21-Folwell Paint Plans Summer 2026.pdf
PDF 708 KB Posted
- Attached to
- Summer '26 District Painting Improvements
- Solicitation number
- RFQ # 25027
- Issued by
- Olmsted County, Minnesota
About this file
This is a painting plans document for William Watts Folwell Elementary School in Rochester Public Schools (ISD #535), Minnesota, detailing interior painting improvements scheduled for Summer 2026. The scope includes painting work across four levels of the building, with designated areas identified on floor plans for Levels 1 through 4. The project specifies comprehensive painting tasks including surface preparation and application of multiple paint colors to walls, hallways, railings, baseboards, ceilings, and accent areas. Paint colors include Dover White (SW 6385) as the primary field color, Dovetail (SW 7018) for hardware frames, accent colors in light blue (Respite SW 6514), dark blue (Down Pour SW 6516), and red (Rave Red SW 6608), with Iron Ore (SW 7069) for railings and baseboards. Priority areas are clearly marked on each floor plan, though no specific preferred start date is established. The document notes that the plans are not to be used for construction and that vendors must field-verify actual conditions before submitting proposals.
The project is part of a district-wide painting initiative spanning 27 sites across Rochester Public Schools that must be substantially completed before the 2026-27 school year begins. Contractors are required to coordinate scheduling with district facilities staff, comply with all applicable safety standards, and meet environmental requirements. Vendors must submit all responses through Bonfire, and no alternative submission methods will be accepted. The document was printed on December 26, 2025, and is intended as a planning reference rather than final construction documentation.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN UP
UP
UP
DN
S B
S B
4 5 5A
100 102
114B
114A
106A 108 110A
701A
120D
118A
120C
700B
170A 171A 172 700A
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
12/26/2025 9:11:02
AM
3A101Floor Plan Level 1
William Watts Folwell Elementary School
Doors 1 and 6 enter on the main levels and actual door may not be shown on this drawing.
3 4
GENERAL NOTES:
NO PREFERED START DATE TO PAINT.
NOTES:PRIORITY
1. PAINT AROUND TABLE FRAMES AND BY ELECTRICAL BOX AS INDICATED, DOVER WHITE SW 6385
2. PAINT BRICK POST TO MATCH EXISTING
3. PAINT BEHIND SMARTBOARD AND HAND SANITIZER, MATCH EXISTING
4. PAINT HAND RAILINGS AND BASEBOARD TO MATCH EXISTING, IRON ORE SW 7069
5. PAINT ENTIRE WALL, DOVER WHITE SW 6385
6. PAINT ACCENT COLOR, DOWN POUR SW 6603
PAINT COLORS:
NEW GENERAL FIELD COLOR: DOVER WHITE SW 6385
NEW H.M. FRAMES COLOR: DOVETAIL SW 7018
NEW LIGHT BLUE ACCENT: RESPITE SW 6514
NEW DARK BLUE ACCENT: DOWN POUR SW 6516
NEW RED ACCENT: RAVE RED SW 6608
DN
DN
DN
UP
UP
DN
212B
212A
208A
200A
201C
201D
201B 201A
203 205 207
1A
4 5 5A
704A 200B
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
12/26/2025 9:11:02
AM
3A102Floor Plan Level 2
William Watts Folwell Elementary School
Doors 2,3,4,5,5A enter on the lower level and door 6 enters on an upper level and actual doors may not be shown on drawing.
1. PAINT ALL WALLS, DOVER WHITE SW 6385
2. PAINT HALLWAY, DOVER WHITE SW 6385
3. PAINT RAILINGS AND BASEBOARD, IRON ORE SW 7069
4. PAINT WALL DOVER WHITE SW 6385
NOTES:PRIORITY PAINT COLORS:
NEW GENERAL FIELD COLOR: DOVER WHITE SW 6385
NEW H.M. FRAMES COLOR: DOVETAIL SW 7018
NEW LIGHT BLUE ACCENT: RESPITE SW 6514
NEW DARK BLUE ACCENT: DOWN POUR SW 6516
NEW RED ACCENT: RAVE RED SW 6608
UP
UP
303A
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
12/26/2025 9:11:02
AM
3A103Floor Plan Level 3
William Watts Folwell Elementary School
Doors 1,2,3,4,5,5A enter on the lower levels and actual doors may not be shown on drawing.
1. PAINT CEILING ABOVE LOCATIONS INDICATED TO MATCH
EXISTING
NOTES:PRIORITY
UP
DN
UP
402A
502C
502D
404A
400A
Door to roof
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
12/26/2025 9:11:02
AM
3A104Floor Plan Level 4
William Watts Folwell Elementary School
1. PAINT CEILING ABOVE LOCATIONS INDICATED TO MATCH
EXISTING
NOTES:PRIORITY
| Sheets |
| 3A101 - Floor Plan Level 1 |
| 3A102 - Floor Plan Level 2 |
| 3A103 - Floor Plan Level 3 |
| 3A104 - Floor Plan Level 4 |
| 3A105 - Floor Plan Level 5 |
File details come from the government source that posted it. Updated .