19-Edison Paint Plans Summer 2026.pdf
PDF 1 MB Posted
- Attached to
- Summer '26 District Painting Improvements
- Solicitation number
- RFQ # 25027
- Issued by
- Olmsted County, Minnesota
About this file
This is a floor plan document for the Thomas Edison Administration Building prepared for Rochester Public Schools (ISD #535) in Minnesota, supporting a district-wide interior painting project scheduled for summer 2026. The document consists of three architectural floor plans (Main and Lower Levels, Second Floor, and Third Floor) that identify specific rooms and areas designated for painting work. The scope requires contractors to paint entire rooms and patch and paint entire walls throughout the building using Pure White (SW 7005) as the general field color. Two priority levels are indicated on the plans to guide the sequencing of work, with no preferred start date specified. The project must be substantially completed before the start of the 2026-27 school year, and vendors are required to field verify conditions during site visits prior to submission.
The document serves as a visual reference guide for one of 27 district sites included in the broader summer 2026 painting improvements initiative. Contractors bidding on this work are expected to coordinate scheduling with district facilities staff, comply with all applicable safety standards, and meet environmental requirements. All responses must be submitted through the Bonfire platform, with no alternative submission methods accepted. The plans include general notes specifying that the document is not to be used for construction and emphasizing the contractor's responsibility to field verify actual conditions before finalizing their proposals.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
DN
DN
DN
DN
DN
DN
UP
UP
DN
8 9
26LL
12BLL
12ALL
12LL
16LL
16CLL
16BLL
16ALL
11LL
10LL
18LL
15LL
13DLL
13LL
13LL
13BLL
13CLL
123A121A121C
121D
123B
123C
120A
120B
120C
120D
122A 122B
122C
129A
618 137A 137B
132H
132E 132G
132A132B 128C
128A
128B
17LL
16DLL
120E
603A
603B
129B
128D
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
12/30/2025 10:47:21 AM
3A101Floor Plan of Main and Lower Levels
Thomas Edison Administration Building
GENERAL NOTES:
NO PREFERED START DATE TO PAINT.
PAINT COLORS:
NEW GENERAL FIELD COLOR: PURE WHITE SW 70051. PAINT ENTIRE ROOM
2. PATCH AND PAINT ENTIRE WALLS
NOTES:PRIORITY
UP
DN
DN
UP
DN
208B
208A
208 623
623A
212 200
202A
202C202B
206D
623B
206C206B206A
206E
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
12/30/2025 10:47:21 AM
3A102Floor Plan of Second Floor
Thomas Edison Administration Building
GENERAL NOTES:
NO PREFERED DATE TO PAINT
PAINT COLORS:
NEW GENERAL FIELD COLOR: PURE WHITE SW 7005
1. PAINT ENTIRE ROOM
2. PATCH AND PAINT ENTIRE WALLS
NOTES:PRIORITY
| Sheets |
| 3A101 - Floor Plan of Main and Lower Levels |
| 3A102 - Floor Plan of Second Floor |
| 3A103 - Floor plan of Third Floor |
File details come from the government source that posted it. Updated .