Atch 1 - Specifications Volume 1.pdf
PDF 9 MB Posted
- Attached to
- Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud Federal contract opportunity
- Solicitation number
- 36C77622B0035
About this file
This document outlines the scope of work for an infrastructure upgrades construction project at the St. Cloud Veterans Affairs Health Care System. The contractor shall provide all labor, materials, tools and equipment to complete electrical, data center, HVAC, and hazardous materials abatement work. Upgrades include installing a diversified fiber path to the data center, upgrading the fiber infrastructure backbone campus wide and within buildings, and expanding and renovating existing spaces as needed. The Department of Veterans Affairs Technology Acquisition Center Austin is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 50
Y1AZ--EHRM Infrastructure Upgrades Construction - St. Cloud has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Anderson Engineering of Minnesota, LLC 13605 1st Avenue North
Plymouth, MN 55441 Phone: 763-412-4000 Fax: 763-412-4090
Prepared in association with the following:
Specialized Engineering Solutions
10360 Ellison Circle Omaha, NE 68134
St. Cloud EHRM Infrastructure Upgrades
VA PROJECT NUMBER: 656-21-235
4801 VETERANS DRIVE
ST CLOUD, MN 56303
TECHNICAL SPECIFICATIONS
Volume 1: DIVISIONS 00 - 14
ANDERSON ENGINEERING OF MN, LLC
Project Number: 16305
Issue for
100% CONSTRUCTION DOCUMENTS
Issued for Bidding
MARCH 30, 2022
VAMC St. Cloud, MN VA Project 656-21-235 EHRM Infrastructure Upgrades March 30, 2022 4801 Veterans Drive 100% CD Issued for Bidding St. Cloud, MN 56303
CERTIFICATIONS PAGE
Architect:
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota
Typed or Printed Name: Tom Olesak_ __________
License Number: 18157___________________________
Professional Engineer: (Civil) or under my direct supervision and that I am a duly Licensed Professional
Engineer under the laws of the state of Minnesota
Typed or Printed Name: Ian J. Weber________
License Number: 55502______________________
Professional Engineer: (Structural)
Typed or Printed Name: _Zachary D. Craig_____
License Number: _57219_______________________
4801 Veterans Drive 100% CD Issued for Bidding St. Cloud, MN 56303
Professional Engineer: (Mechanical)
Typed or Printed Name: Robert Lowe__________________________
License Number: __24706_______________________________
Professional Engineer: (Plumbing)
Typed or Printed Name: _Robert Lowe__________________________
License Number: ___24706_______________________________
Professional Engineer: (Fire Protection)
Typed or Printed Name: _Robert Lowe__________________________
License Number: _24706_________________________________
4801 Veterans Drive 100% CD Issued for Bidding St. Cloud, MN 56303
Professional Engineer: (Electrical)
Typed or Printed Name: _Alexander Quast_______________
License Number: 53095________________________
Professional Engineer: (Technology)
Typed or Printed Name: Nathan Timm_ __________
License Number: 346555___________________________
- - - END - - -
4801 Veterans Drive 100% CD Issued for Bidding St. Cloud, MN 56303
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21 01 33 23 Shop Drawings, Product Data, and Samples 06-21 01 35 26 Safety Requirements 11-21 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 06-21 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 11-21 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 01-21 02 41 00 Demolition 08-17 02 82 13.13 Glovebag Asbestos Abatement 01-21 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21 02 83 33.13 Lead-Based Paint Removal and Disposal 01-21
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 01-21 03 48 33 Precast Concrete Utility Trench
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 01-21 04 20 00 Unit Masonry 08-17 04 72 00 Cast Stone Masonry 01-21
DIVISION 05 – METALS
05 31 00 Steel Decking 01-21
4801 Veterans Drive 100% CD Issued for Bidding St. Cloud, MN 56303
00 01 10-2
SECTION NO. DIVISION AND SECTION TITLES DATE
05 40 00 Cold-Formed Metal Framing 01-21 05 50 00 Metal Fabrications 08-18
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 01-21 07 11 13 Bituminous Dampproofing 01-21 07 13 26 Self-Adhering Sheet Waterproofing 07 14 16 Cold Fluid-Applied Waterproofing 07 21 13 Thermal Insulation 01-21 07 22 00 Roof and Deck Insulation 01-21 07 24 00 Exterior Insulation and Finish Systems 01-21 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 01-21 07 31 13 Asphalt Shingles 02-21 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 01-21 07 60 00 Flashing and Sheet Metal 01-21 07 71 00 Roof Specialties 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 10-17
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 31 13 Access Doors and Frames 01-21 08 56 66 Detention Window Screens 01-21 08 71 00 Door Hardware 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 65 19 Resilient Tile Flooring 09 65 36.13 Static Dissipative Resilient Tile Flooring 09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21 10 22 13 Wire Mesh Partitions 01-21 10 44 13 Fire Extinguisher Cabinets 08-18
4801 Veterans Drive 100% CD Issued for Bidding St. Cloud, MN 56303
00 01 10-3
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 05-21 22 13 00 Facility Sanitary and Vent Piping 09-20 22 14 00 Facility Storm Drainage 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 02-20 23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 21 13 Hydronic Piping 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 23 00 Refrigerant Piping 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 81 23 Computer-Room Air-Conditioners 03-20
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage
Transformers 01-18
26 24 16 Panelboards 01-18 26 26 00 Power Distribution Units for Static Uninterruptible
Power Systems 01-18
26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 33 53.01 Static Uninterruptible Power Supply 01-17 26 33 53 Rack Mounted Uninterruptible Power Supply 26 36 23 Automatic Transfer Switches 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18
4801 Veterans Drive 100% CD Issued for Bidding St. Cloud, MN 56303
00 01 10-4
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 08 00 Commissioning of Communications Systems 11-16 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and
Security 04-18
28 05 13 Conductors and Cables for Electronic Safety and Security
10-18
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 16 00 Intrusion Detection System 10-11 28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 10-12 31 23 19 Dewatering 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15 32 17 23 Pavement Markings 08-16 32 90 00 Planting 08-16
DIVISION 33 – UTILITIES
33 10 00 Water Utilities 03-17 33 40 00 Storm Sewer Utilities 12-17
APPENDIX A
Appendix A – Asbestos Survey Report
4801 Veterans Drive 100% CD Issued for Bidding
00 01 15 - 1
LIST OF DRAWING SHEETS
SECTION 00 01 15
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL - SET 1 OF 2
GI000 COVER SHEET
GI001 SHEET INDEX - 1
GI002 SHEET INDEX - 2
GI003 ABBREVIATIONS
GI004 GENERAL NOTES LIFE SAFETY PHASING SCHEDULE
GI005 GENERAL NOTES AND SYMBOLS
GI100 SITE - OVERALL PLAN
GI101 ICRA OVERVIEW PLAN
GI500 REFERENCE - ICRA DETAIL - CLASS IV CONSTRUCTION LAYOUT
HA100
REFERENCE HAZARDOUS MATERIAL SITE PLAN - ASBESTOS /
LEAD
HA-CE-1A REFERENCE - EAST CORRIDORS - ASBESTOS RE-SURVEY
HA-CW-1A REFERENCE - WEST CORRIDORS - ASBESTOS RE-SURVEY
HA-TU-1A REFERENCE - GENERAL STEAM TUNNELS - ASBESTOS RE-SURVEY
GENERAL - SET 2 OF 2
CD100 OVERALL DEMOLITION PLAN
CD101 DEMOLITION PLAN 1
CD102 DEMOLITION PLAN 2
CD103 DEMOLITION PLAN 3
CU100 OVERALL UTILITY PLAN
CU101 UTILITY PLAN 1
CU102 UTILITY PLAN 2
CU103 UTILITY PLAN 3
CP401 PROFILE 1
CP402 PROFILE 2
CP403 PROFILE 3
CS100 OVERALL SITE RESTORATION PLAN
CS101 SITE RESTORATION PLAN 1
CS102 SITE RESTORATION PLAN 2
CS103 SITE RESTORATION PLAN 3
CJ501 CIVIL DETAILS
CJ502 CIVIL DETAILS
AS600 INTERIOR SCHEDULES & SIGNAGE DETAILS
00 01 15 - 2
AS601 BUILDING ELEMENT TYPES AND DETAILS
AS602 DOOR SCHEDULE AND ELEVATIONS
S100 STRUCTURAL TITLE SHEET
S101 STRUCTURAL NOTES
S500 FOUNDATION DETAILS
S600 MASONRY DETAILS
S700 CONCRETE DETAILS
S800 LIGHT GAUGE DETAILS
T000 TELECOM SYMBOLS AND ABBREVIATIONS
T800 TELECOMMUNICATION ROUTING SCHEMATIC
T801 TELECOMMUNICATION ROUTING SCHEMATIC
T802 TELECOMMUNICATION ROUTING SCHEMATIC
T803 TELECOMMUNICATION ROUTING SCHEMATIC
T804 TELECOMMUNICATION DETAILS
TS001 TELECOMMUNICATION SITE PLAN
0-GE000 ELECTRICAL COVERSHEET
0-GE400 ELECTRICAL COMMON DETAILS
0-GE600 ELECTRICAL COMMON SCHEDULES
BUILDING 1 - SET 1 OF 2
1-GI000 BUILDING 1 COVER SHEET & SHEET INDEX
1-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
1-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
1-GI120 SECOND FLOOR LIFE SAFETY PLAN
1-GI121 SECOND FLOOR - INFECTION CONTROL & PHASING PLAN
1-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
1-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
1-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
1-HA-4A REFERENCE - THIRD / ATTIC FLOOR ASBESOTS RE-SURVEY
1-AS100 BASEMENT FLOOR - OVERALL PLAN
1-AS110 FIRST FLOOR - OVERALL PLAN
1-AS120 SECOND FLOOR - OVERALL PLAN
1-AS130 ATTIC FLOOR - OVERALL PLAN
1-AS400 LARGE SCALE PLANS
1-AS430 BUILDING ADDITION AND ROOF PLAN
1-AS600 ELEVATIONS DETAILS SCHEDULES
1-AS601 INTERIOR PARTITION TYPES AND DETAILS
1-AS602 SECTION DETAILS
1-S120 SECOND FLOOR PLAN - OVERALL
1-S130 ATTIC FLOOR PLAN - OVERALL
1-S400 LARGE SCALE PLANS
00 01 15 - 3
01-E100 BASEMENT DEMOLITION - ELECTRICAL
01-E101 FIRST FLOOR DEMOLITION - ELECTRICAL
01-E200 BASEMENT - ELECTRICAL
01-E201 FIRST FLOOR - ELECTRICAL
01-E202 SECOND FLOOR - ELECTRICAL
01-E204 ROOF - ELECTRICAL
01-M000 MECHANICAL COVERSHEET
01-M100 BASEMENT DEMOLITION - MECHANICAL
01-M101 FIRST FLOOR DEMOLITION - MECHANICAL
01-M102 SECOND FLOOR DEMOLITION - MECHANICAL
01-M200 BASEMENT REMODEL - MECHANICAL
01-M201 FIRST FLOOR REMODEL - MECHANICAL
01-M202 SECOND FLOOR REMODEL - MECHANICAL
01-M400 MECHANICAL DETAILS AND DIAGRAMS
01-M600 MECHANICAL SCHEDULES
BUILDING 1 - SET 2 OF 2
1-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
1-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
1-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
1-TD130 THIRD FLOOR PLAN - TELECOM - DEMOLITION
1-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
1-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
1-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
1-TN130 THIRD FLOOR PLAN - TELECOMMUNICATIONS
1-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
1-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
1-TN220 SECOND FLOOR PLAN - TELECOM - CABLE DISTANCE
1-TN230 THIRD FLOOR PLAN - TELECOM - CABLE DISTANCE
1-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
1-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
1-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
1-TN402 ENLARGED PLANS - TELECOMMUNICATIONS
1-TN403 ENLARGED PLANS - TELECOMMUNICATIONS
BUILDING 2
2-GI000 BUILDING 2 COVER SHEET & SHEET INDEX
2-GI101 BASEMENT FLOOR INFECTION CONTROL & PHASING PLAN
2-HA-1A REFERENCE - BASEMENT FLOOR - ASBESTOS RE-SURVEY
2-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
2-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
00 01 15 - 4
2-AS100 BASEMENT PLANS
2-AS110 FIRST FLOOR - OVERALL PLAN
2-AS120 SECOND FLOOR - OVERALL PLAN
2-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
2-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
2-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
2-TD130 THIRD FLOOR PLAN - TELECOM - DEMOLITION
2-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
2-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
2-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
2-TN130 THIRD FLOOR PLAN - TELECOMMUNICATIONS
2-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
2-TN300 ENLARGED PLAN - TELECOMMUNICATIONS - DEMO
2-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
02-E200 BASEMENT FLOOR PLAN - ELECTRICAL
02-E201 FIRST FLOOR PLAN - ELECTRICAL
02-E300 ELECTRICAL ENLARGED PLANS
02-E400 ELECTRICAL DIAGRAMS
02-E500 ELECTRICAL SCHEDULES
02-M100 BASEMENT AND FIRST FLOOR DEMOLITION - MECHANICAL
02-M200 BASEMENT FLOOR REMODEL - MECHANICAL
02-M201 FIRST FLOOR REMODEL- MECHANICAL
BUILDING 3
3-GI000 BUILDING 3 COVER SHEET & SHEET INDEX
3-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
3-GI121 SECOND FLOOR – INFECTION CONTROL & PHASING PLAN
3-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
3-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
3-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
3-HA-4A REFERENCE - THIRD FLOOR / ATTIC ASBESTOS RE-SURVEY
3-AS110 BASEMENT AND FIRST FLOOR PLANS
3-AS120 SECOND FLOOR AND ATTIC PLANS
3-TD100 BASEMENT & FIRST FLOOR PLANS - TELECOM - DEMOLITION
3-TD120 SECOND & THIRD FLOOR PLANS - TELECOM - DEMOLITION
3-TN100 BASEMENT & FIRST FLOOR PLANS - TELECOMMUNICATIONS
3-TN120 SECOND & THIRD FLOOR PLANS - TELECOMMUNICATIONS
3-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
3-TN220 SECOND FLOOR PLAN - TELECOM - CABLE DISTANCE
3-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
3-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
00 01 15 - 5
3-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
03-E200 BASEMENT FLOOR PLAN - ELECTRICAL
03-E201 FIRST FLOOR - ELECTRICAL
03-E202 SECOND FLOOR - ELECTRICAL
03-E300 ELECTRICAL ENLARGED PLANS
03-E400 ELECTRICAL RISER DIAGRAMS
03-E500 ELECTRICAL SCHEDULES
03-M101 FIRST FLOOR DEMOLITION - MECHANICAL
03-M102 SECOND FLOOR DEMOLITION - MECHANICAL
03-M201 FIRST FLOOR - MECHANICAL
03-M202 SECOND FLOOR REMODEL - MECHANICAL
BUILDING 4
4-GI000 BUILDING 4 COVER SHEET & SHEET INDEX
4-GI100 BASEMENT LIFE SAFETY PLAN
4-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
4-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
4-GI121 SECOND FLOOR - INFECTION CONTROL & PHASING PLAN
4-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
4-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
4-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
4-AS100 BASEMENT FLOOR - OVERALL PLANS
4-AS110 FIRST FLOOR - OVERALL PLANS
4-AS120 SECOND FLOOR - OVERALL PLANS
4-AS400 LARGE SCALE PLANS
4-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
4-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
4-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
4-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
4-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
4-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
4-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
4-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
4-TN220 SECOND FLOOR PLAN - TELECOM - CABLE DISTANCE
4-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
4-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
4-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
4-TN402 ENLARGED PLANS - TELECOMMUNICATIONS
4-TN403 ENLARGED PLANS - TELECOMMUNICATIONS
4-TN500 ONE-LINE DIAGRAM
4-TN501 PANEL SCHEDULES
00 01 15 - 6
04-E200 BASEMENT FLOOR PLAN - ELECTRICAL - EAST
04-E201 FIRST FLOOR PLAN - ELECTRICAL - EAST
04-E202 SECOND FLOOR PLAN - ELECTRICAL - EAST
04-E300 ELECTRICAL ENLARGED PLANS
04-E400 ELECTRICAL ONE-LINE DIAGRAMS
04-E500 ELECTRICAL SCHEDULES
04-M100B BASEMENT DEMOLITION - MECHANICAL - AREA B
04-M101B FIRST FLOOR DEMOLITION - MECHANICAL - AREA B
04-M200B BASEMENT FLOOR - MECHANICAL - AREA B
04-M201 FIRST FLOOR - MECHANICAL
04-M201B FIRST FLOOR - MECHANICAL - AREA B
04-M600 MECHANICAL SCHEDULES
BUILDING 5
5-GI000 BUILDING 5 COVER SHEET & SHEET INDEX
5-GI110 FIRST LEVEL LIFE SAFETY PLAN
5-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
5-AS110 FIRST FLOOR PLANS
5-AS500 SECTIONS DETAILS
5-AS600 ELEVATIONS DETAILS
5-S110 FIRST FLOOR PLANS
5-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
5-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
5-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
5-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
5-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
05-E200 FIRST FLOOR PLAN - ELECTRICAL
05-E300 ELECTRICAL ENLARGED PLANS
05-E400 ELECTRICAL ONE-LINE DIAGRAMS
05-E500 ELECTRICAL SCHEDULES
05-M101 FIRST FLOOR DEMOLITION - MECHANICAL
05-M201 FIRST FLOOR REMODEL - MECHANICAL
BUILDING 6
6-GI000 BUILDING 6 COVER SHEET & SHEET INDEX
6-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
6-AS110 FIRST FLOOR PLAN - OVERALL
6-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
6-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
BUILDING 7 & 13
00 01 15 - 7
7-GI000 BUILDINGS 7 & 13 COVER SHEET & SHEET INDEX
7-GI001 FIRST FLOOR LIFE SAFETY PLAN
7-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
7-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
7-HA-2A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
13-HA-1A REFERENCE - FIRST FLOOR - ASBESTOS RE-SURVEY
7-AS110 FIRST FLOOR PLANS
7-S110 FIRST FLOOR PLANS
7-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
7-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
7-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
7-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
7-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
07-E100 FIRST FLOOR DEMOLITION PLAN - ELECTRICAL
07-E200 FIRST FLOOR PLAN - ELECTRICAL
07-E300 ELECTRICAL ENLARGED PLANS
07-E500 ELECTRICAL ONE-LINE DIAGRAMS
07-E600 ELECTRICAL SCHEDULES
07-M101 FIRST FLOOR DEMOLITION - MECHANICAL
07-M201 FIRST FLOOR REMODEL - MECHANICAL
BUILDING 8
8-GI000 BUILDING 8 COVER SHEET & SHEET INDEX
8-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
8-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
8-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
8-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
8-HA-4A REFERENCE - ATTIC ASBESTOS RE-SURVEY
8-AS100 BASEMENT FLOOR - OVERALL PLAN
8-AS110 FIRST FLOOR PLANS
8-AS120 SECOND FLOOR - OVERALL PLAN
8-TD101 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
8-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
8-TN101 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
8-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
8-TN200 FIRST LEVEL FLOOR PLAN - TELECOM - CABLE DISTANCE
8-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
08-E100 FIRST FLOOR DEMOLITION PLAN - ELECTRICAL
08-E200 BASEMENT FLOOR PLAN - ELECTRICAL
08-E201 FIRST FLOOR PLAN - ELECTRICAL
08-E300 ELECTRICAL ENLARGED PLANS
00 01 15 - 8
08-E400 ELECTRICAL ONE-LINE DIAGRAMS
08-E500 ELECTRICAL SCHEDULES
08-M101 FIRST FLOOR DEMOLITION - MECHANICAL
08-M201 FIRST FLOOR REMODEL - MECHANICAL
BUILDING 9
9-GI000 BUILDING 9 COVER SHEET & SHEET INDEX
9-GI110 FIRST FLOOR LIFE SAFETY PLAN
9-GI111 FIRST FLOOR INFECTION CONTROL & PHASING PLAN
9-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
9-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
9-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
9-HA-4A REFERENCE - ATTIC FLOOR ASBESTOS RE-SURVEY
9-AS100 BASEMENT FIRST AND SECOND FLOOR PLANS
9-TD100 FLOOR PLANS - TELECOM - DEMOLITION
9-TN100 FLOOR PLANS - TELECOMMUNICATIONS
9-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
9-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
9-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
09-E100 FIRST FLOOR DEMOLITION - ELECTRICAL
09-E200 BASEMENT - ELECTRICAL
09-E201 FIRST FLOOR - ELECTRICAL
09-E300 ELECTRICAL ENLARGED PLANS
09-E500 ELECTRICAL ONE-LINE DIAGRAMS
09-E600 ELECTRICAL SCHEDULES
09-M101 FIRST FLOOR DEMOLITION - MECHANICAL
09-M201 FIRST FLOOR REMODEL - MECHANICAL
BUILDING 10
10-GI000 BUILDING 10 COVER SHEET & SHEET INDEX
10-GI101 BASEMENT FLOOR INFECTION CONTROL & PHASING PLAN
10-HA-1A REFERENCE - BASEMENT FLOOR - ASBESTOS RE-SURVEY
10-HA-2A REFERENCE - FIRST FLOOR - ASBESTOS RE-SURVEY
10-HA-3A REFERENCE - SECOND FLOOR - ASBESTOS RE-SURVEY
10-AS100 BASEMENT FIRST AND SECOND FLOOR PLANS
10-TD100 BASEMENT FLOOR PLANS - TELECOM - DEMOLITION
10-TN100 BASEMENT FLOOR PLANS - TELECOMMUNICATIONS
10-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
10-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
10-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
10-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
00 01 15 - 9
10-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
10-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
10-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
10-E200 BASEMENT - ELECTRICAL
10-E201 FIRST FLOOR - ELECTRICAL
10-E300 ELECTRICAL ENLARGED PLANS
10-E500 ELECTRICAL ONE-LINE DIAGRAMS
10-E600 ELECTRICAL SCHEDULES
10-M100 BASEMENT DEMOLITION - MECHANICAL
10-M200 BASEMENT FLOOR - MECHANICAL
BUILDING 11
11-GI000 BUILDING 11 COVER SHEET & SHEET INDEX
11-GI101 BASEMENT FLOOR INFECTION CONTROL & PHASING PLAN
11-HA-1A REFERENCE - BASEMENT FIRST FLOOR ASBESTOS RE-SURVEY
11-HA-2A REFERENCE - SECOND ATTIC FLOOR ASBESTOS RE-SURVEY
11-AS100 BASEMENT FIRST AND SECOND FLOOR PLANS
11-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
11-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
11-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
11-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
11-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
11-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
11-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
11-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
11-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
11-E200 BASEMENT - ELECTRICAL
11-E300 ELECTRICAL ENLARGED PLANS
11-E600 ELECTRICAL SCHEDULES
11-M100 BASEMENT DEMOLITION - MECHANICAL
11-M200 BASEMENT FLOOR - MECHANICAL
BUILDING 14
14-GI000 BUILDING 14 COVER SHEET & SHEET INDEX
14-GI111 FIRST FLOOR INFECTION CONTROL & PHASING PLAN
14-HA-1A REFERENCE - BASEMENT FIRST FLOOR ASBESTOS RE-SURVEY
14-AS110 FIRST FLOOR PLANS
14-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
14-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
14-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
14-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
00 01 15 - 10
14-E101 FIRST FLOOR DEMOLITION - ELECTRICAL
14-E201 FIRST FLOOR - ELECTRICAL
14-E300 ELECTRICAL ENLARGED PLANS
14-E400 ELECTRICAL ONE-LINE DIAGRAMS
14-E500 ELECTRICAL SCHEDULES
14-M101 FIRST FLOOR DEMOLITION PLAN - MECHANICAL
14-M201 FIRST FLOOR PLAN REMODEL - MECHANICAL
BUILDING 28
28-GI000 BUILDING 28 COVER SHEET & SHEET INDEX
28-GI100 BASEMENT FLOOR - LIFE SAFETY PLAN
28-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
28-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
28-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
28-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
28-HA-4A REFERENCE - ATTIC FLOOR FLOOR ASBESTOS RE-SURVEY
28-AS100 BASEMENT FLOOR - OVERALL PLAN
28-AS110 FIRST FLOOR - OVERALL PLAN
28-AS120 SECOND FLOOR - OVERALL PLAN
28-AS400 LARGE SCALE PLANS
28-S100 BASEMENT FLOOR PLAN - OVERALL
28-S110 FIRST FLOOR PLAN - OVERALL
28-S400 LARGE SCALE PLANS
28-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
28-TD110 FIRSTFLOOR PLAN - TELECOM - DEMOLITION
28-TD120 SECONDFLOOR PLAN - TELECOM - DEMOLITION
28-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
28-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
28-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
28-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
28-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
28-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
28-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
28-E200 BASEMENT - ELECTRICAL
28-E201 FIRST FLOOR - ELECTRICAL
28-E300 ELECTRICAL ENLARGED PLANS
28-E400 ELECTRICAL ONE-LINE DIAGRAMS
28-E500 ELECTRICAL SCHEDULES
28-M100 BASEMENT DEMOLITION - MECHANICAL
28-M200 BASEMENT REMODEL - MECHANICAL
28-M201 FIRST FLOOR REMODEL - MECHANICAL
00 01 15 - 11
BUILDING 29
29-GI000 BUILDING 29 COVER SHEET & SHEET INDEX
29-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
29-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
29-HA-1A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
29-HA-2A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
29-HA-3A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
29-HA-4A REFERENCE - ATTIC FLOOR ASBESTOS RE-SURVEY
29-AS100 BASEMENT PLANS
29-AS110 FIRST FLOOR PLANS
29-AS120 SECOND FLOOR - OVERALL PLAN
29-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
29-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
29-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
29-TD130 ATTIC FLOOR PLAN - TELECOM - DEMOLITION
29-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
29-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
29-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
29-TN130 ATTIC FLOOR PLAN - TELECOMMUNICATIONS
29-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
29-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
29-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
29-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
29-E200 BASEMENT - ELECTRICAL
29-E201 FIRST FLOOR - ELECTRICAL
29-E300 ELECTRICAL ENLARGED PLANS
29-M100 BASEMENT DEMOLITION - MECHANICAL
29-M101 FIRST FLOOR DEMOLITION - MECHANICAL
29-M200 BASEMENT FLOOR - MECHANICAL
29-M201 FIRST FLOOR REMODEL - MECHANICAL
BUILDING 48
48-GI000 BUILDING 48 COVER SHEET & SHEET INDEX
48-GI110 FIRST FLOOR - LIFE SAFETY PLAN
48-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
48-GI121 SECOND FLOOR - INFECTION CONTROL & PHASING PLAN
48-HA-1A REFERENCE - CRAWLSPACE FLOOR - ASBESTOS RE-SURVEY
48-HA-2A REFERENCE - BASEMENT FLOOR - ASBESTOS RE-SURVEY
48-HA-3A REFERENCE - FIRST FLOOR - ASBESTOS RE-SURVEY
48-HA-4A REFERENCE - SECOND FLOOR - ASBESTOS RE-SURVEY
00 01 15 - 12
48-HA-5A REFERENCE - THIRD ATTIC FLOOR - ASBESTOS RE-SURVEY
48-AS100 BASEMENT FLOOR - OVERALL PLAN
48-AS110 FIRST FLOOR PLANS
48-AS120 SECOND FLOOR PLANS
48-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
48-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
48-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
48-TD130 ATTIC FLOOR PLAN - TELECOM - DEMOLITION
48-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
48-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
48-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
48-TN130 ATTIC FLOOR PLAN - TELECOMMUNICATIONS
48-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
48-TN220 SECOND FLOOR PLAN - TELECOM - CABLE DISTANCE
48-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
48-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
48-E200 BASEMENT FLOOR PLAN - ELECTRICAL
48-E201 FIRST FLOOR PLAN - ELECTRICAL
48-E202 SECOND FLOOR PLAN - ELECTRICAL
48-E300 ELECTRICAL ENLARGED PLANS
48-E500 ELECTRICAL ONE-LINE DIAGRAMS
48-E600 ELECTRICAL SCHEDULES
48-M101 FIRST FLOOR DEMOLITION PLAN - MECHANICAL
48-M102 SECOND FLOOR DEMOLITION PLAN - MECHANICAL
48-M201 FIRST FLOOR PLAN - MECHANICAL
48-M202 SECOND FLOOR PLAN - MECHANICAL
BUILDING 49
49-GI000 BUILDING 49 COVER SHEET & SHEET INDEX
49-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
49-HA-1A REFERENCE - CRAWLSPACE FLOOR - ASBESTOS RE-SURVEY
49-HA-2A REFERENCE - BASEMENT FLOOR - ASBESTOS RE-SURVEY
49-HA-3A REFERENCE - FIRST FLOOR - ASBESTOS RE-SURVEY
49-HA-4A REFERENCE - SECOND FLOOR - ASBESTOS RE-SURVEY
49-AS100 BASEMENT PLANS
49-AS110 FIRST FLOOR - OVERALL PLAN
49-AS120 SECOND FLOOR - OVERALL PLAN
49-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
49-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
49-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
49-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
00 01 15 - 13
49-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
49-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
49-TN200 BASEMENT FLOOR PLAN -TELECOM -CABLE DISTANCE
49-TN300 ENLARGED PLANS -TELECOMMUNICATIONS - DEMO
49-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
49-E200 BASEMENT - ELECTRICAL
49-E201 FIRST FLOOR - ELECTRICAL
49-E300 ELECTRICAL ENLARGED PLANS
49-E500 ELECTRICAL ONE-LINE DIAGRAMS
49-E600 ELECTRICAL SCHEDULES
49-M100 BASEMENT DEMOLITION - MECHANICAL
49-M200 BASEMENT - MECHANICAL
BUILDING 50
50-GI000 BUILDING 50 COVER SHEET & SHEET INDEX
50-GI101 FIRST FLOOR INFECTION CONTROL & PHASING PLAN
50-HA-1A REFERENCE - CRAWLSPACE FLOOR ASBESTOS RE-SURVEY
50-HA-2A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
50-HA-3A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
50-HA-4A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
50-HA-5A REFERENCE - ATTIC FLOOR ASBESTOS RE-SURVEY
50-AS100 BASEMENT PLANS
50-AS110 FIRST FLOOR - OVERALL PLAN
50-AS120 SECOND FLOOR - OVERALL PLAN
50-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
50-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
50-TD120 SECOND FLOOR PLAN - TELECOM - DEMOLITION
50-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
50-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
50-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
50-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
50-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
50-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
50-E100 BASEMENT FLOOR PLAN - ELECTRICAL
50-E101 FIRST FLOOR PLAN - ELECTRICAL
50-E300 ENLARGED PLANS - ELECTRICAL
50-E500 ELECTRICAL POWER DIAGRAMS
50-E600 ELECTRICAL SCHEDULES
50-M100 BASEMENT DEMOLITION PLAN - MECHANICAL
50-M200 BASEMENT FLOOR PLAN - MECHANICAL
00 01 15 - 14
BUILDING 51
51-GI000 BUILDING 51 COVER SHEET & SHEET INDEX
51-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
51-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
51-HA-1A REFERENCE - SUBBASEMENT FLOOR ASBESTOS RE-SURVEY
51-HA-2A REFERENCE - BASEMENT FLOOR ASBESTOS RE-SURVEY
51-HA-3A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
51-HA-4A REFERENCE - SECOND FLOOR ASBESTOS RE-SURVEY
51-AS100 BASEMENT FLOOR PLANS
51-AS110 FIRST FLOOR - OVERALL PLAN
51-AS120 SECOND FLOOR - OVERALL PLAN
51-TD100 BASEMENT FLOOR PLAN - ELECTRICAL DEMOLITION
51-TD110 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION
51-TD120 SECOND FLOOR PLAN - ELECTRICAL DEMOLITION
51-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
51-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
51-TN120 SECOND FLOOR PLAN - TELECOMMUNICATIONS
51-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
51-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
51-E100 BASEMENT FLOOR PLAN - ELECTRICAL
51-E101 FIRST FLOOR PLAN - ELECTRICAL
51-E300 ENLARGED PLANS - ELECTRICAL
51-E500 ELECTRICAL DIAGRAMS
51-E600 ELECTRICAL SCHEDULES
51-M100 BASEMENT DEMOLITION PLAN - MECHANICAL
51-M200 BASEMENT FLOOR PLAN - MECHANICAL
BUILDINGS 54 & 69
54-GI000 BUILDINGS 54 & 69 COVER SHEET & SHEET INDEX
54-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
54-AS110 FIRST FLOOR PLANS
BUILDINGS 95 & 88
95-GI000 BUILDINGS 95 & 88 COVER SHEET & SHEET INDEX
95-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
88-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
95-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
95-AS100 FIRST FLOOR PLANS (BUILDING 95 & 88)
95-TD110
FIRST FLOOR PLAN (BUILDING 88 & 95) - TELECOM -
DEMOLITION
95-TN110 FIRST FLOOR PLAN (BUILDING 88 & 95) - TELECOMMUNICATION
00 01 15 - 15
95-TN210
FIRST FLOOR PLAN (BUILDING 88 & 95) - TELECOM - CABLE
DISTANCE
95-TN400 ENLARGED PLANS (BUILDING 95) - TELECOMMUNICATIONS
95-E201 FIRST FLOOR PLAN - ELECTRICAL
95-E600 ELECTRICAL SCHEDULES
BUILDING 96
96-GI000 BUILDING 96 COVER SHEET & SHEET INDEX
96-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
96-HA-1A REFERENCE - FIRST FLOOR ASBESTOS RE-SURVEY
96-AS110 FIRST FLOOR PLANS
96-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
96-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
96-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
96-TN300 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO
96-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
96-E201 FIRST FLOOR PLAN - ELECTRICAL
BUILDING 108
108-GI000 BUILDING 108 COVER SHEET & SHEET INDEX
108-AS110 FIRST FLOOR PLAN - OVERALL
BUILDINGS 109 & 57
109-GI000 BUILDINGS 109 & 57 COVER SHEET & SHEET INDEX
109-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
109-AS110 FIRST FLOOR PLANS (BUILDINGS 109 & 57)
109-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
109-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
109-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
109-TN400 ENLARGED PLANS (B57 AND B109) - TELECOMMUNICATIONS
109-E201 FIRST FLOOR PLAN - ELECTRICAL
109-M101 FIRST FLOOR DEMOLITION - MECHANICAL
109-M201 FIRST FLOOR REMODEL - MECHANICAL
BUILDING 111
111-GI000 BUILDING 111 COVER SHEET & SHEET INDEX
111-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
111-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
111-AS100 BASEMENT FLOOR PLANS
111-AS110 FIRST FLOOR PLANS
111-TD100 BASEMENT FLOOR PLAN - TELECOM - DEMOLITION
111-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
00 01 15 - 16
111-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
111-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
111-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
111-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
111-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
111-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
111-E200 BASEMENT FLOOR PLAN - ELECTRICAL
111-E201 FIRST FLOOR PLAN - ELECTRICAL
111-E300 ELECTRICAL ENLARGED PLANS
BUILDING 112
112-GI000 BUILDING 112 COVER SHEET & SHEET INDEX
112-AS110 FIRST FLOOR PLANS
BUILDING 115
115-GI000 BUILDING 115 COVER SHEET & SHEET INDEX
115-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
115-AS110 FIRST FLOOR PLANS
115-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
115-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
115-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
115-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
115-E201 FIRST FLOOR - ELECTRICAL
115-E300 ELECTRICAL ENLARGED PLANS
115-M101 FIRST FLOOR DEMOLITION - MECHANICAL
115-M201 FIRST FLOOR - MECHANICAL
BUILDING 116
116-GI000 BUILDING 116 COVER SHEET & SHEET INDEX
116-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
116-AS110 FIRST FLOOR PLANS
116-TD110 FIRST FLOOR PLAN - TELECOM - DEMOLITION
116-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
116-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
116-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
116-E201 FIRST FLOOR - ELECTRICAL
116-E300 ELECTRICAL ENLARGED PLANS
116-M101 FIRST FLOOR DEMOLITION - MECHANICAL
116-M201 FIRST FLOOR REMODEL - MECHANICAL
BUILDING 118
00 01 15 - 17
118-GI000 BUILDING 118 COVER SHEET & SHEET INDEX
118-GI101 BASEMENT FLOOR - INFECTION CONTROL & PHASING PLAN
118-GI111 FIRST FLOOR - INFECTION CONTROL & PHASING PLAN
118-AS100 BASEMENT FLOOR PLANS
118-AS110 FIRST FLOOR PLANS
118-TD100 BASEMENT FLOOR PLAN - ELECTRICAL DEMOLITION
118-TN100 BASEMENT FLOOR PLAN - TELECOMMUNICATIONS
118-TD110 FIRST FLOOR PLAN - ELECTRICAL DEMOLITION
118-TN110 FIRST FLOOR PLAN - TELECOMMUNICATIONS
118-TN200 BASEMENT FLOOR PLAN - TELECOM - CABLE DISTANCE
118-TN210 FIRST FLOOR PLAN - TELECOM - CABLE DISTANCE
118-TN400 ENLARGED PLANS - TELECOMMUNICATIONS
118-TN401 ENLARGED PLANS - TELECOMMUNICATIONS
118-E200 BASEMENT - ELECTRICAL
118-E201 FIRST FLOOR - ELECTRICAL
118-E300 ELECTRICAL ENLARGED PLANS
118-E400 ELECTRICAL ONE-LINE DIAGRAMS
118-E500 ELECTRICAL SCHEDULES
118-M100 BASEMENT DEMOLITION - MECHANICAL
118-M101 FIRST FLOOR DEMOLITION - MECHANICAL
118-M200 BASEMENT FLOOR - MECHANICAL
118-M201 FIRST FLOOR - MECHANICAL
CONSTRUCT ADULT DAY HEALTH CARE
FB1-GI000
CONSTRUCT ADULT DAY HEALTH CARE COVER SHEET & SHEET
INDEX
FB1-AS110 FIRST FLOOR - OVERALL PLAN
CONSTRUCT PARKING STRUCTURE
FB2-GI000 CONSTRUCT PARKING STRUCTURE COVER SHEET & SHEET INDEX
FB2-AS110 FIRST FLOOR - OVERALL PLAN
- - - E N D - - -
4801 Veterans Drive 100% CD Issued for Bidding St. Cloud, MN 56303
01 00 00 -1
GENERAL REQUIREMENTS
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for EHRM
Infrastructure Upgrades 656-21-235 as required by drawings and specifications.
B. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the
Contracting Officer.
C. Offices of Anderson Engineering, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by
Contractor retained testing company, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
F. The Key Personnel assigned by the contractor for the performance of work on this contract shall be acceptable to VA in terms of
4801 Veterans Drive 100% CD Issued for Bidding St. Cloud, MN 56303
01 00 00 -2
GENERAL REQUIREMENTS
personal and professional conduct and technical knowledge.
Should the assignment to this contract of any person by the contractor be deemed to conflict with the interests of VA, or in the event performance is deemed to be unsatisfactory at any time during the life of the contract, the Contracting Officer may notify the contractor and request the person be removed from the assignment. The reason for removal will be documented and a request to receive key personnel replacement within three (3) business days of the notification will be made. Replacement of key personnel qualifications shall be equal to or greater than those of the key personnel being replaced. Employment and staffing difficulties will not be justification for failure to meet established schedules. The contractor is required to submit a resume with qualifications for the proposed replacement which shall be approved by the COR and CO prior to the replacement starting work.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: BASE BID: Work includes general construction, alterations, roads, walks, grading, drainage, necessary removal of existing structures, and construction and certain other items.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at
Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
4801 Veterans Drive 100% CD Issued for Bidding St. Cloud, MN 56303
01 00 00 -3
GENERAL REQUIREMENTS
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security escort or arrangements can be provided for the employees.
This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the
Contracting Officer.
5. All contractor and subcontractor employees working on this project are subject to a background investigation. VA has the right to refuse to badge any employee that does not pass the background investigation. It is expected that the contractor will have the employee scheduled for the issuance of a badge well in advance of starting work. Due to the badge process, the employee will not be able come to the VA, receive badge, and conduct work on same day. There will be a $200 fine for badges issued and not returned upon completion of project.
6. Contractor and subcontractor employees that will work on VA property shall submit the following information to the
Contracting Officer’s Representative (COR) when requesting a badge:
a. First, middle and last name (Legal name, as shown on picture ID)
b. Date of Birth (DOB)
c. Social Security Number (SSN)
4801 Veterans Drive 100% CD Issued for Bidding St. Cloud, MN 56303
01 00 00 -4
GENERAL REQUIREMENTS
d. Height
e. Eye Color
f. Hair Color
g. Name of Firm or Company
h. VA Contract Number
i. VA Project Name
j. Name of COR
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See
Section 08 71 00, DOOR HARDWARE and coordinate.
3. VA construction core keys will be issued to the contractor as deemed necessary by the COR. All keys must be returned when no longer needed or upon completion of the contract. There will be a $25 charge for each key not returned at the end of the contract. Should
VA security be compromised as a result of failure to return a key(s), there will be an additional charge to the contractor of $25 for each door re-cored. There will be a $60 charge for any VA padlocks not returned by the contractor.
D. Document Control:
1. Before starting any work, the General Contractor/Sub
Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
4801 Veterans Drive 100% CD Issued for Bidding St. Cloud, MN 56303
01 00 00 -5
GENERAL REQUIREMENTS
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or
“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting
Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of
Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the
VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an
Engineering Document Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted
24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
Parking permits are required. A limited number of permits shall be issued for General Contractor and its employees. Contractor may park only in designated areas only. Contractor to coordinate with Contracting Officers Representative.
4801 Veterans Drive 100% CD Issued for Bidding St. Cloud, MN 56303
01 00 00 -6
GENERAL REQUIREMENTS
F. The existing EST FireWorks graphic command center, located in
Building 7, shall be modified to include graphica displays of modified Buildings, using the FireWorks map view port capability.
A graphical display of St. Cloud VA campus building layout shall be the default map viewport file. Additional map viewports for all levels of a remodeled buildings shall be programmed also.
All alarm, supervisory and trouble device locations shall be mapped to both the campus building layout view and to the associated building floor plan on which the device is located.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the
Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the
Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the
Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the
Contractor shall protect them from damage. The Contractor shall
4801 Veterans Drive 100% CD Issued for Bidding St. Cloud, MN 56303
01 00 00 -7
GENERAL REQUIREMENTS
repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the COR.
E. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by
Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to
Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
F. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
All such actions shall be coordinated with the COR or Utility
Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, 4801 Veterans Drive 100% CD Issued for Bidding St. Cloud, MN 56303
01 00 00 -8
GENERAL REQUIREMENTS
electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
G. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
a. Electronic Health Record Modernization (EHRM) standards as outlined in the Veteran Affairs Office of Information and
Technology Infrastructure Standard for Telecommunication
Spaces.
b. Work on the EHRM Upgrades to the entire St Cloud Campus should assume a long time period, with the potential for multiple mobilizations/demobilizations.
c. Work to consider additional cost potential to maintain operations and provide an acceptable sequencing to the service lines.
d. Main Computer Room (MCR) (a.k.a. Data Center) and Telecom
Room (TR) construction/upgrades/decommissioning may assume a building-by-building, or portion of building, sequence dependent on the availability of the service lines.
e. Fiber paths, in both outside and inside plant, may assume a sequence of either campus wide, or segment-by-segment, emplacement or displacement.
f. The following brief description is a general outline of possible sequencing:
1) Upgrade existing MCR per telecommunication and electrical drawings or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .