16-Churchill Paint Plans Summer 2026.pdf

PDF 510 KB Posted

Attached to
Summer '26 District Painting Improvements
Solicitation number
RFQ # 25027
Issued by
Olmsted County, Minnesota

About this file

This is a paint plan document for Winston Churchill Elementary School, part of Rochester Public Schools (ISD #535) District 27 in Minnesota, which is soliciting quotes for district-wide interior painting services during summer 2026. The project scope for Churchill Elementary involves painting designated interior walls and doors throughout the facility to match existing color schemes, with no preferred completion date but work to be finished by June 2026. The existing paint colors to be matched include Pure White (SW 7005) for general field color, Peppercorn (SW 7674) for H.M. frames, Faded Flawflower (SW 9146) for accent light blue, and Endless Sea (SW 9150) for accent dark blue. All work must be substantially completed before the start of the 2026-27 school year across the 27 district sites included in this comprehensive painting initiative.

Contractors are required to field verify all specifications, coordinate scheduling with district facilities staff, comply with applicable safety standards, and meet all environmental requirements. Vendors must submit all quotes and responses through Bonfire, with no alternative submission methods accepted. The broader district painting project encompasses surface preparation, priming, and painting of designated interior and exterior areas as specified in individual site-by-site scope documents provided for each of the 27 participating district locations.

View the file

Other files

File Type Posted
28-Dakota Middle School Paint Plans Summer 2026.pdf PDF
8-TSSC Paint Plan Summer 2026.pdf PDF
25-GW Gibbs Paint Plans Summer 2026.pdf PDF
29-RFQ 25027 Summer2026 Painting.pdf PDF
27-Hoover Paint Plans Summer 2026.pdf PDF
26-John Adams Paint Plans Summer 2026.pdf PDF
12-Washington Paint Plans Summer 2026.pdf PDF
3-Lincoln Paint Plan Summer 2026.pdf PDF
20-Facilities Services Center Paint Plans Summer 2026.pdf PDF
14-Bamber Valley Paint Plan Summer 2026.pdf PDF
15-Bishop Paint Plan Summer 2026.pdf PDF
5-Mighty Oaks Paint Plan Summer 2026.pdf PDF
4-Longfellow Elementary Paint Plans Summer 2026.pdf PDF
21-Folwell Paint Plans Summer 2026.pdf PDF
22-Friedell Paint Plan Summer 2026.pdf PDF
24-Hawthorne Paint Plans Summer 2026.pdf PDF
10-Riverside Paint Plans Summer 2026.pdf PDF
18-ESC Paint Plan Summer 2026.pdf PDF
11-Willow Creek Paint Plans Summer 2026.pdf PDF
30-RFQ 25027 Quoter Acknowledgment.pdf PDF
1-Kellogg Middle School Paint Plans Summer 2026.pdf PDF
7-Rochester Alternative Learning Center Paint Plans Summer 2026.pdf PDF
17-Century High School Paint Plan Summer 2026.pdf PDF
6-Northrop Paint Plans Summer 2026.pdf PDF
2-John Marshall Paint Plan Summer 2026.pdf PDF
13-Master District PaintingSpec.pdf PDF
19-Edison Paint Plans Summer 2026.pdf PDF
9-Sunset Terrace Paint Plan Summer 2026.pdf PDF
23-Gage Paint Plan Summer 2026.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

121 123 125 129

139138135133131

115A

116A

150A

150B

150C

124 126

134A 134B

136A 136B

127B

127A

121A

131A

115B

1A

116B

150G

150H

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

5/4/2026 8:40:36 AM

3A101Floor Plan

Winston Churchill Elementary School

1. PAINT WALL, MATCH EXISTING

2. PAINT DOOR AND/OR AROUND DOOR, MATCH

EXISTING

NOTES:PRIORITY EXISTING PAINT COLORS TO MATCH:

GENERAL FIELD COLOR: PURE WHITE SW 7005

H.M. FRAMES: PEPPERCORN SW 7674

ACCENT LIGHT BLUE: FADED FLAWFLOWER SW 9146

ACCENT DARK BLUE: ENDLESS SEA SW 9150

GENERAL NOTES:

NO PREFERED DATE TO PAINT.

CAN BE COMPLETED IN JUNE.

Sheets
3A101 - Floor Plan

File details come from the government source that posted it. Updated .