About this file
This is a floor plan document for Riverside Central Elementary School, one of 27 district sites included in Rochester Public Schools (ISD #535) Summer 2026 district-wide interior painting improvements project in Minnesota. The document provides detailed architectural layouts for the main floor and second floor of the elementary school, identifying specific rooms, wall sections, and areas designated for painting. The scope of work includes painting sheet rock and bricks on indicated walls to match existing finishes, with Priority 1 work focused on general field painting and Priority 2-3 work involving accent colors and handrails in stairwells. The paint color specifications include Dover White (SW 6385) as the general field color, with accent colors in Lagoon teal (SW 6480), Cordial burgundy (SW 6306), Dovetail grey (SW 7018), Endless Sea blue (SW 9150), Respite light blue (SW 6514), and Mythical purple (SW 6550). The floor plans indicate locker quantities throughout various rooms and corridors, with the notation that vendors and contractors must field verify all conditions prior to bidding. Work is scheduled for summer 2026 with no preferred painting dates specified, and all work must be substantially completed before the start of the 2026-27 school year.
The document explicitly states it is not to be used for construction and serves as a reference document for bidders to assess the scope and scale of painting work required at this elementary school location. Contractors responding through the district's Bonfire submission portal will be required to coordinate scheduling with district facilities staff, ensure compliance with applicable safety standards, and meet environmental requirements. The floor plan serves as one component of site-by-site scope documents that collectively define the work across all 27 district locations participating in this summer 2026 painting initiative.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
UP
UP
1 2
B121
B121-1
B119
B
B113 B113-2
B113-1
B123
B123-1
B
B
B129
B131
B129-1
B128
B128-1
B122
B120-1
B120 B112
B114 B116
B
B
1-
B101-3
B101-1
B101
B
5 B103
B103-1
B107 B101-4
B101-5
B108
C101-2
C101-4
C101-3
C105-1
C105
C107C109
C115
C121
C123 C124
C122
C112
C114C116
C118
C120
C108
C106
C110
A110-1
C104
C102-1 C102
C
0-
C100-2
A110
A101
A1
-1
A113
A102 A104
A1
A106
A1 14 A116
A125
A129
A1
A117
A1
A1
A115
A123
A116-1
B122-1
B100-5
B100-4
B112-1
B109B111
B-100B100-1
B101-1A
C101
C101-1
A112
A123-1
A100-1
C
0-
C100-6
C100-5
C100-3
C
A100
A100-6
A100-2
B-100-2B-100-3
C100-8
B119A
Room a100-2a
10 lockers
11 lockers lo ck er s lo ck er s
7 lockers 10 lockers lo ck er s lo ck er s
19 lockers
19 lockers
20 lockers lo ck er s lo ck er s lo ck er s lo ck er s lo ck er s
18 lockers lo ck er s
9 lockers
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
8/22/2024 1:49:19 PM
3A101Floor Plan Main Floor Riverside Central Elementary School
GENERAL NOTES:
NO PREFERED DATES TO PAINT
PAINT THE SHEET ROCK AND BRICKS ON INDICATED
WALL.
NOTES:PRIORITY
1. PAINT WALLS TO MATCH EXISTING
2. PAINT WALLS TO MATCH EXISTING
3. PAINT HANDRAILS IN STAIRWELL, DOVETAIL SW SW
PAINT COLORS:
NEW GENERAL FIELD COLOR: DOVER WHITE SW 6385
TEAL ACCENT: LAGOON, SW 6480
BURGUNDY ACCENT: CORDIAL, SW 6306
GREY ACCENT/HANDRAILS: DOVETAIL, SW 7018
BLUE ACCENT: ENDLESS SEA, SW 9150
LIGHT BLUE ACCENT: RESPITE, SW 6514
PURPLE ACCENT: MYTHICAL, SW 6550
DN
DN
DN
DN
C214
C222
C224C223
C221
C215
C209
C216
C218
C220
C212
C212-1
C
C208
C206
C204A
C204
C202
C203
C201
C201-1 A205
A203
A214 B202
B204
B206B208B212B214B226B228
B229 B227
B
B221
B221-1
B215
B217
B219
B213
B211-1
B211
B207
B209 B209-1
B2
-2
B205
B203-1
B203
B201
B2
-2B201-1
A202
C
0-
C200-2
C200-7
C
B200B200-AB200-7
C200-9
C200-5
C200-6
C200-8
C200-3
B200-1
B200-4 B200-5
2' - 8"3' - 0"2' - 8"3' - 0"2' - 8"3' - 0"2' - 8" lo ck er s lo ck er s lo ck er s
17 lockers
18 lockers14 lockers16 lockers19 lockers17 lockers
12 lockers lo ck er s
11 lockers
11 lockers lo ck er s
18 lockers
18 lockers lo ck er s lo ck er s
9 lockers
9 lockers
14 lockers
14 lockers lo ck er s lo ck er s
9 lockers
9 lockers
14 lockers
14 lockers lo ck er s lo ck er s
18 lockers lo ck er s lo ck er s
*NOT TO BE USED FOR CONSTRUCTION
*VENDOR / CONTRACTOR TO FIELD VERIFY
Printed on
NOT TO SCALE
8/22/2024 1:49:21 PM
3A102Floor Plan Second Floor Riverside Central Elementary School
GENERAL NOTES:
NO PREFERED DATES TO PAINT
PAINT THE SHEET ROCK AND BRICKS ON INDICATED
WALL.
NOTES:PRIORITY
1 1. PAINT WALLS TO MATCH EXISTING
PAINT COLORS:
NEW GENERAL FIELD COLOR: DOVER WHITE SW 6385
TEAL ACCENT: LAGOON, SW 6480
BURGUNDY ACCENT: CORDIAL, SW 6306
GREY ACCENT/HANDRAILS: DOVETAIL, SW 7018
BLUE ACCENT: ENDLESS SEA, SW 9150
LIGHT BLUE ACCENT: RESPITE, SW 6514
PURPLE ACCENT: MYTHICAL, SW 6550
| Sheets |
| 3A101 - Floor Plan Main Floor |
| 3A102 - Floor Plan Second Floor |
| 3A103 - Floor Plan Penthouse Level |
| 8L101 - Main shutoffs |
| 8L201 - Best Available EVAC Route Main Floor |
| 8L202 - Best Available EVAC Route Second Floor |
| 8L203 - Fire EVAC Meeting Sites |
| 8L303 - Best Available Shelter Areas Main Floor |
| 8L401 - Automated External Defibrillator (AED) Locations Main Level |
| 8L402 - Automated External Defibrillator (AED) Locations Upper Level |
File details come from the government source that posted it. Updated .