23-Gage Paint Plan Summer 2026.pdf
PDF 724 KB Posted
- Attached to
- Summer '26 District Painting Improvements
- Solicitation number
- RFQ # 25027
- Issued by
- Olmsted County, Minnesota
About this file
This is a paint plan document for Robert Gage Elementary School, prepared by Rochester Public Schools (ISD #535) in Minnesota for district-wide interior painting services scheduled for summer 2026. The document provides a floor plan of the facility with designated painting areas identified across multiple rooms and hallways. The scope of work includes painting hallway walls, walls, and areas around doorways in Pure White (SW 7005). The work is prioritized in phases, with Phase 1 and Phase 2 areas clearly marked on the floor plan. The district notes that painting can commence in June and will accommodate summer school operations, with particular scheduling considerations required around rooms 300 and 400 where summer school classes will be held. The document explicitly states it is not to be used for construction and requires vendor or contractor field verification of conditions.
The painting project is part of a larger district-wide initiative spanning 27 sites with work required to be substantially completed before the 2026-27 school year begins. Surface preparation, priming, and painting of designated interior and exterior areas are included in the scope. Contractors must coordinate scheduling with district facilities staff and comply with all applicable safety and environmental standards. Responses must be submitted through the Bonfire platform, and no alternative submission methods are accepted. Specific pricing terms, funding sources, and contract award dates are not detailed in this site-specific document.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
DN
DN
113A
111A111
110A
108 106
135D
135C
135A
103A 716A
102 100
128A
712A
139138
137A137B
135E
124122120
120A
118A
100A
727214
215A
214B214A708
214C
214D
201A
201B
204205
701A
220B
220C
220A
224A
219A
219B
227A
228 229A
233A
309 308
307 306
304303302301
410 409 408 407
403402
135B
121A
112A
726OUT
SIDE
COURT
YARD
709a
101112
14 15 16
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
12/29/2025 1:05:33
PM
3A101Floor Plan
Robert Gage Elementary School
1. PAINT HALLWAY WALLS, PURE WHITE SW 7005
2. PAINT WALL, PURE WHITE SW 7005
3. PAINT WALL AROUND DOORWAY, PURE WHITE SW 7005
NOTES:PRIORITY
GENERAL NOTES:
NO PREFERED DATE TO PAINT. CAN START IN
JUNE. WILL HAVE SUMMER SCHOOL, AFFECTS
PAINTING AROUND ROOM 400 AND 300.
| Sheets |
| 3A101 - Floor Plan |
File details come from the government source that posted it. Updated .