15-Bishop Paint Plan Summer 2026.pdf

PDF 2 MB Posted

Attached to
Summer '26 District Painting Improvements
Solicitation number
RFQ # 25027
Issued by
Olmsted County, Minnesota

About this file

This file consists of architectural floor plans for Harriet Bishop Elementary School in Minnesota, prepared in support of Rochester Public Schools' (ISD #535) Summer 2026 district-wide interior painting improvements project. The plans depict the main floor and upper level layouts with designated areas requiring painting work, identified by priority markings. The scope of work includes patching and painting to match existing conditions, painting columns from floor to 5'0" above finished floor, patching and painting around ceiling access panels, and re-caulking and painting precast joints from floor to door height. The existing color specifications are documented as Pure White SW 7005 for general field color, Copper Harbor SW 6634 for orange accents, and Secure Blue SW 6508 for blue accents. No preferred painting date is specified; work can be completed in June 2026. The plans note that they are not to be used for construction purposes and that vendors and contractors must field-verify conditions.

The document serves as a reference guide for contractors submitting quotes through the Bonfire platform for the district-wide painting services project spanning 27 district sites. Work must be substantially completed before the 2026-27 school year begins and requires coordination with district facilities staff, compliance with applicable safety standards, and adherence to environmental regulations. The architectural plans enable contractors to assess scope requirements and surface preparation needs at the Harriet Bishop Elementary location as part of the larger summer 2026 painting initiative.

View the file

Other files

File Type Posted
28-Dakota Middle School Paint Plans Summer 2026.pdf PDF
8-TSSC Paint Plan Summer 2026.pdf PDF
25-GW Gibbs Paint Plans Summer 2026.pdf PDF
29-RFQ 25027 Summer2026 Painting.pdf PDF
27-Hoover Paint Plans Summer 2026.pdf PDF
26-John Adams Paint Plans Summer 2026.pdf PDF
12-Washington Paint Plans Summer 2026.pdf PDF
3-Lincoln Paint Plan Summer 2026.pdf PDF
20-Facilities Services Center Paint Plans Summer 2026.pdf PDF
14-Bamber Valley Paint Plan Summer 2026.pdf PDF
5-Mighty Oaks Paint Plan Summer 2026.pdf PDF
4-Longfellow Elementary Paint Plans Summer 2026.pdf PDF
21-Folwell Paint Plans Summer 2026.pdf PDF
22-Friedell Paint Plan Summer 2026.pdf PDF
24-Hawthorne Paint Plans Summer 2026.pdf PDF
10-Riverside Paint Plans Summer 2026.pdf PDF
18-ESC Paint Plan Summer 2026.pdf PDF
11-Willow Creek Paint Plans Summer 2026.pdf PDF
30-RFQ 25027 Quoter Acknowledgment.pdf PDF
16-Churchill Paint Plans Summer 2026.pdf PDF
1-Kellogg Middle School Paint Plans Summer 2026.pdf PDF
7-Rochester Alternative Learning Center Paint Plans Summer 2026.pdf PDF
17-Century High School Paint Plan Summer 2026.pdf PDF
6-Northrop Paint Plans Summer 2026.pdf PDF
2-John Marshall Paint Plan Summer 2026.pdf PDF
13-Master District PaintingSpec.pdf PDF
19-Edison Paint Plans Summer 2026.pdf PDF
9-Sunset Terrace Paint Plan Summer 2026.pdf PDF
23-Gage Paint Plan Summer 2026.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD FD FD FD FD FD

FD

FD

FDFD

FD

FD

FD

FD

FDFD

FD

FD

FD

FD FD

FD

FD

FD

FD

FD

FD

FD

FDFD FD

FD

FD

FD

FD

FD

FD

FDFD

GYM

A124

MEDIA

A115

LD

B103

B110

GROUP LEARN

Kindergarten

B109

A106

GROUP LEARN

C100A C109

IDF

MLL

D106

Grade 2

D103

Grade 2

D104

Grade 2

D105

GROUP LEARN

D107

D109

JAN.

D108

ASD

A112

A110

TOILET

A116

Soc Wkr

C115

ED. STOR.

MAKER

A115A

CLASSROOM

A115C A115B

SM GRP

A115D

MEDIA OFFICE

C108

MECHANICAL

C101

B114

COACHES

A125

TABLE STOR.

B101

ED. STOR.

A124C

OTPT / DAPE

A124A

GYM STOR.

A127

GYM EQUIP

A121

BOYS

A119F

OUT. STOR.

A119

BLDG SERVICES

A118

SACC

Grade 1

C106

Grade 1

C105

Grade 1

C104

Grade 1

C103

ASD

A113

C114

Reading Spec

MECHANICAL

D102

A105

STAFF LOUNGE

A104

PRINC

A103

AP

A102

AP A101

RECEPTION

A107

WORK

B102

JAN.

B111

D110

ED. STOR.

A119C

MDF

A108

NURSE

A108E

NURSE OFFICE

C113

ELEC.

A109

EL. EQUIP.

A119B

ELEC.

Early Childhood

B108

Kindergarten

B107

Kindergarten

B106

Kindergarten

B105

Kindergarten

B104

CAFETERIA

A123

Mental Health

A111 SPED

D101

A119E

OFFICE

C112

T

B113

Social Worker

B112

T

B108D

ED. STOR.

B108A

VEST.

B108B

T

B108C

T

B106D

ED. STOR.

B106A

VEST.

B106B

T

B106C

T

B104D

ED. STOR.

B104A

VEST.

B104B

T

B104C

T

A114

CONFERENCE D112

WASH BASIN

A122

GIRLS

A124B

OFFICE

A126

MAINT. STOR.

ASD

C102

A120

CIRCULATION

A100E

CIRCULATION

A117D

KITCHEN STO.

C100

CIRCULATION

B100

CIRCULATION

A3

STAIR

A100B

CIRCULATION

D100

CIRCULATION

B1

STAIR

A107B

MOTHER'S

ROOM

A101B

T

A107A

OFFICE STOR.

A001

SECURE ENTRY

A002

VESTIBULE

C110A

GIRLS

C111A

BOYS

D112A

GIRLS

D111A

BOYS

A117

KITCHEN/SERVING

A100A

CIRCULATION

A2

ELEVATOR

A108A

T

A108B

COT

A108C

COT

A108D

NURSE STOR.

A100C

CIRCULATION

A117C

OFFICE

A117B

WALK IN REF

A119A

TLT

A119D

MAINTENANCE

STOR.

A117A

WALK IN FRZ

C107

121314

B108D

ED. STOR.

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

4/22/2026 11:20:35

AM

3A101Main Floor Plan

HARRIET BISHOP ELEMENTARY

NOTES:PRIORITY

1. PATCH AND PAINT TO MATCH EXISTING

2. PAINT COLUMNS FLOOR TO 5'0" A.F.F., MATCH EXISTING

3. PATCH AND PAINT AROUND ACCESS PANEL ON CEILING,

MATCH EXISTING

4. RE-CAULK PRECAST JOINTS AND PAINT FROM FLOOR TO

DOOR HEIGHT, MATCH EXISTING

GENERAL NOTES:

NO PREFERED DATE TO PAINT.

CAN BE COMPLETED IN JUNE.

EXISTING COLORS TO MATCH:

GENERAL FIELD COLOR: PURE WHITE SW 7005

ORANGE ACCENT: COPPER HARBOR SW 6634

BLUE ACCENT: SECURE BLUE SW 6508

UP

UP

UP

UP

UP UP

UP

UP

SPED

D202

C208

FLEX

B209

FLEX

ASD

B202

Advanced Learning

A203GROUP LEARN

C200A

GROUP LEARN

B208

ASD

B203

OT/PT

C202

ASD SENSORY

B216

Grade 4

B207

Grade 3

D204

GROUP LEARN

D208 D209

FLEX

MECHANICAL

C201

C215

COUNSELOR

MECHANICAL

A212

Grade 5

C206

Grade 5

C205

Grade 5

C204

Grade 4

B206

Grade 4

B205

Grade 4

B204

Grade 3

D205

Grade 3

D206

Science Lab

D207

EBD

B201

C210

ED. STOR.

B211

ED. STOR.

MUSIC

A201

A202B

KILN

MECHANICAL

D203

B210

JAN.

D210

JAN.

D201

ED. STOR.

C214

Sped Coach

D211

IDF

A201A

MUSIC STOR.

A202C

ART STOR.

ART

A202

A205

Speech

A206

Speech

A207

READING

A204

Psych

A208

MLL

A209

MATH

B215A

B215

C209

Social Worker

ASD

C203

A211

CONFERENCE

Science Lab

C207

*NOT TO BE USED FOR CONSTRUCTION

*VENDOR / CONTRACTOR TO FIELD VERIFY

Printed on

NOT TO SCALE

4/22/2026 11:20:38

AM

3A102Upper Level Floor Plan

HARRIET BISHOP ELEMENTARY

GENERAL NOTES:

NO PREFERED DATE TO PAINT. CAN BE DONE

IN JUNE

NOTESPRIORITY

1 1. PATCH AND PAINT TO MATCH EXISTING

EXISTING COLORS:

GENERAL FIELD COLOR: PURE WHITE SW 7005

ORANGE ACCENT: COPPER HARBOR SW 6634

BLUE ACCENT: SECURE BLUE SW 6508

Sheets
3A101 - Main Floor Plan
3A102 - Upper Level Floor Plan

File details come from the government source that posted it. Updated .