8-TSSC Paint Plan Summer 2026.pdf

PDF 54 KB Posted

Attached to
Summer '26 District Painting Improvements
Solicitation number
RFQ # 25027
Issued by
Olmsted County, Minnesota

About this file

This is a paint plan document for Rochester Public Schools (ISD #535) in Minnesota, detailing interior painting specifications for the Technology Services and Support Center facility as part of the Summer 2026 District Painting Improvements project. The scope of work identifies touch-up painting across multiple rooms within the facility, with priority given to painting walls in Pure White (SW 7005) and matching existing door jambs. The project encompasses 27 rooms ranging from 10 to 1,187 square feet, with total paintable areas specified for each space. Work is scheduled to occur during June 2026 with no preferred painting dates, allowing flexibility for contractor scheduling. The project must be substantially completed before the 2026-27 school year begins. Contractors are required to coordinate all scheduling with district facilities staff and comply with applicable safety and environmental standards.

The document serves as a technical reference plan showing room-by-room square footage and painting requirements, though it explicitly notes it is not to be used for construction purposes and directs contractors to contact construction services for clarification. All painting work is classified as touch-up painting rather than full renovation. Vendors must submit all responses and quotes through the Bonfire platform, with no alternative submission methods accepted. The project spans district-wide facilities with work required at 27 separate sites, requiring comprehensive coordination across multiple locations during the summer construction window.

View the file

Other files

File Type Posted
28-Dakota Middle School Paint Plans Summer 2026.pdf PDF
25-GW Gibbs Paint Plans Summer 2026.pdf PDF
29-RFQ 25027 Summer2026 Painting.pdf PDF
27-Hoover Paint Plans Summer 2026.pdf PDF
26-John Adams Paint Plans Summer 2026.pdf PDF
12-Washington Paint Plans Summer 2026.pdf PDF
3-Lincoln Paint Plan Summer 2026.pdf PDF
20-Facilities Services Center Paint Plans Summer 2026.pdf PDF
14-Bamber Valley Paint Plan Summer 2026.pdf PDF
15-Bishop Paint Plan Summer 2026.pdf PDF
5-Mighty Oaks Paint Plan Summer 2026.pdf PDF
4-Longfellow Elementary Paint Plans Summer 2026.pdf PDF
21-Folwell Paint Plans Summer 2026.pdf PDF
22-Friedell Paint Plan Summer 2026.pdf PDF
24-Hawthorne Paint Plans Summer 2026.pdf PDF
10-Riverside Paint Plans Summer 2026.pdf PDF
18-ESC Paint Plan Summer 2026.pdf PDF
11-Willow Creek Paint Plans Summer 2026.pdf PDF
30-RFQ 25027 Quoter Acknowledgment.pdf PDF
16-Churchill Paint Plans Summer 2026.pdf PDF
1-Kellogg Middle School Paint Plans Summer 2026.pdf PDF
7-Rochester Alternative Learning Center Paint Plans Summer 2026.pdf PDF
17-Century High School Paint Plan Summer 2026.pdf PDF
6-Northrop Paint Plans Summer 2026.pdf PDF
2-John Marshall Paint Plan Summer 2026.pdf PDF
13-Master District PaintingSpec.pdf PDF
19-Edison Paint Plans Summer 2026.pdf PDF
9-Sunset Terrace Paint Plan Summer 2026.pdf PDF
23-Gage Paint Plan Summer 2026.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

FD FD

FD

FD

84 SF

101A

550 SF

156 SF

176 SF

189 SF

142 SF

664 SF

82 SF

818 SF

156 SF

140 SF

141 SF

27 SF

23 SF

745 SF

139 SF

1,187 SF

624 SF

163 SF

1,150 SF

639 SF

813 SF

328 SF

84 SF

1 2 3 4

Date

Rochester Public Schools Drawn By

NOT TO BE USED FOR CONSTRUCTION

CONTACT CONSTRUCTION

SERVICES WITH CORRECTION

9/7/2017 12:59:53 PM AS110Room SQFT Technology Services and Support Center

Author Issue Date

NOTES:PRIORITY

1. PAINT WALL, PURE WHITE SW 7005

2. PAINT DOOR JAMBS, MATCH EXISTING

GENERAL NOTES:

NO PREFERED DATES TO PAINT. CAN BE

DONE IN JUNE.

**ALL PAINTING IS TOUCH UP PAINTING

Sheets
103 - Main Shutoffs
AP110 - Floor Plan
AS110 - Room SQFT
GA110 - Building Age
GU110 - Room Usage
LE110 - Best Available Emergency Exit Route
LE701 - Fire EVAC Meeting Sites
LS110 - Best Available Take Cover Area's

File details come from the government source that posted it. Updated .