3-Lincoln Paint Plan Summer 2026.pdf

PDF 362 KB Posted

Attached to
Summer '26 District Painting Improvements
Solicitation number
RFQ # 25027
Issued by
Olmsted County, Minnesota

About this file

This is a facility floor plan and painting scope document for Abraham Lincoln K-8 Choice School, a property managed by Rochester Public Schools (ISD #535) in Minnesota. The document provides detailed square footage measurements for 73 individual rooms and spaces across two levels of the facility, with rooms ranging from 21 square feet to 2,034 square feet. The primary scope of work involves painting entire walls throughout the facility in Dover White (SW 6385). The prioritized painting sequence specifies rooms 151, 153, 155, 171, 173, 175, and two hallway areas (100 and 170) as the priority painting locations. The document includes supplementary sheets referencing floor plans, room square footage schedules, building age documentation, housekeeping standards, teacher locations, room usage data current as of February 7, 2017, evacuation routes, and shelter areas. No preferred painting dates are indicated, though the work must be substantially completed before the start of the 2026-27 school year as part of a district-wide summer 2026 painting initiative spanning 27 sites.

The scope document explicitly notes that it is not to be used for construction and vendors or contractors are required to field-verify all measurements and conditions. The document was printed on March 30, 2017, and serves as the baseline reference for bid preparation. Surface preparation, priming, and painting of designated interior areas constitute the contracted services. All contractors must coordinate scheduling with district facilities staff, comply with applicable safety regulations, and meet environmental standards. Responses must be submitted through Bonfire, with no alternative submission methods accepted.

View the file

Other files

File Type Posted
28-Dakota Middle School Paint Plans Summer 2026.pdf PDF
8-TSSC Paint Plan Summer 2026.pdf PDF
25-GW Gibbs Paint Plans Summer 2026.pdf PDF
29-RFQ 25027 Summer2026 Painting.pdf PDF
27-Hoover Paint Plans Summer 2026.pdf PDF
26-John Adams Paint Plans Summer 2026.pdf PDF
12-Washington Paint Plans Summer 2026.pdf PDF
20-Facilities Services Center Paint Plans Summer 2026.pdf PDF
14-Bamber Valley Paint Plan Summer 2026.pdf PDF
15-Bishop Paint Plan Summer 2026.pdf PDF
5-Mighty Oaks Paint Plan Summer 2026.pdf PDF
4-Longfellow Elementary Paint Plans Summer 2026.pdf PDF
21-Folwell Paint Plans Summer 2026.pdf PDF
22-Friedell Paint Plan Summer 2026.pdf PDF
24-Hawthorne Paint Plans Summer 2026.pdf PDF
10-Riverside Paint Plans Summer 2026.pdf PDF
18-ESC Paint Plan Summer 2026.pdf PDF
11-Willow Creek Paint Plans Summer 2026.pdf PDF
30-RFQ 25027 Quoter Acknowledgment.pdf PDF
16-Churchill Paint Plans Summer 2026.pdf PDF
1-Kellogg Middle School Paint Plans Summer 2026.pdf PDF
7-Rochester Alternative Learning Center Paint Plans Summer 2026.pdf PDF
17-Century High School Paint Plan Summer 2026.pdf PDF
6-Northrop Paint Plans Summer 2026.pdf PDF
2-John Marshall Paint Plan Summer 2026.pdf PDF
13-Master District PaintingSpec.pdf PDF
19-Edison Paint Plans Summer 2026.pdf PDF
9-Sunset Terrace Paint Plan Summer 2026.pdf PDF
23-Gage Paint Plan Summer 2026.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

8A

11 and 12 are on lower level

1195 SF

597 SF

142840 SF

93 SF

840 SF

940 SF

153 SF

137 SF

262 SF

163B

329 SF

991 SF

187 840 SF

840 SF

3173 SF

154 SF

181A

73 SF

185A

34 SF

185B

52 SF

187A

321 SF

187B

SF

3A

131 SF

161B

119 SF

161A

187 SF

144B

550 SF

144C

72 SF

144A

34 SF

32 SF

117A

114 SF

144D

999 SF

975 SF

1747 SF

1142 SF

21 SF

826 SF

849 SF

828 SF

848 SF

219 SF

305 SF

864 SF

2034 SF

213 SF

169 SF

120A

211 SF

47 SF

114A

37 SF

37 SF

80 SF

102A

25 SF

104A

25 SF

106A

227 SF

234 SF

26 SF

107A

167 SF

101A

145 SF

100A

165 SF

100B

170 SF

122A

734 SF

224 SF

90 SF

122B

223 SF

1142 SF

840 SF

840 SF

155 SF

101C2034 SF

665 SF

956 SF

945 SF

113261 SF

100D

202 SF

100C

123 SF

114A

56 SF

114B

121 SF

113A

55 SF

113B

Rochester Public Schools Printed on

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

*NOT TO SCALE

3/30/2017 12:58:48 PM AS110Main Floor SQFT

Abraham Lincoln K-8 Choice School

NOTES:PRIORITY

1. 1. PAINT ENTIRE WALL, DOVER WHITE SW 6385

GENERAL NOTES:

PRIORITY OF ROOMS GOES:

151, 153, 155, 171, 173, 175, HALLWAY 100, HALLWAY 170 (BY ROOM

144)

NO PREFERED DATES TO PAINT

Sheets
AP100 - Lower Level Floor Plan
AP110 - Main Level Floor Plan
AS100 - Lower Level Room SQFT
AS110 - Main Floor SQFT
AS700 - Area's Over 550 SF Lower Level
AS701 - Area's Over 550 SF Main Level
GA100 - Building Age Lower Level
GA110 - Building Age Main Level
GH100 - Housekeeping Lower Level
GH110 - Housekeeping Main Level
GH601 - Housekeeping SF Schedules
GT100 - Lower Level Teacher Locations
GT110 - Main Level Teacher Locations
GU100 - Lower Level Room Usage as of February 7, 2017
GU110 - Main Level Room Usage as of February 7, 2017
GU602 - Main Shutoffs
LE100 - Best Available Lower Level Evacuation Routes
LE110 - Best Available Main Level Evacuation Routes
LE701 - Fire EVAC Meeting Sites
LS100 - Best Available Lower Level Shelter Area's
LS110 - Best Available Main Level Shelter Area's

File details come from the government source that posted it. Updated .