24-Hawthorne Paint Plans Summer 2026.pdf

PDF 756 KB Posted

Attached to
Summer '26 District Painting Improvements
Solicitation number
RFQ # 25027
Issued by
Olmsted County, Minnesota

About this file

This file consists of architectural floor plans for the Nathaniel Hawthorne Education Center, a facility within Rochester Public Schools (ISD #535) in Minnesota, prepared to support a district-wide interior painting project scheduled for summer 2026. The plans depict the main, second, and third floors of the building with designated painting work areas and priorities. The scope of work includes repainting stair handrails in Pavestone SW 7642, painting entire walls in Dover White SW 6385, and painting doors and frames in Dovetail SW 7018. Priority designations range from 1 to 3, with Priority 1 items including work under windows on the third floor and wall protection required in rooms 301, 304, 305, and 307. The plans indicate that no preferred paint date has been established, though all work must be substantially completed before the 2026-27 school year begins. The document is explicitly marked as not to be used for construction and requires vendors and contractors to field verify conditions before submitting quotes.

No pricing terms, set-asides, incumbent contractors, funding sources, or other financial information are detailed in this floor plan document. The plans serve as visual reference materials to accompany the formal solicitation issued through Bonfire, through which all contractor responses must be submitted. Contractors are responsible for surface preparation, priming, and painting operations while coordinating schedules with district facilities staff and maintaining compliance with applicable safety and environmental standards across the 27 district sites included in the overall summer 2026 painting improvements program.

View the file

Other files

File Type Posted
28-Dakota Middle School Paint Plans Summer 2026.pdf PDF
8-TSSC Paint Plan Summer 2026.pdf PDF
25-GW Gibbs Paint Plans Summer 2026.pdf PDF
29-RFQ 25027 Summer2026 Painting.pdf PDF
27-Hoover Paint Plans Summer 2026.pdf PDF
26-John Adams Paint Plans Summer 2026.pdf PDF
12-Washington Paint Plans Summer 2026.pdf PDF
3-Lincoln Paint Plan Summer 2026.pdf PDF
20-Facilities Services Center Paint Plans Summer 2026.pdf PDF
14-Bamber Valley Paint Plan Summer 2026.pdf PDF
15-Bishop Paint Plan Summer 2026.pdf PDF
5-Mighty Oaks Paint Plan Summer 2026.pdf PDF
4-Longfellow Elementary Paint Plans Summer 2026.pdf PDF
21-Folwell Paint Plans Summer 2026.pdf PDF
22-Friedell Paint Plan Summer 2026.pdf PDF
10-Riverside Paint Plans Summer 2026.pdf PDF
18-ESC Paint Plan Summer 2026.pdf PDF
11-Willow Creek Paint Plans Summer 2026.pdf PDF
30-RFQ 25027 Quoter Acknowledgment.pdf PDF
16-Churchill Paint Plans Summer 2026.pdf PDF
1-Kellogg Middle School Paint Plans Summer 2026.pdf PDF
7-Rochester Alternative Learning Center Paint Plans Summer 2026.pdf PDF
17-Century High School Paint Plan Summer 2026.pdf PDF
6-Northrop Paint Plans Summer 2026.pdf PDF
2-John Marshall Paint Plan Summer 2026.pdf PDF
13-Master District PaintingSpec.pdf PDF
19-Edison Paint Plans Summer 2026.pdf PDF
9-Sunset Terrace Paint Plan Summer 2026.pdf PDF
23-Gage Paint Plan Summer 2026.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

DN

DN

DN

UP

DN

DN

DN

DN

UP

117A

115A

122A

112 110

108A

108B

101E 101A

101B 101F

G

101C

101D

101H

101J

101L

103A

103E

102A

107B

107C

107A

107109 111A

111B

-1

Maint Closet

105B

Classroom

103C

Classroom

103B Classroom

103E

Classroom

103D

Room

103F

Room

103G

114B

113A

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

12/29/2025 3:12:41

PM

3A101Main Floor Plan

Nathaniel Hawthorne Education Center

2. REPAINT STAIR HAND RAILS, PAVESTONE SW 7642

3. PAINT ENTIRE WALL, DOVER WHITE SW 6385

4. PAINT DOORS AND FRAME, DOVETAIL SW 7018

NOTES:PRIORITY

GENERAL NOTES:

NO PREFERED DATE TO PAINT

UP

DN

UPDN

UP

DN

UP

214A

C

217A217B

215A

216A

202B

C

202A

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

12/29/2025 3:12:41

PM

3A102Second Floor Plan

Nathaniel Hawthorne Education Center

2. PAINT STAIR HAND RAILS, PAVESTONE SW 7642

3. PAINT ENTIRE WALL, DOVER WHITE SW 6385

PRIORITY

NOTES:

DN

DN

316A

311A

312A

302B

C

302A

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

12/29/2025 3:12:41

PM

3A103Third Floor Plan

Nathaniel Hawthorne Education Center

1. PAINT UNDER WINDOWS, DOVER WHITE SW 6385

2. PAINT STAIR HAND RAILS, PAVESTONE SW 7642

3. PAINT ENTIRE WALL, DOVER WHITE SW 6385

NOTES:PRIORITY

GENERAL NOTES:

NEED FOR WALL PROTECTION IN ROOMS: 307, 304,

305, AND 301.

NO PREFERED DATE TO PAINT

2 1

Sheets
3A101 - Main Floor Plan
3A102 - Second Floor Plan
3A103 - Third Floor Plan