19-Edison Paint Plans Summer 2026.pdf

PDF 1 MB Posted

Attached to
Summer '26 District Painting Improvements
Solicitation number
RFQ # 25027
Issued by
Olmsted County, Minnesota

About this file

This is a floor plan document for the Thomas Edison Administration Building prepared for Rochester Public Schools (ISD #535) in Minnesota, supporting a district-wide interior painting project scheduled for summer 2026. The document consists of three architectural floor plans (Main and Lower Levels, Second Floor, and Third Floor) that identify specific rooms and areas designated for painting work. The scope requires contractors to paint entire rooms and patch and paint entire walls throughout the building using Pure White (SW 7005) as the general field color. Two priority levels are indicated on the plans to guide the sequencing of work, with no preferred start date specified. The project must be substantially completed before the start of the 2026-27 school year, and vendors are required to field verify conditions during site visits prior to submission.

The document serves as a visual reference guide for one of 27 district sites included in the broader summer 2026 painting improvements initiative. Contractors bidding on this work are expected to coordinate scheduling with district facilities staff, comply with all applicable safety standards, and meet environmental requirements. All responses must be submitted through the Bonfire platform, with no alternative submission methods accepted. The plans include general notes specifying that the document is not to be used for construction and emphasizing the contractor's responsibility to field verify actual conditions before finalizing their proposals.

View the file

Other files

File Type Posted
28-Dakota Middle School Paint Plans Summer 2026.pdf PDF
8-TSSC Paint Plan Summer 2026.pdf PDF
25-GW Gibbs Paint Plans Summer 2026.pdf PDF
29-RFQ 25027 Summer2026 Painting.pdf PDF
27-Hoover Paint Plans Summer 2026.pdf PDF
26-John Adams Paint Plans Summer 2026.pdf PDF
12-Washington Paint Plans Summer 2026.pdf PDF
3-Lincoln Paint Plan Summer 2026.pdf PDF
20-Facilities Services Center Paint Plans Summer 2026.pdf PDF
14-Bamber Valley Paint Plan Summer 2026.pdf PDF
15-Bishop Paint Plan Summer 2026.pdf PDF
5-Mighty Oaks Paint Plan Summer 2026.pdf PDF
4-Longfellow Elementary Paint Plans Summer 2026.pdf PDF
21-Folwell Paint Plans Summer 2026.pdf PDF
22-Friedell Paint Plan Summer 2026.pdf PDF
24-Hawthorne Paint Plans Summer 2026.pdf PDF
10-Riverside Paint Plans Summer 2026.pdf PDF
18-ESC Paint Plan Summer 2026.pdf PDF
11-Willow Creek Paint Plans Summer 2026.pdf PDF
30-RFQ 25027 Quoter Acknowledgment.pdf PDF
16-Churchill Paint Plans Summer 2026.pdf PDF
1-Kellogg Middle School Paint Plans Summer 2026.pdf PDF
7-Rochester Alternative Learning Center Paint Plans Summer 2026.pdf PDF
17-Century High School Paint Plan Summer 2026.pdf PDF
6-Northrop Paint Plans Summer 2026.pdf PDF
2-John Marshall Paint Plan Summer 2026.pdf PDF
13-Master District PaintingSpec.pdf PDF
9-Sunset Terrace Paint Plan Summer 2026.pdf PDF
23-Gage Paint Plan Summer 2026.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

DN

DN

DN

DN

DN

DN

UP

UP

DN

8 9

26LL

12BLL

12ALL

12LL

16LL

16CLL

16BLL

16ALL

11LL

10LL

18LL

15LL

13DLL

13LL

13LL

13BLL

13CLL

123A121A121C

121D

123B

123C

120A

120B

120C

120D

122A 122B

122C

129A

618 137A 137B

132H

132E 132G

132A132B 128C

128A

128B

17LL

16DLL

120E

603A

603B

129B

128D

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

12/30/2025 10:47:21 AM

3A101Floor Plan of Main and Lower Levels

Thomas Edison Administration Building

GENERAL NOTES:

NO PREFERED START DATE TO PAINT.

PAINT COLORS:

NEW GENERAL FIELD COLOR: PURE WHITE SW 70051. PAINT ENTIRE ROOM

2. PATCH AND PAINT ENTIRE WALLS

NOTES:PRIORITY

UP

DN

DN

UP

DN

208B

208A

208 623

623A

212 200

202A

202C202B

206D

623B

206C206B206A

206E

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

12/30/2025 10:47:21 AM

3A102Floor Plan of Second Floor

Thomas Edison Administration Building

GENERAL NOTES:

NO PREFERED DATE TO PAINT

PAINT COLORS:

NEW GENERAL FIELD COLOR: PURE WHITE SW 7005

1. PAINT ENTIRE ROOM

2. PATCH AND PAINT ENTIRE WALLS

NOTES:PRIORITY

Sheets
3A101 - Floor Plan of Main and Lower Levels
3A102 - Floor Plan of Second Floor
3A103 - Floor plan of Third Floor

File details come from the government source that posted it. Updated .