4-Longfellow Elementary Paint Plans Summer 2026.pdf
PDF 2 MB Posted
- Attached to
- Summer '26 District Painting Improvements
- Solicitation number
- RFQ # 25027
- Issued by
- Olmsted County, Minnesota
About this file
This is a paint plan document for Longfellow Elementary School, part of Rochester Public Schools (ISD #535) in Minnesota, detailing interior painting improvements scheduled for summer 2026. The scope of work encompasses painting on both the main floor and upper floor of the facility, with priority areas designated on architectural floor plans. Work includes painting walls to match existing colors, touch-up painting as needed, and surface preparation. The preferred painting schedule is July 2026, and all work must be substantially completed before the start of the 2026-27 school year. The existing paint color palette specified includes Pure White (SW 7005) as the general field color, Dovetail (SW 7018) for H.M. frames, and six accent colors: Jovial Pink (SW 611), Delicious Melon Orange (SW 6653), Springtime Green (SW 6708), Swimming Blue (SW 6764), and Inspired Lilac Purple (SW 6820). The document notes that it is not to be used for construction and that contractors must field verify conditions on-site.
The district is soliciting quotes for district-wide interior painting services across 27 district sites as part of a broader summer 2026 painting improvements initiative. Contractors are required to coordinate scheduling with district facilities staff, comply with all applicable safety standards, and meet environmental requirements. All vendor responses must be submitted through the Bonfire platform, and no alternative submission methods will be accepted. No specific pricing terms, contract award dates, or funding source information is provided in this paint plan document.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W D
UP
W D
FD
FD
FD
FD
FD
FD
FD
FD FD
FD
FD
FD
FD
FD
FD
FD FD
FD
FD
FD
FD
FD FD
FD FD
FD FD
FD FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD FD
FD
FD
FD
A100A G101 G103
G103B
G103A
F100
F103 E108
E106
E104
E103
E102
D110
C109 C107C108
E113
C106C105
C104
C100B
D100B
E100A
D112
D109
B110
B110D B110C
F102
A111
B110B
D108
E111
A109 A107 A106 A105 A104
B102
A108
A101C
D113
E114
F107
F103B
F106 F105
F104
F108
A109A
C107B
C109B
G106
G105 B111 G106B
F109
G106E
D104
D105
D106
D103
D102
D101
C110
A001
B100B
B110A
E109
E112
F100A
G101A
G104
B101
A101
A103
A101D A101E
A101B
C105B
F109A
F109B
F109D
F109C
A002
F108A
E100B
E107
D100C
B100E
F101A
G100
A101A
A102
C105A
C109A
C107A
C101B
C105C C105D
C109C C109D
C107C C107D
D107
B104
G106A
G102
C103
C102
C101
A103A
A110
F110
F103A
G106C G106D
E110
F107A
C101A
C101C
A112
D111
E105
E109A
E109B
E109C
E109D E109E
E109F E109G
E109H
B104H
B104G
B104F
B104E
B104D
B104C
B104B
B104A
G104I G104B
C100C
B100C
C100A
A100B
F101
G104J G104A
B103
G104H G104G
G104F G104E
G104D G104C
B100D
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
1/26/2026 11:15:42
AM
3A101Main Floor Plan
Longfellow Elementary School
NOTES:PRIORITY
1. PAINT WALL TO MATCH EXISTING
2. TOUCH UP WALL AS NEEDED, MATCH
EXISTING COLOR
EXISTING PAINT COLORS TO MATCH:
GENERAL FIELD COLOR: PURE WHITE SW 7005
H.M. FRAMES: DOVETAIL SW 7018
LIGHT PINK ACCENT: JOVIAL SW 611
LIGHT ORANGE ACCENT: DELICIOUS MELON SW
LIGHT GREEN ACCENT: SPRINGTIME SW 6708
LIGHT BLUE ACCENT: SWIMMING SW 6764
LIGHT PURPLE ACCENT: INSPIRED LILAC SW 6820
GENERAL NOTES:
PREFERED TO PAINT IN JULY
UP
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
E206
E205
E204
E203
E202
D205
OPEN TO GYM
BELOW
OPEN TO
CAFETERIA
BELOW
E207
E200A
C208 C207
C206
C204C203
B205
C201 C202
C200B
E214
F202
C213
C213A
D214
OPEN TO
MEDIA
CENTER
BELOW
E211
D216
B202
D211
C210
E215
C205
B203
D210
C200A
B200B
B200A
C201A
ROOF BELOW
ROOF BELOW 12
D212 D213
D215
D206
D204
D203
D202 D201
D200A
D200B
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
1/26/2026 11:15:43
AM
3A102Upper Floor Plan
Longfellow Elementary School
NOTES:PRIORITY
1 1. PAINT WALL TO MATCH EXISTING
GENERAL NOTES:
PREFERED TO PAINT IN JULY
EXISTING PAINT COLORS TO MATCH:
GENERAL FIELD COLOR: PURE WHITE SW 7005
H.M. FRAMES: DOVETAIL SW 7018
LIGHT PINK ACCENT: JOVIAL SW 611
LIGHT ORANGE ACCENT: DELICIOUS MELON SW 6653
LIGHT GREEN ACCENT: SPRINGTIME SW 6708
LIGHT BLUE ACCENT: SWIMMING SW 6764
LIGHT PURPLE ACCENT: INSPIRED LILAC SW 6820
| Sheets |
| 3A101 - Main Floor Plan |
| 3A102 - Upper Floor Plan |
File details come from the government source that posted it. Updated .