25-GW Gibbs Paint Plans Summer 2026.pdf

PDF 1 MB Posted

Attached to
Summer '26 District Painting Improvements
Solicitation number
RFQ # 25027
Issued by
Olmsted County, Minnesota

About this file

This file consists of architectural floor plans for George W. Gibbs Jr. Elementary School that detail interior painting improvements scheduled for summer 2026 as part of Rochester Public Schools (ISD #535) district-wide painting initiative. The plans identify specific rooms and areas across main/lower floors and upper floors requiring paint work, with priority-ranked tasks including hallway painting in Dover White (SW 6385), hand railing painting in Naval (SW 6244), and accent wall painting with color verification by the contractor. The scope of work encompasses surface preparation, priming, and painting of designated interior areas across the elementary school site, with no preferred painting date specified though work can commence in June 2026. The project must be substantially completed before the start of the 2026-27 school year, and contractors are required to coordinate scheduling with district facilities staff and comply with all applicable safety and environmental standards.

The work is part of a broader summer 2026 district painting initiative spanning 27 district sites throughout Rochester Public Schools. All responses must be submitted through Bonfire, with no alternative submission methods accepted. Contractors will be responsible for field verification of existing conditions and colors before beginning work. The document serves as a reference guide for vendors and explicitly states it is not to be used for construction purposes, requiring contractors to conduct site visits to verify all specifications and conditions prior to submitting quotes.

View the file

Other files

File Type Posted
28-Dakota Middle School Paint Plans Summer 2026.pdf PDF
8-TSSC Paint Plan Summer 2026.pdf PDF
29-RFQ 25027 Summer2026 Painting.pdf PDF
27-Hoover Paint Plans Summer 2026.pdf PDF
26-John Adams Paint Plans Summer 2026.pdf PDF
12-Washington Paint Plans Summer 2026.pdf PDF
3-Lincoln Paint Plan Summer 2026.pdf PDF
20-Facilities Services Center Paint Plans Summer 2026.pdf PDF
14-Bamber Valley Paint Plan Summer 2026.pdf PDF
15-Bishop Paint Plan Summer 2026.pdf PDF
5-Mighty Oaks Paint Plan Summer 2026.pdf PDF
4-Longfellow Elementary Paint Plans Summer 2026.pdf PDF
21-Folwell Paint Plans Summer 2026.pdf PDF
22-Friedell Paint Plan Summer 2026.pdf PDF
24-Hawthorne Paint Plans Summer 2026.pdf PDF
10-Riverside Paint Plans Summer 2026.pdf PDF
18-ESC Paint Plan Summer 2026.pdf PDF
11-Willow Creek Paint Plans Summer 2026.pdf PDF
30-RFQ 25027 Quoter Acknowledgment.pdf PDF
16-Churchill Paint Plans Summer 2026.pdf PDF
1-Kellogg Middle School Paint Plans Summer 2026.pdf PDF
7-Rochester Alternative Learning Center Paint Plans Summer 2026.pdf PDF
17-Century High School Paint Plan Summer 2026.pdf PDF
6-Northrop Paint Plans Summer 2026.pdf PDF
2-John Marshall Paint Plan Summer 2026.pdf PDF
13-Master District PaintingSpec.pdf PDF
19-Edison Paint Plans Summer 2026.pdf PDF
9-Sunset Terrace Paint Plan Summer 2026.pdf PDF
23-Gage Paint Plan Summer 2026.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OPEN

TO

BELOW

B107

B108

B110

B121

B111

B117

B112A

B128

B130

A105

A104A103

A102

A110

B109

B114

A101

A114

A113

B123

B124

B122

B104

A107

B113 B119

A108 A117

B120

A116

B131

B103

B116

B115

A109

A111

B129

B101

B105

A115

B125

B102

B106

B122A

A106 B118

C111

C106

C123

C128

C136

C137

C131

C130C129

C132

C138 C140

C139

C141

D101

D104

D103

D126A

D106

D118

D109

D120

D122

D123

C146

D114

D105

D113

D127

D124

C126

C124

C107

C109

C122

C119

C121

C104

C135

D108

C134

C145

D121

C142

C113

C112

C118

C101 C102

D110

D115

D112

D102

D119

C144

C115

C117 C127

C116

C114

D111

D107

C105

C110 C133

C103

C108

C120

C125

C143

D117

D116

D125

D124A

C146A

C145A

D111A

C147 D128

D108A

D126

D117A

D106F

A120 A121 13

D101A D120A

A100

B112

D101B D101C

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

12/29/2025 1:47:19

PM

3A101Main and Lower Floors Room Numbers

GEORGE W. GIBBS Jr ELEMENTARY SCHOOL

NOTES:PRIORITY

1. PAINT HALLWAY, DOVER WHITE SW 6385

2. PAINT HAND RAILING IN STAIRS, NAVAL SW 6244

3. PAINT ENTIRE WALL, DOVER WHITE SW 6385

4. PAINT ENTIRE WALL, DOVER WHITE SW 6385

GENERAL NOTES:

NO PREFERED DATE TO PAINT. CAN PAINT IN

JUNE.

DN

UP

OPEN TO BELOW

B112A

B128

A106

C138 C140

C139

D126A

D122 D123C146

D121

D102

C147

D126

B206

B208

B209

B210

B211

A217

A210 B203

A208 B204

B201

B218A214

B202

B213 A207

B217A213

A205

A204 A203

A202

A201

B219

B220

B216

B215

A209

A211 A215

A301

B301

B221

A206

A218

A216

B223 B222

B212A

B101A A200

B212

B200aA215a

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

12/29/2025 1:47:20

PM

3A102Upper Floor Room Numbers

GEORGE W. GIBBS Jr ELEMENTARY SCHOOL

NOTES:PRIORITY

1. PAINT ACCENT WALL TO MATCH EXISTING *CONTRACTOR TO SITE VERIFY COLOR

2. PAINT UPPER HALF OF HALLWAY WALL, DOVER WHITE SW 6385

3. PAINT DOORWAY WALL INSIDE CLASSROOM, DOVER WHITE SW 6385

GENERAL NOTES:

NO PREFERED DATE TO PAINT. CAN START IN

JUNE

Sheets
3A101 - Main and Lower Floors Room Numbers
3A102 - Upper Floor Room Numbers

File details come from the government source that posted it. Updated .