24-Hawthorne Paint Plans Summer 2026.pdf
PDF 756 KB Posted
- Attached to
- Summer '26 District Painting Improvements
- Solicitation number
- RFQ # 25027
- Issued by
- Olmsted County, Minnesota
About this file
This file consists of architectural floor plans for the Nathaniel Hawthorne Education Center, a facility within Rochester Public Schools (ISD #535) in Minnesota, prepared to support a district-wide interior painting project scheduled for summer 2026. The plans depict the main, second, and third floors of the building with designated painting work areas and priorities. The scope of work includes repainting stair handrails in Pavestone SW 7642, painting entire walls in Dover White SW 6385, and painting doors and frames in Dovetail SW 7018. Priority designations range from 1 to 3, with Priority 1 items including work under windows on the third floor and wall protection required in rooms 301, 304, 305, and 307. The plans indicate that no preferred paint date has been established, though all work must be substantially completed before the 2026-27 school year begins. The document is explicitly marked as not to be used for construction and requires vendors and contractors to field verify conditions before submitting quotes.
No pricing terms, set-asides, incumbent contractors, funding sources, or other financial information are detailed in this floor plan document. The plans serve as visual reference materials to accompany the formal solicitation issued through Bonfire, through which all contractor responses must be submitted. Contractors are responsible for surface preparation, priming, and painting operations while coordinating schedules with district facilities staff and maintaining compliance with applicable safety and environmental standards across the 27 district sites included in the overall summer 2026 painting improvements program.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
DN
DN
DN
UP
DN
DN
DN
DN
UP
117A
115A
122A
112 110
108A
108B
101E 101A
101B 101F
G
101C
101D
101H
101J
101L
103A
103E
102A
107B
107C
107A
107109 111A
111B
-1
Maint Closet
105B
Classroom
103C
Classroom
103B Classroom
103E
Classroom
103D
Room
103F
Room
103G
114B
113A
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
12/29/2025 3:12:41
PM
3A101Main Floor Plan
Nathaniel Hawthorne Education Center
2. REPAINT STAIR HAND RAILS, PAVESTONE SW 7642
3. PAINT ENTIRE WALL, DOVER WHITE SW 6385
4. PAINT DOORS AND FRAME, DOVETAIL SW 7018
NOTES:PRIORITY
GENERAL NOTES:
NO PREFERED DATE TO PAINT
UP
DN
UPDN
UP
DN
UP
214A
C
217A217B
215A
216A
202B
C
202A
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
12/29/2025 3:12:41
PM
3A102Second Floor Plan
Nathaniel Hawthorne Education Center
2. PAINT STAIR HAND RAILS, PAVESTONE SW 7642
3. PAINT ENTIRE WALL, DOVER WHITE SW 6385
PRIORITY
NOTES:
DN
DN
316A
311A
312A
302B
C
302A
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
12/29/2025 3:12:41
PM
3A103Third Floor Plan
Nathaniel Hawthorne Education Center
1. PAINT UNDER WINDOWS, DOVER WHITE SW 6385
2. PAINT STAIR HAND RAILS, PAVESTONE SW 7642
3. PAINT ENTIRE WALL, DOVER WHITE SW 6385
NOTES:PRIORITY
GENERAL NOTES:
NEED FOR WALL PROTECTION IN ROOMS: 307, 304,
305, AND 301.
NO PREFERED DATE TO PAINT
2 1
| Sheets |
| 3A101 - Main Floor Plan |
| 3A102 - Second Floor Plan |
| 3A103 - Third Floor Plan |
File details come from the government source that posted it. Updated .