/2

/2

:4

:4

A

M

109-TN400

ENLARGED PLANS (B57 AND

B109) -

TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

109 & 57

0 2' 4'1'

0 4' 8'2' 0 4' 8'2' 0 4' 8'2' 0 4' 8'2'

CABLING NOTE:

CABLING NOTES:

A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE.

THE CABLE RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED

FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE

PRESENT IN THE SPACE AT THE COMPLETION OF THE PROJECT.

1. ROOM 101 (BUILDING 109)

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 56

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 32 FROM ROOM 101A (BUILDING 57)

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6A): 88

DATA (CAT6): 0

1/2" = 1'-0"

ENLARGED PLAN - EXIST TR 101 (BUILDING 109) - TELECOM - CABLE TRAY AND DATA

1/4" = 1'-0"2 1 - a

1/4" = 1'-0"3 1 - b

1/4" = 1'-0"4 1 - c

1/4" = 1'-0"5 1 - d

N

TRUE

NORTH

GENERAL NOTES:

A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.

NOT TO SCALE6

COMMUNICATIONS - TYPICAL WALL CABINET (TE) ELEVATION - EXIST TR 101 (BUILDING 109)

CWT WORK

AREA

TOILET

I.D.

SD

E

E

I.D.

TELECOM

ROOM

BUILDING 109

109-E201

109-E201

TELECOM

ROOM

A

ELECTRIC

SERVICE

PULLBOX

TELECOM

ROOM

ELECTRIC

SERVICE

PULLBOX

109-41

109-42

CU-109-1

109-38,40

AC-109-1

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Minnesota.

Name:

Date: 03/30/2022

License Number: MN#

03/30/2022

B

IM

/2

.0

V A

S t C lo u d

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.E

R

.r v t

/2

/2

:3

:5

P

M

109-E201

FIRST FLOOR PLAN -

ELECTRICAL

EHRM INFRASTRUCTURE

UPGRADES

656-21-235

TBD GJL

16305

1/8" = 1'-0"

FIRST FLOOR PLAN - ELECTRICAL

0 8' 16'4'

N

KEYNOTES:

1. COORDINATE FINAL LOCATION OF

RECEPTACLE L21-20R WITH TELECOM

CONTRACTOR. PROVIDE 3/4"C-4#10, 1#12 GND

TO PANEL FOR EACH RECEPTACLE.

2. PROVIDE EATON BLADEUPS, 5KW, 120/208V, 3-

PHASE, 4-WIRE RACK MOUNTED UPS FOR

3. EACH RACK TOWER.

4. PROVIDE APC#AP8861 RPDU RACK PDU 2G

WITH L21-20P CORD. (120/208V, 3-PHASE, 20A,

ZERO U, 5.7 KW, 208V, (36) C13 (6) C19 (2) 5-20R

OUTLETS. PROVIDE TWO PER RACK, MOUNTED

PER MANUFACTURER'S REQUIREMENTS.

NO SCALE

FIRST FLOOR PLAN - TR 101 - LIGHTING

NO SCALE

FIRST FLOOR PLAN - TR 101 - POWER & SYSTEM

0 8' 16'4'

N

0 8' 16'4'

N

100% CD 03/30

53095

PHONE/

DATA

WATER

HEATER

D E

S K

X

L A

T . F

IL

E

X

DESK

30X60

L A

T . F

IL

E

X

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

C O

M P

U T

E R

T A

B L E x

T A

B L E x

T A

B L E x

C O

M P

U T

E R

PALLET

34X36

PALLET

34X36

PALLET PALLET

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

T A

B L E x

S H

E

LF

X

D E

S K

X

L A

T . F

IL

E

X

CABINET

18X36

C A

B

IN

E T

X

T A

B L E x

34X36 34X36

ROOM

WORK

ROOM

WORK

BATH

OFFICE

1O3

HAC

101A

MECH

I.D.

E

CWT WORK

AREA

TOILET

CWT WORK

AREA

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE COR AND THE ARCHITECT/ENGINEER BEFORE

PROCEEDING WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS. FINAL LOCATIONS TO BE ACCURATELY DESCRIBED N AS-BUILTS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST, TIME OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO CONTRACT DOCUMENTS, TO INCLUDE, BUT NOT LIMITED TO, THE

ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY AUDIO/VISUAL, AND

OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING MOUNTED DEVICES,

OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING, TO THE SATISFACTION OF THE COR, TO MATCH ORIGINAL

CONSTRUCTION, FIRE RATING, AND FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

COR FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE COR OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING, AND DUCTS

PENETRATE, BOTH NEW AND EXISTING. PENETRATIONS THROUGH EXTERIOR WALLS AND

ROOF SHALL BE SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY

MANUFACTURER FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES, BOTH NEW AND EXISTING. THIS IS ESSENTIAL

TO PREVENT NOISE TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE

DESIRED NC LEVELS WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR

STARTERS, SWITCHES, AND DISCONNECTS.

16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL

EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.

17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

18. CONTRACTOR TO COORDINATE SCHEDULE OF ANY NOISE-PRODUCING WORK WITH COR AT

LEAST 10 DAYS PRIOR TO COMMENCING WORK.

19. ALL CARTS, EQUIPMENT, MATERIALS AND TOOLS AS WELL AS ALL TOOL BAGS/BOXES AND

LADDERS, ARE TO BE LABELED, CLEARLY IDENTIFYING THE

CONTRACTOR/SUBCONTRACTOR NAME AND PROJECT.

20. STORAGEOF TOOLS, EQUIPMENT AND MATERIALS IS ONLY AUTHORIZED IN APPROVED

LOCATIONS.

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Minnesota.

Name:

Date: 03/30/2022

License Number: MN#

03/30/2022

B

IM

/2

.0

V A

S t C lo u d

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.M

R

.r v t

/2

/2

:4

:1

P

M

109-M101

FIRST FLOOR DEMOLITION -

MECHANICAL

EHRM INFRASTRUCTURE

UPGRADES

656-21-235

RDL DJC

16305

1/8" = 1'-0"

FIRST FLOOR DEMOLITION

FIELD VERIFICATION NOTES

1. THE HVAC CONTRACTOR SHOULD VISIT THE SITE PRIOR TO BID TO FIELD VERIFY ALL EXISTING CONDITIONS WHICH MAY AFFECT THEIR

BID. THE FOLLOWING ITEMS SHALL BE VERIFIED:

A. EXACT PLACEMENT, SIZE, CAPACITY, MANUFACTURER, AND CONDITION OF ALL EXISTING HVAC EQUIPMENT WITHIN SCOPE

OF WORK, WHETHER EXPLICITLY SHOWN OR NOT.

B. SIZE AND LOCATION OF ALL EXISTING DUCTWORK.

C. SIZE AND LOCATION OF ALL EXISTING GRILLES, REGISTERS AND DIFFUSERS.

D. SIZE AND LOCATION OF ALL EXISTING THERMOSTATIC CONTROL DEVICES.

E. SIZE AND LOCATION OF ALL EXISTING PLUMBING AND HYDRONIC PIPING

2. ALL REFERENCES ON THESE DRAWINGS TO EXISTING EQUIPMENT, DUCTWORK, DIFFUSERS, THERMOSTATS AND PIPING ARE FOR REFERENCE ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL THESE ITEMS PRIOR TO BID AND INCLUDE IN THEIR

BID ANY AND ALL AMOUNTS REQUIRED TO ACCOMMODATE EXISTING CONDITIONS.

3. NO ALLOWANCES WILL BE MADE AFTER THE PROJECT HAS BEEN AWARDED FOR FAILURE TO VERIFY EXISTING CONDITIONS.

4. ANY DISCREPANCIES WHICH MAY AFFECT THE CONTRACTORS BID SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND

ARCHITECT FOR DIRECTION.

N

0 8' 16'4'

KEYNOTES 1/109-M101:

1. EXISTING 2" DOMESTIC WATER SERVICE TO BE REMOVED WHERE SHOWN

AND REROUTED.

2. EXISTING FIRE SPRINKLER HEAD AND BRANCH LINE TO BE REMOVED WHERE

SHOWN AND REROUTED.

24706

T

E

CWT WORK

AREA

TOILET

PROPOSED RACK

LOCATIONS

NEW WALL MOUNTED DUCTLESS

COOLING UNITAC-109-1

AC-109-1 CP-109-1

TELECOM

ROOM

BUILDING 1095

CU-109-1

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE COR AND THE ARCHITECT/ENGINEER BEFORE

PROCEEDING WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS. FINAL LOCATIONS TO BE ACCURATELY DESCRIBED N AS-BUILTS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST, TIME OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO CONTRACT DOCUMENTS, TO INCLUDE, BUT NOT LIMITED TO, THE

ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY AUDIO/VISUAL, AND

OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING MOUNTED DEVICES,

OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING, TO THE SATISFACTION OF THE COR, TO MATCH ORIGINAL

CONSTRUCTION, FIRE RATING, AND FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

COR FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE COR OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING, AND DUCTS

PENETRATE, BOTH NEW AND EXISTING. PENETRATIONS THROUGH EXTERIOR WALLS AND

ROOF SHALL BE SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY

MANUFACTURER FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES, BOTH NEW AND EXISTING. THIS IS ESSENTIAL

TO PREVENT NOISE TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE

DESIRED NC LEVELS WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR

STARTERS, SWITCHES, AND DISCONNECTS.

16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL

EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.

17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

18. CONTRACTOR TO COORDINATE SCHEDULE OF ANY NOISE-PRODUCING WORK WITH COR AT

LEAST 10 DAYS PRIOR TO COMMENCING WORK.

19. ALL CARTS, EQUIPMENT, MATERIALS AND TOOLS AS WELL AS ALL TOOL BAGS/BOXES AND

LADDERS, ARE TO BE LABELED, CLEARLY IDENTIFYING THE

CONTRACTOR/SUBCONTRACTOR NAME AND PROJECT.

20. STORAGEOF TOOLS, EQUIPMENT AND MATERIALS IS ONLY AUTHORIZED IN APPROVED

LOCATIONS.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. NOTIFYCOR AND ENGINEER OF ANY CONFLICTS WITH NEW

WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE

FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD

CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK

AND SHALL NOTIFY THE COR AND ENGINEER PRIOR TO BIDDING IF OTHER UTILITIES ARE

REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF

WORK.

5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF

ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.

CONTRACTORS SHALL NOTIFY THE COR AND ENGINEER OF AFFECTED AREAS PRIOR TO

BIDDING.

6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL

CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO

BIDDING.

7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING SYSTEMS TO ALLOW

FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW

SYSTEMS ARE INSTALLED.

10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Minnesota.

Name:

Date: 03/30/2022

License Number: MN#

03/30/2022

B

IM

/2

.0

V A

S t C lo u d

E H

R M

I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.M

R

.r v t

/2

/2

:4

:1

P

M

109-M201

FIRST FLOOR REMODEL -

MECHANICAL

EHRM INFRASTRUCTURE

UPGRADES

656-21-235

RDL DJC

16305

1/8" = 1'-0"

FIRST FLOOR - MECHANICAL - TELECOM 100B

FIELD VERIFICATION NOTES

1. THE HVAC CONTRACTOR SHOULD VISIT THE SITE PRIOR TO BID TO FIELD VERIFY ALL EXISTING CONDITIONS WHICH MAY AFFECT THEIR

BID. THE FOLLOWING ITEMS SHALL BE VERIFIED:

A. EXACT PLACEMENT, SIZE, CAPACITY, MANUFACTURER, AND CONDITION OF ALL EXISTING HVAC EQUIPMENT WITHIN SCOPE

OF WORK, WHETHER EXPLICITLY SHOWN OR NOT.

B. SIZE AND LOCATION OF ALL EXISTING DUCTWORK.

C. SIZE AND LOCATION OF ALL EXISTING GRILLES, REGISTERS AND DIFFUSERS.

D. SIZE AND LOCATION OF ALL EXISTING THERMOSTATIC CONTROL DEVICES.

E. SIZE AND LOCATION OF ALL EXISTING PLUMBING AND HYDRONIC PIPING

2. ALL REFERENCES ON THESE DRAWINGS TO EXISTING EQUIPMENT, DUCTWORK, DIFFUSERS, THERMOSTATS AND PIPING ARE FOR REFERENCE ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL THESE ITEMS PRIOR TO BID AND INCLUDE IN THEIR

BID ANY AND ALL AMOUNTS REQUIRED TO ACCOMMODATE EXISTING CONDITIONS.

3. NO ALLOWANCES WILL BE MADE AFTER THE PROJECT HAS BEEN AWARDED FOR FAILURE TO VERIFY EXISTING CONDITIONS.

4. ANY DISCREPANCIES WHICH MAY AFFECT THE CONTRACTORS BID SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND

ARCHITECT FOR DIRECTION.

0 4' 8'2'

N

KEYNOTES 1/109-M201:

1. NEW WALL MOUNTED SPLIT SYSTEM AC UNIT.

2. PROVIDE CONDENSATE PUMP.

3. ROUTE NEW 1" CONDENSATE LINE TO FLOOR DRAIN IN TOILET ROOM 102,

APPROXIMATELY 35 FEET NORTH.

4. ROUTE REFRIGERANT PIPING TO NEW AIR-COOLED CONDENSING UNIT.

5. NEW AIR-COOLED CONDENSING UNIT ON GRADE. PROVIDE CONCRETE PAD.

6. PROVIDE NEW THERMOSTAT.

7. REROUTED 2" DOMESTIC WATER LINE.

8. REROUTED FIRE SPRINKLER BRANCH LINE. PROVIDE NEW SPRINKLER HEAD.

9. DRIP PAN WATER PIPE IN TR ROOM. SEE DETAIL FOR REQUIREMENTS.

24706

109-GI000 - BUILDINGS 109 & 57 COVER SHEET & SHEET INDEX
109-GI111 - FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
109-AS110 - FIRST FLOOR PLANS (BUILDINGS 109 & 57)
109-TD110 - FIRST FLOOR PLAN - TELECOM - DEMOLITION
109-TN110 - FIRST FLOOR PLAN - TELECOMMUNICATIONS
109-TN210 - FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
109-TN400 - ENLARGED PLANS (B57 AND B109) - TELECOMMUNICATIONS
109-E201 - FIRST FLOOR PLAN - ELECTRICAL
109-M101 - FIRST FLOOR DEMOLITION - MECHANICAL
109-M201 - FIRST FLOOR REMODEL - MECHANICAL

File details come from the government source that posted it. Updated .