28-Dakota Middle School Paint Plans Summer 2026.pdf
PDF 4 MB Posted
- Attached to
- Summer '26 District Painting Improvements
- Solicitation number
- RFQ # 25027
- Issued by
- Olmsted County, Minnesota
About this file
This file is a floor plan document for Dakota Middle School's interior painting project scheduled for summer 2026, prepared by Rochester Public Schools (ISD #535) in Minnesota. The document consists of three architectural floor plans—Lower Level, Main Level, and Upper Level—with designated painting areas marked and color specifications provided. The project scope includes painting stairway walls from top to bottom in Pure White (SW 7005), painting select interior walls to match existing colors including Pure White (SW 7005) and Determined Orange (SW 6635), painting doors in Iron Ore (SW 7069), and spot-painting areas where hand sanitizer dispensers were previously located. The work is prioritized across five levels, with Priority 5 assigned to lower level stairway painting, Priority 4 to upper level work, and Priority 3 to main level work. The plans indicate approximately 40 linear feet of heavy-duty adjustable instrument wall shelving installation. Contractors are permitted to begin work in June with no specific date preference, and all work must be substantially completed before the 2026-27 school year begins.
The document is marked "Not to be Used for Construction" and "Vendor/Contractor to Field Verify," indicating that vendors must conduct site visits to verify all existing conditions and measurements before submitting quotes. The plans were printed on January 26, 2026, and are provided at no specific scale. The file does not contain information regarding pricing, contract terms, submission deadlines through Bonfire, or other administrative details beyond the physical scope of painting work and color specifications for Dakota Middle School.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
UP
UP
UP
FD
FD
FD
FD
FD FD
FD
FD
FD
FDFD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD FD
F000
C046C045
C020
C012
C013
E007
F007
F005
F008
E006
D027
E005
E008
F006
D024A
D024
D030
E000
E001E002 E001C
D020
D023
D022
D024D
D028
E003
C044
F015
E010
D025
D012
E013
F013
F010
D026
D024C
E000A
E003A
F001
D024E
F002 F003A
F003
D014
C047
D000B
D000A
E001D
E001B
D1
D011
D010
E1
E011E012
E014 E015
D021
D022C
D022B
D022A
D2
D013
C010
C011
F000A
F1
F014
F011
F012
C040 C041
C000
C030
D000C
C1
D024B
E001EE002A
C043
C000A
D024G
D015
C048
D014A
D024F
12 13 14
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
1/26/2026 11:00:00
AM
3A101Lower Level Floor Plan
Dakota Middle School
GENERAL NOTES:
NO PREFERENCE TO PAINT DATES. CAN
START IN JUNE
1. PAINT STAIRWAY WALLS (TOP TO BOTTOM) EXISTING: PURE
WHITE SW 7005
NOTES:PRIORITY
GENERAL NOTES:
NO PREFERENCE TO PAINT DATES. CAN
START IN JUNE
1. PAINT STAIRWAY WALLS (TOP TO BOTTOM) EXISTING: PURE
WHITE SW 7005
NOTES:PRIORITY
#15
#07N
N
#11N #42
N
N
#05N
#15 #12
#15 #15
N
#42
#11N#05N#11N#05#11N#05#11N#05#11N#05#11N#05
N
N#
N#
N#
N#
N#
N
N#
N
N#
N
N#
N
N#
N
A
#07N #11N#11N #05#11N
#01N #04N#01N#01N #04N#01N #04N#01N#04N
#15
UP
UP
UP
UP
DN
DN
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FDFD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
C130
C120
F107
E107
E106
F105
F108
E101
F101
F101C
F101B
F101A
D122
E105
E103 E102
E108
F106
F100
D121
C113
C110
F110
E113
D123
D120
A103
A102B
B122
B
B121
B113
B110B111B112
B102
B106
B104
B101
E100
MEDIA BELOW
OPEN
B105
B103
F115
GYM BELOW
E100A
E102B
A131
A110
A134 A101
E112
D121A
A118
A111 A112
A115
A114
A132
A133 A135
A113 A101
B100
A130
A100
C140
D100A
D100B
D120A
E111
E114
C101
D110
D140
F102 F111
F114
F113
F112
F102A
F100A
C131
E110
E115
A121
A122 A123 A124 A117
A110B
A125
A120
A110A
A116
A115A
B111A
B111B B112A
B112B
B107
C112
C111
C123
C122
C121
E102A
E1
D1
D2
F1
C1
40 LF OF HEAVY DUTY ADJ.
INSTRUMENT WALL SHELVING
A102C
F100N
F100S
E100N
E100S
D100
C132
C132
A129
C133
D130
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
1/26/2026 11:00:01
AM
3A102Main Level Floor Plan
Dakota Middle School
1. PAINT TO MATCH EXISTING: PURE WHITE SW 7005,
DETERMINED ORANGE SW 6635
2. PAINT STAIRWAY WALLS (TOP TO BOTTOM) EXISTING: PURE
WHITE SW 7005
3. PAINT ALL WALLS TO MATCH EXISTING: PURE WHITE SW 7005
4. PAINT DOORS TO MATCH EXISTING: IRON ORE SW 7069
5. PAINT SPOT WHERE HAND SANITIZER PREVIOUSLY WAS
EXISTING: PURE WHITE SW 7005
NOTES:PRIORITY
GENERAL NOTES:
NO PREFERENCE TO PAINT DATES.
CAN START IN JUNE.
DN
DN
DN
DN
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FDFD
FD
FD
D222
D220
D221
D231
D202
D223
D224
F208
F205
E206
E215
E210
E200
F201
E201 E201B
E201A
F206
E208
E205
F207
E207
F200
F213
F215
E213
CAFETERIA BELOW
ROOF BELOW
D230
F210
D200C
D200A
D200B
E202
E200A
E202A
E203
F202
F203
D231A
E214
E211E212
D201
F202A
F202B
F200A
F214
F211
F212
D201
D210
D240
D1
E1
D2
F1
SWING
E200S
E200N
F200S
F200N
E201C
D203
D231B
B220
A101
B221
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
1/26/2026 11:00:04
AM
3A103Upper Level Floor Plan
Dakota Middle School
GENERAL NOTES:
NO PREFERENCE TO PAINT DATES.
CAN START IN JUNE.
1. PAINT TO MATCH EXISTING: PURE WHITE SW 7005,
DETERMINED ORANGE SW 6635
2. PAINT STAIRWAY WALLS (TOP TO BOTTOM) EXISTING: PURE
WHITE SW 7005
NOTES:PRIORITY
| Sheets |
| 3A101 - Lower Level Floor Plan |
| 3A102 - Main Level Floor Plan |
| 3A103 - Upper Level Floor Plan |
File details come from the government source that posted it. Updated .