5-Mighty Oaks Paint Plan Summer 2026.pdf

PDF 610 KB Posted

Attached to
Summer '26 District Painting Improvements
Solicitation number
RFQ # 25027
Issued by
Olmsted County, Minnesota

About this file

This file is a building floor plan document for Mighty Oaks Early Learning School, prepared in support of Rochester Public Schools (ISD #535) Summer 2026 district-wide interior painting improvements project. The plan identifies specific painting work required at this facility as part of a larger initiative encompassing 27 district sites across Minnesota. Priority paint work includes matching existing wall paint in Lagoon SW 6480 and painting an exterior door in Iron Ore SW 7069, with the contractor required to field-verify all colors before application. The project scope encompasses surface preparation, priming, and painting of designated interior and exterior areas, with work preferred to occur in July 2026 and must be substantially completed before the 2026-27 school year begins. All responses must be submitted through Bonfire, and contractors are required to coordinate scheduling with district facilities staff while complying with applicable safety and environmental standards.

The floor plan serves as a site-specific scope document that contractors must reference when preparing quotes for this location. Vendors should note that the plan is not to scale and contractors are responsible for field verification of existing conditions and color specifications. No additional pricing terms, set-asides, incumbent information, or funding details are specified within this particular document; however, all interested contractors must submit proposals through the designated Bonfire submission portal with no alternative submission methods accepted.

View the file

Other files

File Type Posted
28-Dakota Middle School Paint Plans Summer 2026.pdf PDF
8-TSSC Paint Plan Summer 2026.pdf PDF
25-GW Gibbs Paint Plans Summer 2026.pdf PDF
29-RFQ 25027 Summer2026 Painting.pdf PDF
27-Hoover Paint Plans Summer 2026.pdf PDF
26-John Adams Paint Plans Summer 2026.pdf PDF
12-Washington Paint Plans Summer 2026.pdf PDF
3-Lincoln Paint Plan Summer 2026.pdf PDF
20-Facilities Services Center Paint Plans Summer 2026.pdf PDF
14-Bamber Valley Paint Plan Summer 2026.pdf PDF
15-Bishop Paint Plan Summer 2026.pdf PDF
4-Longfellow Elementary Paint Plans Summer 2026.pdf PDF
21-Folwell Paint Plans Summer 2026.pdf PDF
22-Friedell Paint Plan Summer 2026.pdf PDF
24-Hawthorne Paint Plans Summer 2026.pdf PDF
10-Riverside Paint Plans Summer 2026.pdf PDF
18-ESC Paint Plan Summer 2026.pdf PDF
11-Willow Creek Paint Plans Summer 2026.pdf PDF
30-RFQ 25027 Quoter Acknowledgment.pdf PDF
16-Churchill Paint Plans Summer 2026.pdf PDF
1-Kellogg Middle School Paint Plans Summer 2026.pdf PDF
7-Rochester Alternative Learning Center Paint Plans Summer 2026.pdf PDF
17-Century High School Paint Plan Summer 2026.pdf PDF
6-Northrop Paint Plans Summer 2026.pdf PDF
2-John Marshall Paint Plan Summer 2026.pdf PDF
13-Master District PaintingSpec.pdf PDF
19-Edison Paint Plans Summer 2026.pdf PDF
9-Sunset Terrace Paint Plan Summer 2026.pdf PDF
23-Gage Paint Plan Summer 2026.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

108111

100B 100C 100D

108A

108B

108C

127A

121 101

135A

135B

100E

115117A 114 116A

104A

104B

103a

104C

107A

110A

124A

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

2/23/2026 3:49:03 PM

3A101Building Floor Plan

Mighty Oaks Early Learning School

NOTES:PRIORITY

1. PAINT WALL TO MATCH EXISTING, LAGOON SW 6480

2. PAINT DOOR ON OUTSIDE, IRON ORE SW 7069

*CONTRACTOR TO VERIFY COLOR

GENERAL NOTES:

PREFERED TO PAINT IN JULY

Sheets
3A101 - Building Floor Plan

File details come from the government source that posted it. Updated .