This is a paint plan document for Robert Gage Elementary School, prepared by Rochester Public Schools (ISD #535) in Minnesota for district-wide interior painting services scheduled for summer 2026. The document provides a floor plan of the facility with designated painting areas identified across multiple rooms and hallways. The scope of work includes painting hallway walls, walls, and areas around doorways in Pure White (SW 7005). The work is prioritized in phases, with Phase 1 and Phase 2 areas clearly marked on the floor plan. The district notes that painting can commence in June and will accommodate summer school operations, with particular scheduling considerations required around rooms 300 and 400 where summer school classes will be held. The document explicitly states it is not to be used for construction and requires vendor or contractor field verification of conditions.

The painting project is part of a larger district-wide initiative spanning 27 sites with work required to be substantially completed before the 2026-27 school year begins. Surface preparation, priming, and painting of designated interior and exterior areas are included in the scope. Contractors must coordinate scheduling with district facilities staff and comply with all applicable safety and environmental standards. Responses must be submitted through the Bonfire platform, and no alternative submission methods are accepted. Specific pricing terms, funding sources, and contract award dates are not detailed in this site-specific document.

View the file

Other files

File Type Posted
28-Dakota Middle School Paint Plans Summer 2026.pdf PDF
8-TSSC Paint Plan Summer 2026.pdf PDF
25-GW Gibbs Paint Plans Summer 2026.pdf PDF
29-RFQ 25027 Summer2026 Painting.pdf PDF
27-Hoover Paint Plans Summer 2026.pdf PDF
26-John Adams Paint Plans Summer 2026.pdf PDF
12-Washington Paint Plans Summer 2026.pdf PDF
3-Lincoln Paint Plan Summer 2026.pdf PDF
20-Facilities Services Center Paint Plans Summer 2026.pdf PDF
14-Bamber Valley Paint Plan Summer 2026.pdf PDF
15-Bishop Paint Plan Summer 2026.pdf PDF
5-Mighty Oaks Paint Plan Summer 2026.pdf PDF
4-Longfellow Elementary Paint Plans Summer 2026.pdf PDF
21-Folwell Paint Plans Summer 2026.pdf PDF
22-Friedell Paint Plan Summer 2026.pdf PDF
24-Hawthorne Paint Plans Summer 2026.pdf PDF
10-Riverside Paint Plans Summer 2026.pdf PDF
18-ESC Paint Plan Summer 2026.pdf PDF
11-Willow Creek Paint Plans Summer 2026.pdf PDF
30-RFQ 25027 Quoter Acknowledgment.pdf PDF
16-Churchill Paint Plans Summer 2026.pdf PDF
1-Kellogg Middle School Paint Plans Summer 2026.pdf PDF
7-Rochester Alternative Learning Center Paint Plans Summer 2026.pdf PDF
17-Century High School Paint Plan Summer 2026.pdf PDF
6-Northrop Paint Plans Summer 2026.pdf PDF
2-John Marshall Paint Plan Summer 2026.pdf PDF
13-Master District PaintingSpec.pdf PDF
19-Edison Paint Plans Summer 2026.pdf PDF
9-Sunset Terrace Paint Plan Summer 2026.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

DN

113A

111A111

110A

108 106

135D

135C

135A

103A 716A

102 100

128A

712A

139138

137A137B

135E

124122120

120A

118A

100A

727214

215A

214B214A708

214C

214D

201A

201B

204205

701A

220B

220C

220A

224A

219A

219B

227A

228 229A

233A

309 308

307 306

304303302301

410 409 408 407

403402

135B

121A

112A

726OUT

SIDE

COURT

YARD

709a

101112

14 15 16

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

12/29/2025 1:05:33

PM

3A101Floor Plan

Robert Gage Elementary School

1. PAINT HALLWAY WALLS, PURE WHITE SW 7005

2. PAINT WALL, PURE WHITE SW 7005

3. PAINT WALL AROUND DOORWAY, PURE WHITE SW 7005

NOTES:PRIORITY

GENERAL NOTES:

NO PREFERED DATE TO PAINT. CAN START IN

JUNE. WILL HAVE SUMMER SCHOOL, AFFECTS

PAINTING AROUND ROOM 400 AND 300.