About this file
This document is a set of paint plans for the Northrop Education Center, a facility within Rochester Public Schools (ISD #535) in Minnesota, for summer 2026 interior painting improvements. The plans consist of three floor levels—Lower Level, Main Level, and Upper Level—identifying specific rooms and areas designated for painting with color specifications and priority rankings. The project requires painting walls and columns in designated areas using Sherwin-Williams colors including Worldly Gray (SW 7043), Granite Peak (SW 6250), and Dover White (SW 6385L). Priority 1 and Priority 2 areas are marked throughout the facility, with additional tasks including corner protection installation on columns and touch-up work to match existing finishes. The plans note that summer school may affect painting schedules, with no preferred dates specified for work completion. The project is part of a broader district-wide painting initiative spanning 27 district sites that must be substantially completed before the 2026-27 school year begins.
The painting contract requires contractors to perform surface preparation, priming, and painting of interior areas as identified in site-specific scope documents across all designated areas. Vendors must coordinate scheduling with district facilities staff, comply with applicable safety regulations, and meet environmental standards. All contractor responses must be submitted through the Bonfire platform, with no alternative submission methods accepted. The work represents routine maintenance and facility improvement efforts typical of school district summer capital projects, with coordination requirements and scheduling constraints necessary to accommodate the educational calendar and ongoing summer school operations.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP UP
DN
UP
DN DN
DN
DN
DN
UP
113A
112A
102A102B
103A
102C
101A
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
12/29/2025 1:50:35
PM
3A101Floor Plan Lower Level
Northrop Education Center
NOTES:PRIORITY
1. PAINT WALLS, WORLDLY GRAY SW 7043
2. PAINT WALLS AND COLUMN GRANITE PEAK SW 6250,
ADD CORNER PROTECTION TO COLUMN
3. PAINT WALLS, DOVER WHITE SW 6385L
4. PAINT WALLS, GRANITE PEAK SW 6250
GENERAL NOTES:
NO PREFERED DATES TO PAINT. SUMMER
SCHOOL MAY AFFECT PAINTING.
DN
UP
DN
UP
DN
210A
207H
207G2
E
207D 207B
207A
203A
208A 202A
202D
202E
202F
201A
202B
202C
207C 207F
212A
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
12/29/2025 1:50:35
PM
3A102Floor Plan Main Level
Northrop Education Center
NOTESPRIORITY
1. PAINT WALLS AND COLUMNS WORDLY GRAY SW 7043, ADD
PROTECTION TO CORNERS
2. TOUCH UP WALL, MATCH EXISTING, AND ADD WALL
PROTECTION
GENERAL NOTES:
NO PREFERED DATES TO PAINT. SUMMER
SCHOOL MAY AFFECT PAINTING.
UP
307A
308A
310 312
314A
320A 320B
305A303A
302A
301C
301D
301B301A
320D
320C
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
12/29/2025 1:50:35
PM
3A103Floor Plan Upper Level
Northrop Education Center
NOTES:PRIORITY
1. PAINT WALLS WORLDLY GRAY SW 7043
2. PAINT WALL TO MATCH EXISTING
3. PAINT UNDER WINDOWS TO MATCH EXISTING
4. PAINT WALLS GRANITE PEAK SW 6250
5. PAINT AND ADD CORNER PROTECTION
GENERAL NOTES:
NO PREFERED DATES TO PAINT. SUMMER
SCHOOL MAY AFFECT PAINTING.
| Sheets |
| 3A101 - Floor Plan Lower Level |
| 3A102 - Floor Plan Main Level |
| 3A103 - Floor Plan Upper Level |
File details come from the government source that posted it. Updated .