This file is a floor plan document for Dakota Middle School's interior painting project scheduled for summer 2026, prepared by Rochester Public Schools (ISD #535) in Minnesota. The document consists of three architectural floor plans—Lower Level, Main Level, and Upper Level—with designated painting areas marked and color specifications provided. The project scope includes painting stairway walls from top to bottom in Pure White (SW 7005), painting select interior walls to match existing colors including Pure White (SW 7005) and Determined Orange (SW 6635), painting doors in Iron Ore (SW 7069), and spot-painting areas where hand sanitizer dispensers were previously located. The work is prioritized across five levels, with Priority 5 assigned to lower level stairway painting, Priority 4 to upper level work, and Priority 3 to main level work. The plans indicate approximately 40 linear feet of heavy-duty adjustable instrument wall shelving installation. Contractors are permitted to begin work in June with no specific date preference, and all work must be substantially completed before the 2026-27 school year begins.

The document is marked "Not to be Used for Construction" and "Vendor/Contractor to Field Verify," indicating that vendors must conduct site visits to verify all existing conditions and measurements before submitting quotes. The plans were printed on January 26, 2026, and are provided at no specific scale. The file does not contain information regarding pricing, contract terms, submission deadlines through Bonfire, or other administrative details beyond the physical scope of painting work and color specifications for Dakota Middle School.

View the file

Other files

File Type Posted
8-TSSC Paint Plan Summer 2026.pdf PDF
25-GW Gibbs Paint Plans Summer 2026.pdf PDF
29-RFQ 25027 Summer2026 Painting.pdf PDF
27-Hoover Paint Plans Summer 2026.pdf PDF
26-John Adams Paint Plans Summer 2026.pdf PDF
12-Washington Paint Plans Summer 2026.pdf PDF
3-Lincoln Paint Plan Summer 2026.pdf PDF
20-Facilities Services Center Paint Plans Summer 2026.pdf PDF
14-Bamber Valley Paint Plan Summer 2026.pdf PDF
15-Bishop Paint Plan Summer 2026.pdf PDF
5-Mighty Oaks Paint Plan Summer 2026.pdf PDF
4-Longfellow Elementary Paint Plans Summer 2026.pdf PDF
21-Folwell Paint Plans Summer 2026.pdf PDF
22-Friedell Paint Plan Summer 2026.pdf PDF
24-Hawthorne Paint Plans Summer 2026.pdf PDF
10-Riverside Paint Plans Summer 2026.pdf PDF
18-ESC Paint Plan Summer 2026.pdf PDF
11-Willow Creek Paint Plans Summer 2026.pdf PDF
30-RFQ 25027 Quoter Acknowledgment.pdf PDF
16-Churchill Paint Plans Summer 2026.pdf PDF
1-Kellogg Middle School Paint Plans Summer 2026.pdf PDF
7-Rochester Alternative Learning Center Paint Plans Summer 2026.pdf PDF
17-Century High School Paint Plan Summer 2026.pdf PDF
6-Northrop Paint Plans Summer 2026.pdf PDF
2-John Marshall Paint Plan Summer 2026.pdf PDF
13-Master District PaintingSpec.pdf PDF
19-Edison Paint Plans Summer 2026.pdf PDF
9-Sunset Terrace Paint Plan Summer 2026.pdf PDF
23-Gage Paint Plan Summer 2026.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

UP

UP

UP

FD

FD

FD

FD

FD FD

FD

FD

FD

FDFD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD FD

F000

C046C045

C020

C012

C013

E007

F007

F005

F008

E006

D027

E005

E008

F006

D024A

D024

D030

E000

E001E002 E001C

D020

D023

D022

D024D

D028

E003

C044

F015

E010

D025

D012

E013

F013

F010

D026

D024C

E000A

E003A

F001

D024E

F002 F003A

F003

D014

C047

D000B

D000A

E001D

E001B

D1

D011

D010

E1

E011E012

E014 E015

D021

D022C

D022B

D022A

D2

D013

C010

C011

F000A

F1

F014

F011

F012

C040 C041

C000

C030

D000C

C1

D024B

E001EE002A

C043

C000A

D024G

D015

C048

D014A

D024F

12 13 14

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

1/26/2026 11:00:00

AM

3A101Lower Level Floor Plan

Dakota Middle School

GENERAL NOTES:

NO PREFERENCE TO PAINT DATES. CAN

START IN JUNE

1. PAINT STAIRWAY WALLS (TOP TO BOTTOM) EXISTING: PURE

WHITE SW 7005

NOTES:PRIORITY

GENERAL NOTES:

NO PREFERENCE TO PAINT DATES. CAN

START IN JUNE

1. PAINT STAIRWAY WALLS (TOP TO BOTTOM) EXISTING: PURE

WHITE SW 7005

NOTES:PRIORITY

#15

#07N

N

#11N #42

N

N

#05N

#15 #12

#15 #15

N

#42

#11N#05N#11N#05#11N#05#11N#05#11N#05#11N#05

N

N#

N#

N#

N#

N#

N

N#

N

N#

N

N#

N

N#

N

A

#07N #11N#11N #05#11N

#01N #04N#01N#01N #04N#01N #04N#01N#04N

#15

UP

UP

UP

UP

DN

DN

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FDFD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

C130

C120

F107

E107

E106

F105

F108

E101

F101

F101C

F101B

F101A

D122

E105

E103 E102

E108

F106

F100

D121

C113

C110

F110

E113

D123

D120

A103

A102B

B122

B

B121

B113

B110B111B112

B102

B106

B104

B101

E100

MEDIA BELOW

OPEN

B105

B103

F115

GYM BELOW

E100A

E102B

A131

A110

A134 A101

E112

D121A

A118

A111 A112

A115

A114

A132

A133 A135

A113 A101

B100

A130

A100

C140

D100A

D100B

D120A

E111

E114

C101

D110

D140

F102 F111

F114

F113

F112

F102A

F100A

C131

E110

E115

A121

A122 A123 A124 A117

A110B

A125

A120

A110A

A116

A115A

B111A

B111B B112A

B112B

B107

C112

C111

C123

C122

C121

E102A

E1

D1

D2

F1

C1

40 LF OF HEAVY DUTY ADJ.

INSTRUMENT WALL SHELVING

A102C

F100N

F100S

E100N

E100S

D100

C132

C132

A129

C133

D130

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

1/26/2026 11:00:01

AM

3A102Main Level Floor Plan

Dakota Middle School

1. PAINT TO MATCH EXISTING: PURE WHITE SW 7005,

DETERMINED ORANGE SW 6635

2. PAINT STAIRWAY WALLS (TOP TO BOTTOM) EXISTING: PURE

WHITE SW 7005

3. PAINT ALL WALLS TO MATCH EXISTING: PURE WHITE SW 7005

4. PAINT DOORS TO MATCH EXISTING: IRON ORE SW 7069

5. PAINT SPOT WHERE HAND SANITIZER PREVIOUSLY WAS

EXISTING: PURE WHITE SW 7005

NOTES:PRIORITY

GENERAL NOTES:

NO PREFERENCE TO PAINT DATES.

CAN START IN JUNE.

DN

DN

DN

DN

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FDFD

FD

FD

D222

D220

D221

D231

D202

D223

D224

F208

F205

E206

E215

E210

E200

F201

E201 E201B

E201A

F206

E208

E205

F207

E207

F200

F213

F215

E213

CAFETERIA BELOW

ROOF BELOW

D230

F210

D200C

D200A

D200B

E202

E200A

E202A

E203

F202

F203

D231A

E214

E211E212

D201

F202A

F202B

F200A

F214

F211

F212

D201

D210

D240

D1

E1

D2

F1

SWING

E200S

E200N

F200S

F200N

E201C

D203

D231B

B220

A101

B221

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

1/26/2026 11:00:04

AM

3A103Upper Level Floor Plan

Dakota Middle School

GENERAL NOTES:

NO PREFERENCE TO PAINT DATES.

CAN START IN JUNE.

1. PAINT TO MATCH EXISTING: PURE WHITE SW 7005,

DETERMINED ORANGE SW 6635

2. PAINT STAIRWAY WALLS (TOP TO BOTTOM) EXISTING: PURE

WHITE SW 7005

NOTES:PRIORITY

Sheets
3A101 - Lower Level Floor Plan
3A102 - Main Level Floor Plan
3A103 - Upper Level Floor Plan

File details come from the government source that posted it. Updated .