20-Facilities Services Center Paint Plans Summer 2026.pdf

PDF 767 KB Posted

Attached to
Summer '26 District Painting Improvements
Solicitation number
RFQ # 25027
Issued by
Olmsted County, Minnesota

About this file

This is a facilities services center paint plan document for Rochester Public Schools (ISD #535) in Minnesota for summer 2026 interior painting improvements across the district. The plan designates two priority work areas at the Facilities Services Center: the office area (Sheet 3A401) and the shop area (Sheet 3A402). The office area, totaling approximately 7,900 square feet across 33 rooms, requires touch-up and blemish coverage in Pure White SW 7005 with Priority 2 status. The shop area, comprising approximately 16,900 square feet across 26 rooms and storage spaces, requires full wall painting in Pure White SW 7005 with Priority 1 status. The plan includes detailed room-by-room specifications with square footage measurements for each designated area. Work is scheduled for summer 2026 with no preferred start date, and must be substantially completed before the 2026-27 school year begins. The document was drawn on December 29, 2025, with explicit notation that it is not to be used for construction without contacting construction services for corrections.

No pricing information, set-aside provisions, incumbent contractor details, or specific funding sources are identified in this facilities services paint plan document. The scope of work encompasses surface preparation and painting services across 27 district sites as part of the broader Summer 2026 District Painting Improvements solicitation. Contractors must submit all responses through the Bonfire platform, coordinate scheduling with district facilities staff, and comply with applicable safety and environmental standards. The document serves as a technical specification reference for the painting scope at the Facilities Services Center location within the larger district-wide painting project.

View the file

Other files

File Type Posted
28-Dakota Middle School Paint Plans Summer 2026.pdf PDF
8-TSSC Paint Plan Summer 2026.pdf PDF
25-GW Gibbs Paint Plans Summer 2026.pdf PDF
29-RFQ 25027 Summer2026 Painting.pdf PDF
27-Hoover Paint Plans Summer 2026.pdf PDF
26-John Adams Paint Plans Summer 2026.pdf PDF
12-Washington Paint Plans Summer 2026.pdf PDF
3-Lincoln Paint Plan Summer 2026.pdf PDF
14-Bamber Valley Paint Plan Summer 2026.pdf PDF
15-Bishop Paint Plan Summer 2026.pdf PDF
5-Mighty Oaks Paint Plan Summer 2026.pdf PDF
4-Longfellow Elementary Paint Plans Summer 2026.pdf PDF
21-Folwell Paint Plans Summer 2026.pdf PDF
22-Friedell Paint Plan Summer 2026.pdf PDF
24-Hawthorne Paint Plans Summer 2026.pdf PDF
10-Riverside Paint Plans Summer 2026.pdf PDF
18-ESC Paint Plan Summer 2026.pdf PDF
11-Willow Creek Paint Plans Summer 2026.pdf PDF
30-RFQ 25027 Quoter Acknowledgment.pdf PDF
16-Churchill Paint Plans Summer 2026.pdf PDF
1-Kellogg Middle School Paint Plans Summer 2026.pdf PDF
7-Rochester Alternative Learning Center Paint Plans Summer 2026.pdf PDF
17-Century High School Paint Plan Summer 2026.pdf PDF
6-Northrop Paint Plans Summer 2026.pdf PDF
2-John Marshall Paint Plan Summer 2026.pdf PDF
13-Master District PaintingSpec.pdf PDF
19-Edison Paint Plans Summer 2026.pdf PDF
9-Sunset Terrace Paint Plan Summer 2026.pdf PDF
23-Gage Paint Plan Summer 2026.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD

FD

FD

FD

FD

FD

FD

FD

236 SF

Tanner

212 SF

Mike

186 SF

Dawn

186 SF

Kari

186 SF

Cole

135 SF

Bill

164 SF

Wendy

163 SF

Vault

271 SF

Plan Room

223 SF

Break

80 SF

Tech

124A

150 SF

Work Rm

152 SF

Sm Conf

315 SF

LG Conference

99 SF

Corridor

114 SF

Mens

120 SF

Women

155 SF

Mech

191 SF

Corridor

1433 SF

Meeting Room

150 SF

Mech

85 SF

Storage

51 SF

Elec

199 SF

Vestibule

409 SF

Lobby

183 SF

Corridor

1291 SF

GIP

100 SF

Breezeway

186 SF

Bill

186 SF

Leah

195 SF

Erik

205 SF

Leads

134A

237 SF

RITS

159 SF

Donlie

303 SF

Scott

529 SF

Conference room

244 SF

Jerry

171 SF

Jim

120 SF

Mens

108 SF

Womens

54 SF

Maint

Date

Drawn By

NOT TO BE USED FOR CONSTRUCTION

CONTACT CONSTRUCTION

SERVICES WITH CORRECTION

12/29/2025 3:03:47 PM 3A401Room SQFT Office Area

Facilities Services Center

Author

Issue Date

GENERAL NOTES:

NO PREFERED START DATE TO PAINT.

1. COVER ALL BLEMISHES/MARKS, PURE WHITE SW 7005

2. TOUCH UP THROUGHOUT ENTIRE ROOM, PURE WHITE SW

NOTES:PRIORITY

DN

DN

DN

UP

UP

UP

UP

UP

UP

FD FD FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

3512 SF

Storage

100 SF

Breezeway

137 SF

Mens Shower

161A

191 SF

Corridor

284 SF

Mens Locker Rm

300 SF

Break Rm

199 SF

H&S Storage

199 SF

Dale

201 SF

Work Area

241 SF

H&S Storage

399 SF

Storage

168 209 SF

Mail Rm

268 SF

Womens Locker

RM

170 78 SF

Gen

91 SF

Laund

293 SF

Print Entry

129 SF

Corridor

2135 SF

Work Area

14660 SF

Vehicle Storage

953 SF

Loading Dock

466 SF

Mech/Elec

101 SF

Office

70 SF

Storage

1369 SF

Garage

623 SF

Wash Bay

1153 SF

Garage

2784 SF

Dry Food Storage

650 SF

Cooler

185B

1118 SF

Freezer

185A

1044 SF

Corridor

183A

2494 SF

Print Shop

Date

Drawn By

NOT TO BE USED FOR CONSTRUCTION

CONTACT CONSTRUCTION

SERVICES WITH CORRECTION

12/29/2025 3:03:48 PM 3A402Room SQFT Shop Area

Facilities Services Center

Author

Issue Date

1. PAINT ALL WALLS, PURE WHITE SW 7005

NOTES:PRIORITY

Sheets
3A401 - Room SQFT Office Area
3A402 - Room SQFT Shop Area

File details come from the government source that posted it. Updated .