This file is a paint plan document for Frank B. Kellogg Middle School, a facility within Rochester Public Schools (ISD #535) in Minnesota. The document provides architectural floor plans for Levels 2, 3, and 4 of the school and identifies painting work to be completed during summer 2026. The scope of work includes painting hallway walls in Pure White (SW 7005) and requires all walls to be sanded before painting. The plans cover multiple rooms and areas across the school, with doors 2, 3, 4, and 10 noted as entrances to the lower level. No preferred painting dates are specified, with work eligible to begin June 1, 2026. The document is one of multiple site-specific scope documents covering 27 district sites across Rochester Public Schools, with all work requiring substantial completion before the 2026-27 school year begins.
The painting improvements project encompasses surface preparation, priming, and painting of designated interior and exterior areas as part of district-wide improvements. Contractors must coordinate scheduling with district facilities staff and comply with applicable safety and environmental standards. Responses must be submitted through Bonfire, and no alternative submission methods will be accepted. The plans are explicitly noted as not to be used for construction, with contractors required to field-verify all conditions before beginning work.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
UPDN
DN
DN
DN
DN
UP
UP
DNUP
DN
UP
DN
DN
DN
UP
DN
UP
DN
DN
DN
UP
202214B
214D
214C212A 212B212C212D212E
210B
218A
822 821
235 236
EV1
826 221A
221B
221C
210E
210C
871A 212F
245C
242A
242B 242C
245D
EV 2
205B
202F202E
202A 202A1
201D
201A1
202D
201C
205A
843844
201A-1 201A-2
201A
214E
9 11
203H 203J
10212G
218A
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
1/26/2026 11:02:56
AM
3A102Level 2 Main Floor Plan
Frank B. Kellogg Middle School
Doors 2,3,4,10 enter onto lower level and actual door may not be shown on this drawing.
NOTES:
1. PAINT HALLWAY WALLS, PURE WHITE SW 7005
GENERAL NOTES:
ALL WALLS NEED TO BE SANDED BEFORE
PAINTING
NO PREFERED DATES TO PAINT. CAN BE JUNE
| Sheets |
| 3A101 - Level 1 Ground Floor Plan |
| 3A102 - Level 2 Main Floor Plan |
| 3A103 - Level 3 Third Floor Plan |
| 3A104 - Level 4 Fourth Floor and Penthouse Plan |
File details come from the government source that posted it. Updated .